Why Business Systems Fail to
Deliver Significant Benefit
July 2015
Dave Derham
Managing Director
Dave Derham Associates Ltd
In association with Xledger Ltd
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Executive Summary
It is very common these days to find executives who
are highly sceptical about the business benefits
which would result from any investment in
deploying new business systems. Sadly, in all too
many cases, this scepticism is completely justified as
a high proportion of projects do fail to deliver the
benefits anticipated at the outset.
In contrast with these failures are organisations which
do derive massive benefit from the implementation
of new systems. The question we should be asking
ourselves is:
A Series of
Whitepapers
focussing on:
 System Selection
 System
Implementation
 Ongoing
Management
“What is happening in these successful projects which
is not happening in the ones which fail to deliver
benefit?”
The purpose of this series of Whitepapers is to shed
some light on the answer to this important question.
We shall achieve this by focusing on the topic from 3
logical perspectives:
 System Selection
 System Implementation
 Ongoing Management
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Most projects which fail to deliver positive results
actually go wrong before they even start.
To understand this, let us look at an all too typical set
of circumstances which precede a new system
implementation.
The first thing to realise is that organisations only
ever implement a new system when they feel they
have to. These projects are complicated, fraught with
pain and get in the way of day-to-day operations. No
business leader is going to leap out of bed in the
morning thinking that it would be a great idea to put
a new system into the business to transform
effectiveness. What happens in practice is that the
business either outgrows whatever “systems” are in
place to manage it and an increasing number of
problems come to the surface or the system has to be
replaced because it is no longer supportable.
In cases where the system has been outgrown, the
resulting problems can be related to the inability to
effectively control some operations or very often they
are the result of the inability to clearly measure and
understand what is happening in the business. The
consequence of these increasing mismatches
between the “systems” and the business are
inefficiency in operations, increasing headcount in
overhead activities to attempt to manage things
better and poor decision making based on inaccurate
information.
Part 1: System Selection8 Steps to Successful
System Selection
1. Put in place an
appropriate
structure
2. Identify all
requirements
3. Beware of specifying
the existing system
4. Keep requirements
in perspective
5. Don’t get precious
about the Way You
do things
6. Avoid being
prescriptive
7. Check out the detail
at the end
8. It’s not all about
functionality
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Eventually, the pain gets big enough for the subject to
be raised at a Board meeting and if enough of those
present are affected by the problems it is agreed to
set up a project to select and implement a new
system.
Having gained agreement to launch the project, the
Board need someone to manage it. Since none of the
Board members feel that they know enough about
the subject, they delegate the matter to someone
further down the organisation.
The appointed Project Manager’s first task is to
produce a list of requirements which can be used as a
basis for selecting the new system. In order to get
this done as quickly as possible they either visit each
relevant department or send a questionnaire to get
the appropriate requirements documented.
The requirements are eventually compiled into one
document and a consistent approach is taken to
describing them. The document will typically have an
introduction which sets out they key objectives of the
project, which have been passed down to the Project
Manager. Typical descriptions found here include:
“the need for better management information” or
“ability to improve efficiency of operations”.
The Project Manager then turns their attention to
potential suppliers. A list of possible suitors is
gathered from a number of sources including
research on the internet and asking for suggestions
from colleagues. The requirements document is sent
to each supplier and a request is made for them to
respond formally with their compliance with the
requirements.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Following receipt of the responses, along with
indicative pricing, the list is slimmed down and the
finalists are invited to present their system to an
invited group so that a final selection can be made.
The short-listed suppliers, typically 2 or3 in number,
arrive on the appointed days to give a presentation
about their organisation and then they go through a
detailed demonstration of how the specified
requirements can be met.
After all of the demonstrations have been seen, those
invited to participate in the events are brought back
together to have a vote on which systems is their
preferred choice. Where there is a significant cost
differential in the systems, this factor may well be
introduced for consideration of “value for money”.
Eventually, a recommendation is put back to the
Board for rubber-stamping before contracts are
signed with the chosen supplier.
Is there anything wrong with the above scenario?
Yes. This is absolutely not how those aforementioned
‘successful’ organisations set about selecting a new
system.
Let’s read on and learn how they have very
successfully approached system selection.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Put in Place an Appropriate Structure
The person put in charge of the selection and
implementation process is frequently chosen
because of their availability rather than appropriate
knowledge.
How valuable are they to the business if they have so
much spare time?
The person nominated is very seldom a very senior
manager who has an understanding of the critical
issues that the business is facing at that point in time.
Unfortunately it is also common for Board members
to avoid involvement in such projects either because
they do not understand the strategic importance or
because they want to distance themselves from
something which they fully expect to be problematic.
Highly successful projects start off on a different
premise. The strategic importance of the new system
is recognised and a Board-level Sponsor is usually
nominated.
A Project Manager with appropriate experience is
then chosen either from inside the business or from
outside, and this person works very closely with the
Project Sponsor to ensure that the key objectives stay
in focus.
1
The strategic importance
of the new system is
recognised and a Board-
level Sponsor is usually
nominated.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Identify All Requirements
When gathering requirements, the Project Manager
frequently seeks input from everyone in the
business except Board Members.
This may be due to a lack of confidence or it may be
down to their view that this is an operational level
matter and the Board do not need to be troubled
with it.
It should be remembered that most projects only
came into existence because the level of pain in the
organisation became great enough. Does it not
therefore make sense for the Project Manager to
initially work with the Board to investigate in some
detail what arose to give birth to the project?
This will result in very specific key objectives being
produced. For example rather, than the typical woolly
statement of “we need better management
information”, a list would be produced of the specific
types of information which are needed at all levels to
effectively run the business.
In this example it would also produce the need to
understand how easy it is to set up a new system to
capture and deliver the necessary information, as
well as modify this when significant changes occur in
the business.
2
The Project Manager
should initially work with
the Board to investigate,
in some detail, what
arose to give birth to the
project.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Beware of Specifying the Existing System
The departmental representatives who provide
requirements to the Project Manager typically
generate information based on what they already
know i.e. how they do things at the moment.
This means that a great deal of time is spent collating
system requirements which are largely a detailed
description of the current computerised and manual
systems used within the business.
Little, if any, consideration is given to how efficiency
could be improved by doing things differently,
particularly where it may result in the need for a
reduced headcount.
The end result of a selection process based on such a
premise is the selection of a modern system which
does just what the old system did and which offers no
significant business benefit.
This is a relatively frequent occurrence.
3
Little, if any,
consideration is given to
how efficiency could be
improved by doing things
differently - particularly
where it may result in the
need for a reduced
headcount.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Keep Requirements in Perspective
The problems which need to be addressed will be at
very different levels within the business and have
hugely varying consequences.
For example, addressing the problems experienced by
an accountant in managing depreciation of fixed
assets has completely different consequences to
providing the Chief Executive with constantly up to
date information on which elements of the business
are making money and which aren’t.
One of these may save a few hours of clerical time
each month whereas the other enables early
intervention to maximise profitability of the entire
business.
Each of the requirements needs to have recognition
of its relative impact on the business. This is
particularly important because there is no such thing
as a perfect business system and each product will
have its own strengths and weaknesses.
The important thing is to identify the strengths with
the greatest impact on the big problems.
4
The important thing is to
identify the strengths
with the greatest impact
on the big problems.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Don’t get Precious about the Way You do Things
In any business there are processes that
differentiate the organisation and generate business
and there are processes which are there because of
habit. When selecting a new system it is critically
important to be able to separate these very different
situations.
Processes which are critical to the success of the
organisation absolutely need to be implemented
without compromise. In many cases this means
building them as bespoke systems.
However, most processes involved in support
functions do not need to be carried out in precisely
the same way that may have been in place for years.
There are often very good reasons to change
procedures in line with commonly accepted practice
for the sake of efficiency.
It is relatively common to find that suppliers have
been chosen on the condition that they will modify
their packaged software to enable it to behave just
like the previous system.
In the vast majority of cases this is absolute folly as it
will frequently result in delays and arguments in the
implementation process and will lead to inevitable
problems with future software upgrades.
Before any modifications to standard software
packages are even considered, tough questions
should be asked by the Project Sponsor to clarify the
consequences of living with the standard software. In
the majority of cases the answer will be that a bit
more work is required to use the system.
5
Most processes relating
to business support
functions do not need to
be carried out in precisely
the same way they have
for years.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Avoid Being Prescriptive
Rather than putting in a great deal of effort into
being prescriptive about how an entire new system
should work, why not invite the potential suppliers
to present how they would address the really
important business issues.
This enables meaningful discussion and brings fresh
thinking to problems.
Suppliers will bring insight into how their system can
be used to improve efficiency and provide easier
management in areas which had not even been
considered.
It is essential that top level management is involved in
this type of discussion. It is also important to give
suppliers access to top level management in order to
be able to formulate their thinking.
6
Suppliers will bring
insight into how their
system can be used to
improve efficiency and
provide easier
management in areas
which had not even been
considered.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Check Out the Detail at the End –
Not the Beginning
Assuming that potential suppliers have a track
record of being implemented successfully, then it is
completely reasonable to assume that their system
will be able to handle most detailed operational
requirements one way or another.
Investigation of such detail can be done at a later
stage and these should be kept in context.
The consequences of non-ideal functionality should
be carefully weighed against areas of major business
benefit.
Where short-listing is carried out based on responses
to prescribed functionality, this will frequently
eliminate the most creative and beneficial future
partners.
As stated previously, much of this prescription is
looking backwards rather than forwards.
It is important to carefully investigate the market and
talk to suppliers which appear to be in tune with the
real challenges which the organisation is facing.
7
Where short-listing is
carried out based on
responses to prescribed
functionality, this will
frequently eliminate the
most creative and
beneficial future
partners.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
It’s not just about Functionality
8
Where systems are
performing support
functions, from which
there is no major
strategic gain, then what
is the point in spending a
huge amount of effort
and cost to have them
different to everyone
else.
A new system needs to deliver functionality which is
essential to the business - but it must do this with an
appropriate level of management overhead and
ongoing costs.
Systems have not all be designed with the same goals
in mind. There are many extremely customisable
applications (often with code being written to do the
customisation), which can be made to do virtually
anything during the initial implementation. However,
this level of initial customisability can mean that
change later on is very difficult and costly.
Highly customisable systems also tend to have more
complex technical structures, and require a high level
of ongoing management, as well as large resources
deployed when testing new releases. Ongoing
management of the system can also require a lot of
manpower.
Some systems on the market have been specifically
designed to have more of a “best practice” approach
to functionality and are not customisable. These will
have massively lower costs of implementation,
upgrading and ongoing management than heavily
customisable applications.
Some software providers, such as cloud-based
Xledger, have taken this concept even further and
have recognised that business management systems
should not be a major drain on companies’ resources.
As a result, the focus of the design has been to
provide very fast implementation, low ongoing
management overhead and automation of many key
business processes.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
What is important is to recognise the role that the
software plays within the business. Where systems
are responsible for differentiating the organisation
and generating business, then it is essential that they
can be customised to be far better than those
adopted by the competition.
However, where systems are performing support or
back office functions from which there is no major
strategic gain then what is the point in spending a
huge amount of effort and cost to have them
different to everyone else. It seems to make sense to
make these systems run as efficiently as possible with
minimal cost and effort.
| Tel +44 (0)117 3291050 | www.xledger.co.uk
Dave Derham
Associates Ltd
Swallows Barn
Severn Road
Pilning
Bristol
BS35 4HW
dave.derham@btinternet
.com
Xledger UK
10 Victoria Street
Bristol
BS1 6BN
Tel +44 (0)117 3291050
www.xledger.co.uk
About Xledger
Dave Derham is a business strategy consultant who
has spent most of his working life in the IT sector.
Dave spent several years with Hewlett Packard before
joining a fledgling software business which, as a
Director and key strategy developer, he helped to
steer into becoming a major international business
systems provider.
Dave has witnessed the selection, implementation
and ownership processes of several hundred business
systems over many years. He has witnessed a wide
range of results from dismal, costly failures to
enormous successes.
At the core of Dave’s philosophy is the belief that if
organisations adopt clear, deliverable strategies then
not only is the business more profitable, but everyone
inside the business is far happier as well.
Founded in 2001, Xledger is a privately held software
company with international operations in the UK, US,
Norway & Sweden. They provide revolutionary Cloud
Finance & Project Accounting systems to
organisations that want to focus on running their
business – not their business systems.
The company have helped over 6,000 distributed and
project-based organisations in 30 countries achieve
significant benefits in greater flexibility, improved
control and understanding of their businesses along
with significant savings in both cost (25% - 75%
savings) and management time.
Please visit www.xledger.co.uk for more information.
About the Author

More Related Content

What's hot

Helping you to Understand Maintenance Management Software
Helping you to Understand Maintenance Management SoftwareHelping you to Understand Maintenance Management Software
Helping you to Understand Maintenance Management SoftwareChris Lee
 
IT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT AlignementIT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT Alignement
Rick Lemieux
 
Adapting to case management
Adapting to case managementAdapting to case management
Adapting to case management
Tom Shepherd
 
Implementing ERP In Public Sector
Implementing ERP In Public SectorImplementing ERP In Public Sector
Implementing ERP In Public Sector
ggauthority
 
Increasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coachingIncreasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coaching
WGroup
 
From Reactive to Predictive Process Management
From Reactive to Predictive Process ManagementFrom Reactive to Predictive Process Management
From Reactive to Predictive Process Management
Michael zur Muehlen
 
IAOP Outsourcing Insights Olson 0309
IAOP Outsourcing Insights Olson 0309IAOP Outsourcing Insights Olson 0309
IAOP Outsourcing Insights Olson 0309F Stephen Olson
 
Regulatory Instability, BPM Technology, and BPM Skill Configurations
Regulatory Instability, BPM Technology, and BPM Skill ConfigurationsRegulatory Instability, BPM Technology, and BPM Skill Configurations
Regulatory Instability, BPM Technology, and BPM Skill Configurations
Michael zur Muehlen
 
IT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_WhitepaperIT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_WhitepaperChuck Boutcher
 
Justifying ITIL - Building the ROI
Justifying ITIL - Building the ROIJustifying ITIL - Building the ROI
Justifying ITIL - Building the ROI
Acend Corporate Learning
 
Designs of Organization
Designs of OrganizationDesigns of Organization
Designs of Organization
Cheryl Isiderio
 
IT outsourcing is not about cost savings
IT outsourcing is not about cost savingsIT outsourcing is not about cost savings
IT outsourcing is not about cost savings
WGroup
 
The ROI of Problem Management
The ROI of Problem ManagementThe ROI of Problem Management
The ROI of Problem Management
FrontRange
 
Business Continuation The Basics
Business Continuation   The BasicsBusiness Continuation   The Basics
Business Continuation The Basics
guest13df88e8
 
Formal Information Technology in a Small, Growing Company
Formal Information Technology in a Small, Growing CompanyFormal Information Technology in a Small, Growing Company
Formal Information Technology in a Small, Growing Company
Farrokh Poorooshasb
 
Improving Change Impact Analysis
Improving Change Impact AnalysisImproving Change Impact Analysis
Improving Change Impact Analysis
ITinvolve, Inc.
 
In-house vs. Outsourced Payroll Processing: Separating Fact from Fiction
In-house vs. Outsourced Payroll Processing: Separating Fact from FictionIn-house vs. Outsourced Payroll Processing: Separating Fact from Fiction
In-house vs. Outsourced Payroll Processing: Separating Fact from Fiction
Adrian Boucek
 
It's worse than you think poor document processes lead to significat business...
It's worse than you think poor document processes lead to significat business...It's worse than you think poor document processes lead to significat business...
It's worse than you think poor document processes lead to significat business...
Larry Levine
 
Case Management and BPM
Case Management and BPMCase Management and BPM
Case Management and BPM
Sandy Kemsley
 

What's hot (20)

ebizQ publication
ebizQ publicationebizQ publication
ebizQ publication
 
Helping you to Understand Maintenance Management Software
Helping you to Understand Maintenance Management SoftwareHelping you to Understand Maintenance Management Software
Helping you to Understand Maintenance Management Software
 
IT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT AlignementIT Service Management (ITSM) Model for Business & IT Alignement
IT Service Management (ITSM) Model for Business & IT Alignement
 
Adapting to case management
Adapting to case managementAdapting to case management
Adapting to case management
 
Implementing ERP In Public Sector
Implementing ERP In Public SectorImplementing ERP In Public Sector
Implementing ERP In Public Sector
 
Increasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coachingIncreasing project success rates using project behavioral coaching
Increasing project success rates using project behavioral coaching
 
From Reactive to Predictive Process Management
From Reactive to Predictive Process ManagementFrom Reactive to Predictive Process Management
From Reactive to Predictive Process Management
 
IAOP Outsourcing Insights Olson 0309
IAOP Outsourcing Insights Olson 0309IAOP Outsourcing Insights Olson 0309
IAOP Outsourcing Insights Olson 0309
 
Regulatory Instability, BPM Technology, and BPM Skill Configurations
Regulatory Instability, BPM Technology, and BPM Skill ConfigurationsRegulatory Instability, BPM Technology, and BPM Skill Configurations
Regulatory Instability, BPM Technology, and BPM Skill Configurations
 
IT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_WhitepaperIT_Crisis_Problem_Management_Whitepaper
IT_Crisis_Problem_Management_Whitepaper
 
Justifying ITIL - Building the ROI
Justifying ITIL - Building the ROIJustifying ITIL - Building the ROI
Justifying ITIL - Building the ROI
 
Designs of Organization
Designs of OrganizationDesigns of Organization
Designs of Organization
 
IT outsourcing is not about cost savings
IT outsourcing is not about cost savingsIT outsourcing is not about cost savings
IT outsourcing is not about cost savings
 
The ROI of Problem Management
The ROI of Problem ManagementThe ROI of Problem Management
The ROI of Problem Management
 
Business Continuation The Basics
Business Continuation   The BasicsBusiness Continuation   The Basics
Business Continuation The Basics
 
Formal Information Technology in a Small, Growing Company
Formal Information Technology in a Small, Growing CompanyFormal Information Technology in a Small, Growing Company
Formal Information Technology in a Small, Growing Company
 
Improving Change Impact Analysis
Improving Change Impact AnalysisImproving Change Impact Analysis
Improving Change Impact Analysis
 
In-house vs. Outsourced Payroll Processing: Separating Fact from Fiction
In-house vs. Outsourced Payroll Processing: Separating Fact from FictionIn-house vs. Outsourced Payroll Processing: Separating Fact from Fiction
In-house vs. Outsourced Payroll Processing: Separating Fact from Fiction
 
It's worse than you think poor document processes lead to significat business...
It's worse than you think poor document processes lead to significat business...It's worse than you think poor document processes lead to significat business...
It's worse than you think poor document processes lead to significat business...
 
Case Management and BPM
Case Management and BPMCase Management and BPM
Case Management and BPM
 

Similar to 8 steps to Successful Accounts System Selection - Xledger Whitepaper

6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf
6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf
6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf
Benevolence Technologies
 
10 Steps To Successful Enterprise Software Selection
10 Steps To Successful Enterprise Software Selection10 Steps To Successful Enterprise Software Selection
10 Steps To Successful Enterprise Software Selection
PhilKeet
 
THE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR SUCCESSFUL DIVESTITURE
THE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR  SUCCESSFUL DIVESTITURETHE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR  SUCCESSFUL DIVESTITURE
THE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR SUCCESSFUL DIVESTITURE
Abhishek Sood
 
ITM business barriers.pptx
ITM  business barriers.pptxITM  business barriers.pptx
ITM business barriers.pptx
rajalakshmi5921
 
Overcome barriers to good req mgmt
Overcome barriers to good req mgmtOvercome barriers to good req mgmt
Overcome barriers to good req mgmt
Info-Tech Research Group
 
White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...
White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...
White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...
31West Global Services
 
10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION
10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION
10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION
BhavanthSoni
 
Bi in financial industry
Bi in financial industryBi in financial industry
Bi in financial industry
Souvik Chakraborty
 
Bi in financial industry
Bi in financial industryBi in financial industry
Bi in financial industry
Souvik Chakraborty
 
ch03-Design Project.ppt
ch03-Design Project.pptch03-Design Project.ppt
ch03-Design Project.ppt
LuckySaigon1
 
How to Implement a Manufacturing System
How to Implement a Manufacturing SystemHow to Implement a Manufacturing System
How to Implement a Manufacturing System
Sania Baker
 
Killing Bureacracy
Killing Bureacracy Killing Bureacracy
Killing Bureacracy
LucieColt
 
Inside the Minds - Ziethlow Chapter cleaned
Inside the Minds - Ziethlow Chapter cleanedInside the Minds - Ziethlow Chapter cleaned
Inside the Minds - Ziethlow Chapter cleanedMichael Ziethlow
 
implementing an Applicant Tracking System
implementing an Applicant Tracking Systemimplementing an Applicant Tracking System
implementing an Applicant Tracking System
jkrumwie
 
Building cbis, mis, csvtu
Building cbis, mis, csvtuBuilding cbis, mis, csvtu
Building cbis, mis, csvtu
Narender Chintada
 
Chapter 2 analyzing the business case
Chapter 2 analyzing the business caseChapter 2 analyzing the business case
Chapter 2 analyzing the business case
Raquel Miranda
 
Breaking Through the Roadblocks of a New ELM Implementation eBook
Breaking Through the Roadblocks of a New ELM Implementation eBookBreaking Through the Roadblocks of a New ELM Implementation eBook
Breaking Through the Roadblocks of a New ELM Implementation eBookJason Emanis
 
IT Project Success through Corporate Profiling
IT Project Success through Corporate ProfilingIT Project Success through Corporate Profiling
IT Project Success through Corporate Profiling
ITPSB Pty Ltd
 
Minimizing Business Risk in IT Projects
Minimizing Business Risk in IT ProjectsMinimizing Business Risk in IT Projects
Minimizing Business Risk in IT ProjectsITPSB Pty Ltd
 
Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1Lawrence Dillon
 

Similar to 8 steps to Successful Accounts System Selection - Xledger Whitepaper (20)

6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf
6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf
6 Challenges to Implementing an ECM System & How to Avoid Them-2.pdf
 
10 Steps To Successful Enterprise Software Selection
10 Steps To Successful Enterprise Software Selection10 Steps To Successful Enterprise Software Selection
10 Steps To Successful Enterprise Software Selection
 
THE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR SUCCESSFUL DIVESTITURE
THE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR  SUCCESSFUL DIVESTITURETHE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR  SUCCESSFUL DIVESTITURE
THE CIO PLAYBOOK NINE STEPS CIOS MUST TAKE FOR SUCCESSFUL DIVESTITURE
 
ITM business barriers.pptx
ITM  business barriers.pptxITM  business barriers.pptx
ITM business barriers.pptx
 
Overcome barriers to good req mgmt
Overcome barriers to good req mgmtOvercome barriers to good req mgmt
Overcome barriers to good req mgmt
 
White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...
White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...
White Paper: "Keys to a Successful Call Center Transition" (31West Knowledge ...
 
10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION
10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION
10 ESSENTIALS FOR A SUCCESSFUL OFFSHORE TRANSITION
 
Bi in financial industry
Bi in financial industryBi in financial industry
Bi in financial industry
 
Bi in financial industry
Bi in financial industryBi in financial industry
Bi in financial industry
 
ch03-Design Project.ppt
ch03-Design Project.pptch03-Design Project.ppt
ch03-Design Project.ppt
 
How to Implement a Manufacturing System
How to Implement a Manufacturing SystemHow to Implement a Manufacturing System
How to Implement a Manufacturing System
 
Killing Bureacracy
Killing Bureacracy Killing Bureacracy
Killing Bureacracy
 
Inside the Minds - Ziethlow Chapter cleaned
Inside the Minds - Ziethlow Chapter cleanedInside the Minds - Ziethlow Chapter cleaned
Inside the Minds - Ziethlow Chapter cleaned
 
implementing an Applicant Tracking System
implementing an Applicant Tracking Systemimplementing an Applicant Tracking System
implementing an Applicant Tracking System
 
Building cbis, mis, csvtu
Building cbis, mis, csvtuBuilding cbis, mis, csvtu
Building cbis, mis, csvtu
 
Chapter 2 analyzing the business case
Chapter 2 analyzing the business caseChapter 2 analyzing the business case
Chapter 2 analyzing the business case
 
Breaking Through the Roadblocks of a New ELM Implementation eBook
Breaking Through the Roadblocks of a New ELM Implementation eBookBreaking Through the Roadblocks of a New ELM Implementation eBook
Breaking Through the Roadblocks of a New ELM Implementation eBook
 
IT Project Success through Corporate Profiling
IT Project Success through Corporate ProfilingIT Project Success through Corporate Profiling
IT Project Success through Corporate Profiling
 
Minimizing Business Risk in IT Projects
Minimizing Business Risk in IT ProjectsMinimizing Business Risk in IT Projects
Minimizing Business Risk in IT Projects
 
Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1Creating Optimized Business Relationships - Article #1
Creating Optimized Business Relationships - Article #1
 

Recently uploaded

Visitor Management System in India- Vizman.app
Visitor Management System in India- Vizman.appVisitor Management System in India- Vizman.app
Visitor Management System in India- Vizman.app
NaapbooksPrivateLimi
 
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus
 
Why React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdfWhy React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdf
ayushiqss
 
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Anthony Dahanne
 
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Globus
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
Globus
 
Advanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should KnowAdvanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should Know
Peter Caitens
 
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoamOpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
takuyayamamoto1800
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdf
Cyanic lab
 
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume MontevideoVitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke
 
SOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBrokerSOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar
 
Corporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMSCorporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMS
Tendenci - The Open Source AMS (Association Management Software)
 
De mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FMEDe mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FME
Jelle | Nordend
 
How Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptxHow Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptx
wottaspaceseo
 
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Globus
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
Globus
 
Lecture 1 Introduction to games development
Lecture 1 Introduction to games developmentLecture 1 Introduction to games development
Lecture 1 Introduction to games development
abdulrafaychaudhry
 
Designing for Privacy in Amazon Web Services
Designing for Privacy in Amazon Web ServicesDesigning for Privacy in Amazon Web Services
Designing for Privacy in Amazon Web Services
KrzysztofKkol1
 
Quarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden ExtensionsQuarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden Extensions
Max Andersen
 
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
XfilesPro
 

Recently uploaded (20)

Visitor Management System in India- Vizman.app
Visitor Management System in India- Vizman.appVisitor Management System in India- Vizman.app
Visitor Management System in India- Vizman.app
 
Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024Globus Compute wth IRI Workflows - GlobusWorld 2024
Globus Compute wth IRI Workflows - GlobusWorld 2024
 
Why React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdfWhy React Native as a Strategic Advantage for Startup Innovation.pdf
Why React Native as a Strategic Advantage for Startup Innovation.pdf
 
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
Paketo Buildpacks : la meilleure façon de construire des images OCI? DevopsDa...
 
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
 
Advanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should KnowAdvanced Flow Concepts Every Developer Should Know
Advanced Flow Concepts Every Developer Should Know
 
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoamOpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
OpenFOAM solver for Helmholtz equation, helmholtzFoam / helmholtzBubbleFoam
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdf
 
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume MontevideoVitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume Montevideo
 
SOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBrokerSOCRadar Research Team: Latest Activities of IntelBroker
SOCRadar Research Team: Latest Activities of IntelBroker
 
Corporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMSCorporate Management | Session 3 of 3 | Tendenci AMS
Corporate Management | Session 3 of 3 | Tendenci AMS
 
De mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FMEDe mooiste recreatieve routes ontdekken met RouteYou en FME
De mooiste recreatieve routes ontdekken met RouteYou en FME
 
How Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptxHow Recreation Management Software Can Streamline Your Operations.pptx
How Recreation Management Software Can Streamline Your Operations.pptx
 
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
Innovating Inference - Remote Triggering of Large Language Models on HPC Clus...
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
 
Lecture 1 Introduction to games development
Lecture 1 Introduction to games developmentLecture 1 Introduction to games development
Lecture 1 Introduction to games development
 
Designing for Privacy in Amazon Web Services
Designing for Privacy in Amazon Web ServicesDesigning for Privacy in Amazon Web Services
Designing for Privacy in Amazon Web Services
 
Quarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden ExtensionsQuarkus Hidden and Forbidden Extensions
Quarkus Hidden and Forbidden Extensions
 
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, BetterWebinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
Webinar: Salesforce Document Management 2.0 - Smarter, Faster, Better
 

8 steps to Successful Accounts System Selection - Xledger Whitepaper

  • 1. | Tel +44 (0)117 3291050 | www.xledger.co.uk Why Business Systems Fail to Deliver Significant Benefit July 2015 Dave Derham Managing Director Dave Derham Associates Ltd In association with Xledger Ltd
  • 2. | Tel +44 (0)117 3291050 | www.xledger.co.uk Executive Summary It is very common these days to find executives who are highly sceptical about the business benefits which would result from any investment in deploying new business systems. Sadly, in all too many cases, this scepticism is completely justified as a high proportion of projects do fail to deliver the benefits anticipated at the outset. In contrast with these failures are organisations which do derive massive benefit from the implementation of new systems. The question we should be asking ourselves is: A Series of Whitepapers focussing on:  System Selection  System Implementation  Ongoing Management “What is happening in these successful projects which is not happening in the ones which fail to deliver benefit?” The purpose of this series of Whitepapers is to shed some light on the answer to this important question. We shall achieve this by focusing on the topic from 3 logical perspectives:  System Selection  System Implementation  Ongoing Management
  • 3. | Tel +44 (0)117 3291050 | www.xledger.co.uk Most projects which fail to deliver positive results actually go wrong before they even start. To understand this, let us look at an all too typical set of circumstances which precede a new system implementation. The first thing to realise is that organisations only ever implement a new system when they feel they have to. These projects are complicated, fraught with pain and get in the way of day-to-day operations. No business leader is going to leap out of bed in the morning thinking that it would be a great idea to put a new system into the business to transform effectiveness. What happens in practice is that the business either outgrows whatever “systems” are in place to manage it and an increasing number of problems come to the surface or the system has to be replaced because it is no longer supportable. In cases where the system has been outgrown, the resulting problems can be related to the inability to effectively control some operations or very often they are the result of the inability to clearly measure and understand what is happening in the business. The consequence of these increasing mismatches between the “systems” and the business are inefficiency in operations, increasing headcount in overhead activities to attempt to manage things better and poor decision making based on inaccurate information. Part 1: System Selection8 Steps to Successful System Selection 1. Put in place an appropriate structure 2. Identify all requirements 3. Beware of specifying the existing system 4. Keep requirements in perspective 5. Don’t get precious about the Way You do things 6. Avoid being prescriptive 7. Check out the detail at the end 8. It’s not all about functionality
  • 4. | Tel +44 (0)117 3291050 | www.xledger.co.uk Eventually, the pain gets big enough for the subject to be raised at a Board meeting and if enough of those present are affected by the problems it is agreed to set up a project to select and implement a new system. Having gained agreement to launch the project, the Board need someone to manage it. Since none of the Board members feel that they know enough about the subject, they delegate the matter to someone further down the organisation. The appointed Project Manager’s first task is to produce a list of requirements which can be used as a basis for selecting the new system. In order to get this done as quickly as possible they either visit each relevant department or send a questionnaire to get the appropriate requirements documented. The requirements are eventually compiled into one document and a consistent approach is taken to describing them. The document will typically have an introduction which sets out they key objectives of the project, which have been passed down to the Project Manager. Typical descriptions found here include: “the need for better management information” or “ability to improve efficiency of operations”. The Project Manager then turns their attention to potential suppliers. A list of possible suitors is gathered from a number of sources including research on the internet and asking for suggestions from colleagues. The requirements document is sent to each supplier and a request is made for them to respond formally with their compliance with the requirements.
  • 5. | Tel +44 (0)117 3291050 | www.xledger.co.uk Following receipt of the responses, along with indicative pricing, the list is slimmed down and the finalists are invited to present their system to an invited group so that a final selection can be made. The short-listed suppliers, typically 2 or3 in number, arrive on the appointed days to give a presentation about their organisation and then they go through a detailed demonstration of how the specified requirements can be met. After all of the demonstrations have been seen, those invited to participate in the events are brought back together to have a vote on which systems is their preferred choice. Where there is a significant cost differential in the systems, this factor may well be introduced for consideration of “value for money”. Eventually, a recommendation is put back to the Board for rubber-stamping before contracts are signed with the chosen supplier. Is there anything wrong with the above scenario? Yes. This is absolutely not how those aforementioned ‘successful’ organisations set about selecting a new system. Let’s read on and learn how they have very successfully approached system selection.
  • 6. | Tel +44 (0)117 3291050 | www.xledger.co.uk Put in Place an Appropriate Structure The person put in charge of the selection and implementation process is frequently chosen because of their availability rather than appropriate knowledge. How valuable are they to the business if they have so much spare time? The person nominated is very seldom a very senior manager who has an understanding of the critical issues that the business is facing at that point in time. Unfortunately it is also common for Board members to avoid involvement in such projects either because they do not understand the strategic importance or because they want to distance themselves from something which they fully expect to be problematic. Highly successful projects start off on a different premise. The strategic importance of the new system is recognised and a Board-level Sponsor is usually nominated. A Project Manager with appropriate experience is then chosen either from inside the business or from outside, and this person works very closely with the Project Sponsor to ensure that the key objectives stay in focus. 1 The strategic importance of the new system is recognised and a Board- level Sponsor is usually nominated.
  • 7. | Tel +44 (0)117 3291050 | www.xledger.co.uk Identify All Requirements When gathering requirements, the Project Manager frequently seeks input from everyone in the business except Board Members. This may be due to a lack of confidence or it may be down to their view that this is an operational level matter and the Board do not need to be troubled with it. It should be remembered that most projects only came into existence because the level of pain in the organisation became great enough. Does it not therefore make sense for the Project Manager to initially work with the Board to investigate in some detail what arose to give birth to the project? This will result in very specific key objectives being produced. For example rather, than the typical woolly statement of “we need better management information”, a list would be produced of the specific types of information which are needed at all levels to effectively run the business. In this example it would also produce the need to understand how easy it is to set up a new system to capture and deliver the necessary information, as well as modify this when significant changes occur in the business. 2 The Project Manager should initially work with the Board to investigate, in some detail, what arose to give birth to the project.
  • 8. | Tel +44 (0)117 3291050 | www.xledger.co.uk Beware of Specifying the Existing System The departmental representatives who provide requirements to the Project Manager typically generate information based on what they already know i.e. how they do things at the moment. This means that a great deal of time is spent collating system requirements which are largely a detailed description of the current computerised and manual systems used within the business. Little, if any, consideration is given to how efficiency could be improved by doing things differently, particularly where it may result in the need for a reduced headcount. The end result of a selection process based on such a premise is the selection of a modern system which does just what the old system did and which offers no significant business benefit. This is a relatively frequent occurrence. 3 Little, if any, consideration is given to how efficiency could be improved by doing things differently - particularly where it may result in the need for a reduced headcount.
  • 9. | Tel +44 (0)117 3291050 | www.xledger.co.uk Keep Requirements in Perspective The problems which need to be addressed will be at very different levels within the business and have hugely varying consequences. For example, addressing the problems experienced by an accountant in managing depreciation of fixed assets has completely different consequences to providing the Chief Executive with constantly up to date information on which elements of the business are making money and which aren’t. One of these may save a few hours of clerical time each month whereas the other enables early intervention to maximise profitability of the entire business. Each of the requirements needs to have recognition of its relative impact on the business. This is particularly important because there is no such thing as a perfect business system and each product will have its own strengths and weaknesses. The important thing is to identify the strengths with the greatest impact on the big problems. 4 The important thing is to identify the strengths with the greatest impact on the big problems.
  • 10. | Tel +44 (0)117 3291050 | www.xledger.co.uk Don’t get Precious about the Way You do Things In any business there are processes that differentiate the organisation and generate business and there are processes which are there because of habit. When selecting a new system it is critically important to be able to separate these very different situations. Processes which are critical to the success of the organisation absolutely need to be implemented without compromise. In many cases this means building them as bespoke systems. However, most processes involved in support functions do not need to be carried out in precisely the same way that may have been in place for years. There are often very good reasons to change procedures in line with commonly accepted practice for the sake of efficiency. It is relatively common to find that suppliers have been chosen on the condition that they will modify their packaged software to enable it to behave just like the previous system. In the vast majority of cases this is absolute folly as it will frequently result in delays and arguments in the implementation process and will lead to inevitable problems with future software upgrades. Before any modifications to standard software packages are even considered, tough questions should be asked by the Project Sponsor to clarify the consequences of living with the standard software. In the majority of cases the answer will be that a bit more work is required to use the system. 5 Most processes relating to business support functions do not need to be carried out in precisely the same way they have for years.
  • 11. | Tel +44 (0)117 3291050 | www.xledger.co.uk Avoid Being Prescriptive Rather than putting in a great deal of effort into being prescriptive about how an entire new system should work, why not invite the potential suppliers to present how they would address the really important business issues. This enables meaningful discussion and brings fresh thinking to problems. Suppliers will bring insight into how their system can be used to improve efficiency and provide easier management in areas which had not even been considered. It is essential that top level management is involved in this type of discussion. It is also important to give suppliers access to top level management in order to be able to formulate their thinking. 6 Suppliers will bring insight into how their system can be used to improve efficiency and provide easier management in areas which had not even been considered.
  • 12. | Tel +44 (0)117 3291050 | www.xledger.co.uk Check Out the Detail at the End – Not the Beginning Assuming that potential suppliers have a track record of being implemented successfully, then it is completely reasonable to assume that their system will be able to handle most detailed operational requirements one way or another. Investigation of such detail can be done at a later stage and these should be kept in context. The consequences of non-ideal functionality should be carefully weighed against areas of major business benefit. Where short-listing is carried out based on responses to prescribed functionality, this will frequently eliminate the most creative and beneficial future partners. As stated previously, much of this prescription is looking backwards rather than forwards. It is important to carefully investigate the market and talk to suppliers which appear to be in tune with the real challenges which the organisation is facing. 7 Where short-listing is carried out based on responses to prescribed functionality, this will frequently eliminate the most creative and beneficial future partners.
  • 13. | Tel +44 (0)117 3291050 | www.xledger.co.uk It’s not just about Functionality 8 Where systems are performing support functions, from which there is no major strategic gain, then what is the point in spending a huge amount of effort and cost to have them different to everyone else. A new system needs to deliver functionality which is essential to the business - but it must do this with an appropriate level of management overhead and ongoing costs. Systems have not all be designed with the same goals in mind. There are many extremely customisable applications (often with code being written to do the customisation), which can be made to do virtually anything during the initial implementation. However, this level of initial customisability can mean that change later on is very difficult and costly. Highly customisable systems also tend to have more complex technical structures, and require a high level of ongoing management, as well as large resources deployed when testing new releases. Ongoing management of the system can also require a lot of manpower. Some systems on the market have been specifically designed to have more of a “best practice” approach to functionality and are not customisable. These will have massively lower costs of implementation, upgrading and ongoing management than heavily customisable applications. Some software providers, such as cloud-based Xledger, have taken this concept even further and have recognised that business management systems should not be a major drain on companies’ resources. As a result, the focus of the design has been to provide very fast implementation, low ongoing management overhead and automation of many key business processes.
  • 14. | Tel +44 (0)117 3291050 | www.xledger.co.uk What is important is to recognise the role that the software plays within the business. Where systems are responsible for differentiating the organisation and generating business, then it is essential that they can be customised to be far better than those adopted by the competition. However, where systems are performing support or back office functions from which there is no major strategic gain then what is the point in spending a huge amount of effort and cost to have them different to everyone else. It seems to make sense to make these systems run as efficiently as possible with minimal cost and effort.
  • 15. | Tel +44 (0)117 3291050 | www.xledger.co.uk Dave Derham Associates Ltd Swallows Barn Severn Road Pilning Bristol BS35 4HW dave.derham@btinternet .com Xledger UK 10 Victoria Street Bristol BS1 6BN Tel +44 (0)117 3291050 www.xledger.co.uk About Xledger Dave Derham is a business strategy consultant who has spent most of his working life in the IT sector. Dave spent several years with Hewlett Packard before joining a fledgling software business which, as a Director and key strategy developer, he helped to steer into becoming a major international business systems provider. Dave has witnessed the selection, implementation and ownership processes of several hundred business systems over many years. He has witnessed a wide range of results from dismal, costly failures to enormous successes. At the core of Dave’s philosophy is the belief that if organisations adopt clear, deliverable strategies then not only is the business more profitable, but everyone inside the business is far happier as well. Founded in 2001, Xledger is a privately held software company with international operations in the UK, US, Norway & Sweden. They provide revolutionary Cloud Finance & Project Accounting systems to organisations that want to focus on running their business – not their business systems. The company have helped over 6,000 distributed and project-based organisations in 30 countries achieve significant benefits in greater flexibility, improved control and understanding of their businesses along with significant savings in both cost (25% - 75% savings) and management time. Please visit www.xledger.co.uk for more information. About the Author