 History
•
•
•
•
•

Transpek Industry Limited was set up in 1965.
Initially was manufacturing Transparent
Acrylic Sheets.
Since then company has become leading
chemical manufacturer in world wide.
This company believe in creativity and
innovation in its respective field.
Over decades of presence in international
market, transpek has expertise in handling
Chlorine and Sulphur.
Introduction to company
 Board












of Directors.

Mr. A. C. Shroff (Chairman)
Mr. A. G. Shroff (Managing Director)
Mr. Ninad D. Gupte (Director)
Mr. D. K. Shroff (Director)
Mr. M. D. Patel (Director)
Mr. A. H. Patel (Director)
Dr. Bernd Dill (Director)
Mr R. A. Shroff (Director)
Mr Nimish U. Patel (Director)
Mr Bimal V. Mehta (Director)
Introduction to company
 Products
Transpek is an leading chemical
manufacturer for photography chemical,
Dyes, Ploymers, Chlorinating agents,
Lubes additives, Pharmacueticals,
Agrochemical.
 Transpek has an 42 years of experience in
sulphur and chlorine chemistry and
decade’s presence in international market.

Introduction to company


Transpek is certified as ISO 9001:2000, for
Quality Management system. ISO 14001:2004, for
Environment Management system OHSAS
18001:1999, for Occupational Health & Safety
Assessment Series.



ISO 9001

ISO 14001

ISO 18001
Introduction to company

Plants available for
mechanical engineers
Boiler plant
Refrigeration plant
Introduction to company
 Departments





of our study.

Safety induction & practice.
Utility Department.
Plant maintenance Department.
Workshop & fabrication.
Manufacturing processes


High temperature pressurized steam
generation, through 3 different boilers.



Refrigeration system for generation of cooling
water, chilled water, brine water, air supply,
Nitrogen supply.



Welding, HDPE pipe cutting through HDPE
(High Density Poly Ethylene) cutter, drilling
process under workshop department.
Manufacturing processes.
 Specification
•

•
•

of Boilers.

In transpek all boilers are fuel based boilers to
fulfil the demand of Hot Oil and high Tempreture
Steam.
Generally 4 TPH to 8 TPH capacity steam is
generated in transpek,
In Transpek pressure of steam required is 4.2
kg/cm2, pressure in the boiler can be regulated
upto 10.5 kg/cm2 if required.
Manufacturing processes.
•In this vessel water is
heated at boiling point
(100o C) to obtain
steam, this steam is
pressurised in vessel to
obtain high temperature
steam (150o C)
•This boiler are
comprises of mounting
& accessories, which
are installed for safety
and higher efficiency.
Manufacturing processes.
 Specification

of cooling tower.

•

In the cooling tower temperature
difference obtain is of 2o to 5o C

•

In this hot water vapour is removed from
top of tower with help of induced fan.
While more cooling can be done by
modification in design and refrigerant.
Manufacturing processes.

As shown in figure above, in Induced draft cooling tower there
is induced fan at top of tower, which is design in a manner to
suck up air from inside the tower and throw it out, while on
tower body fins are provided, such that it can allow passage for
air to flow in tower, water used as refrigerant is constantly
poured from top of tower.
Problem Identification.
In Transpek, as it is an chemical based
plant, the whole manufacturing practice
are done with chemical, different
hazardious, toxic gas or liquid are
manufactured here.
 This chemical are also corrosive which
lead the corrosion in plant site,
Equipments like metal pipes, metal
vessel or storage vessels are also
corroded.

Problem Identification.


Problem: 1



To prevent corrosion routine and schedule
maintenance work are carried out, in
Transpek.
while its is continues working plant, mostly
corroded pipes or vessels are replaced
because its more economical then shut down.
Thus replaced of this pipe line, or creating new
network of pipe line in plant create an rumble.




Problem Identification.

•Such type of unwanted pipe line network creates
an Mesh, and leads to confusion.
•This mesh may create problem at time of critical
situation like accidents and maintenance.
Problem Identification.


So to avoid this confusing network of
pipe line in plant, an suitable
maintenance scheme should be adopted
in which there should be an removal of
unwanted pipe line should be done.
Problem Identification.


Problem : 2



The problem of corrosion is also an
major issue in chemical plant, mostly in
transpek ,metal pipe, metal storage
vessel are corroded due conduction and
storage of corrosive chemical.
Problem Identification.
Solution to the Defined Problem.


Our little research on Engineering material,
suggest that rather than the use of metal in pipe
line, vessel or storage container, the use of
material FRP ( FIBRE REINFORCED PLASTIC ).



Its is unsaturated polyester and vinyl ester resins.
The main fundamental of this material is This
versatile polymer materials immediately found
acceptance in aerospace, construction,
transportation, the infrastructure, and industrial
process equipment, where their unique properties
brought value and new solutions to the practicing
engineer.
Solution to the Defined Problem.


Because of its superb corrosion resistant
properties, composite fiber reinforced plastic
(FRP) has displaced other more costly metals
in many industrial process equipment, e.g.
tanks, piping, duct and hood systems, reaction
vessels, etc.



This material is highly Ductile, this material
can duct concentrated acid easily, its is also
resistive to high tempreture, and it is quit
cheaper to install, thus it can be consider as
the future of material Engineering.
Solution to the Defined Problem.


Many other properties of FRP is light in weight, easy
is transpotable, and can resist any temperature, as
the plant of Transpek is situated in south eastern
Gujarat, it was moderate tempreture and atmosphere
condition, so use of FRP is advicable.



The main factor of this material is that it can be used
in any practice like piping, underground piping,
vessels, storage tank, etc.



Another option of choice than FRP is fibre ciremic
coating in pipes, which is also resistive to corrosion
and also duct concentrated acid.
Fiber Reinforced Plastic.


Advantages:

•

High strength
Resistance to corrosion
Fast & easy installation
Composites cost less than stainless or
high-carbon alloy steel components that
might be used in highly corrosive
environments.
FRP can conduct concentrated acids.
Easily mouldable. And Durable.

•
•
•

•
•
Fiber Reinforced Plastic.
Fiber Reinforced Plastic.



Disadvantages:

At high temperatures the material's
strength decreases and deflection
increases.
 These materials continue deflecting under
heavy, sustained loads (creep).
 Can not handle high pressurized fluid.
Limitations in Implementing the Solution.


Thus FRP being very versatile
conducting material can not be used in
boiler pipes.



FRP can only be restricted in utilization
for conducting acids or any other fluid.
Conclusion.


The use of best maintenance scheme, is
very essential for avoid any mesh
pipeline network.



The use of FRP (Fiber Reinforced
Plastic) is more appropriate than metal
pipes.
References:







FEASIBILITY REVIEW OF FRP
MATERIALS FOR STRUCTURAL
APPLICATIONS. Submitted by
Hota V.S. GangaRao, Ph.D.,
P.E.P.V. Vijay, Ph.D., P.E.

Smallman, R. E., and R.J.
Bishop. Modern Physical Metallurgy and
Materials .
 Transpek industry.
Industrial report presentation

Industrial report presentation

  • 1.
    SELECTION OF MATERIAL Transpekindustry, padra Prepared by (group 31) Arpit Jayaswal (116380319093) Hasnain Durga (116380319124) Dishank Shah (116380319067) Guided by Gaurav Bandhania MECHANICAL ENGINEERING DEPARTMENT PARUL INSTITUTE OF ENGINEERING AND TECHNOLOGY DIPLOMA STUDIES 2013-14
  • 2.
    Introduction to company Transpekindustry ltd. Transpek Industry limited. AT & PO. EKALBARA – 391440 TAL. PADRA DIST VADODARA.
  • 3.
    Introduction to company History • • • • • Transpek Industry Limited was set up in 1965. Initially was manufacturing Transparent Acrylic Sheets. Since then company has become leading chemical manufacturer in world wide. This company believe in creativity and innovation in its respective field. Over decades of presence in international market, transpek has expertise in handling Chlorine and Sulphur.
  • 4.
    Introduction to company Board           of Directors. Mr. A. C. Shroff (Chairman) Mr. A. G. Shroff (Managing Director) Mr. Ninad D. Gupte (Director) Mr. D. K. Shroff (Director) Mr. M. D. Patel (Director) Mr. A. H. Patel (Director) Dr. Bernd Dill (Director) Mr R. A. Shroff (Director) Mr Nimish U. Patel (Director) Mr Bimal V. Mehta (Director)
  • 5.
    Introduction to company Products Transpek is an leading chemical manufacturer for photography chemical, Dyes, Ploymers, Chlorinating agents, Lubes additives, Pharmacueticals, Agrochemical.  Transpek has an 42 years of experience in sulphur and chlorine chemistry and decade’s presence in international market. 
  • 6.
    Introduction to company  Transpekis certified as ISO 9001:2000, for Quality Management system. ISO 14001:2004, for Environment Management system OHSAS 18001:1999, for Occupational Health & Safety Assessment Series.  ISO 9001 ISO 14001 ISO 18001
  • 7.
    Introduction to company Plantsavailable for mechanical engineers Boiler plant Refrigeration plant
  • 8.
    Introduction to company Departments     of our study. Safety induction & practice. Utility Department. Plant maintenance Department. Workshop & fabrication.
  • 9.
    Manufacturing processes  High temperaturepressurized steam generation, through 3 different boilers.  Refrigeration system for generation of cooling water, chilled water, brine water, air supply, Nitrogen supply.  Welding, HDPE pipe cutting through HDPE (High Density Poly Ethylene) cutter, drilling process under workshop department.
  • 10.
    Manufacturing processes.  Specification • • • ofBoilers. In transpek all boilers are fuel based boilers to fulfil the demand of Hot Oil and high Tempreture Steam. Generally 4 TPH to 8 TPH capacity steam is generated in transpek, In Transpek pressure of steam required is 4.2 kg/cm2, pressure in the boiler can be regulated upto 10.5 kg/cm2 if required.
  • 11.
    Manufacturing processes. •In thisvessel water is heated at boiling point (100o C) to obtain steam, this steam is pressurised in vessel to obtain high temperature steam (150o C) •This boiler are comprises of mounting & accessories, which are installed for safety and higher efficiency.
  • 12.
    Manufacturing processes.  Specification ofcooling tower. • In the cooling tower temperature difference obtain is of 2o to 5o C • In this hot water vapour is removed from top of tower with help of induced fan. While more cooling can be done by modification in design and refrigerant.
  • 13.
    Manufacturing processes. As shownin figure above, in Induced draft cooling tower there is induced fan at top of tower, which is design in a manner to suck up air from inside the tower and throw it out, while on tower body fins are provided, such that it can allow passage for air to flow in tower, water used as refrigerant is constantly poured from top of tower.
  • 14.
    Problem Identification. In Transpek,as it is an chemical based plant, the whole manufacturing practice are done with chemical, different hazardious, toxic gas or liquid are manufactured here.  This chemical are also corrosive which lead the corrosion in plant site, Equipments like metal pipes, metal vessel or storage vessels are also corroded. 
  • 15.
    Problem Identification.  Problem: 1  Toprevent corrosion routine and schedule maintenance work are carried out, in Transpek. while its is continues working plant, mostly corroded pipes or vessels are replaced because its more economical then shut down. Thus replaced of this pipe line, or creating new network of pipe line in plant create an rumble.  
  • 16.
    Problem Identification. •Such typeof unwanted pipe line network creates an Mesh, and leads to confusion. •This mesh may create problem at time of critical situation like accidents and maintenance.
  • 17.
    Problem Identification.  So toavoid this confusing network of pipe line in plant, an suitable maintenance scheme should be adopted in which there should be an removal of unwanted pipe line should be done.
  • 18.
    Problem Identification.  Problem :2  The problem of corrosion is also an major issue in chemical plant, mostly in transpek ,metal pipe, metal storage vessel are corroded due conduction and storage of corrosive chemical.
  • 19.
  • 20.
    Solution to theDefined Problem.  Our little research on Engineering material, suggest that rather than the use of metal in pipe line, vessel or storage container, the use of material FRP ( FIBRE REINFORCED PLASTIC ).  Its is unsaturated polyester and vinyl ester resins. The main fundamental of this material is This versatile polymer materials immediately found acceptance in aerospace, construction, transportation, the infrastructure, and industrial process equipment, where their unique properties brought value and new solutions to the practicing engineer.
  • 21.
    Solution to theDefined Problem.  Because of its superb corrosion resistant properties, composite fiber reinforced plastic (FRP) has displaced other more costly metals in many industrial process equipment, e.g. tanks, piping, duct and hood systems, reaction vessels, etc.  This material is highly Ductile, this material can duct concentrated acid easily, its is also resistive to high tempreture, and it is quit cheaper to install, thus it can be consider as the future of material Engineering.
  • 22.
    Solution to theDefined Problem.  Many other properties of FRP is light in weight, easy is transpotable, and can resist any temperature, as the plant of Transpek is situated in south eastern Gujarat, it was moderate tempreture and atmosphere condition, so use of FRP is advicable.  The main factor of this material is that it can be used in any practice like piping, underground piping, vessels, storage tank, etc.  Another option of choice than FRP is fibre ciremic coating in pipes, which is also resistive to corrosion and also duct concentrated acid.
  • 23.
    Fiber Reinforced Plastic.  Advantages: • Highstrength Resistance to corrosion Fast & easy installation Composites cost less than stainless or high-carbon alloy steel components that might be used in highly corrosive environments. FRP can conduct concentrated acids. Easily mouldable. And Durable. • • • • •
  • 24.
  • 25.
    Fiber Reinforced Plastic.   Disadvantages: Athigh temperatures the material's strength decreases and deflection increases.  These materials continue deflecting under heavy, sustained loads (creep).  Can not handle high pressurized fluid.
  • 26.
    Limitations in Implementingthe Solution.  Thus FRP being very versatile conducting material can not be used in boiler pipes.  FRP can only be restricted in utilization for conducting acids or any other fluid.
  • 27.
    Conclusion.  The use ofbest maintenance scheme, is very essential for avoid any mesh pipeline network.  The use of FRP (Fiber Reinforced Plastic) is more appropriate than metal pipes.
  • 28.