PERSONAL SUMMARY
A cost conscious and dependable Maintenance Manager who is able to administer the functions and
activities of an entire maintenance department. Khan is very good at identifying any maintenance
work that needs to be done urgently and has the ability to balance staff needs with departmental &
operational expectations. He is a talented communicator who exhibits good judgment, integrity,
ingenuity, and personal professionalism at all times. His background gives him the skills needed to
handle any maintenance task. Aside from his technical competencies he has a long track record of
consistently making the right decisions. His key skills include; mechanical and HVAC troubleshooting,
analyzing maintenance operations, eliminating downtime and reducing maintenance costs.
Khan reacts well under pressure and is an expert at pinpointing future maintenance issues to
minimize the need for any last minute reactive or emergency maintenance. He can inspect operating
machines and equipment for conformance with operational standards. By staying current on all
applicable maintenance codes and safety standards he is able to identify potential threats, and
opportunities to existing processes. On a personal level he always treats others with respect and
consideration regardless of their status or position. Right now he would like to join a reputable
company that is looking for dedicated individuals to support their existing team.
QULIFICATIONS
ď‚§ B-Tech Mechanical
ď‚§ DAE Refrigeration & Air-conditioning Technology
ď‚§ Short Course HVAC
PRROFECIONAL TRAINING
ď‚§ Carrier Reciprocating, Screw GX, HX, Centrifugal and XA Chillers technical trainings got from
Carrier Service training center Abu Dhabi.
ď‚§ UAE driving license No 2019606
Imran Khan ContactNoUAE +971501205259 im_jadoon79@live.com
Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com
Page 2
KEY SKILLS
PROFESSIONAL
ď‚· Predicting the cost of any future repair or maintenance work.
ď‚· Managing relationships with vendors and contractors.
ď‚· Ensuring that all maintenance work and repairs are completed on time and within budget.
ď‚· Directing the work activities of company and contract personnel.
ď‚· Monitoring the performance of installed equipment.
ď‚· Following all policies regarding health, safety and environmental procedures.
ď‚· Determining the need for outside contractors to be involved in a project.
ď‚· Preparing schedules of work.
ď‚· Maintaining a large number of machines.
ď‚· Ensuring that there is adequate breakdown cover at all times outside of the working day.
ď‚· Installing machinery and equipment.
ď‚· Accurately interpreting documents such as blueprints, maintenance instructions and
procedure manuals.
ď‚· Able to meet the individual needs of staff.
ď‚· Environmentally friendly practices.
ď‚· Excellent scheduling and time management skills.
ď‚· Responding to emergencies in a timely manner.
ď‚· Leading teams to become maintenance experts in their respective fields.
PERSONAL
ď‚§ Able to do physically strenuous and demanding jobs.
ď‚§ Sound work ethics.
ď‚§ Have a driving license and possess reliable transport.
AREAS OF EXPERTISE
ď‚· Maintenance budgets
ď‚· Root Cause Analysis
ď‚· Troubleshooting issues
ď‚· Service management
ď‚· Project management
ď‚· Resource planning
Imran Khan ContactNoUAE +971501205259 im_jadoon79@live.com
Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com
Page 3
ď‚· Grounds maintenance
ď‚· Quality assurance
ď‚· Developing subordinates
ď‚· Replacement maintenance
ď‚· Team building
ď‚· Maintenance service issues
PROFESSIONAL EXPERIENCE & CAREER HISTORY
ď‚§ Having more than 15 years of experience in the field of MEP & HVAC (Heat Ventilation and Air-
conditioning)
Maintenance Project Manager – Jan 2013 - Present
Gulf Industrial Services Co. LLC (GISCO)
CLIENTS
1. CICPA (Critical Infrastructure Costal Protection Authority)
2. BOROUGE POLYMERS (ADNOC)
3. CMW (UAE)
4. BIN HAMOODA
5. TRANSCO
6. ADDC
7. AADC
8. ADMA OPCO
9. ADNOC HOUSING
10. ADCO
Responsible for making the day to day decisions needed to ensure that maintenance activities are
completed on schedule.
Role and Responsibilities:
ď‚§ Maintaining a balanced maintenance team to cover the workload.
ď‚§ Managing the work of maintenance contractors to ensure that their work is of the highest
professional workmanship and is completed on time.
ď‚§ Interviewing, hiring and training up maintenance staff.
ď‚§ Developing preventive maintenance programs.
ď‚§ Monitoring workshop performance.
ď‚§ Organizing repair work to be carried out.
Imran Khan ContactNoUAE +971501205259 im_jadoon79@live.com
Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com
Page 4
ď‚§ Establishing standardized work protocols.
ď‚§ Monitoring the use of spare parts and maintenance supplies.
ď‚§ Following up all customer service issues to a successful resolution.
ď‚§ Keeping a track of all expenditures.
ď‚§ Collecting technical data.
ď‚§ Managing maintenance schedules and budgets.
ď‚§ Delivering planned for maintenance.
ď‚§ Managing a team of multi-disciplined maintenance Engineers, Supervisors & Technicians.
ď‚§ Planning, directing and controlling the efforts of the Maintenance Team.
ď‚§ Ensuring that all electrical & Mechanical equipment is in safe working order in line with
current regulations and for the satisfactory level of Client.
ď‚§ Ensuring that all certificates of compliance are maintained and up to date in accordance with
relevant legislation.
ď‚§ Designing maintenance programs.
ď‚§ Delegating work responsibilities.
ď‚§ Responding quickly to any emergencies.
ď‚§ Conducting employee performance reviews.
ď‚§ Running a preventive maintenance program that will minimize service repairs in the long run.
ď‚§ Participating in senior management meetings.
ď‚§ Building up maintenance teams.
ď‚§ Predicting the cost of any future repair or maintenance work.
ď‚§ Managing relationships with vendors and contractors.
ď‚§ Directing the work activities of company and contract personnel.
ď‚§ Following all policies regarding health, safety and environmental procedures.
ď‚§ Determining the need for outside contractors to be involved in a project.
ď‚§ Ensuring that there is adequate breakdown cover at all times outside of the working day.
HVAC Team Leader – May 2007 – Dec 2013
UTS Carrier (LLC)
ď‚§ Troubleshooting & maintenance of reciprocating chillers, screw chillers, XA and Centrifugal
Chillers AHUS, FCUS, and split air conditioners.
ď‚§ Making the maintenance plan for equipments.
ď‚§ Startup, Commissioning and Service of all types of CARRIER Chillers
ď‚§ Troubleshooting of Electrical, Mechanical and control system problems.
ď‚§ Software downloading, uploading and (PCDCT) Personal Computer Data Collecting Tool of
Reciprocating.
Imran Khan ContactNoUAE +971501205259 im_jadoon79@live.com
Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com
Page 5
ď‚§ Screw and Centrifugal Chillers Inspection and Overhauling of Reciprocating, Screw and
Centrifugal Compressors.
ď‚§ Day to day supervision of work and Quality of workman ship
ď‚§ Appraises the Project supervisor in respect of progress of work
ď‚§ Monitor the availability of the types and quantities of materials required for maintenance of
the equipment
ď‚§ Raises such material requisitions as may be necessary.
ď‚§ Day to day supervision of work and quality of work man ship
ď‚§ Also have a good experience with oil companies ZADCO and Abu Dhabi Marine Operating
Company (ADMA OPCO) Head Quarters on their HVAC maintenance and operating.
ď‚§ Liaison with the main contractor engineers, and other subcontractor engineer act
Environment Control Supervisor – March 2005 – May 2007
Pakistan International Airline (PIAC)
ď‚§ Supervision and Coordination with contractor of Air-conditioning equipment maintenance
ď‚§ Responsible for procurement of material and parts of Air-conditioning machines from local
and international market
ď‚§ Report generation of all Air-conditioning equipments, parts, condition of machines and
establishing plan for next year
ď‚§ Involved in establishing the system procedures in accordance with quality management
system in order to get company ISO certified
ď‚§ Assisting QA department in internal and external audits
Imran Khan

Imran Khan CV2 - Copy

  • 1.
    Imran Khan ContactNoUAE+971501205259 im_jadoon79@live.com Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com Page 1 PERSONAL SUMMARY A cost conscious and dependable Maintenance Manager who is able to administer the functions and activities of an entire maintenance department. Khan is very good at identifying any maintenance work that needs to be done urgently and has the ability to balance staff needs with departmental & operational expectations. He is a talented communicator who exhibits good judgment, integrity, ingenuity, and personal professionalism at all times. His background gives him the skills needed to handle any maintenance task. Aside from his technical competencies he has a long track record of consistently making the right decisions. His key skills include; mechanical and HVAC troubleshooting, analyzing maintenance operations, eliminating downtime and reducing maintenance costs. Khan reacts well under pressure and is an expert at pinpointing future maintenance issues to minimize the need for any last minute reactive or emergency maintenance. He can inspect operating machines and equipment for conformance with operational standards. By staying current on all applicable maintenance codes and safety standards he is able to identify potential threats, and opportunities to existing processes. On a personal level he always treats others with respect and consideration regardless of their status or position. Right now he would like to join a reputable company that is looking for dedicated individuals to support their existing team. QULIFICATIONS ď‚§ B-Tech Mechanical ď‚§ DAE Refrigeration & Air-conditioning Technology ď‚§ Short Course HVAC PRROFECIONAL TRAINING ď‚§ Carrier Reciprocating, Screw GX, HX, Centrifugal and XA Chillers technical trainings got from Carrier Service training center Abu Dhabi. ď‚§ UAE driving license No 2019606
  • 2.
    Imran Khan ContactNoUAE+971501205259 im_jadoon79@live.com Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com Page 2 KEY SKILLS PROFESSIONAL ď‚· Predicting the cost of any future repair or maintenance work. ď‚· Managing relationships with vendors and contractors. ď‚· Ensuring that all maintenance work and repairs are completed on time and within budget. ď‚· Directing the work activities of company and contract personnel. ď‚· Monitoring the performance of installed equipment. ď‚· Following all policies regarding health, safety and environmental procedures. ď‚· Determining the need for outside contractors to be involved in a project. ď‚· Preparing schedules of work. ď‚· Maintaining a large number of machines. ď‚· Ensuring that there is adequate breakdown cover at all times outside of the working day. ď‚· Installing machinery and equipment. ď‚· Accurately interpreting documents such as blueprints, maintenance instructions and procedure manuals. ď‚· Able to meet the individual needs of staff. ď‚· Environmentally friendly practices. ď‚· Excellent scheduling and time management skills. ď‚· Responding to emergencies in a timely manner. ď‚· Leading teams to become maintenance experts in their respective fields. PERSONAL ď‚§ Able to do physically strenuous and demanding jobs. ď‚§ Sound work ethics. ď‚§ Have a driving license and possess reliable transport. AREAS OF EXPERTISE ď‚· Maintenance budgets ď‚· Root Cause Analysis ď‚· Troubleshooting issues ď‚· Service management ď‚· Project management ď‚· Resource planning
  • 3.
    Imran Khan ContactNoUAE+971501205259 im_jadoon79@live.com Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com Page 3  Grounds maintenance  Quality assurance  Developing subordinates  Replacement maintenance  Team building  Maintenance service issues PROFESSIONAL EXPERIENCE & CAREER HISTORY  Having more than 15 years of experience in the field of MEP & HVAC (Heat Ventilation and Air- conditioning) Maintenance Project Manager – Jan 2013 - Present Gulf Industrial Services Co. LLC (GISCO) CLIENTS 1. CICPA (Critical Infrastructure Costal Protection Authority) 2. BOROUGE POLYMERS (ADNOC) 3. CMW (UAE) 4. BIN HAMOODA 5. TRANSCO 6. ADDC 7. AADC 8. ADMA OPCO 9. ADNOC HOUSING 10. ADCO Responsible for making the day to day decisions needed to ensure that maintenance activities are completed on schedule. Role and Responsibilities:  Maintaining a balanced maintenance team to cover the workload.  Managing the work of maintenance contractors to ensure that their work is of the highest professional workmanship and is completed on time.  Interviewing, hiring and training up maintenance staff.  Developing preventive maintenance programs.  Monitoring workshop performance.  Organizing repair work to be carried out.
  • 4.
    Imran Khan ContactNoUAE+971501205259 im_jadoon79@live.com Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com Page 4  Establishing standardized work protocols.  Monitoring the use of spare parts and maintenance supplies.  Following up all customer service issues to a successful resolution.  Keeping a track of all expenditures.  Collecting technical data.  Managing maintenance schedules and budgets.  Delivering planned for maintenance.  Managing a team of multi-disciplined maintenance Engineers, Supervisors & Technicians.  Planning, directing and controlling the efforts of the Maintenance Team.  Ensuring that all electrical & Mechanical equipment is in safe working order in line with current regulations and for the satisfactory level of Client.  Ensuring that all certificates of compliance are maintained and up to date in accordance with relevant legislation.  Designing maintenance programs.  Delegating work responsibilities.  Responding quickly to any emergencies.  Conducting employee performance reviews.  Running a preventive maintenance program that will minimize service repairs in the long run.  Participating in senior management meetings.  Building up maintenance teams.  Predicting the cost of any future repair or maintenance work.  Managing relationships with vendors and contractors.  Directing the work activities of company and contract personnel.  Following all policies regarding health, safety and environmental procedures.  Determining the need for outside contractors to be involved in a project.  Ensuring that there is adequate breakdown cover at all times outside of the working day. HVAC Team Leader – May 2007 – Dec 2013 UTS Carrier (LLC)  Troubleshooting & maintenance of reciprocating chillers, screw chillers, XA and Centrifugal Chillers AHUS, FCUS, and split air conditioners.  Making the maintenance plan for equipments.  Startup, Commissioning and Service of all types of CARRIER Chillers  Troubleshooting of Electrical, Mechanical and control system problems.  Software downloading, uploading and (PCDCT) Personal Computer Data Collecting Tool of Reciprocating.
  • 5.
    Imran Khan ContactNoUAE+971501205259 im_jadoon79@live.com Born 16th, Feb, 1979 Contact No PAK +923343552043 im_jadoon79@yahoo.com Page 5  Screw and Centrifugal Chillers Inspection and Overhauling of Reciprocating, Screw and Centrifugal Compressors.  Day to day supervision of work and Quality of workman ship  Appraises the Project supervisor in respect of progress of work  Monitor the availability of the types and quantities of materials required for maintenance of the equipment  Raises such material requisitions as may be necessary.  Day to day supervision of work and quality of work man ship  Also have a good experience with oil companies ZADCO and Abu Dhabi Marine Operating Company (ADMA OPCO) Head Quarters on their HVAC maintenance and operating.  Liaison with the main contractor engineers, and other subcontractor engineer act Environment Control Supervisor – March 2005 – May 2007 Pakistan International Airline (PIAC)  Supervision and Coordination with contractor of Air-conditioning equipment maintenance  Responsible for procurement of material and parts of Air-conditioning machines from local and international market  Report generation of all Air-conditioning equipments, parts, condition of machines and establishing plan for next year  Involved in establishing the system procedures in accordance with quality management system in order to get company ISO certified  Assisting QA department in internal and external audits Imran Khan