SlideShare a Scribd company logo
1 of 3
Iain Young
4 School Road
Symington
Biggar
ML12 6LT
Phone : 07515381344
Email : youngiain258@gmail.com
Introduction
I have recently completed an HND in Electrical Engineering with an A grade and after being out of the
education system for several years, I can say that I am self-motivated, driven person who can adapt
well to many different situations. I am currently looking for a new role to allow me to utilise my newly
earned HND and am very interested in being involved in the design side of Electrical Engineering as I
am eager to learn as much as I possibly can in this field. I am an individual who takes great pride in
their work and always tries as hard as I can too make sure that the quality of my work is to the
highest standard possible. I also have excellent communication and problem solving skills with a good
IT understanding and am comfortable with all Microsoft office programmes. I enjoy working as part
of a dedicated team and I am looking to join a company that rewards hard work, dedication and can
help me develop my knowledge as much as possible.
Current Employment
After finishing college I decided that I needed to gain some on-site experience and through contacts
got a two week work experience place, in August, with SES Engineering Services working on their
new Macallan Distillery project. This was a great experience as the project is massive and has many
industry leading contractors all working to an extremely high standard. This gave me a great insight
into how projects are managed and all the different aspects that need to be considered in the
construction industry.
After the two weeks were finished I was offered a role helping out with the administrative duties as
the team needed help and I had shown enough skill that they felt I had something to offer in this
aspect. I have been working with them since.
In this role I have been helping with a great number of different tasks. Such roles include; drawing
control, where I was in charge of printing and storing all drawings and making sure our own drawing
register was up to date with the most recent revisions.
I spent a lot of time setting up and helping to fill in a Commissioning dossier, where I had to get all
the commissioning method statements and risk assessments from all the sub-contractors that SES
use for the different works needing done for the project. This entailed contacting the contractors and
ensuring that the information that was sent was relevant and properly filed both with hard and soft
copies.
Another task that I was put in charge of was issuing Request for Actions, which are any jobs needing
completed by the main contractor as requested by any member of the SES team, I also would check
around site to see if these tasks were being completed.
I helped out with the fortnightly progress report, making sure that all relevant documents were up to
date and in place and showing where progress was made by photographs taken round the site.
The project had many variances between the tendered and construction stages and I helped the
team by marking these down in spreadsheets I made up myself, which were sent to the Quantity
Surveyor to be checked and put in the system.
I have gained a lot of knowledge from this project and have enjoyed doing something that definitely
took me out of my comfort zone.
Education
College; HND Electrical Engineering, 1st year completed with a high band B in my graded unit
2nd year Graded unit I designed and built a control unit for a music system that raises and lowers the
volume of music depending on background noise, for which I got an A
University; Completed two years of Music Technology at the University of the West of Scotland,
Paisley
Highers; Music B; Physics C; Maths C; English D; I.T; D
Skill
Technical Knowledge; Throughout college I have studied and passed a wide range of technical
subjects including;
Three Phase Systems; Working with balanced and unbalanced loads; star and delta configurations; all
relevant formula for working out line and phase voltages and currents and how to get good efficiency
Electrical Installation Design; Designing and planning electrical installations including working out
cable calculations and using the IET wiring regulations set out in BS7671:2008 17th edition.
Switchgear and Protective Devices; Where they are situated in a power network, different types of
circuit breakers, high voltage fuses, switches and isolators; how they work and why they are needed.
Electrical Safety; Good safe practices, rules and regulations
Adaptability; Over the years I have had to complete tasks out with my comfort zone, to allow for
the smooth running of the business and make sure assigned tasks were completed.
Problem Solving; Every module that I have passed at college has had a degree of problem solving
that I enjoyed completing. These ranged from many different types of calculations to report writing.
Customer Service; In a front facing customer service role excellent communication skills, both
verbal and written were essential.
I am an integral part of a team that for the p ast four years has been awarded a Certificate of
Excellence for consistently scoring 4.5 out of 5 in customer service but am capable of working alone
to achieve set targets.
Working to Targets; As supervisor I was given weekly targets to meet that I achieved by up selling
products, giving good service and maintaining the necessary documentation.
I was responsible for leading the team when required as well as maintaining adequate stock levels
which meant having to prioritise my work load and that of the team.
Work History
M & E Site Assistant 09/2016 to present
SES Engineering – New Macallan Distillery, Craigellachie
Learning as much as I can from the experienced management and staff
Documentation control
Liaising with sub-contractors
Communicating between Client, Architect and Project Management
Ordering office materials
Marking variances between tendered and construction stages
Bar Supervisor, 01/2011 to 09/2016
The Crown Inn – Biggar
Stepping up in the absence of management
Leading and Working as part of a team
Staff Representative
Problem Solving; Such as fixing broken taps
Dealing with Customers; Complaints and antisocial behaviour
Stock Taking and Ordering
Organising Rotas
Bar Associate, 09/2007 to 04/2010
Wetherspoons; The Last Post – Paisley
Working as part of a team
Up- keeping the cleanliness of bar
Serving the public.
Driving Licence – Full and clean
References
Matt McKean; Pub Manager; The Crown Inn, Biggar ML12 6DL, 01899220116
Stuart Logan; Curriculum Head – Engineering & Energy; City of Glasgow College;
stuart.logan@cityofglasgowcollege.ac.uk
Colin Paterson; Senior Project Manager; SES Engineering Services; Cpaterson@ses-ltd.co.uk

More Related Content

What's hot (12)

Ici magazine
Ici magazineIci magazine
Ici magazine
 
Motivation letter
Motivation letterMotivation letter
Motivation letter
 
Top 5 quality engineer cover letter samples
Top 5 quality engineer cover letter samplesTop 5 quality engineer cover letter samples
Top 5 quality engineer cover letter samples
 
cover letter
cover lettercover letter
cover letter
 
Creating Clarity
Creating ClarityCreating Clarity
Creating Clarity
 
Cary Hendrix Resume 2016
Cary Hendrix Resume 2016Cary Hendrix Resume 2016
Cary Hendrix Resume 2016
 
A.Elghobashy_recommendation letter
A.Elghobashy_recommendation letterA.Elghobashy_recommendation letter
A.Elghobashy_recommendation letter
 
Client Liaison & Managing Expectations - Malcolm Pounder
Client Liaison & Managing Expectations - Malcolm PounderClient Liaison & Managing Expectations - Malcolm Pounder
Client Liaison & Managing Expectations - Malcolm Pounder
 
Charles-Smith Resume
Charles-Smith ResumeCharles-Smith Resume
Charles-Smith Resume
 
Manufacturing engineer questionnaire
Manufacturing engineer questionnaireManufacturing engineer questionnaire
Manufacturing engineer questionnaire
 
Senior Sterling OMS Consultant 1
Senior Sterling OMS Consultant 1Senior Sterling OMS Consultant 1
Senior Sterling OMS Consultant 1
 
Aakas H. Desai Resume
Aakas H. Desai ResumeAakas H. Desai Resume
Aakas H. Desai Resume
 

Viewers also liked (6)

Presentacion internet
Presentacion internetPresentacion internet
Presentacion internet
 
CoachUp_Deck
CoachUp_Deck CoachUp_Deck
CoachUp_Deck
 
Announcements 12.11.16
Announcements 12.11.16Announcements 12.11.16
Announcements 12.11.16
 
Expresión oral
Expresión oralExpresión oral
Expresión oral
 
Khaled Mahfouz
Khaled MahfouzKhaled Mahfouz
Khaled Mahfouz
 
2017APPT_Brochure_en_1207_final
2017APPT_Brochure_en_1207_final2017APPT_Brochure_en_1207_final
2017APPT_Brochure_en_1207_final
 

Similar to Iain YoungCV

James King CV 2016
James King CV 2016James King CV 2016
James King CV 2016
James King
 
EngineerYourCareer_215
EngineerYourCareer_215EngineerYourCareer_215
EngineerYourCareer_215
Lauren Collins
 
Jason Cherry resume
Jason Cherry resumeJason Cherry resume
Jason Cherry resume
Jason Cherry
 
Amit Hankare CV Sept 16
Amit Hankare CV Sept 16Amit Hankare CV Sept 16
Amit Hankare CV Sept 16
Amit Hankare
 
Lee Smith CV 16
Lee Smith CV 16Lee Smith CV 16
Lee Smith CV 16
Lee Smith
 
Duncan Bews Nov15
Duncan Bews Nov15Duncan Bews Nov15
Duncan Bews Nov15
Duncan Bews
 
Lee Jull CV
Lee Jull CVLee Jull CV
Lee Jull CV
Lee Jull
 
Shafeeque Ali Resume planning
Shafeeque Ali Resume planningShafeeque Ali Resume planning
Shafeeque Ali Resume planning
shafeeque ali
 
Construction Operations Training - Work Club
Construction Operations Training - Work ClubConstruction Operations Training - Work Club
Construction Operations Training - Work Club
The Pathway Group
 

Similar to Iain YoungCV (20)

Resume
ResumeResume
Resume
 
Resume.
Resume.Resume.
Resume.
 
James King CV 2016
James King CV 2016James King CV 2016
James King CV 2016
 
VICTOR CV-LINK
VICTOR CV-LINKVICTOR CV-LINK
VICTOR CV-LINK
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
OFFICIAL CV
OFFICIAL CVOFFICIAL CV
OFFICIAL CV
 
Vishnu Charan Resume
Vishnu Charan ResumeVishnu Charan Resume
Vishnu Charan Resume
 
EngineerYourCareer_215
EngineerYourCareer_215EngineerYourCareer_215
EngineerYourCareer_215
 
John axon cv 2016
John axon cv 2016John axon cv 2016
John axon cv 2016
 
Jason Cherry resume
Jason Cherry resumeJason Cherry resume
Jason Cherry resume
 
Amit Hankare CV Sept 16
Amit Hankare CV Sept 16Amit Hankare CV Sept 16
Amit Hankare CV Sept 16
 
Lee Smith CV 16
Lee Smith CV 16Lee Smith CV 16
Lee Smith CV 16
 
Puratchi Resume - PMO
Puratchi Resume - PMOPuratchi Resume - PMO
Puratchi Resume - PMO
 
CV_Gagan
CV_GaganCV_Gagan
CV_Gagan
 
CV_Gagan
CV_GaganCV_Gagan
CV_Gagan
 
Duncan Bews Nov15
Duncan Bews Nov15Duncan Bews Nov15
Duncan Bews Nov15
 
Lee Jull CV
Lee Jull CVLee Jull CV
Lee Jull CV
 
Shafeeque Ali Resume planning
Shafeeque Ali Resume planningShafeeque Ali Resume planning
Shafeeque Ali Resume planning
 
CV 03.03.16
CV 03.03.16CV 03.03.16
CV 03.03.16
 
Construction Operations Training - Work Club
Construction Operations Training - Work ClubConstruction Operations Training - Work Club
Construction Operations Training - Work Club
 

Iain YoungCV

  • 1. Iain Young 4 School Road Symington Biggar ML12 6LT Phone : 07515381344 Email : youngiain258@gmail.com Introduction I have recently completed an HND in Electrical Engineering with an A grade and after being out of the education system for several years, I can say that I am self-motivated, driven person who can adapt well to many different situations. I am currently looking for a new role to allow me to utilise my newly earned HND and am very interested in being involved in the design side of Electrical Engineering as I am eager to learn as much as I possibly can in this field. I am an individual who takes great pride in their work and always tries as hard as I can too make sure that the quality of my work is to the highest standard possible. I also have excellent communication and problem solving skills with a good IT understanding and am comfortable with all Microsoft office programmes. I enjoy working as part of a dedicated team and I am looking to join a company that rewards hard work, dedication and can help me develop my knowledge as much as possible. Current Employment After finishing college I decided that I needed to gain some on-site experience and through contacts got a two week work experience place, in August, with SES Engineering Services working on their new Macallan Distillery project. This was a great experience as the project is massive and has many industry leading contractors all working to an extremely high standard. This gave me a great insight into how projects are managed and all the different aspects that need to be considered in the construction industry. After the two weeks were finished I was offered a role helping out with the administrative duties as the team needed help and I had shown enough skill that they felt I had something to offer in this aspect. I have been working with them since. In this role I have been helping with a great number of different tasks. Such roles include; drawing control, where I was in charge of printing and storing all drawings and making sure our own drawing register was up to date with the most recent revisions. I spent a lot of time setting up and helping to fill in a Commissioning dossier, where I had to get all the commissioning method statements and risk assessments from all the sub-contractors that SES use for the different works needing done for the project. This entailed contacting the contractors and ensuring that the information that was sent was relevant and properly filed both with hard and soft copies. Another task that I was put in charge of was issuing Request for Actions, which are any jobs needing completed by the main contractor as requested by any member of the SES team, I also would check around site to see if these tasks were being completed. I helped out with the fortnightly progress report, making sure that all relevant documents were up to date and in place and showing where progress was made by photographs taken round the site. The project had many variances between the tendered and construction stages and I helped the team by marking these down in spreadsheets I made up myself, which were sent to the Quantity Surveyor to be checked and put in the system. I have gained a lot of knowledge from this project and have enjoyed doing something that definitely took me out of my comfort zone.
  • 2. Education College; HND Electrical Engineering, 1st year completed with a high band B in my graded unit 2nd year Graded unit I designed and built a control unit for a music system that raises and lowers the volume of music depending on background noise, for which I got an A University; Completed two years of Music Technology at the University of the West of Scotland, Paisley Highers; Music B; Physics C; Maths C; English D; I.T; D Skill Technical Knowledge; Throughout college I have studied and passed a wide range of technical subjects including; Three Phase Systems; Working with balanced and unbalanced loads; star and delta configurations; all relevant formula for working out line and phase voltages and currents and how to get good efficiency Electrical Installation Design; Designing and planning electrical installations including working out cable calculations and using the IET wiring regulations set out in BS7671:2008 17th edition. Switchgear and Protective Devices; Where they are situated in a power network, different types of circuit breakers, high voltage fuses, switches and isolators; how they work and why they are needed. Electrical Safety; Good safe practices, rules and regulations Adaptability; Over the years I have had to complete tasks out with my comfort zone, to allow for the smooth running of the business and make sure assigned tasks were completed. Problem Solving; Every module that I have passed at college has had a degree of problem solving that I enjoyed completing. These ranged from many different types of calculations to report writing. Customer Service; In a front facing customer service role excellent communication skills, both verbal and written were essential. I am an integral part of a team that for the p ast four years has been awarded a Certificate of Excellence for consistently scoring 4.5 out of 5 in customer service but am capable of working alone to achieve set targets. Working to Targets; As supervisor I was given weekly targets to meet that I achieved by up selling products, giving good service and maintaining the necessary documentation. I was responsible for leading the team when required as well as maintaining adequate stock levels which meant having to prioritise my work load and that of the team. Work History
  • 3. M & E Site Assistant 09/2016 to present SES Engineering – New Macallan Distillery, Craigellachie Learning as much as I can from the experienced management and staff Documentation control Liaising with sub-contractors Communicating between Client, Architect and Project Management Ordering office materials Marking variances between tendered and construction stages Bar Supervisor, 01/2011 to 09/2016 The Crown Inn – Biggar Stepping up in the absence of management Leading and Working as part of a team Staff Representative Problem Solving; Such as fixing broken taps Dealing with Customers; Complaints and antisocial behaviour Stock Taking and Ordering Organising Rotas Bar Associate, 09/2007 to 04/2010 Wetherspoons; The Last Post – Paisley Working as part of a team Up- keeping the cleanliness of bar Serving the public. Driving Licence – Full and clean References Matt McKean; Pub Manager; The Crown Inn, Biggar ML12 6DL, 01899220116 Stuart Logan; Curriculum Head – Engineering & Energy; City of Glasgow College; stuart.logan@cityofglasgowcollege.ac.uk Colin Paterson; Senior Project Manager; SES Engineering Services; Cpaterson@ses-ltd.co.uk