A social unit of people, systematically structured
and managed to meet a need or to pursue
collective goals on a continuing basis.
It is a framework within which an Organization arranges
it’s lines of authorities and communications and
allocates rights and duties.
1. Tall Organizational Structure
2. Flat Organizational Structure
3. Virtual Organizational Structure
4. Boundary less Organizational Structure
• Large, complex organizations often require a
taller hierarchy.
• In its simplest form, a tall structure results in one
long chain of command similar to the military.
• As an organization grows, the number of
management levels increases and the structure
grows taller. In a tall structure, managers form
many ranks and each has a small area of control.
• Flat structures have fewer management levels,
with each level controlling a broad area or group.
• Flat organizations focus on empowering
employees rather than adhering to the chain of
command.
• By encouraging autonomy and self-direction, flat
structures attempt to tap into employees’
creative talents and to solve problems by
collaboration.
Flatter Organizations
Technical
Development
Team
Manufacturing
Engineering
Team
People
Systems
Team
Finance
Team
Purchasing and
Suppllier Quality
Team
Sales, Service and
Marketing
Team
Executive and
Operations
Team
Copyright © 2004 South-Western. All rights reserved. 3–8
• Virtual organization can be thought of as a
way in
which an organization uses information and
communication technologies to replace or
augment some aspect of the organization.
• People who are virtually organized primarily
interact by electronic mea
• For example, many customer help desks link
customers and consultants together via
telephone or the Internet and problems may
be solved without ever bringing people
together face-to-face
• A boundary less Organizational structure is a
contemporary approach in Organizational design.
• It is an organization that is not defined by, or
limited to the horizontal, vertical or external
boundaries imposed by a pre-defined structure.
• It behaves more like an organism encouraging
better integration among employees and closer
partnership with stakeholders.
• Functional
• Line
• Matrix
• product
Job Analysis
• Formal and detailed examination of jobs
• Process of defining a job in terms of its
component tasks or duties and the
knowledge or skills required to perform them
.
 .
DEFINITION
• Job refers to a group of activities performed by an employees
• Tasks is a larger work segment composed of several tasks that are
performed by an individual
• Responsibilities is an obligations to perform certain tasks and
duties.
• Job analysis
– The procedure for determining the duties and skill
requirements of a job and the kind of person who should be
hired for it.
– The process of obtaining information about jobs by
determining what the duties, tasks, or activities of jobs are
Job description
 Statement of the tasks, duties, and responsibilities
(TDRs) of a job to be performed
Job specification
• Job Specification
– Statement of the needed knowledge, skills, and
abilities (KSAs) of the person who is to perform
the job
Relationship of Job Requirements
to Other HRM Functions
Copyright © 2004 South-Western. All rights
reserved.
3–17
Job Requirements
Recruitment
Selection
Performance
Appraisal
Training and
Development
Compensation
Management
Determine recruitment qualifications
Provide job duties and job
specifications for selection process
Provide performance criteria for
evaluating employees
Determine training needs and develop
instructional programs
Provide basis for determining
employee’s rate of pay
Presentation Slide 3–1
Methods of Collecting Job Analysis
Information: The Interview
• Information Sources
– Individual employees
– Groups of employees
– Supervisors with knowledge
of the job
• Advantages
– Quick, direct way to find
overlooked information
• Disadvantages
– Distorted information
© 2008 Prentice Hall, Inc. All rights
reserved.
4–18
Methods of Collecting Job Analysis
Information: Questionnaires
• Information Source
– Have employees fill out
questionnaires to describe
their job-related duties and
responsibilities
• Advantages
– Quick and efficient way to
gather information from
large numbers of employees
• Disadvantages
– Expense and time consumed
in preparing and testing the
questionnaire
© 2008 Prentice Hall, Inc. All rights
reserved.
4–19
Methods of Collecting Job Analysis
Information: Observation
• Information Source
– Observing and noting the
physical activities of
employees as they go about
their jobs
• Advantages
– Provides first-hand
information
– Reduces distortion of
information
• Disadvantages
– Time consuming
– Difficulty in capturing entire
job cycle
– Of little use if job involves a
high level of mental activity
© 2008 Prentice Hall, Inc. All rights
reserved.
4–20
Methods of Collecting Job Analysis
Information: Participant Diary/Logs
• Information Source
– Workers keep a chronological
diary/ log of what they do
and the time spent on each
activity
• Advantages
– Produces a more complete
picture of the job
– Employee participation
• Disadvantages
– Distortion of information
– Depends upon employees to
accurately recall their
activities
© 2008 Prentice Hall, Inc. All rights
reserved.
4–21
The process of Job analysis
4-10
The major steps involved in job analysis are:
 Organisational analysis
 Selection of representative positions to be analysed
 Collection of job analysis data
 Preparation of job description
 Preparation of job specification
Job Analysis
Job Description
• Job description is an important document
which is basically descriptive in nature and
contains a statement of job analysis
• It serves to identify a job for consideration by
other job analysts
• It tells us what should be done, why it should
be done, and where it should be performed.
Job specifications
• It is a written statement of qualifications,
traits, physical and mental characteristics that
an individual must possess to perform the job
duties and discharge responsibilities
effectively.
Job analysis information and facts
Job description
Contains information and facts about:
• Job identification
• Job summary
• Relation to other jobs
• Supervision taken, location in the
hierarchy
• Machine tools and equipments
used
• Materials and form used
• Condition of work, location of
work, working hours, posture
standing, sitting, walking, accuracy,
health hazards, occupational
diseases etc.
Job specification
Contains information and facts about:
• Education
• Experience
• Training
• Judgment
• Initiative
• Physical effort
• Physical skills
• Responsibilities
• Communication skills
• Emotional characteristics
• Unusual sensory demands such as
vision, smell , hearing etc.
Human Resource Planning
• Human Resource is an important corporate
asset and the overall performance of the
companies depends upon the way it is put to
use.
• In order to realize company’s objectives, it is
essential to have a human resource plan.
Human Resource Planning
• Human Resource planning (also called
employment or personnel planning) is
essentially the process of getting the right
number of qualified people into the right job
at the right time so that an organization can
meet its objectives.
According to E.W. Witter,
• HRP is defined as “A process by which an
organization should move from its current
manpower position to its desired manpower
position.
5-3
Human Resource Planning
Objective
The basic purpose of HRP is to decide what positions the organisation will
have to fill and how to fill them.
Objectives of human resource planning
Forecast personnel requirements
Cope with changes
Use existing manpower productively
Promote employees in a systematic way
Importance of HRP
HRP is important in a number of ways:
• Reservoir of talent
• Prepare people for future
• Expand or contract
• Cut costs
• Succession planning
Benefits of HRP
The major benefits of HR planning are:
• It checks the corporate plan of the
organization
• It offsets uncertainty and change
• It provides scope for advancement and
development of employees through training,
development etc.
• It helps to anticipate the cost of salary
enhancement, better benefits etc.
• It gives an idea of the type of tests to be used and
interview techniques in selection based on the
level of skills, qualifications, intelligence, value
etc.
• It causes the development of various sources of
human resources to meet the organizational
needs.
• It facilitates the control of all the functions,
operations, contribution and cost of human
resources.
The Process Of HRP
• Forecasting the demand for human resources
• Supply Forecasting (preparing
man power inventory)
• Determining man power gap
• Formulating HR plans
5-5
Human Resource Planning
The Process Of HRP
The HRP is a four step process: demand forecasting, supply forecasting,
estimating manpower gaps and formulating HR plans. The demand for
human resources is influenced by several factors
Forecasting the demand for human resources
External challenges
Economic developments
Political, legal, social, technological changes
Competition
Organisational decisions
Workforce factors
Forecasting technique
5-6
Human Resource Planning
External Challenges: Liberalisation, privatisation and globalisation (LPG
era) have created huge demand for people in software, finance marketing,
and manufacturing fields.
Organisational Decisions: Decisions such as expansion, diversification,
and relocation leading to demand for people possessing requisite skills
Workforce Factors: Such as retirement, resignation, and termination etc
creating manpower gaps.
The Process Of HRP
5-7
Forecasting Techniques
HR forecasts are an attempt to find out an organisation's future demand
for employees
Human Resource Planning
Forecasting techniques
Expert forecasts
Trend analysis
Workforce analysis
Workload analysis
5-8
Human Resource Planning
Expert Forecasts: These are based on the judgements of those who possess
good knowledge of future human resource needs
Trend Analysis: Human resource needs, as such, can be estimated by
examining past trends.
Forecasting techniques
An example of trend analysis
2001-02 Production of Units : 5,000
2002-03 No. of Workers : 100
Ratio : 100:5000
2003-04 Estimated Production : 8,000
No. of Workers required : 8000 × = 160100
5000
5-9
Workforce Analysis: All relevant factors in planning manpower flows in a
firm such as transfers, promotions, new recruitments, retirement,
resignation etc are taken into account while estimating HR needs
Human Resource Planning
Forecasting techniques
5-10
Human Resource Planning
Workload analysis: Based on the planned output, a firm tires to calculate the
number of persons required for various jobs.
Forecasting techniques
An example of workload analysis
Planned output for the year 10,000 pieces
Standard hours per piece 3 hours
Planned hours required 30,000 hours
Productive hours per person per year 1,000 hours (estimated on annual basis)
(allowing for absenteeism, turnover, idle time etc.)
No. of workers required 30
5-11
Human Resource Planning
Supply Forecasting
to find out the size and quality of personnel available within the org to
various position
A) Internal labour supply: a manpower inventory in terms of
the size and quality of personnel available (their age, sex,
education, training, experience, job performance, etc) is
usually prepared by HR departments. Several techniques are
used while ascertaining the internal supply of manpower (a
supply of employees to fill projected vacancies can come from
within the firm or from new hires )
5-12
Human Resource Planning
Estimated internal labour supply
for a given firm
The FirmSources of Inflows
 Transfers
 Promotions
 New Recruits
 Recalls
 Promotions
 Quits
 Terminations
 Retirements
 Deaths
 Layoffs
Employees In Employees Out
Current
staffing
level
Projected
outflows
this year
Projected
inflows
this year
Firm’s internal
supply for this
time next year
– + =
Projected Outflows
Current Staffing
Level
5-13
Human Resource Planning
forecasting technique
Staffing table: Shows the number of employees in each job, how they are
utilised and the future employment needs for each type of job.
Marcov analysis: Uses historical information from personnel movements
of the internal labour supply to predict what will happen in the future
This technique uses historical rates of promotion , transfer and turn over
to estimate future availabilities in the work force .
Supply Forecasting
5-14
Marcov analysis for a hypothetical
retail company
Human Resource Planning
Figures in circles show the transition percentages
80%
12
20%
3
6%
2
11%
4
83%
30
11%
11
66%
63
8%
8
10%
29
72%
207
2%
6
16%
46
6%
86
74%
1066
20%
288
15%
14
2003-2004 Store Asst. Store Section Dept. Sales Exit
Managers Managers Heads Heds Executives
Store Managers
(n = 15)
Asst. Store
Managers
(n = 36)
Section
Heads
(n = 94)
Departmental
Heads
(n = 288)
Sales
Executives
(n = 1440)
Forecasted
Supply 16 41 92 301 1072 353
5-15
Skills inventory: It is a summary of the skills and abilities , experience of each
of current employees .
Human Resource Planning
Supply Forecasting
5-16
Human Resource Planning
Skills inventory: an example
Name : A.K. Sen Date printed : 1-4-2004
Number : 429 Department : 41
Key words Work experience
Word Description Activity From To
Accounting Tax Supervision 1998 2000 Tax clerk ABC Company
and analysis
Book Keeping Ledger Supervision 2000 2002 Accountant XYZ Co.
Auditing Computer Analysis 2002 2003 Chief Accounts TT Bank
records Officer
Education Special Qualifications Memberships
Degree Major Year Course Date 1. AIMA
MBA Finance 1998 DBF 1996 2. ISTD
B.Com Accounts 1995 Risk Management 1999 3. ICA
Computer Languages Position Location Hobbies
Literacy preference choice
 Tally French Accounting Kolkata Chess
 Banking Auditing Delhi Football
Software Bangalore Boating
Employees Signature __________ HR Department________
Date _______________________ Date ________________
5-17
Human Resource Planning
Replacement chart: It is a visual representation of who will replace whom
in the event of a job opening.
Supply Forecasting
5-18
Human Resource Planning
Replacement chart
General Manager
V. K. Garg
A/2
Key
Names given are replacement
candidates
A. Promotable now
B. Needing development
C. Not suitable to position
1. Superior performance
2. Above Average performance
3. Acceptable performance
4. Poor performance
P A to
General Manager
L. Mathews
B/1
Assistant General Manager
R.K. Arora A/2
B.K. Nehru B/3
Division:
HR Manager
C.P. Thakur A/1
Division:
Accounting &
Taxation Manager
A.T. Roy C/2
Division:
Planning Manager
A.N. Gupta A/1
K.P. Rao B/1
Technical Advisor
N.R. Murthy B/3
Northern Region
Manager
L.C. Srivatsav A/2
A. Thapar C/4
Central Region
Manager
S.P. Kumar A/1
R. Pandey B/3
Southern Region Manager
A. Subramanyam B/2
B.K. Menon B/1
Eastern Region
Manager
R. Krishna B/3
5-19
B) External Labour supply: External hires need to be contacted
when suitable internal replacements are not available. A growing
number of firms are now using computerised human resource
information systems to track the qualifications of hundreds or
thousands of employees. HRIS can provide managers with a
listing of candidates with required qualifications after scanning the
data base.
Human Resource Planning
Supply Forecasting
5-20
Important barometers of labour
supply
Human Resource Planning
1. Net migration into and out of the area
2. Education levels of workforce
3. Demographic changes in population
4. Technological developments and shifts
5. Population Mobility
6. Demand for specific skills
7. National, regional unemployment rates
8. Actions of competing employers
9. Government policies, regulations, pressures
10. Economic Forecasts for the next few years
11. The attractiveness of an area
12. The attractiveness of an industry in a particular place
Manpower Gap Analysis
5-21
Human Resource Planning
This is used to reconcile the forecasts of labour demand and supply. This
process identifies potential skill shortages or surpluses of employees, skills
and jobs
Estimating manpower requirements
Year
1 2 3
1. Number required at the beginning of the year
2. Changes to requirements forecast during the year DEMAND
3. Total requirements at the end of the year (1+2) ------- ------
4. Number available at the beginning of the year
5. Additions (transfers, promotions) SUPPLY
6. Separations (retirement, wastage, promotions out and other losses)
7. Total available at the end of year (4+5+6) --------------------
8. Deficit or surplus (3-7) RECONCILIATION
9. Losses of those recruited during the year OF THE ABOVE
10. Additional numbers needed during the year (8+9) MANPOWERNEEDED
5-22
Formulating HR Plans
Human Resource Planning
Once supply and demand for labour is known adjustments can be made
formulating requisite HR plans
A variety of HR plans
 Recruitment plan
 Redeployment plan
 Redundancy plan
 Training plan
 Productivity plan
 Retention plan

Human resource management

  • 1.
    A social unitof people, systematically structured and managed to meet a need or to pursue collective goals on a continuing basis.
  • 2.
    It is aframework within which an Organization arranges it’s lines of authorities and communications and allocates rights and duties.
  • 3.
    1. Tall OrganizationalStructure 2. Flat Organizational Structure 3. Virtual Organizational Structure 4. Boundary less Organizational Structure
  • 4.
    • Large, complexorganizations often require a taller hierarchy. • In its simplest form, a tall structure results in one long chain of command similar to the military. • As an organization grows, the number of management levels increases and the structure grows taller. In a tall structure, managers form many ranks and each has a small area of control.
  • 6.
    • Flat structureshave fewer management levels, with each level controlling a broad area or group. • Flat organizations focus on empowering employees rather than adhering to the chain of command. • By encouraging autonomy and self-direction, flat structures attempt to tap into employees’ creative talents and to solve problems by collaboration.
  • 8.
    Flatter Organizations Technical Development Team Manufacturing Engineering Team People Systems Team Finance Team Purchasing and SuppllierQuality Team Sales, Service and Marketing Team Executive and Operations Team Copyright © 2004 South-Western. All rights reserved. 3–8
  • 9.
    • Virtual organizationcan be thought of as a way in which an organization uses information and communication technologies to replace or augment some aspect of the organization. • People who are virtually organized primarily interact by electronic mea
  • 10.
    • For example,many customer help desks link customers and consultants together via telephone or the Internet and problems may be solved without ever bringing people together face-to-face
  • 11.
    • A boundaryless Organizational structure is a contemporary approach in Organizational design. • It is an organization that is not defined by, or limited to the horizontal, vertical or external boundaries imposed by a pre-defined structure. • It behaves more like an organism encouraging better integration among employees and closer partnership with stakeholders.
  • 12.
    • Functional • Line •Matrix • product
  • 13.
    Job Analysis • Formaland detailed examination of jobs • Process of defining a job in terms of its component tasks or duties and the knowledge or skills required to perform them .  .
  • 14.
    DEFINITION • Job refersto a group of activities performed by an employees • Tasks is a larger work segment composed of several tasks that are performed by an individual • Responsibilities is an obligations to perform certain tasks and duties. • Job analysis – The procedure for determining the duties and skill requirements of a job and the kind of person who should be hired for it. – The process of obtaining information about jobs by determining what the duties, tasks, or activities of jobs are
  • 15.
    Job description  Statementof the tasks, duties, and responsibilities (TDRs) of a job to be performed
  • 16.
    Job specification • JobSpecification – Statement of the needed knowledge, skills, and abilities (KSAs) of the person who is to perform the job
  • 17.
    Relationship of JobRequirements to Other HRM Functions Copyright © 2004 South-Western. All rights reserved. 3–17 Job Requirements Recruitment Selection Performance Appraisal Training and Development Compensation Management Determine recruitment qualifications Provide job duties and job specifications for selection process Provide performance criteria for evaluating employees Determine training needs and develop instructional programs Provide basis for determining employee’s rate of pay Presentation Slide 3–1
  • 18.
    Methods of CollectingJob Analysis Information: The Interview • Information Sources – Individual employees – Groups of employees – Supervisors with knowledge of the job • Advantages – Quick, direct way to find overlooked information • Disadvantages – Distorted information © 2008 Prentice Hall, Inc. All rights reserved. 4–18
  • 19.
    Methods of CollectingJob Analysis Information: Questionnaires • Information Source – Have employees fill out questionnaires to describe their job-related duties and responsibilities • Advantages – Quick and efficient way to gather information from large numbers of employees • Disadvantages – Expense and time consumed in preparing and testing the questionnaire © 2008 Prentice Hall, Inc. All rights reserved. 4–19
  • 20.
    Methods of CollectingJob Analysis Information: Observation • Information Source – Observing and noting the physical activities of employees as they go about their jobs • Advantages – Provides first-hand information – Reduces distortion of information • Disadvantages – Time consuming – Difficulty in capturing entire job cycle – Of little use if job involves a high level of mental activity © 2008 Prentice Hall, Inc. All rights reserved. 4–20
  • 21.
    Methods of CollectingJob Analysis Information: Participant Diary/Logs • Information Source – Workers keep a chronological diary/ log of what they do and the time spent on each activity • Advantages – Produces a more complete picture of the job – Employee participation • Disadvantages – Distortion of information – Depends upon employees to accurately recall their activities © 2008 Prentice Hall, Inc. All rights reserved. 4–21
  • 22.
    The process ofJob analysis 4-10 The major steps involved in job analysis are:  Organisational analysis  Selection of representative positions to be analysed  Collection of job analysis data  Preparation of job description  Preparation of job specification Job Analysis
  • 23.
    Job Description • Jobdescription is an important document which is basically descriptive in nature and contains a statement of job analysis • It serves to identify a job for consideration by other job analysts • It tells us what should be done, why it should be done, and where it should be performed.
  • 24.
    Job specifications • Itis a written statement of qualifications, traits, physical and mental characteristics that an individual must possess to perform the job duties and discharge responsibilities effectively.
  • 25.
    Job analysis informationand facts Job description Contains information and facts about: • Job identification • Job summary • Relation to other jobs • Supervision taken, location in the hierarchy • Machine tools and equipments used • Materials and form used • Condition of work, location of work, working hours, posture standing, sitting, walking, accuracy, health hazards, occupational diseases etc. Job specification Contains information and facts about: • Education • Experience • Training • Judgment • Initiative • Physical effort • Physical skills • Responsibilities • Communication skills • Emotional characteristics • Unusual sensory demands such as vision, smell , hearing etc.
  • 26.
    Human Resource Planning •Human Resource is an important corporate asset and the overall performance of the companies depends upon the way it is put to use. • In order to realize company’s objectives, it is essential to have a human resource plan.
  • 27.
    Human Resource Planning •Human Resource planning (also called employment or personnel planning) is essentially the process of getting the right number of qualified people into the right job at the right time so that an organization can meet its objectives.
  • 28.
    According to E.W.Witter, • HRP is defined as “A process by which an organization should move from its current manpower position to its desired manpower position.
  • 29.
    5-3 Human Resource Planning Objective Thebasic purpose of HRP is to decide what positions the organisation will have to fill and how to fill them. Objectives of human resource planning Forecast personnel requirements Cope with changes Use existing manpower productively Promote employees in a systematic way
  • 30.
    Importance of HRP HRPis important in a number of ways: • Reservoir of talent • Prepare people for future • Expand or contract • Cut costs • Succession planning
  • 31.
    Benefits of HRP Themajor benefits of HR planning are: • It checks the corporate plan of the organization • It offsets uncertainty and change • It provides scope for advancement and development of employees through training, development etc. • It helps to anticipate the cost of salary enhancement, better benefits etc.
  • 32.
    • It givesan idea of the type of tests to be used and interview techniques in selection based on the level of skills, qualifications, intelligence, value etc. • It causes the development of various sources of human resources to meet the organizational needs. • It facilitates the control of all the functions, operations, contribution and cost of human resources.
  • 33.
    The Process OfHRP • Forecasting the demand for human resources • Supply Forecasting (preparing man power inventory) • Determining man power gap • Formulating HR plans
  • 34.
    5-5 Human Resource Planning TheProcess Of HRP The HRP is a four step process: demand forecasting, supply forecasting, estimating manpower gaps and formulating HR plans. The demand for human resources is influenced by several factors Forecasting the demand for human resources External challenges Economic developments Political, legal, social, technological changes Competition Organisational decisions Workforce factors Forecasting technique
  • 35.
    5-6 Human Resource Planning ExternalChallenges: Liberalisation, privatisation and globalisation (LPG era) have created huge demand for people in software, finance marketing, and manufacturing fields. Organisational Decisions: Decisions such as expansion, diversification, and relocation leading to demand for people possessing requisite skills Workforce Factors: Such as retirement, resignation, and termination etc creating manpower gaps. The Process Of HRP
  • 36.
    5-7 Forecasting Techniques HR forecastsare an attempt to find out an organisation's future demand for employees Human Resource Planning Forecasting techniques Expert forecasts Trend analysis Workforce analysis Workload analysis
  • 37.
    5-8 Human Resource Planning ExpertForecasts: These are based on the judgements of those who possess good knowledge of future human resource needs Trend Analysis: Human resource needs, as such, can be estimated by examining past trends. Forecasting techniques An example of trend analysis 2001-02 Production of Units : 5,000 2002-03 No. of Workers : 100 Ratio : 100:5000 2003-04 Estimated Production : 8,000 No. of Workers required : 8000 × = 160100 5000
  • 38.
    5-9 Workforce Analysis: Allrelevant factors in planning manpower flows in a firm such as transfers, promotions, new recruitments, retirement, resignation etc are taken into account while estimating HR needs Human Resource Planning Forecasting techniques
  • 39.
    5-10 Human Resource Planning Workloadanalysis: Based on the planned output, a firm tires to calculate the number of persons required for various jobs. Forecasting techniques An example of workload analysis Planned output for the year 10,000 pieces Standard hours per piece 3 hours Planned hours required 30,000 hours Productive hours per person per year 1,000 hours (estimated on annual basis) (allowing for absenteeism, turnover, idle time etc.) No. of workers required 30
  • 40.
    5-11 Human Resource Planning SupplyForecasting to find out the size and quality of personnel available within the org to various position A) Internal labour supply: a manpower inventory in terms of the size and quality of personnel available (their age, sex, education, training, experience, job performance, etc) is usually prepared by HR departments. Several techniques are used while ascertaining the internal supply of manpower (a supply of employees to fill projected vacancies can come from within the firm or from new hires )
  • 41.
    5-12 Human Resource Planning Estimatedinternal labour supply for a given firm The FirmSources of Inflows  Transfers  Promotions  New Recruits  Recalls  Promotions  Quits  Terminations  Retirements  Deaths  Layoffs Employees In Employees Out Current staffing level Projected outflows this year Projected inflows this year Firm’s internal supply for this time next year – + = Projected Outflows Current Staffing Level
  • 42.
    5-13 Human Resource Planning forecastingtechnique Staffing table: Shows the number of employees in each job, how they are utilised and the future employment needs for each type of job. Marcov analysis: Uses historical information from personnel movements of the internal labour supply to predict what will happen in the future This technique uses historical rates of promotion , transfer and turn over to estimate future availabilities in the work force . Supply Forecasting
  • 43.
    5-14 Marcov analysis fora hypothetical retail company Human Resource Planning Figures in circles show the transition percentages 80% 12 20% 3 6% 2 11% 4 83% 30 11% 11 66% 63 8% 8 10% 29 72% 207 2% 6 16% 46 6% 86 74% 1066 20% 288 15% 14 2003-2004 Store Asst. Store Section Dept. Sales Exit Managers Managers Heads Heds Executives Store Managers (n = 15) Asst. Store Managers (n = 36) Section Heads (n = 94) Departmental Heads (n = 288) Sales Executives (n = 1440) Forecasted Supply 16 41 92 301 1072 353
  • 44.
    5-15 Skills inventory: Itis a summary of the skills and abilities , experience of each of current employees . Human Resource Planning Supply Forecasting
  • 45.
    5-16 Human Resource Planning Skillsinventory: an example Name : A.K. Sen Date printed : 1-4-2004 Number : 429 Department : 41 Key words Work experience Word Description Activity From To Accounting Tax Supervision 1998 2000 Tax clerk ABC Company and analysis Book Keeping Ledger Supervision 2000 2002 Accountant XYZ Co. Auditing Computer Analysis 2002 2003 Chief Accounts TT Bank records Officer Education Special Qualifications Memberships Degree Major Year Course Date 1. AIMA MBA Finance 1998 DBF 1996 2. ISTD B.Com Accounts 1995 Risk Management 1999 3. ICA Computer Languages Position Location Hobbies Literacy preference choice  Tally French Accounting Kolkata Chess  Banking Auditing Delhi Football Software Bangalore Boating Employees Signature __________ HR Department________ Date _______________________ Date ________________
  • 46.
    5-17 Human Resource Planning Replacementchart: It is a visual representation of who will replace whom in the event of a job opening. Supply Forecasting
  • 47.
    5-18 Human Resource Planning Replacementchart General Manager V. K. Garg A/2 Key Names given are replacement candidates A. Promotable now B. Needing development C. Not suitable to position 1. Superior performance 2. Above Average performance 3. Acceptable performance 4. Poor performance P A to General Manager L. Mathews B/1 Assistant General Manager R.K. Arora A/2 B.K. Nehru B/3 Division: HR Manager C.P. Thakur A/1 Division: Accounting & Taxation Manager A.T. Roy C/2 Division: Planning Manager A.N. Gupta A/1 K.P. Rao B/1 Technical Advisor N.R. Murthy B/3 Northern Region Manager L.C. Srivatsav A/2 A. Thapar C/4 Central Region Manager S.P. Kumar A/1 R. Pandey B/3 Southern Region Manager A. Subramanyam B/2 B.K. Menon B/1 Eastern Region Manager R. Krishna B/3
  • 48.
    5-19 B) External Laboursupply: External hires need to be contacted when suitable internal replacements are not available. A growing number of firms are now using computerised human resource information systems to track the qualifications of hundreds or thousands of employees. HRIS can provide managers with a listing of candidates with required qualifications after scanning the data base. Human Resource Planning Supply Forecasting
  • 49.
    5-20 Important barometers oflabour supply Human Resource Planning 1. Net migration into and out of the area 2. Education levels of workforce 3. Demographic changes in population 4. Technological developments and shifts 5. Population Mobility 6. Demand for specific skills 7. National, regional unemployment rates 8. Actions of competing employers 9. Government policies, regulations, pressures 10. Economic Forecasts for the next few years 11. The attractiveness of an area 12. The attractiveness of an industry in a particular place
  • 50.
    Manpower Gap Analysis 5-21 HumanResource Planning This is used to reconcile the forecasts of labour demand and supply. This process identifies potential skill shortages or surpluses of employees, skills and jobs Estimating manpower requirements Year 1 2 3 1. Number required at the beginning of the year 2. Changes to requirements forecast during the year DEMAND 3. Total requirements at the end of the year (1+2) ------- ------ 4. Number available at the beginning of the year 5. Additions (transfers, promotions) SUPPLY 6. Separations (retirement, wastage, promotions out and other losses) 7. Total available at the end of year (4+5+6) -------------------- 8. Deficit or surplus (3-7) RECONCILIATION 9. Losses of those recruited during the year OF THE ABOVE 10. Additional numbers needed during the year (8+9) MANPOWERNEEDED
  • 51.
    5-22 Formulating HR Plans HumanResource Planning Once supply and demand for labour is known adjustments can be made formulating requisite HR plans A variety of HR plans  Recruitment plan  Redeployment plan  Redundancy plan  Training plan  Productivity plan  Retention plan

Editor's Notes