This document summarizes the traffic control plan for a construction project on I-40 from west of US 21 to east of I-77 in Statesville. It outlines that minimum two lanes will remain open in each direction on affected routes. It details several road and ramp closures and detours necessitated by the project. Lane closure times are specified by route. Median crossover and holiday restrictions are also provided. Contractors can stop traffic for up to 30 minutes outside of restricted times to facilitate work operations.