HVAC Systems – Understanding
HVAC Systems – Understanding
the basis
the basis
Table of Contents
Table of Contents
1.
1. Introduction to HVAC Systems
Introduction to HVAC Systems
2.
2. HVAC System Types
HVAC System Types
3.
3. HVAC Piping System
HVAC Piping System
4.
4. HVAC Air Distribution Equipments
HVAC Air Distribution Equipments
5.
5. Fans and Pumps
Fans and Pumps
6.
6. HVAC Instrumentation and Control
HVAC Instrumentation and Control
7.
7. HVAC System Commissioning
HVAC System Commissioning
Introduction to HVAC Systems
Introduction to HVAC Systems
 This article introduces the heating, ventilating and air-conditioning
This article introduces the heating, ventilating and air-conditioning
(HVAC) systems. The primary function of HVAC systems is to provide
(HVAC) systems. The primary function of HVAC systems is to provide
healthy and comfortable interior conditions for occupants; well-
healthy and comfortable interior conditions for occupants; well-
designed, efficient systems do this with minimal non-renewable
designed, efficient systems do this with minimal non-renewable
energy and air, and water pollutant emissions.
energy and air, and water pollutant emissions.
Introduction to HVAC Systems
Introduction to HVAC Systems
 The purpose of
The purpose of HVAC design
HVAC design is both high indoor air quality and energy
is both high indoor air quality and energy
efficiency. These dual considerations require an integrated design
efficiency. These dual considerations require an integrated design
approach. Rigs heating,
approach. Rigs heating,
ventilation, and air conditioning
ventilation, and air conditioning
system (HVAC) creates a climate
system (HVAC) creates a climate
that allows for maximum comfort by
that allows for maximum comfort by
compensating for changing climatic
compensating for changing climatic
conditions.
conditions.
 Though more costly to install and more complicated to operate, a chiller plant
Though more costly to install and more complicated to operate, a chiller plant
offers a number of benefits over a large number of individual packaged
offers a number of benefits over a large number of individual packaged
cooling units, including greater energy efficiency, better controllability,
cooling units, including greater energy efficiency, better controllability,
cheaper overall maintenance, and longer life. Using a comprehensive
cheaper overall maintenance, and longer life. Using a comprehensive
approach to building design, designers around the world have succeeded at
approach to building design, designers around the world have succeeded at
creating highly efficient air-conditioning systems that provide excellent
creating highly efficient air-conditioning systems that provide excellent
comfort at significant savings.
comfort at significant savings.
Introduction to HVAC Systems
Introduction to HVAC Systems
 Heating, ventilating and air-
Heating, ventilating and air-
conditioning (HVAC) systems
conditioning (HVAC) systems
reduce the environmental
reduce the environmental
impact of rigs/buildings in several
impact of rigs/buildings in several
key ways. The most important
key ways. The most important
function of a HVAC systems is
function of a HVAC systems is
to provide the rig/buildings occupants
to provide the rig/buildings occupants
with healthy and comfortable interior
with healthy and comfortable interior
conditions. A carefully designed, efficient
conditions. A carefully designed, efficient
system can do this with minimal non-
system can do this with minimal non-
renewable energy and air and water pollutant emissions to minimize the
renewable energy and air and water pollutant emissions to minimize the
environmental impact.
environmental impact.
Cooling equipment that avoids chlorofluorocarbons and hydro-
Cooling equipment that avoids chlorofluorocarbons and hydro-
chlorofluorocarbons (CFCs and HCFCs) eliminates a major cause of
chlorofluorocarbons (CFCs and HCFCs) eliminates a major cause of
damage to the ozone layer.
damage to the ozone layer.
Introduction to HVAC Systems
Introduction to HVAC Systems
 Even the best HVAC equipment and systems cannot compensate for a
Even the best HVAC equipment and systems cannot compensate for a
faulty rig design. Problems of this type cause inherently high cooling and
faulty rig design. Problems of this type cause inherently high cooling and
heating needs and consume unnecessary resources and should be
heating needs and consume unnecessary resources and should be
corrected if possible. Conservation of non-renewable energy through an
corrected if possible. Conservation of non-renewable energy through an
intelligent architectural design offers the greatest opportunity for savings.
intelligent architectural design offers the greatest opportunity for savings.
The most important factors in these designs are careful control of solar gain,
The most important factors in these designs are careful control of solar gain,
while taking advantage of passive heating, daylighting, natural ventilation
while taking advantage of passive heating, daylighting, natural ventilation
and cooling. The critical factors in mechanical systems' energy consumption
and cooling. The critical factors in mechanical systems' energy consumption
- and capital cost - are reducing the cooling and heating loads they must
- and capital cost - are reducing the cooling and heating loads they must
handle.
handle.
HVAC System Types
HVAC System Types
 Types of System Designs - There are several major heating, ventilating, and air
Types of System Designs - There are several major heating, ventilating, and air
conditioning system types in wide spread use today. These are air systems, hydronic
conditioning system types in wide spread use today. These are air systems, hydronic
and steam systems, and unitary type systems. Most systems in use today fall into one of
and steam systems, and unitary type systems. Most systems in use today fall into one of
these categories, or are a combination or variation of them. Each type of system has
these categories, or are a combination or variation of them. Each type of system has
advantages and disadvantages.
advantages and disadvantages.
 Air cooled
Air cooled
-
- Air cooled
Air cooled Chillers
Chillers
 Air Cooled Chiller Advantages
Air Cooled Chiller Advantages
• Lower installed cost
Lower installed cost
• Quicker availability
Quicker availability
• No cooling tower or condenser pump required
No cooling tower or condenser pump required
• Less maintenance
Less maintenance
• No mechanical room required
No mechanical room required
 Water Cooled
Water Cooled
- Sea Water cooled Chillers
- Sea Water cooled Chillers
- Fresh Water cooled Chillers
- Fresh Water cooled Chillers
 Water-Cooled Chiller advantages
Water-Cooled Chiller advantages
• Higher efficiency
Higher efficiency
• Custom selection in larger sizes
Custom selection in larger sizes
• Large tonnage capabilities
Large tonnage capabilities
• Indoor Chiller location
Indoor Chiller location
• Longer life
Longer life
Purpose of an air handling system
Purpose of an air handling system
Air Handling
System
Room
With
Defined
Requirements
Supply
Air
Outlet
Air
Air Handling Systems
Objectives
In the following slides, we will study the components of
air handling systems in order to:
1. Become familiar with the components
2. Know their functions
3. Become aware of possible problems
+
Room/Cabin
Exhaust air treatment
Central air handling unit
Terminal air treatment
at production room level
Fresh air treatment
(make-up air)
Main subsystems
Filter
Silence
r
Terminal filter
Weather louvre Control damper
Fan
Flow rate controller
Humidifier
Heating
coil
Cooling
coil
with
droplet
separator
Production Room
Overview components
+
Prefilter
Exhaust Air Grille
Heater
Secondary Filter
Re-circulated
air
 Weather
Weather
louvre
louvre
 Silencer
Silencer
 Flow rate
Flow rate
controller
controller
 Control
Control
damper
damper
 To prevent insects, leaves,
To prevent insects, leaves,
dirt
dirt and rain
and rain from entering
from entering
 To reduce noise caused by air
To reduce noise caused by air
circulation
circulation
 Automated adjustment of
Automated adjustment of
volume of air (night and day,
volume of air (night and day,
pressure control)
pressure control)
 Fixed adjustment of volume
Fixed adjustment of volume
of air
of air
Components (1)
 Heating unit
Heating unit
Cooling unit
Cooling unit
/dehumidifier
/dehumidifier
Humidifier
Humidifier
Filters
Filters
Ducts
Ducts
 To
To heat
heat the air to the proper
the air to the proper
temperature
temperature
 To
To cool
cool the air to the
the air to the required
required
temperature
temperature or to remove moisture
or to remove moisture
from the air
from the air
 To bring the air to the proper
To bring the air to the proper
humidity, if too low
humidity, if too low
 To eliminate particles of pre-
To eliminate particles of pre-
determined dimensions and/or
determined dimensions and/or
micro-organisms
micro-organisms
 To transport the air
To transport the air
Components (2)
+
Production Room
Exhaust
air
Return air
(re-circulated)
Fresh air
(make-up air)
Supply
air
Air types
Filter classes
Filter classes
Dust filters
Standard Aerosol
Fine
Coarse ULPA
HEPA
10 µ m > Dp > 1 µ m
Dp > 10 µ m Dp < 1 µ m
F5 - F9
G1 - G4 U 14- 17
H 11 - 13
EN 1822 Standard
EN 779 Standard
Primary panel
Primary panel
filter
filter
Secondary
Secondary
filter
filter
HEPA or tertiaary filter
Duct heaters
Duct heaters Room Heters
Room Heters
Silensers
Silensers
Volume control damper
Volume control damper
De-humidification
Filter Pressure
Gauges
AHU with fan
Variable Speed
Controller
Humid room air
Air heater
Regeneration air
Humid room air
Adsorber wheel Dry air
Fire
Fire Dampers
Dampers
Annex 1, 17.26
Regulation of room pressure
Regulation of room pressure – pressure
– pressure
differentials concept
differentials concept
Room pressure
gauges
Room pressure indication panel
Pressure cascade injectables
Pressure cascade injectables
P
Protection from micro-organisms and
rotection from micro-organisms and
particles
particles
N o te : D ir e c t io n o f d o o r o p e n in g r e la t iv e to r o o m p r e s s u r e
1 5 P a
0 P a
A ir
L o c k
3 0 P a P a s s a g e
D
C
A
B
D
L F
A ir L o c k
A ir L o c k
4 5 P a
R o o m 3
R o o m 2
R o o m 1
4 5 P a
6 0 P a
3 0 P a
Pressure cascade solids
Protection from cross-contamination
Note:Directionofdooropeningrelativetoroompressure 15Pa
15Pa
15P aE
30PaPassage 0PaAirLock
Room3
Room2Room115Pa
AirLockAirLock
N o t e : D i r e c t i o n o f d o o r o p e n i n g r e l a t i v e t o r o o m p r e s s u r e
1 5 Pa
1 5 Pa
1 5 Pa
E
3 0 Pa
P a s s a g e
0 Pa
A ir
L o c k
R o o m 3
R o o m 2
R o o m 1
1 5 Pa
A ir L o c k
A ir L o c k
Fan Coil Unit
Fan Coil Unit
Self Contain Unit
Self Contain Unit
HVAC Air Distribution Equipments
HVAC Air Distribution Equipments
 Diffusers
Diffusers
4 Way Diffusers
4 Way Diffusers Two Way Diffusers One Way Diffuser
Two Way Diffusers One Way Diffuser
Round Diffusers
Round Diffusers
Cabin Units
Cabin Units
 Return / Exhaust Grilles
Return / Exhaust Grilles
Contents
Contents
 Fan Design
Fan Design
 Fan Performance
Fan Performance
 Fan-duct Systems
Fan-duct Systems
 Duct Construction
Duct Construction
 Air Duct Design
Air Duct Design
Fans and Pumps
Fan Design
Fan Design
 Common types of fans
Common types of fans

Centrifugal fans
Centrifugal fans: radial, forward curved, air
: radial, forward curved, air
foil (backward curved), backward inclined,
foil (backward curved), backward inclined,
tubular, roof ventilator
tubular, roof ventilator

Axial fans
Axial fans: propeller, tube-axial, vane-axial
: propeller, tube-axial, vane-axial
 Fan arrangements
Fan arrangements

Motor location, air discharge orientation, drive
Motor location, air discharge orientation, drive
train type (direct drive or pulley drive)
train type (direct drive or pulley drive)

Centrifugal: single width single inlet (SWSI),
Centrifugal: single width single inlet (SWSI),
double width double inlet (DWDI)
double width double inlet (DWDI)
Centrifugal and axial fan components
AXIAL FANS
CENTRIFUGAL FANS
Propeller Tube-axial
Tube-vane
AXIAL FANS
Tubular centrifugal fan Centrifugal roof ventilator
CENTRIFUGAL FANS
(* Note the airflow paths and impeller design.)
Drive arrangements and motor positions
Single- and double-width centrifugal fans
Fan Performance
Fan Performance
 Major parameters
Major parameters
 Fan volume flow rate (m
Fan volume flow rate (m3
3
/s or l/s),
/s or l/s), V
Vf
f
 Fan total pressure
Fan total pressure Δ
Δp
ptf
tf, fan velocity pressure
, fan velocity pressure
p
pvf
vf & fan static pressure
& fan static pressure Δ
Δp
psf
sf (Pa)
(Pa)

Fan power & efficiency
Fan power & efficiency
• Fan power or air power (W) =
Fan power or air power (W) = Δ
Δp
ptf
tf x
x V
Vf
f
• Fan power input on the fan shaft (brake
Fan power input on the fan shaft (brake
horsepower),
horsepower), P
Pf
f
• Fan total efficiency:
Fan total efficiency: η
ηt
t =
= Δ
Δp
ptf
tf x
x V
Vf
f /
/ P
Pf
f

Combined aerodynamic, volumetric & mechanical
Combined aerodynamic, volumetric & mechanical
efficiencies
efficiencies
• Fan static efficiency:
Fan static efficiency: η
ηs
s =
= Δ
Δp
psf
sf x
x V
Vf
f /
/ P
Pf
f
• Air temp. increase through fan,
Air temp. increase through fan, Δ
ΔT
T =
= Δ
Δp
p /(
/(ρ
ρc
c η
η)
)
Fan performance curves
Total pressure
Static pressure
Fan total efficiency
Fan static efficiency
Fan power input
Velocity pressure
Volume flow rate
Typical fan performance curve
Fan Performance
Fan Performance
 Fan Laws
Fan Laws

Speed (
Speed (n
n)
)

Volume flow (
Volume flow (V
V)
)

Total pressure loss
Total pressure loss
(
(Δ
Δp
p )
)

Air density (
Air density (ρ
ρ)
)

For air systems that
For air systems that
are geometrically &
are geometrically &
dynamically similar:
dynamically similar:
(D = impeller
(D = impeller
diameter)
diameter)
 c.f.: pump laws
c.f.: pump laws
Velocity triangle at the blade inlet and outlet of a centrifugal fan
CENTRIFUGAL FANS
Fan Performance
Fan Performance
 Major issues causing energy losses to a
Major issues causing energy losses to a
centrifugal fan:
centrifugal fan:

Circulatory flow between the blades
Circulatory flow between the blades

Air leakage at the inlet
Air leakage at the inlet

Friction between fluid particles and the blade
Friction between fluid particles and the blade

Energy loss at the entrance
Energy loss at the entrance

Partially filled passage
Partially filled passage
Operating characteristics for a backward-curved centrifugal fan
Total efficiency
curves for
centrifugal fans
Fan power curves for centrifugal fans with same impeller diameter
Fan pressure curves for centrifugal fans with same impeller diameter
Velocity triangles for a vane-axial fan
AXIAL FANS
Fan pressure curves for axial fans with same impeller diameter
Fan efficiency curves for axial fans with same impeller diameter
Fan power curves for axial fans with same impeller diameter
Performance
curves for
controllable-
pitch vane-axial
fans
Fan-duct Systems
Fan-duct Systems
 Duct pressure changes (c.f. atm
Duct pressure changes (c.f. atm
pressure)
pressure)

Static pressure (SP)
Static pressure (SP)

Velocity pressure (VP) =
Velocity pressure (VP) = ρ
ρV
V2
2
/ 2 g
/ 2 g

Total pressure (TP) = SP + VP
Total pressure (TP) = SP + VP
 Fan: a pumping device
Fan: a pumping device

Fan (total) pressure = pressure difference
Fan (total) pressure = pressure difference
between fan inlet and fan discharge
between fan inlet and fan discharge

At fan suction/inlet, SP = negative (c.f.
At fan suction/inlet, SP = negative (c.f.
atmospheric); at discharge, SP = positive
atmospheric); at discharge, SP = positive
Fan-duct Systems
Fan-duct Systems
 Pressure characteristics
Pressure characteristics

SP and VP are mutually convertible (↑or↓)
SP and VP are mutually convertible (↑or↓)

TP always decreases in the direction of
TP always decreases in the direction of
airflow
airflow

For constant-area straight duct sections
For constant-area straight duct sections
• Velocity and VP are constant
Velocity and VP are constant
• TP change = SP change
TP change = SP change

When duct cross-sectional areas are reduced
When duct cross-sectional areas are reduced
• Velocity and VP increase
Velocity and VP increase
• Absolute value of both TP and SP decrease
Absolute value of both TP and SP decrease
• Dynamic losses from elbow, dampers, etc.
Dynamic losses from elbow, dampers, etc.
Fan-duct Systems
Fan-duct Systems
 Fan-duct systems
Fan-duct systems

Flow resistance
Flow resistance R
R, pressure drop
, pressure drop Δ
Δp
p and
and
volume flow rate
volume flow rate V
V

Duct sections in series:
Duct sections in series:

Duct sections in parallel:
Duct sections in parallel:
2
V
R
p 
⋅
=
∆
o
n
s R
R
R
R +
+
+
= 
2
1
n
p R
R
R
R
1
1
1
1
2
1
+
+
+
= 
Fan-duct Systems
Fan-duct Systems
 Fan-duct systems
Fan-duct systems

Terminology
Terminology
• Primary air (conditioned air or makeup air)
Primary air (conditioned air or makeup air)
• Secondary air (induced space air, plenum air, or
Secondary air (induced space air, plenum air, or
recirculating air)
recirculating air)
• Transfer air (indoor air that moves from an
Transfer air (indoor air that moves from an
adjacent area)
adjacent area)

System curve: volume flow vs pressure loss
System curve: volume flow vs pressure loss

System operating point
System operating point
Fan-duct Systems
Fan-duct Systems
 System effect
System effect Δ
Δp
pts
ts

Its additional total pressure loss caused by
Its additional total pressure loss caused by
uneven or non-uniform velocity profile at the
uneven or non-uniform velocity profile at the
fan inlet, or at duct fittings after fan outlet
fan inlet, or at duct fittings after fan outlet

Due to the actual inlet and outlet connections
Due to the actual inlet and outlet connections
as compared with the total pressure loss of the
as compared with the total pressure loss of the
fan test unit during laboratory ratings
fan test unit during laboratory ratings
Inlet Outlet
Fan system operating point & system effect
Fan-duct Systems
Fan-duct Systems
 Modulation of air systems
Modulation of air systems

Constant volume system
Constant volume system
• Volume flow rate remains constant
Volume flow rate remains constant
• Supply temperature is raised during part load
Supply temperature is raised during part load

Variable-air-volume (VAV) system
Variable-air-volume (VAV) system
• Volume flow rate is reduced to match part load
Volume flow rate is reduced to match part load
operation
operation
• Modulation curve
Modulation curve
Fan modulation curve
Fan-duct Systems
Fan-duct Systems
 Fan modulation methods
Fan modulation methods

Damper
Damper (vary the opening of the air flow
(vary the opening of the air flow
passage)
passage)
• Waste energy
Waste energy

Inlet vanes
Inlet vanes (opening & angle of inlet vanes)
(opening & angle of inlet vanes)
• Low cost; less efficient than following types
Low cost; less efficient than following types

Inlet cone
Inlet cone (peripheral area of fan impeller)
(peripheral area of fan impeller)
• Inexpensive; for backward curved centrifugal fan
Inexpensive; for backward curved centrifugal fan

Blade pitch
Blade pitch (blade angle of axial fan)
(blade angle of axial fan)

Fan speed
Fan speed (using adjustable frequency
(using adjustable frequency
drives)
drives)
• Most energy-efficient; but usually cost more
Most energy-efficient; but usually cost more
Damper, inlet vanes & fan speed modulation
Inlet vane
modulation
Fan speed
modulation using
AC inverter
Fan-duct Systems
Fan-duct Systems
 Fan surge
Fan surge (in centrifugal fan)
(in centrifugal fan)

Occurs when air volume flow is not sufficient to
Occurs when air volume flow is not sufficient to
sustain the static pressure difference between
sustain the static pressure difference between
discharge & suction
discharge & suction
• Discharge pressure is reduced momentarily
Discharge pressure is reduced momentarily
• Volume flow & pressure fluctuations
Volume flow & pressure fluctuations
• Create noise & vibration
Create noise & vibration

Surge region: shall avoid operation in it
Surge region: shall avoid operation in it
 Fan stall
Fan stall (in axial fans)
(in axial fans)

When smooth air flow suddenly breaks & pressure
When smooth air flow suddenly breaks & pressure
difference across the blades decreases
difference across the blades decreases

The fan loses pressure capability drastically
The fan loses pressure capability drastically
Stall and stall region of an axial fan
Fan-duct Systems
Fan-duct Systems
 Fan selection
Fan selection

Select fan type + determine fan size
Select fan type + determine fan size

Important factors:
Important factors:
• Pressure-volume flow operating characteristics
Pressure-volume flow operating characteristics
• Fan capacity modulation
Fan capacity modulation
• Fan efficiency
Fan efficiency
• Sound power level
Sound power level
• Airflow direction
Airflow direction
• Initial cost
Initial cost
Duct Construction
Duct Construction
 Types of air duct
Types of air duct

Supply air duct
Supply air duct

Return air duct
Return air duct

Outdoor air duct
Outdoor air duct

Exhaust air
Exhaust air
 Duct sections
Duct sections

Header or main duct (trunk)
Header or main duct (trunk)

Branch duct or runout
Branch duct or runout
Duct Construction
Duct Construction
 Duct systems
Duct systems

Max. pressure difference (between air inside
Max. pressure difference (between air inside
the duct and the ambient air)
the duct and the ambient air)
• 125, 250, 500, 750, 1000, 1500, 2500 Pa
125, 250, 500, 750, 1000, 1500, 2500 Pa

Commercial buildings
Commercial buildings
• Low-pressure duct system: ≤ 500 Pa, max 12 m/s
Low-pressure duct system: ≤ 500 Pa, max 12 m/s
• Medium-pressure system: 500-1500 Pa, max 17.5
Medium-pressure system: 500-1500 Pa, max 17.5
m/s
m/s

Residential buildings: 125 Pa or 250 Pa
Residential buildings: 125 Pa or 250 Pa

Industrial duct system:
Industrial duct system: Δ
ΔP can be higher
P can be higher
Duct Construction
Duct Construction
 Duct material: e.g. UL (Underwriters’
Duct material: e.g. UL (Underwriters’
Laboratory) standard
Laboratory) standard

Class 0: zero flame spread, zero smoke
Class 0: zero flame spread, zero smoke
developed
developed
• Iron, galvanized steel, aluminum, concrete,
Iron, galvanized steel, aluminum, concrete,
masonry, clay tile
masonry, clay tile

Class 1: flame spread ≤ 25, smoke
Class 1: flame spread ≤ 25, smoke
developed ≤ 50
developed ≤ 50
• Fiberglass, many flexible ducts
Fiberglass, many flexible ducts

Class 2: flame spread ≤ 50, smoke
Class 2: flame spread ≤ 50, smoke
developed ≤ 100
developed ≤ 100
Duct Construction
Duct Construction
 Shapes of air duct
Shapes of air duct

Rectangular
Rectangular
• More easily fabricated on site, air leakage
More easily fabricated on site, air leakage

Round
Round
• Less fluid resistance, better rigidity/strength
Less fluid resistance, better rigidity/strength

Flat oval
Flat oval

Flexible
Flexible
• Multiple-ply polyester film w/ metal wire or strips
Multiple-ply polyester film w/ metal wire or strips
 SMACNA (Sheet Metal and Air
SMACNA (Sheet Metal and Air
Conditioning Contractors’ National
Conditioning Contractors’ National
Association) standards
Association) standards
Rectangular duct Round duct w/ spiral seam
Flat oval duct Flexible duct
(Source: Wang, S. K., 2001. Handbook of Air Conditioning and Refrigeration)
Transverse joint reinforcement
(Source: Wang, S. K., 2001. Handbook of Air Conditioning and Refrigeration)
Duct Construction
Duct Construction
 Duct specification
Duct specification

Sheet gauge and thickness of duct material
Sheet gauge and thickness of duct material

Traverse joints & longitudinal seam
Traverse joints & longitudinal seam
reinforcements
reinforcements

Duct hangers & their spacing
Duct hangers & their spacing

Tapes & adhesive closures
Tapes & adhesive closures

Fire spread and smoke developed
Fire spread and smoke developed

Site-fabricated or factory-/pre-fabricated
Site-fabricated or factory-/pre-fabricated
Duct Construction
Duct Construction
 Duct heat gain or loss
Duct heat gain or loss

Temperature rise or drop
Temperature rise or drop

Duct insulation (mounted or inner-lined)
Duct insulation (mounted or inner-lined)
• Reduce heat gain/loss, prevent condensation,
Reduce heat gain/loss, prevent condensation,
sound attentuation
sound attentuation
• Minimum & recommended thickness
Minimum & recommended thickness

See ASHRAE standard or local codes
See ASHRAE standard or local codes

Temperature rise curves
Temperature rise curves
• Depends on air velocity, duct dimensions &
Depends on air velocity, duct dimensions &
insulation
insulation
Temperature rise from duct heat gain
(Source: Wang, S. K., 2001. Handbook of Air Conditioning and Refrigeration)
Duct Construction
Duct Construction
 Frictional losses
Frictional losses

Darcey-Weisbach Equation
Darcey-Weisbach Equation
• H
Hf
f = friction head loss, or
= friction head loss, or Δ
Δp
pf
f = pressure loss
= pressure loss
• f
f = friction factor (dimensionless)
= friction factor (dimensionless)
• L
L = length of duct or pipe (m)
= length of duct or pipe (m)
• D
D = diameter of duct or pipe (m)
= diameter of duct or pipe (m)
• v
v = mean air velocity in duct (m/s)
= mean air velocity in duct (m/s)
Mode of airflow when air passes over and around
surface protuberances of the duct wall
δ >ε
δ <ε
Duct Construction
Duct Construction
 Duct friction chart
Duct friction chart

Colebrook formula
Colebrook formula
 Roughness & temperature corrections
Roughness & temperature corrections
 Δ
Δp
pf
f =
= K
Ksr
sr K
KT
T K
Kel
elΔ
Δp
pf,c
f,c
• K
Ksr
sr = correction factor for surface roughness
= correction factor for surface roughness
• K
KT
T = correction factor for air temperature
= correction factor for air temperature
• K
Kel
el = correction factor for elevation
= correction factor for elevation
Friction chart for round duct
Duct Construction
Duct Construction
 Circular equivalent
Circular equivalent
 Hydraulic diameter,
Hydraulic diameter, D
Dh
h = 4
= 4 A
A /
/ P
P
• A
A = area (mm
= area (mm2
2
);
); P
P = perimeter (mm)
= perimeter (mm)

Rectangular duct:
Rectangular duct:

Flat oval duct:
Flat oval duct:
Duct Construction
Duct Construction
 Dynamic losses
Dynamic losses

Result from flow disturbances caused by duct-
Result from flow disturbances caused by duct-
mounted equipment and fittings
mounted equipment and fittings
• Change airflow path’s direction and/or area
Change airflow path’s direction and/or area
• Flow separation & eddies/disturbances
Flow separation & eddies/disturbances

In dynamic similarity (same Reynolds number
In dynamic similarity (same Reynolds number
& geometrically similar duct fittings), dynamic
& geometrically similar duct fittings), dynamic
loss is proportional to their velocity pressure
loss is proportional to their velocity pressure
Duct Construction
Duct Construction
 Local or dynamic loss coefficient
Local or dynamic loss coefficient

Ratio of total pressure loss to velocity
Ratio of total pressure loss to velocity
pressure
pressure
Duct Construction
Duct Construction
 Duct fittings
Duct fittings

Elbows
Elbows

Converging or diverging tees and wyes
Converging or diverging tees and wyes

Entrances and exits
Entrances and exits

Enlargements and contractions
Enlargements and contractions
 Means to reduce dynamic losses
Means to reduce dynamic losses

Turning angle, splitter vanes
Turning angle, splitter vanes
 ASHRAE duct fitting database
ASHRAE duct fitting database

Fitting loss coefficients
Fitting loss coefficients
Region of eddies and
turbulences in a round elbow 5-piece 90o
round elbow
Rectangular elbow, smooth radius, 2 splitter vanes
Mitered elbow and its secondary flow
Airflow through a
rectangular converging
or diverging wye
Entrance Exit
Abrupt enlargement Sudden contraction
Duct Construction
Duct Construction
 Flow resistance,
Flow resistance, R
R
 Total pressure loss
Total pressure loss Δ
Δp
pt
t at a specific volume flow
at a specific volume flow
rate
rate V
V

Flow resistance in series:
Flow resistance in series:

Flow resistance in parallel:
Flow resistance in parallel:
2
V
R
pt

⋅
=
∆
n
s R
R
R
R +
+
+
= 
2
1
n
p R
R
R
R
1
1
1
1
2
1
+
+
+
= 
Total pressure loss and flow resistance of a round duct section
Flow resistance in series
Flow resistance in parallel
Flow resistance for a Y connection
Air Duct Design
Air Duct Design
 Optimal air duct design
Optimal air duct design

Optimal duct system layout, space available
Optimal duct system layout, space available

Satisfactory system balance
Satisfactory system balance

Acceptable sound level
Acceptable sound level

Optimum energy loss and initial cost
Optimum energy loss and initial cost

Install only necessary balancing devices
Install only necessary balancing devices
(dampers)
(dampers)

Fire codes, duct construction & insulation
Fire codes, duct construction & insulation
 Require comprehensive analysis & care for
Require comprehensive analysis & care for
different transport functions
different transport functions
Flow characteristics of a supply duct system
Air Duct Design
Air Duct Design
 Design velocity
Design velocity

Constraints: space available, beam depth
Constraints: space available, beam depth

Typical guidelines:
Typical guidelines:
• Main ducts: air flow usually ≤ 15 m/s; air flow noise
Main ducts: air flow usually ≤ 15 m/s; air flow noise
must be checked
must be checked
• With more demanding noise criteria (e.g. hotels),
With more demanding noise criteria (e.g. hotels),
max. air velocity: main duct ≤ 10-12.5 m/s, return
max. air velocity: main duct ≤ 10-12.5 m/s, return
main duct ≤ 8 m/s, branch ducts ≤ 6 m/s
main duct ≤ 8 m/s, branch ducts ≤ 6 m/s

Face velocities for air-handling system
Face velocities for air-handling system
components
components
Air Duct Design
Air Duct Design
 Reduce dynamic losses of the critical path
Reduce dynamic losses of the critical path

Maintain optimum air velocity through duct
Maintain optimum air velocity through duct
fittings
fittings

Emphasize reduction of dynamic losses
Emphasize reduction of dynamic losses
nearer to the fan outlet or inlet (high air
nearer to the fan outlet or inlet (high air
velocity)
velocity)

Proper use of splitter vanes
Proper use of splitter vanes

Set 2 duct fittings as far apart as possible
Set 2 duct fittings as far apart as possible
 Air duct leakage
Air duct leakage

Duct leakage classification
Duct leakage classification
• AISI, SMACNA, ASHRAE standards
AISI, SMACNA, ASHRAE standards
Air Duct Design
Air Duct Design
 Fire protection
Fire protection

Duct material selection
Duct material selection

Vertical ducts (using masonry, concrete or
Vertical ducts (using masonry, concrete or
clay)
clay)

When ducts pass through floors & walls
When ducts pass through floors & walls

Use of fire dampers
Use of fire dampers

Filling the gaps between ducts & bldg
Filling the gaps between ducts & bldg
structure
structure

Duct systems for industrial applications
Duct systems for industrial applications
 Any other fire precautions?
Any other fire precautions?
Air Duct Design
Air Duct Design
 Design procedure (computer-aided or manual)
Design procedure (computer-aided or manual)

Verify local codes & material availability
Verify local codes & material availability

Preliminary duct layout
Preliminary duct layout

Divide into consecutive duct sections
Divide into consecutive duct sections

Minimise local loss coefficients of duct fittings
Minimise local loss coefficients of duct fittings

Select duct sizing methods
Select duct sizing methods

Critical total pressure loss of tentative critical path
Critical total pressure loss of tentative critical path

Size branch ducts & balance total pressure at
Size branch ducts & balance total pressure at
junctions
junctions

Adjust supply flow rates according to duct heat gain
Adjust supply flow rates according to duct heat gain

Resize duct sections, recalculate & balance parallel
Resize duct sections, recalculate & balance parallel
paths
paths

Check sound level & add necessary attenuation
Check sound level & add necessary attenuation
Air Duct Design
Air Duct Design
 Duct layout
Duct layout

Symmetric layout is easier to balance
Symmetric layout is easier to balance
• Smaller main duct & shorter design path
Smaller main duct & shorter design path

For VAV systems, duct looping allows feed
For VAV systems, duct looping allows feed
from opposite direction
from opposite direction
• Optimise transporting capacity (balance points
Optimise transporting capacity (balance points
often follow the sun’s position)
often follow the sun’s position)
• Result in smaller main duct
Result in smaller main duct

Compare alternative layouts & reduce fittings
Compare alternative layouts & reduce fittings

For exposed ducts, appearance & integration
For exposed ducts, appearance & integration
with the structure is important
with the structure is important
Typical supply duct system with symmetric layout & looping
Air Duct Design
Air Duct Design
 Duct liner
Duct liner

Lined internally on inner surface of duct wall
Lined internally on inner surface of duct wall

Mainly used for noise attenuation & insulation
Mainly used for noise attenuation & insulation

Fiberglass blanket or boards
Fiberglass blanket or boards
 Duct cleaning
Duct cleaning

Prevent accumulation of dirt & debris
Prevent accumulation of dirt & debris

Agitation device to loosen the dirt & debris
Agitation device to loosen the dirt & debris

Duct vacuum to extract loosened debris
Duct vacuum to extract loosened debris

Sealing of access openings
Sealing of access openings
Duct breakout noise
HVAC Piping System
HVAC Piping System
HVAC Instrumentation and Control
HVAC Instrumentation and Control
HVAC System Commissioning
HVAC System Commissioning
 The key elements of commissioning include:
The key elements of commissioning include:
 Installation checks.
Installation checks. Check installed equipment to ensure that all associated
Check installed equipment to ensure that all associated
components and accessories are in place.
components and accessories are in place.
 Operational checks.
Operational checks. Verify and document that systems are performing as expected,
Verify and document that systems are performing as expected,
and that all sensors and other system control devices are properly calibrated.
and that all sensors and other system control devices are properly calibrated.
 Documentation.
Documentation. Confirm that all required documentation has been provided, such as
Confirm that all required documentation has been provided, such as
a statement of the design intent and operating protocols for all building systems.
a statement of the design intent and operating protocols for all building systems.
 O&M manuals and training.
O&M manuals and training. Prepare comprehensive operation and maintenance
Prepare comprehensive operation and maintenance
(O&M) manuals, and provide training for rig operations staff.
(O&M) manuals, and provide training for rig operations staff.
 Ongoing monitoring.
Ongoing monitoring. Conduct periodic monitoring after the school is occupied to
Conduct periodic monitoring after the school is occupied to
ensure that equipment and systems continue to perform according to design intent.
ensure that equipment and systems continue to perform according to design intent.
 Correctly implemented, commissioning is extremely cost-effective, and should
Correctly implemented, commissioning is extremely cost-effective, and should
improve the delivery process, increase systems reliability, improve energy
improve the delivery process, increase systems reliability, improve energy
performance, ensure good indoor environmental quality, and improve operation and
performance, ensure good indoor environmental quality, and improve operation and
maintenance of the facility.
maintenance of the facility.

hvacpresentation-12909388454634-phpapp01.pdf

  • 1.
    HVAC Systems –Understanding HVAC Systems – Understanding the basis the basis Table of Contents Table of Contents 1. 1. Introduction to HVAC Systems Introduction to HVAC Systems 2. 2. HVAC System Types HVAC System Types 3. 3. HVAC Piping System HVAC Piping System 4. 4. HVAC Air Distribution Equipments HVAC Air Distribution Equipments 5. 5. Fans and Pumps Fans and Pumps 6. 6. HVAC Instrumentation and Control HVAC Instrumentation and Control 7. 7. HVAC System Commissioning HVAC System Commissioning
  • 2.
    Introduction to HVACSystems Introduction to HVAC Systems  This article introduces the heating, ventilating and air-conditioning This article introduces the heating, ventilating and air-conditioning (HVAC) systems. The primary function of HVAC systems is to provide (HVAC) systems. The primary function of HVAC systems is to provide healthy and comfortable interior conditions for occupants; well- healthy and comfortable interior conditions for occupants; well- designed, efficient systems do this with minimal non-renewable designed, efficient systems do this with minimal non-renewable energy and air, and water pollutant emissions. energy and air, and water pollutant emissions.
  • 3.
    Introduction to HVACSystems Introduction to HVAC Systems  The purpose of The purpose of HVAC design HVAC design is both high indoor air quality and energy is both high indoor air quality and energy efficiency. These dual considerations require an integrated design efficiency. These dual considerations require an integrated design approach. Rigs heating, approach. Rigs heating, ventilation, and air conditioning ventilation, and air conditioning system (HVAC) creates a climate system (HVAC) creates a climate that allows for maximum comfort by that allows for maximum comfort by compensating for changing climatic compensating for changing climatic conditions. conditions.  Though more costly to install and more complicated to operate, a chiller plant Though more costly to install and more complicated to operate, a chiller plant offers a number of benefits over a large number of individual packaged offers a number of benefits over a large number of individual packaged cooling units, including greater energy efficiency, better controllability, cooling units, including greater energy efficiency, better controllability, cheaper overall maintenance, and longer life. Using a comprehensive cheaper overall maintenance, and longer life. Using a comprehensive approach to building design, designers around the world have succeeded at approach to building design, designers around the world have succeeded at creating highly efficient air-conditioning systems that provide excellent creating highly efficient air-conditioning systems that provide excellent comfort at significant savings. comfort at significant savings.
  • 4.
    Introduction to HVACSystems Introduction to HVAC Systems  Heating, ventilating and air- Heating, ventilating and air- conditioning (HVAC) systems conditioning (HVAC) systems reduce the environmental reduce the environmental impact of rigs/buildings in several impact of rigs/buildings in several key ways. The most important key ways. The most important function of a HVAC systems is function of a HVAC systems is to provide the rig/buildings occupants to provide the rig/buildings occupants with healthy and comfortable interior with healthy and comfortable interior conditions. A carefully designed, efficient conditions. A carefully designed, efficient system can do this with minimal non- system can do this with minimal non- renewable energy and air and water pollutant emissions to minimize the renewable energy and air and water pollutant emissions to minimize the environmental impact. environmental impact. Cooling equipment that avoids chlorofluorocarbons and hydro- Cooling equipment that avoids chlorofluorocarbons and hydro- chlorofluorocarbons (CFCs and HCFCs) eliminates a major cause of chlorofluorocarbons (CFCs and HCFCs) eliminates a major cause of damage to the ozone layer. damage to the ozone layer.
  • 5.
    Introduction to HVACSystems Introduction to HVAC Systems  Even the best HVAC equipment and systems cannot compensate for a Even the best HVAC equipment and systems cannot compensate for a faulty rig design. Problems of this type cause inherently high cooling and faulty rig design. Problems of this type cause inherently high cooling and heating needs and consume unnecessary resources and should be heating needs and consume unnecessary resources and should be corrected if possible. Conservation of non-renewable energy through an corrected if possible. Conservation of non-renewable energy through an intelligent architectural design offers the greatest opportunity for savings. intelligent architectural design offers the greatest opportunity for savings. The most important factors in these designs are careful control of solar gain, The most important factors in these designs are careful control of solar gain, while taking advantage of passive heating, daylighting, natural ventilation while taking advantage of passive heating, daylighting, natural ventilation and cooling. The critical factors in mechanical systems' energy consumption and cooling. The critical factors in mechanical systems' energy consumption - and capital cost - are reducing the cooling and heating loads they must - and capital cost - are reducing the cooling and heating loads they must handle. handle.
  • 6.
    HVAC System Types HVACSystem Types  Types of System Designs - There are several major heating, ventilating, and air Types of System Designs - There are several major heating, ventilating, and air conditioning system types in wide spread use today. These are air systems, hydronic conditioning system types in wide spread use today. These are air systems, hydronic and steam systems, and unitary type systems. Most systems in use today fall into one of and steam systems, and unitary type systems. Most systems in use today fall into one of these categories, or are a combination or variation of them. Each type of system has these categories, or are a combination or variation of them. Each type of system has advantages and disadvantages. advantages and disadvantages.  Air cooled Air cooled - - Air cooled Air cooled Chillers Chillers
  • 10.
     Air CooledChiller Advantages Air Cooled Chiller Advantages • Lower installed cost Lower installed cost • Quicker availability Quicker availability • No cooling tower or condenser pump required No cooling tower or condenser pump required • Less maintenance Less maintenance • No mechanical room required No mechanical room required
  • 11.
     Water Cooled WaterCooled - Sea Water cooled Chillers - Sea Water cooled Chillers - Fresh Water cooled Chillers - Fresh Water cooled Chillers
  • 13.
     Water-Cooled Chilleradvantages Water-Cooled Chiller advantages • Higher efficiency Higher efficiency • Custom selection in larger sizes Custom selection in larger sizes • Large tonnage capabilities Large tonnage capabilities • Indoor Chiller location Indoor Chiller location • Longer life Longer life
  • 14.
    Purpose of anair handling system Purpose of an air handling system Air Handling System Room With Defined Requirements Supply Air Outlet Air Air Handling Systems
  • 15.
    Objectives In the followingslides, we will study the components of air handling systems in order to: 1. Become familiar with the components 2. Know their functions 3. Become aware of possible problems
  • 16.
    + Room/Cabin Exhaust air treatment Centralair handling unit Terminal air treatment at production room level Fresh air treatment (make-up air) Main subsystems
  • 17.
    Filter Silence r Terminal filter Weather louvreControl damper Fan Flow rate controller Humidifier Heating coil Cooling coil with droplet separator Production Room Overview components + Prefilter Exhaust Air Grille Heater Secondary Filter Re-circulated air
  • 18.
     Weather Weather louvre louvre  Silencer Silencer Flow rate Flow rate controller controller  Control Control damper damper  To prevent insects, leaves, To prevent insects, leaves, dirt dirt and rain and rain from entering from entering  To reduce noise caused by air To reduce noise caused by air circulation circulation  Automated adjustment of Automated adjustment of volume of air (night and day, volume of air (night and day, pressure control) pressure control)  Fixed adjustment of volume Fixed adjustment of volume of air of air Components (1)
  • 19.
     Heating unit Heatingunit Cooling unit Cooling unit /dehumidifier /dehumidifier Humidifier Humidifier Filters Filters Ducts Ducts  To To heat heat the air to the proper the air to the proper temperature temperature  To To cool cool the air to the the air to the required required temperature temperature or to remove moisture or to remove moisture from the air from the air  To bring the air to the proper To bring the air to the proper humidity, if too low humidity, if too low  To eliminate particles of pre- To eliminate particles of pre- determined dimensions and/or determined dimensions and/or micro-organisms micro-organisms  To transport the air To transport the air Components (2)
  • 20.
  • 21.
    Filter classes Filter classes Dustfilters Standard Aerosol Fine Coarse ULPA HEPA 10 µ m > Dp > 1 µ m Dp > 10 µ m Dp < 1 µ m F5 - F9 G1 - G4 U 14- 17 H 11 - 13 EN 1822 Standard EN 779 Standard
  • 22.
  • 23.
    Duct heaters Duct heatersRoom Heters Room Heters Silensers Silensers
  • 24.
    Volume control damper Volumecontrol damper De-humidification Filter Pressure Gauges AHU with fan Variable Speed Controller Humid room air Air heater Regeneration air Humid room air Adsorber wheel Dry air Fire Fire Dampers Dampers
  • 25.
    Annex 1, 17.26 Regulationof room pressure Regulation of room pressure – pressure – pressure differentials concept differentials concept Room pressure gauges Room pressure indication panel
  • 26.
    Pressure cascade injectables Pressurecascade injectables P Protection from micro-organisms and rotection from micro-organisms and particles particles N o te : D ir e c t io n o f d o o r o p e n in g r e la t iv e to r o o m p r e s s u r e 1 5 P a 0 P a A ir L o c k 3 0 P a P a s s a g e D C A B D L F A ir L o c k A ir L o c k 4 5 P a R o o m 3 R o o m 2 R o o m 1 4 5 P a 6 0 P a 3 0 P a
  • 27.
    Pressure cascade solids Protectionfrom cross-contamination Note:Directionofdooropeningrelativetoroompressure 15Pa 15Pa 15P aE 30PaPassage 0PaAirLock Room3 Room2Room115Pa AirLockAirLock N o t e : D i r e c t i o n o f d o o r o p e n i n g r e l a t i v e t o r o o m p r e s s u r e 1 5 Pa 1 5 Pa 1 5 Pa E 3 0 Pa P a s s a g e 0 Pa A ir L o c k R o o m 3 R o o m 2 R o o m 1 1 5 Pa A ir L o c k A ir L o c k
  • 32.
  • 33.
  • 34.
    HVAC Air DistributionEquipments HVAC Air Distribution Equipments  Diffusers Diffusers 4 Way Diffusers 4 Way Diffusers Two Way Diffusers One Way Diffuser Two Way Diffusers One Way Diffuser Round Diffusers Round Diffusers
  • 35.
  • 36.
     Return /Exhaust Grilles Return / Exhaust Grilles
  • 37.
    Contents Contents  Fan Design FanDesign  Fan Performance Fan Performance  Fan-duct Systems Fan-duct Systems  Duct Construction Duct Construction  Air Duct Design Air Duct Design Fans and Pumps
  • 38.
    Fan Design Fan Design Common types of fans Common types of fans  Centrifugal fans Centrifugal fans: radial, forward curved, air : radial, forward curved, air foil (backward curved), backward inclined, foil (backward curved), backward inclined, tubular, roof ventilator tubular, roof ventilator  Axial fans Axial fans: propeller, tube-axial, vane-axial : propeller, tube-axial, vane-axial  Fan arrangements Fan arrangements  Motor location, air discharge orientation, drive Motor location, air discharge orientation, drive train type (direct drive or pulley drive) train type (direct drive or pulley drive)  Centrifugal: single width single inlet (SWSI), Centrifugal: single width single inlet (SWSI), double width double inlet (DWDI) double width double inlet (DWDI)
  • 39.
    Centrifugal and axialfan components AXIAL FANS CENTRIFUGAL FANS
  • 40.
  • 41.
    Tubular centrifugal fanCentrifugal roof ventilator CENTRIFUGAL FANS (* Note the airflow paths and impeller design.)
  • 42.
    Drive arrangements andmotor positions
  • 43.
    Single- and double-widthcentrifugal fans
  • 44.
    Fan Performance Fan Performance Major parameters Major parameters  Fan volume flow rate (m Fan volume flow rate (m3 3 /s or l/s), /s or l/s), V Vf f  Fan total pressure Fan total pressure Δ Δp ptf tf, fan velocity pressure , fan velocity pressure p pvf vf & fan static pressure & fan static pressure Δ Δp psf sf (Pa) (Pa)  Fan power & efficiency Fan power & efficiency • Fan power or air power (W) = Fan power or air power (W) = Δ Δp ptf tf x x V Vf f • Fan power input on the fan shaft (brake Fan power input on the fan shaft (brake horsepower), horsepower), P Pf f • Fan total efficiency: Fan total efficiency: η ηt t = = Δ Δp ptf tf x x V Vf f / / P Pf f  Combined aerodynamic, volumetric & mechanical Combined aerodynamic, volumetric & mechanical efficiencies efficiencies • Fan static efficiency: Fan static efficiency: η ηs s = = Δ Δp psf sf x x V Vf f / / P Pf f • Air temp. increase through fan, Air temp. increase through fan, Δ ΔT T = = Δ Δp p /( /(ρ ρc c η η) )
  • 45.
    Fan performance curves Totalpressure Static pressure Fan total efficiency Fan static efficiency Fan power input Velocity pressure Volume flow rate
  • 46.
  • 47.
    Fan Performance Fan Performance Fan Laws Fan Laws  Speed ( Speed (n n) )  Volume flow ( Volume flow (V V) )  Total pressure loss Total pressure loss ( (Δ Δp p ) )  Air density ( Air density (ρ ρ) )  For air systems that For air systems that are geometrically & are geometrically & dynamically similar: dynamically similar: (D = impeller (D = impeller diameter) diameter)  c.f.: pump laws c.f.: pump laws
  • 48.
    Velocity triangle atthe blade inlet and outlet of a centrifugal fan CENTRIFUGAL FANS
  • 49.
    Fan Performance Fan Performance Major issues causing energy losses to a Major issues causing energy losses to a centrifugal fan: centrifugal fan:  Circulatory flow between the blades Circulatory flow between the blades  Air leakage at the inlet Air leakage at the inlet  Friction between fluid particles and the blade Friction between fluid particles and the blade  Energy loss at the entrance Energy loss at the entrance  Partially filled passage Partially filled passage
  • 50.
    Operating characteristics fora backward-curved centrifugal fan
  • 51.
  • 52.
    Fan power curvesfor centrifugal fans with same impeller diameter
  • 53.
    Fan pressure curvesfor centrifugal fans with same impeller diameter
  • 54.
    Velocity triangles fora vane-axial fan AXIAL FANS
  • 55.
    Fan pressure curvesfor axial fans with same impeller diameter
  • 56.
    Fan efficiency curvesfor axial fans with same impeller diameter
  • 57.
    Fan power curvesfor axial fans with same impeller diameter
  • 58.
  • 59.
    Fan-duct Systems Fan-duct Systems Duct pressure changes (c.f. atm Duct pressure changes (c.f. atm pressure) pressure)  Static pressure (SP) Static pressure (SP)  Velocity pressure (VP) = Velocity pressure (VP) = ρ ρV V2 2 / 2 g / 2 g  Total pressure (TP) = SP + VP Total pressure (TP) = SP + VP  Fan: a pumping device Fan: a pumping device  Fan (total) pressure = pressure difference Fan (total) pressure = pressure difference between fan inlet and fan discharge between fan inlet and fan discharge  At fan suction/inlet, SP = negative (c.f. At fan suction/inlet, SP = negative (c.f. atmospheric); at discharge, SP = positive atmospheric); at discharge, SP = positive
  • 62.
    Fan-duct Systems Fan-duct Systems Pressure characteristics Pressure characteristics  SP and VP are mutually convertible (↑or↓) SP and VP are mutually convertible (↑or↓)  TP always decreases in the direction of TP always decreases in the direction of airflow airflow  For constant-area straight duct sections For constant-area straight duct sections • Velocity and VP are constant Velocity and VP are constant • TP change = SP change TP change = SP change  When duct cross-sectional areas are reduced When duct cross-sectional areas are reduced • Velocity and VP increase Velocity and VP increase • Absolute value of both TP and SP decrease Absolute value of both TP and SP decrease • Dynamic losses from elbow, dampers, etc. Dynamic losses from elbow, dampers, etc.
  • 63.
    Fan-duct Systems Fan-duct Systems Fan-duct systems Fan-duct systems  Flow resistance Flow resistance R R, pressure drop , pressure drop Δ Δp p and and volume flow rate volume flow rate V V  Duct sections in series: Duct sections in series:  Duct sections in parallel: Duct sections in parallel: 2 V R p  ⋅ = ∆ o n s R R R R + + + =  2 1 n p R R R R 1 1 1 1 2 1 + + + = 
  • 64.
    Fan-duct Systems Fan-duct Systems Fan-duct systems Fan-duct systems  Terminology Terminology • Primary air (conditioned air or makeup air) Primary air (conditioned air or makeup air) • Secondary air (induced space air, plenum air, or Secondary air (induced space air, plenum air, or recirculating air) recirculating air) • Transfer air (indoor air that moves from an Transfer air (indoor air that moves from an adjacent area) adjacent area)  System curve: volume flow vs pressure loss System curve: volume flow vs pressure loss  System operating point System operating point
  • 65.
    Fan-duct Systems Fan-duct Systems System effect System effect Δ Δp pts ts  Its additional total pressure loss caused by Its additional total pressure loss caused by uneven or non-uniform velocity profile at the uneven or non-uniform velocity profile at the fan inlet, or at duct fittings after fan outlet fan inlet, or at duct fittings after fan outlet  Due to the actual inlet and outlet connections Due to the actual inlet and outlet connections as compared with the total pressure loss of the as compared with the total pressure loss of the fan test unit during laboratory ratings fan test unit during laboratory ratings Inlet Outlet
  • 66.
    Fan system operatingpoint & system effect
  • 67.
    Fan-duct Systems Fan-duct Systems Modulation of air systems Modulation of air systems  Constant volume system Constant volume system • Volume flow rate remains constant Volume flow rate remains constant • Supply temperature is raised during part load Supply temperature is raised during part load  Variable-air-volume (VAV) system Variable-air-volume (VAV) system • Volume flow rate is reduced to match part load Volume flow rate is reduced to match part load operation operation • Modulation curve Modulation curve
  • 68.
  • 69.
    Fan-duct Systems Fan-duct Systems Fan modulation methods Fan modulation methods  Damper Damper (vary the opening of the air flow (vary the opening of the air flow passage) passage) • Waste energy Waste energy  Inlet vanes Inlet vanes (opening & angle of inlet vanes) (opening & angle of inlet vanes) • Low cost; less efficient than following types Low cost; less efficient than following types  Inlet cone Inlet cone (peripheral area of fan impeller) (peripheral area of fan impeller) • Inexpensive; for backward curved centrifugal fan Inexpensive; for backward curved centrifugal fan  Blade pitch Blade pitch (blade angle of axial fan) (blade angle of axial fan)  Fan speed Fan speed (using adjustable frequency (using adjustable frequency drives) drives) • Most energy-efficient; but usually cost more Most energy-efficient; but usually cost more
  • 70.
    Damper, inlet vanes& fan speed modulation
  • 71.
  • 72.
  • 73.
    Fan-duct Systems Fan-duct Systems Fan surge Fan surge (in centrifugal fan) (in centrifugal fan)  Occurs when air volume flow is not sufficient to Occurs when air volume flow is not sufficient to sustain the static pressure difference between sustain the static pressure difference between discharge & suction discharge & suction • Discharge pressure is reduced momentarily Discharge pressure is reduced momentarily • Volume flow & pressure fluctuations Volume flow & pressure fluctuations • Create noise & vibration Create noise & vibration  Surge region: shall avoid operation in it Surge region: shall avoid operation in it  Fan stall Fan stall (in axial fans) (in axial fans)  When smooth air flow suddenly breaks & pressure When smooth air flow suddenly breaks & pressure difference across the blades decreases difference across the blades decreases  The fan loses pressure capability drastically The fan loses pressure capability drastically
  • 74.
    Stall and stallregion of an axial fan
  • 75.
    Fan-duct Systems Fan-duct Systems Fan selection Fan selection  Select fan type + determine fan size Select fan type + determine fan size  Important factors: Important factors: • Pressure-volume flow operating characteristics Pressure-volume flow operating characteristics • Fan capacity modulation Fan capacity modulation • Fan efficiency Fan efficiency • Sound power level Sound power level • Airflow direction Airflow direction • Initial cost Initial cost
  • 77.
    Duct Construction Duct Construction Types of air duct Types of air duct  Supply air duct Supply air duct  Return air duct Return air duct  Outdoor air duct Outdoor air duct  Exhaust air Exhaust air  Duct sections Duct sections  Header or main duct (trunk) Header or main duct (trunk)  Branch duct or runout Branch duct or runout
  • 79.
    Duct Construction Duct Construction Duct systems Duct systems  Max. pressure difference (between air inside Max. pressure difference (between air inside the duct and the ambient air) the duct and the ambient air) • 125, 250, 500, 750, 1000, 1500, 2500 Pa 125, 250, 500, 750, 1000, 1500, 2500 Pa  Commercial buildings Commercial buildings • Low-pressure duct system: ≤ 500 Pa, max 12 m/s Low-pressure duct system: ≤ 500 Pa, max 12 m/s • Medium-pressure system: 500-1500 Pa, max 17.5 Medium-pressure system: 500-1500 Pa, max 17.5 m/s m/s  Residential buildings: 125 Pa or 250 Pa Residential buildings: 125 Pa or 250 Pa  Industrial duct system: Industrial duct system: Δ ΔP can be higher P can be higher
  • 80.
    Duct Construction Duct Construction Duct material: e.g. UL (Underwriters’ Duct material: e.g. UL (Underwriters’ Laboratory) standard Laboratory) standard  Class 0: zero flame spread, zero smoke Class 0: zero flame spread, zero smoke developed developed • Iron, galvanized steel, aluminum, concrete, Iron, galvanized steel, aluminum, concrete, masonry, clay tile masonry, clay tile  Class 1: flame spread ≤ 25, smoke Class 1: flame spread ≤ 25, smoke developed ≤ 50 developed ≤ 50 • Fiberglass, many flexible ducts Fiberglass, many flexible ducts  Class 2: flame spread ≤ 50, smoke Class 2: flame spread ≤ 50, smoke developed ≤ 100 developed ≤ 100
  • 81.
    Duct Construction Duct Construction Shapes of air duct Shapes of air duct  Rectangular Rectangular • More easily fabricated on site, air leakage More easily fabricated on site, air leakage  Round Round • Less fluid resistance, better rigidity/strength Less fluid resistance, better rigidity/strength  Flat oval Flat oval  Flexible Flexible • Multiple-ply polyester film w/ metal wire or strips Multiple-ply polyester film w/ metal wire or strips  SMACNA (Sheet Metal and Air SMACNA (Sheet Metal and Air Conditioning Contractors’ National Conditioning Contractors’ National Association) standards Association) standards
  • 82.
    Rectangular duct Roundduct w/ spiral seam Flat oval duct Flexible duct (Source: Wang, S. K., 2001. Handbook of Air Conditioning and Refrigeration)
  • 83.
    Transverse joint reinforcement (Source:Wang, S. K., 2001. Handbook of Air Conditioning and Refrigeration)
  • 84.
    Duct Construction Duct Construction Duct specification Duct specification  Sheet gauge and thickness of duct material Sheet gauge and thickness of duct material  Traverse joints & longitudinal seam Traverse joints & longitudinal seam reinforcements reinforcements  Duct hangers & their spacing Duct hangers & their spacing  Tapes & adhesive closures Tapes & adhesive closures  Fire spread and smoke developed Fire spread and smoke developed  Site-fabricated or factory-/pre-fabricated Site-fabricated or factory-/pre-fabricated
  • 85.
    Duct Construction Duct Construction Duct heat gain or loss Duct heat gain or loss  Temperature rise or drop Temperature rise or drop  Duct insulation (mounted or inner-lined) Duct insulation (mounted or inner-lined) • Reduce heat gain/loss, prevent condensation, Reduce heat gain/loss, prevent condensation, sound attentuation sound attentuation • Minimum & recommended thickness Minimum & recommended thickness  See ASHRAE standard or local codes See ASHRAE standard or local codes  Temperature rise curves Temperature rise curves • Depends on air velocity, duct dimensions & Depends on air velocity, duct dimensions & insulation insulation
  • 86.
    Temperature rise fromduct heat gain (Source: Wang, S. K., 2001. Handbook of Air Conditioning and Refrigeration)
  • 87.
    Duct Construction Duct Construction Frictional losses Frictional losses  Darcey-Weisbach Equation Darcey-Weisbach Equation • H Hf f = friction head loss, or = friction head loss, or Δ Δp pf f = pressure loss = pressure loss • f f = friction factor (dimensionless) = friction factor (dimensionless) • L L = length of duct or pipe (m) = length of duct or pipe (m) • D D = diameter of duct or pipe (m) = diameter of duct or pipe (m) • v v = mean air velocity in duct (m/s) = mean air velocity in duct (m/s)
  • 88.
    Mode of airflowwhen air passes over and around surface protuberances of the duct wall δ >ε δ <ε
  • 89.
    Duct Construction Duct Construction Duct friction chart Duct friction chart  Colebrook formula Colebrook formula  Roughness & temperature corrections Roughness & temperature corrections  Δ Δp pf f = = K Ksr sr K KT T K Kel elΔ Δp pf,c f,c • K Ksr sr = correction factor for surface roughness = correction factor for surface roughness • K KT T = correction factor for air temperature = correction factor for air temperature • K Kel el = correction factor for elevation = correction factor for elevation
  • 90.
  • 92.
    Duct Construction Duct Construction Circular equivalent Circular equivalent  Hydraulic diameter, Hydraulic diameter, D Dh h = 4 = 4 A A / / P P • A A = area (mm = area (mm2 2 ); ); P P = perimeter (mm) = perimeter (mm)  Rectangular duct: Rectangular duct:  Flat oval duct: Flat oval duct:
  • 93.
    Duct Construction Duct Construction Dynamic losses Dynamic losses  Result from flow disturbances caused by duct- Result from flow disturbances caused by duct- mounted equipment and fittings mounted equipment and fittings • Change airflow path’s direction and/or area Change airflow path’s direction and/or area • Flow separation & eddies/disturbances Flow separation & eddies/disturbances  In dynamic similarity (same Reynolds number In dynamic similarity (same Reynolds number & geometrically similar duct fittings), dynamic & geometrically similar duct fittings), dynamic loss is proportional to their velocity pressure loss is proportional to their velocity pressure
  • 94.
    Duct Construction Duct Construction Local or dynamic loss coefficient Local or dynamic loss coefficient  Ratio of total pressure loss to velocity Ratio of total pressure loss to velocity pressure pressure
  • 95.
    Duct Construction Duct Construction Duct fittings Duct fittings  Elbows Elbows  Converging or diverging tees and wyes Converging or diverging tees and wyes  Entrances and exits Entrances and exits  Enlargements and contractions Enlargements and contractions  Means to reduce dynamic losses Means to reduce dynamic losses  Turning angle, splitter vanes Turning angle, splitter vanes  ASHRAE duct fitting database ASHRAE duct fitting database  Fitting loss coefficients Fitting loss coefficients
  • 97.
    Region of eddiesand turbulences in a round elbow 5-piece 90o round elbow
  • 98.
    Rectangular elbow, smoothradius, 2 splitter vanes Mitered elbow and its secondary flow
  • 99.
    Airflow through a rectangularconverging or diverging wye
  • 100.
  • 101.
  • 102.
    Duct Construction Duct Construction Flow resistance, Flow resistance, R R  Total pressure loss Total pressure loss Δ Δp pt t at a specific volume flow at a specific volume flow rate rate V V  Flow resistance in series: Flow resistance in series:  Flow resistance in parallel: Flow resistance in parallel: 2 V R pt  ⋅ = ∆ n s R R R R + + + =  2 1 n p R R R R 1 1 1 1 2 1 + + + = 
  • 103.
    Total pressure lossand flow resistance of a round duct section
  • 104.
    Flow resistance inseries Flow resistance in parallel
  • 105.
    Flow resistance fora Y connection
  • 106.
    Air Duct Design AirDuct Design  Optimal air duct design Optimal air duct design  Optimal duct system layout, space available Optimal duct system layout, space available  Satisfactory system balance Satisfactory system balance  Acceptable sound level Acceptable sound level  Optimum energy loss and initial cost Optimum energy loss and initial cost  Install only necessary balancing devices Install only necessary balancing devices (dampers) (dampers)  Fire codes, duct construction & insulation Fire codes, duct construction & insulation  Require comprehensive analysis & care for Require comprehensive analysis & care for different transport functions different transport functions
  • 107.
    Flow characteristics ofa supply duct system
  • 108.
    Air Duct Design AirDuct Design  Design velocity Design velocity  Constraints: space available, beam depth Constraints: space available, beam depth  Typical guidelines: Typical guidelines: • Main ducts: air flow usually ≤ 15 m/s; air flow noise Main ducts: air flow usually ≤ 15 m/s; air flow noise must be checked must be checked • With more demanding noise criteria (e.g. hotels), With more demanding noise criteria (e.g. hotels), max. air velocity: main duct ≤ 10-12.5 m/s, return max. air velocity: main duct ≤ 10-12.5 m/s, return main duct ≤ 8 m/s, branch ducts ≤ 6 m/s main duct ≤ 8 m/s, branch ducts ≤ 6 m/s  Face velocities for air-handling system Face velocities for air-handling system components components
  • 110.
    Air Duct Design AirDuct Design  Reduce dynamic losses of the critical path Reduce dynamic losses of the critical path  Maintain optimum air velocity through duct Maintain optimum air velocity through duct fittings fittings  Emphasize reduction of dynamic losses Emphasize reduction of dynamic losses nearer to the fan outlet or inlet (high air nearer to the fan outlet or inlet (high air velocity) velocity)  Proper use of splitter vanes Proper use of splitter vanes  Set 2 duct fittings as far apart as possible Set 2 duct fittings as far apart as possible  Air duct leakage Air duct leakage  Duct leakage classification Duct leakage classification • AISI, SMACNA, ASHRAE standards AISI, SMACNA, ASHRAE standards
  • 111.
    Air Duct Design AirDuct Design  Fire protection Fire protection  Duct material selection Duct material selection  Vertical ducts (using masonry, concrete or Vertical ducts (using masonry, concrete or clay) clay)  When ducts pass through floors & walls When ducts pass through floors & walls  Use of fire dampers Use of fire dampers  Filling the gaps between ducts & bldg Filling the gaps between ducts & bldg structure structure  Duct systems for industrial applications Duct systems for industrial applications  Any other fire precautions? Any other fire precautions?
  • 112.
    Air Duct Design AirDuct Design  Design procedure (computer-aided or manual) Design procedure (computer-aided or manual)  Verify local codes & material availability Verify local codes & material availability  Preliminary duct layout Preliminary duct layout  Divide into consecutive duct sections Divide into consecutive duct sections  Minimise local loss coefficients of duct fittings Minimise local loss coefficients of duct fittings  Select duct sizing methods Select duct sizing methods  Critical total pressure loss of tentative critical path Critical total pressure loss of tentative critical path  Size branch ducts & balance total pressure at Size branch ducts & balance total pressure at junctions junctions  Adjust supply flow rates according to duct heat gain Adjust supply flow rates according to duct heat gain  Resize duct sections, recalculate & balance parallel Resize duct sections, recalculate & balance parallel paths paths  Check sound level & add necessary attenuation Check sound level & add necessary attenuation
  • 113.
    Air Duct Design AirDuct Design  Duct layout Duct layout  Symmetric layout is easier to balance Symmetric layout is easier to balance • Smaller main duct & shorter design path Smaller main duct & shorter design path  For VAV systems, duct looping allows feed For VAV systems, duct looping allows feed from opposite direction from opposite direction • Optimise transporting capacity (balance points Optimise transporting capacity (balance points often follow the sun’s position) often follow the sun’s position) • Result in smaller main duct Result in smaller main duct  Compare alternative layouts & reduce fittings Compare alternative layouts & reduce fittings  For exposed ducts, appearance & integration For exposed ducts, appearance & integration with the structure is important with the structure is important
  • 114.
    Typical supply ductsystem with symmetric layout & looping
  • 115.
    Air Duct Design AirDuct Design  Duct liner Duct liner  Lined internally on inner surface of duct wall Lined internally on inner surface of duct wall  Mainly used for noise attenuation & insulation Mainly used for noise attenuation & insulation  Fiberglass blanket or boards Fiberglass blanket or boards  Duct cleaning Duct cleaning  Prevent accumulation of dirt & debris Prevent accumulation of dirt & debris  Agitation device to loosen the dirt & debris Agitation device to loosen the dirt & debris  Duct vacuum to extract loosened debris Duct vacuum to extract loosened debris  Sealing of access openings Sealing of access openings
  • 116.
  • 117.
  • 118.
    HVAC Instrumentation andControl HVAC Instrumentation and Control
  • 119.
    HVAC System Commissioning HVACSystem Commissioning  The key elements of commissioning include: The key elements of commissioning include:  Installation checks. Installation checks. Check installed equipment to ensure that all associated Check installed equipment to ensure that all associated components and accessories are in place. components and accessories are in place.  Operational checks. Operational checks. Verify and document that systems are performing as expected, Verify and document that systems are performing as expected, and that all sensors and other system control devices are properly calibrated. and that all sensors and other system control devices are properly calibrated.  Documentation. Documentation. Confirm that all required documentation has been provided, such as Confirm that all required documentation has been provided, such as a statement of the design intent and operating protocols for all building systems. a statement of the design intent and operating protocols for all building systems.  O&M manuals and training. O&M manuals and training. Prepare comprehensive operation and maintenance Prepare comprehensive operation and maintenance (O&M) manuals, and provide training for rig operations staff. (O&M) manuals, and provide training for rig operations staff.  Ongoing monitoring. Ongoing monitoring. Conduct periodic monitoring after the school is occupied to Conduct periodic monitoring after the school is occupied to ensure that equipment and systems continue to perform according to design intent. ensure that equipment and systems continue to perform according to design intent.  Correctly implemented, commissioning is extremely cost-effective, and should Correctly implemented, commissioning is extremely cost-effective, and should improve the delivery process, increase systems reliability, improve energy improve the delivery process, increase systems reliability, improve energy performance, ensure good indoor environmental quality, and improve operation and performance, ensure good indoor environmental quality, and improve operation and maintenance of the facility. maintenance of the facility.