I was selected as the Project Architect to design the new 48 bed Juvenile Detention Facility for
Greenville County. My involvement included:
- Site analysis and development of conceptual massing studies to maximize the usable space on
the sloping site.
- Programming and confirmation of regulatory requirements with State Officials.
- Development of Schematic Design including floor plans, elevations, sections and 3D renderings.
- Coordination with Structural, MEP and Security Consultants.
- Presentation of Schematic Design to County Officials and State Regulators.
- Development of Design Development Documents.
- Construction Cost Estimating.
- Bidding and Construction Administration