QUANTITY
SURVEYOR
DAY TO DAY RESPONSIBILITIES
meeting with clients preparation of contracts
on-going cost analysis of
maintenance and
repair work
feasibility studies of
client requests
analysing completed work
and arranging payment to
contractors
site visits
assessment and
projections for
future work
STAGES OF COST PLANNING
DURING THE DESIGN AND
CONSTRUCTION PHASES
1.PRELIMINARY ESTIMATION
2.COST PLANNING
3.COST CHECKING
4.TENDER RECONCILIATION
5.POST-CONTRACT COST CONTROL
RESPONSIBILITIES
OF A
QUANTITY
SURVEYOR
STAGE ONE
DURING CONSTRUCTION
STAGE TWO
POST-CONSTRUCTION
STAGE THREE
DRAWINGS THAT
QUANTITY SURVEYORS
READ
PHASES AND DRAWINGS
OF CONSTRUCTION
COST PLANNING
COST CHECKING
ARCHITECTURAL
DRAWING
COSTRUCTION
DRAWING
TENDER DRAWINGTENDER
RECONCILIATION
POST-CONTRACT
COST CONTROL
CONTRACT DRAWING
PRELIMINARY
ESTIMATION
ARCHITECTURAL DRAWING
CONSTRUCTION DRAWING
CONTRACT DRAWING
TENDER DRAWING
DOCUMENTS PRODUCED BY
QUANTITY SURVEYORS
BILL OF QUANTITIES
REFERENCES
‘Willis’s Practice and Procedure for the Quantity Surveyor’ by Allan Ashworth and K
www.careerinconstruction.com/article/the-role-of-a-quantity-surveryor.org
targetjobs.co.uk/career-sectors/quantity-surveying-and-building-surveying/326497-
THANK YOU

Ici and itd