SlideShare a Scribd company logo
How to prepare a good Eurostars
application
IBRAHIM SINAN AKMANDOR
EUROSTARS-2 IEP CHAIRMAN, 17 NOVEMBER 2014, BRUSSELS
1
From an IEP member perspective:
What happened in COD1:
 Number of accepted projects:
 In Eurostars 2-COD1 roughly 82out of 158 above threshold.
 First 70 out of 82 have been funded
 In any case, intended project must rank within first 50, whatever the
number of project submitted,
 If a project fails the first time, you can resubmit. However, from past
experience, it is seen that a resubmission receive +- same ranking,
 If a resubmission, change the product scope as well as the
consortium partnerships (totally new submission may have a better
ranking opportunity).
2
Funding
 The funding of partners is based on the national funding rules.
Project partners must demonstrate good financial health. Otherwise
project is killed. The content has no real value at all.
 The funding of projects is following the ranking list until national
budget exhaustion. If project is of mediocre quality (ranking
between 50-80), then partner countries (countries which can fund all
proposals) must be carefully selected.
 All partners must be funded to be a Eurostars project
3
Eurostars2: try to cooperate with No.1’s SME’s (and
institutions) in their respective countries:
 Allows the combination of the best institutions of each country: try to
cooperate with an SME with
 Links to top research institutions AND
 Companies with already strong market presence and good market access
 Past: good research background, already patented good
technology,
 Present: good pre-applications of patented idea, healthy financial
structure,
 Future:good product marketing planning.
4
Basic Assessment - Quality and
efficiency of the implementation - 1
 1. At least 2 participants that are Eurostars members. Well balanced
partnership (no country responsible for more than 75% of the project
costs).
 2. Consortium Leader must be an R&D-performing SME. The
managerial capacity of the project coordinator should be clearly
outlined. The coordiantor must have a clear track record of
international project management.
 3. The consortium must be extremely well balanced. The innovation
is embedded within the leading SME + there a high tech research
institution backing the technological idea + there is a company
already well rooted in the market willing to exploit and/or market
the new product.
5
Basic Assessment - Quality and
efficiency of the implementation -2
 4. There must Added Value through cooperation. Cooperation of
similar companies should be avoided. Technologically
complementary institutions should form the consortium. Also
companies already present in the market should be chosen.
 5. Methodology and Planning should be detailed. Risks and
contingency plans must be clearly described.
 6. Milestones and deliverables should be detailed. The work share of
the partners in the consortium should be evenly distributed.
6
Basic Assessment - Quality and
efficiency of the implementation-3
 7. Cost and Financing Structure should be detailed. The cost and
project financial share and benefits of the partners in the consortium
should be evenly distributed. The R&D performing SMEs are
undertaking at least 50% of total R&D cost.
 How IPR will be expoited usually not well answered.
 8. Financial Commitment of each partner should be detailed.
7
Product development level must be already
mature at time of application
 Project duration is less than 3 years
 Time to Market: Market introduction is foreseen within 2 years after
project completion.
8
Technology and Innovation –
Excellence -1
 Degree of Innovation should be very high. Very recents IPR’s to be
well documented/tabulated.
 Degree of technical maturity should be low. Not a conglomeration
of existing technologies,
 Technological risks should be very high,
 But all risks must have been properly addressed,
9
Technology and Innovation –
Excellence -2
 Technological achievements should be detailed,
 Technological progress for SMEs should be clearly stated,
 Geographical or sectorial impact should be very wide.
10
Market and Commercialization –
Impact -1
 1. Market and Commercialisation is most often neglected in
project proposal. Actually it is the most important part of the
proposal. What is the added value of the proposed product ? What
are its strength and weaknesses?. How to correct the weaknesses.
 2. Market Size should not be overrealistic. Usually it is described
larger than reality. No major already established player should be in
the targeted market. Market share should be described.
 3. Market access barrier should be low.
 4. Return On Investment (ROI) should be correctly calculated.
Input parameters and assumptions should be detailed and
calculation steps should be presented.
11
Market and Commercialization –
Impact -2
 5. Market potential for SME should be analysed
 6. Time to Market should be short (around 2 years)
 7. Strategic importance of the new product should be detailed.
This will affect market share.
 8. Enhanced capabilities/visibility. Stength of the product,
presence in the market and market planning should be detailed.
12
2-step evaluation
 1.Technical Assessment by 3 experts + NPC cover note
 2. Evaluation and Ranking by Independent Evaluation Panel. Very
strong statictical data and impartial expert analysis making ranking
close to perfect (continued legacy of Eurostars 1)
 What is evaluated: be the devils advocate in writing the proposal:
 Basic Assessment. Proposal should not only focus on setting up a good
consortıum. Timely product idea and how to achieve it should be underlined.
 Technology and Innovation. Risky technology is good but risks must be
assessed very well. This part of the proposal should be written very easily. If
no IPR how to protect it in the marketing phase as well?
 Market and Competitiveness. A good time and effort should be dedicated to
writing the marketting of the new product. An excellent consortium helps the
MC as well.
13
Thanks for listening 14

More Related Content

What's hot

Project report of a business
Project report of a businessProject report of a business
Project report of a business
Yuvaraj neelakandan
 
Preparation of project ppt
Preparation of project pptPreparation of project ppt
Preparation of project ppt
Mit mysore
 
Project Management: Unit I - introduction
Project Management: Unit I - introductionProject Management: Unit I - introduction
Project Management: Unit I - introduction
Ghaith Al Darmaki
 
Project identification and Project selection
Project identification and Project selectionProject identification and Project selection
Project identification and Project selection
AmandaBvera
 
Project Planning & Feasibility Study
Project Planning & Feasibility StudyProject Planning & Feasibility Study
Project Planning & Feasibility Study
Visual Design Solution
 
Pm chapter 2...
Pm chapter 2...Pm chapter 2...
Pm chapter 2...
Golam Bitonsir
 
ITFT - Business Opportunity
ITFT - Business OpportunityITFT - Business Opportunity
ITFT - Business Opportunity
Aarti Katoch
 
Project appraisal part 1
Project appraisal part  1Project appraisal part  1
Project appraisal part 1
danappadharwad
 
Generation of Project Ideas
Generation of Project IdeasGeneration of Project Ideas
Generation of Project Ideas
Usama Raees
 
Generation and screening of project
Generation and screening of projectGeneration and screening of project
Generation and screening of project
tahmina rahman
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
Surya C D
 
Project Identification Technique
Project Identification TechniqueProject Identification Technique
Project Identification Technique
SamreenAkhtar8
 
Feasibility and viability
Feasibility and viabilityFeasibility and viability
Feasibility and viability
Anjan991
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project Idea
MOHAMMAD IQBAL
 
New Project Identification and Selection of Right Project, Best Business Oppo...
New Project Identification and Selection of Right Project, Best Business Oppo...New Project Identification and Selection of Right Project, Best Business Oppo...
New Project Identification and Selection of Right Project, Best Business Oppo...
Ajjay Kumar Gupta
 
Project feasibility study report
Project feasibility study report Project feasibility study report
Project feasibility study report
Harish Satya
 
Feasibility Study
Feasibility StudyFeasibility Study
Feasibility Study
Rejvi Ahmed
 
Project identification & screening
Project identification & screeningProject identification & screening
Project identification & screening
sachin kumar sharma
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
Rajesh Adatravu
 

What's hot (20)

Project report of a business
Project report of a businessProject report of a business
Project report of a business
 
Preparation of project ppt
Preparation of project pptPreparation of project ppt
Preparation of project ppt
 
Project Management: Unit I - introduction
Project Management: Unit I - introductionProject Management: Unit I - introduction
Project Management: Unit I - introduction
 
Project identification and Project selection
Project identification and Project selectionProject identification and Project selection
Project identification and Project selection
 
Risk project mgt, infra
Risk project mgt, infraRisk project mgt, infra
Risk project mgt, infra
 
Project Planning & Feasibility Study
Project Planning & Feasibility StudyProject Planning & Feasibility Study
Project Planning & Feasibility Study
 
Pm chapter 2...
Pm chapter 2...Pm chapter 2...
Pm chapter 2...
 
ITFT - Business Opportunity
ITFT - Business OpportunityITFT - Business Opportunity
ITFT - Business Opportunity
 
Project appraisal part 1
Project appraisal part  1Project appraisal part  1
Project appraisal part 1
 
Generation of Project Ideas
Generation of Project IdeasGeneration of Project Ideas
Generation of Project Ideas
 
Generation and screening of project
Generation and screening of projectGeneration and screening of project
Generation and screening of project
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 
Project Identification Technique
Project Identification TechniqueProject Identification Technique
Project Identification Technique
 
Feasibility and viability
Feasibility and viabilityFeasibility and viability
Feasibility and viability
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project Idea
 
New Project Identification and Selection of Right Project, Best Business Oppo...
New Project Identification and Selection of Right Project, Best Business Oppo...New Project Identification and Selection of Right Project, Best Business Oppo...
New Project Identification and Selection of Right Project, Best Business Oppo...
 
Project feasibility study report
Project feasibility study report Project feasibility study report
Project feasibility study report
 
Feasibility Study
Feasibility StudyFeasibility Study
Feasibility Study
 
Project identification & screening
Project identification & screeningProject identification & screening
Project identification & screening
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 

Similar to How to prepare a good eurostars application v2

EU funding for SME's and Startups
EU funding for SME's and Startups EU funding for SME's and Startups
EU funding for SME's and Startups
Entrepreneurs Anonymous
 
Pm 2 (1)
Pm 2 (1)Pm 2 (1)
Pm 2 (1)
SabithaKabilan
 
Startup Grind Bucharest April 2019 Gyorgy Bodo
Startup Grind Bucharest April 2019 Gyorgy BodoStartup Grind Bucharest April 2019 Gyorgy Bodo
Startup Grind Bucharest April 2019 Gyorgy Bodo
Daniel-Ioan Dumitrescu, PhD.
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
KTN
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
KTN
 
Open Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De MartinoOpen Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De MartinoJIC
 
Grant Funding from Europe for Innovation and New Product Development
Grant Funding from Europe for Innovation and New Product DevelopmentGrant Funding from Europe for Innovation and New Product Development
Grant Funding from Europe for Innovation and New Product Development
The Pathway Group
 
EU Framework for Research and Innovation- Grants from European Commission
EU Framework for Research and Innovation- Grants from European CommissionEU Framework for Research and Innovation- Grants from European Commission
EU Framework for Research and Innovation- Grants from European Commission
The Pathway Group
 
TCI Pathway working with Pera Technology on Horizon 2020 funding UK
TCI Pathway working with Pera Technology on Horizon 2020 funding UKTCI Pathway working with Pera Technology on Horizon 2020 funding UK
TCI Pathway working with Pera Technology on Horizon 2020 funding UK
The Pathway Group
 
Horizon 2020 - EU Funding Opportunities, SME instrument
Horizon 2020 - EU Funding Opportunities, SME instrumentHorizon 2020 - EU Funding Opportunities, SME instrument
Horizon 2020 - EU Funding Opportunities, SME instrument
The Pathway Group
 
Applying for Eurostars-3 Call 3 (12 July 2022)
Applying for Eurostars-3 Call 3 (12 July 2022)Applying for Eurostars-3 Call 3 (12 July 2022)
Applying for Eurostars-3 Call 3 (12 July 2022)
EUREKA Secretariat
 
Maxine Smith 19 May V Final
Maxine Smith 19 May V FinalMaxine Smith 19 May V Final
Maxine Smith 19 May V Final
InnovateUK
 
Horizon 2020 Fast Track to Innovation - Jane Watkins
Horizon 2020 Fast Track to Innovation - Jane WatkinsHorizon 2020 Fast Track to Innovation - Jane Watkins
Horizon 2020 Fast Track to Innovation - Jane Watkins
Invest Northern Ireland
 
Fast track to innovation
Fast track to innovationFast track to innovation
Fast track to innovation
IS-X
 
Feasibility study ppt
Feasibility study pptFeasibility study ppt
Feasibility study ppt
kunal kishore
 
Horizon 2020 Fast Track to Innovation - Catherine Pouret
Horizon 2020 Fast Track to Innovation - Catherine PouretHorizon 2020 Fast Track to Innovation - Catherine Pouret
Horizon 2020 Fast Track to Innovation - Catherine Pouret
Invest Northern Ireland
 
Chaintech BitTalk Series Episode 3
Chaintech BitTalk Series Episode 3Chaintech BitTalk Series Episode 3
Chaintech BitTalk Series Episode 3
Francois Zhang Mingqian
 
CME Smart Prosperity Now Program Overview
CME Smart Prosperity Now Program OverviewCME Smart Prosperity Now Program Overview
CME Smart Prosperity Now Program Overview
JohnGunn
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
BBAsourashtracollege
 
Project report
Project reportProject report
Project report
Manoj Reddy
 

Similar to How to prepare a good eurostars application v2 (20)

EU funding for SME's and Startups
EU funding for SME's and Startups EU funding for SME's and Startups
EU funding for SME's and Startups
 
Pm 2 (1)
Pm 2 (1)Pm 2 (1)
Pm 2 (1)
 
Startup Grind Bucharest April 2019 Gyorgy Bodo
Startup Grind Bucharest April 2019 Gyorgy BodoStartup Grind Bucharest April 2019 Gyorgy Bodo
Startup Grind Bucharest April 2019 Gyorgy Bodo
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
 
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
GCRF Demonstrate Impact Competition Briefing Round 2: How to Increase Impact ...
 
Open Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De MartinoOpen Day JIC: Evaluation process of SME Instrument, Pietro De Martino
Open Day JIC: Evaluation process of SME Instrument, Pietro De Martino
 
Grant Funding from Europe for Innovation and New Product Development
Grant Funding from Europe for Innovation and New Product DevelopmentGrant Funding from Europe for Innovation and New Product Development
Grant Funding from Europe for Innovation and New Product Development
 
EU Framework for Research and Innovation- Grants from European Commission
EU Framework for Research and Innovation- Grants from European CommissionEU Framework for Research and Innovation- Grants from European Commission
EU Framework for Research and Innovation- Grants from European Commission
 
TCI Pathway working with Pera Technology on Horizon 2020 funding UK
TCI Pathway working with Pera Technology on Horizon 2020 funding UKTCI Pathway working with Pera Technology on Horizon 2020 funding UK
TCI Pathway working with Pera Technology on Horizon 2020 funding UK
 
Horizon 2020 - EU Funding Opportunities, SME instrument
Horizon 2020 - EU Funding Opportunities, SME instrumentHorizon 2020 - EU Funding Opportunities, SME instrument
Horizon 2020 - EU Funding Opportunities, SME instrument
 
Applying for Eurostars-3 Call 3 (12 July 2022)
Applying for Eurostars-3 Call 3 (12 July 2022)Applying for Eurostars-3 Call 3 (12 July 2022)
Applying for Eurostars-3 Call 3 (12 July 2022)
 
Maxine Smith 19 May V Final
Maxine Smith 19 May V FinalMaxine Smith 19 May V Final
Maxine Smith 19 May V Final
 
Horizon 2020 Fast Track to Innovation - Jane Watkins
Horizon 2020 Fast Track to Innovation - Jane WatkinsHorizon 2020 Fast Track to Innovation - Jane Watkins
Horizon 2020 Fast Track to Innovation - Jane Watkins
 
Fast track to innovation
Fast track to innovationFast track to innovation
Fast track to innovation
 
Feasibility study ppt
Feasibility study pptFeasibility study ppt
Feasibility study ppt
 
Horizon 2020 Fast Track to Innovation - Catherine Pouret
Horizon 2020 Fast Track to Innovation - Catherine PouretHorizon 2020 Fast Track to Innovation - Catherine Pouret
Horizon 2020 Fast Track to Innovation - Catherine Pouret
 
Chaintech BitTalk Series Episode 3
Chaintech BitTalk Series Episode 3Chaintech BitTalk Series Episode 3
Chaintech BitTalk Series Episode 3
 
CME Smart Prosperity Now Program Overview
CME Smart Prosperity Now Program OverviewCME Smart Prosperity Now Program Overview
CME Smart Prosperity Now Program Overview
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
 
Project report
Project reportProject report
Project report
 

More from Open Concept

A guide to ICT-related activities in WP2016-17
A guide to ICT-related activities in WP2016-17A guide to ICT-related activities in WP2016-17
A guide to ICT-related activities in WP2016-17
Open Concept
 
Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...
Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...
Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...
Open Concept
 
Sektorowe programy B+R w 2017 dla firm
Sektorowe programy B+R w 2017 dla firmSektorowe programy B+R w 2017 dla firm
Sektorowe programy B+R w 2017 dla firm
Open Concept
 
Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...
Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...
Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...
Open Concept
 
Harmonogram naborów wniosków WRPO na rok 2017 - oś 1.
Harmonogram naborów wniosków WRPO na rok 2017 - oś 1. Harmonogram naborów wniosków WRPO na rok 2017 - oś 1.
Harmonogram naborów wniosków WRPO na rok 2017 - oś 1.
Open Concept
 
harmonogram konkursów 2016/2017 dla mśp
harmonogram konkursów 2016/2017 dla mśp harmonogram konkursów 2016/2017 dla mśp
harmonogram konkursów 2016/2017 dla mśp
Open Concept
 
raport Global Entrepreneurship Monitor – Polska
raport Global Entrepreneurship Monitor – Polskaraport Global Entrepreneurship Monitor – Polska
raport Global Entrepreneurship Monitor – Polska
Open Concept
 
Doradca klienta oferta pracy
Doradca klienta oferta pracyDoradca klienta oferta pracy
Doradca klienta oferta pracy
Open Concept
 
Doradca klienta oferta pracy
Doradca klienta oferta pracyDoradca klienta oferta pracy
Doradca klienta oferta pracy
Open Concept
 
Poddziałanie 3.3.3
Poddziałanie 3.3.3Poddziałanie 3.3.3
Poddziałanie 3.3.3
Open Concept
 
TRWAJĄCE NABORY W WOJ. OPOLSKIM
TRWAJĄCE NABORY W WOJ. OPOLSKIM TRWAJĄCE NABORY W WOJ. OPOLSKIM
TRWAJĄCE NABORY W WOJ. OPOLSKIM
Open Concept
 
Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...
Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...
Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...
Open Concept
 
Zarządzanie uczelnia oraz infrastruktura priorytet xiii pois
Zarządzanie uczelnia oraz infrastruktura priorytet xiii  poisZarządzanie uczelnia oraz infrastruktura priorytet xiii  pois
Zarządzanie uczelnia oraz infrastruktura priorytet xiii pois
Open Concept
 
20160118 090540 standardy zarzadzania_klastrem
20160118 090540 standardy zarzadzania_klastrem20160118 090540 standardy zarzadzania_klastrem
20160118 090540 standardy zarzadzania_klastrem
Open Concept
 
Prosto o konkursach_fe_poradnik
Prosto o konkursach_fe_poradnikProsto o konkursach_fe_poradnik
Prosto o konkursach_fe_poradnik
Open Concept
 
Poddziałanie 2.3.2
Poddziałanie 2.3.2Poddziałanie 2.3.2
Poddziałanie 2.3.2
Open Concept
 
Przewodnik po finansowaniu_energetyki_obywatelskiej
Przewodnik po finansowaniu_energetyki_obywatelskiejPrzewodnik po finansowaniu_energetyki_obywatelskiej
Przewodnik po finansowaniu_energetyki_obywatelskiej
Open Concept
 
2016 call for ki cs presentation
2016 call for ki cs presentation2016 call for ki cs presentation
2016 call for ki cs presentation
Open Concept
 
Wytyczne kwalifikowalnosci wydatkow_poir_28082015
Wytyczne kwalifikowalnosci wydatkow_poir_28082015Wytyczne kwalifikowalnosci wydatkow_poir_28082015
Wytyczne kwalifikowalnosci wydatkow_poir_28082015
Open Concept
 
Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...
Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...
Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...
Open Concept
 

More from Open Concept (20)

A guide to ICT-related activities in WP2016-17
A guide to ICT-related activities in WP2016-17A guide to ICT-related activities in WP2016-17
A guide to ICT-related activities in WP2016-17
 
Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...
Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...
Harmonogram naboru wniosków w 2017 roku w ramach Programu Operacyjnego Polska...
 
Sektorowe programy B+R w 2017 dla firm
Sektorowe programy B+R w 2017 dla firmSektorowe programy B+R w 2017 dla firm
Sektorowe programy B+R w 2017 dla firm
 
Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...
Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...
Infrastruktura kapitału ludzkiego - harmonogram naborów wniosków dla Wielkopo...
 
Harmonogram naborów wniosków WRPO na rok 2017 - oś 1.
Harmonogram naborów wniosków WRPO na rok 2017 - oś 1. Harmonogram naborów wniosków WRPO na rok 2017 - oś 1.
Harmonogram naborów wniosków WRPO na rok 2017 - oś 1.
 
harmonogram konkursów 2016/2017 dla mśp
harmonogram konkursów 2016/2017 dla mśp harmonogram konkursów 2016/2017 dla mśp
harmonogram konkursów 2016/2017 dla mśp
 
raport Global Entrepreneurship Monitor – Polska
raport Global Entrepreneurship Monitor – Polskaraport Global Entrepreneurship Monitor – Polska
raport Global Entrepreneurship Monitor – Polska
 
Doradca klienta oferta pracy
Doradca klienta oferta pracyDoradca klienta oferta pracy
Doradca klienta oferta pracy
 
Doradca klienta oferta pracy
Doradca klienta oferta pracyDoradca klienta oferta pracy
Doradca klienta oferta pracy
 
Poddziałanie 3.3.3
Poddziałanie 3.3.3Poddziałanie 3.3.3
Poddziałanie 3.3.3
 
TRWAJĄCE NABORY W WOJ. OPOLSKIM
TRWAJĄCE NABORY W WOJ. OPOLSKIM TRWAJĄCE NABORY W WOJ. OPOLSKIM
TRWAJĄCE NABORY W WOJ. OPOLSKIM
 
Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...
Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...
Zamówienia publiczne porady dla osób odpowiedzialnych za udzielanie zamówi...
 
Zarządzanie uczelnia oraz infrastruktura priorytet xiii pois
Zarządzanie uczelnia oraz infrastruktura priorytet xiii  poisZarządzanie uczelnia oraz infrastruktura priorytet xiii  pois
Zarządzanie uczelnia oraz infrastruktura priorytet xiii pois
 
20160118 090540 standardy zarzadzania_klastrem
20160118 090540 standardy zarzadzania_klastrem20160118 090540 standardy zarzadzania_klastrem
20160118 090540 standardy zarzadzania_klastrem
 
Prosto o konkursach_fe_poradnik
Prosto o konkursach_fe_poradnikProsto o konkursach_fe_poradnik
Prosto o konkursach_fe_poradnik
 
Poddziałanie 2.3.2
Poddziałanie 2.3.2Poddziałanie 2.3.2
Poddziałanie 2.3.2
 
Przewodnik po finansowaniu_energetyki_obywatelskiej
Przewodnik po finansowaniu_energetyki_obywatelskiejPrzewodnik po finansowaniu_energetyki_obywatelskiej
Przewodnik po finansowaniu_energetyki_obywatelskiej
 
2016 call for ki cs presentation
2016 call for ki cs presentation2016 call for ki cs presentation
2016 call for ki cs presentation
 
Wytyczne kwalifikowalnosci wydatkow_poir_28082015
Wytyczne kwalifikowalnosci wydatkow_poir_28082015Wytyczne kwalifikowalnosci wydatkow_poir_28082015
Wytyczne kwalifikowalnosci wydatkow_poir_28082015
 
Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...
Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...
Broszura informacyjna-zakładanie-działaności-gospodarczej w Wielkopolsce 14.0...
 

Recently uploaded

Create a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdfCreate a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdf
andreakaterasco
 
Best Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to SuccessBest Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to Success
Intelisync
 
Zeeshan Hayat - A Guide to Efficient Business Management.pdf
Zeeshan Hayat - A Guide to Efficient Business Management.pdfZeeshan Hayat - A Guide to Efficient Business Management.pdf
Zeeshan Hayat - A Guide to Efficient Business Management.pdf
Zeeshan Hayat
 
Showcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdfShowcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdf
MarianAndreaSTana
 
Michael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdfMichael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdf
Michael Oikonomou
 
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
pv4uhplv
 
Get To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdfGet To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdf
Salma Karina Hayat
 
How To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine BusinessHow To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine Business
Charlie McDermott
 
Legal Mandates of technopreneurship.pptx
Legal Mandates of technopreneurship.pptxLegal Mandates of technopreneurship.pptx
Legal Mandates of technopreneurship.pptx
JadielByronAntonio
 

Recently uploaded (9)

Create a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdfCreate a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdf
 
Best Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to SuccessBest Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to Success
 
Zeeshan Hayat - A Guide to Efficient Business Management.pdf
Zeeshan Hayat - A Guide to Efficient Business Management.pdfZeeshan Hayat - A Guide to Efficient Business Management.pdf
Zeeshan Hayat - A Guide to Efficient Business Management.pdf
 
Showcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdfShowcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdf
 
Michael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdfMichael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdf
 
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
在线办理(uofc毕业证书)芝加哥大学毕业证学历学位证书原版一模一样
 
Get To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdfGet To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdf
 
How To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine BusinessHow To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine Business
 
Legal Mandates of technopreneurship.pptx
Legal Mandates of technopreneurship.pptxLegal Mandates of technopreneurship.pptx
Legal Mandates of technopreneurship.pptx
 

How to prepare a good eurostars application v2

  • 1. How to prepare a good Eurostars application IBRAHIM SINAN AKMANDOR EUROSTARS-2 IEP CHAIRMAN, 17 NOVEMBER 2014, BRUSSELS 1
  • 2. From an IEP member perspective: What happened in COD1:  Number of accepted projects:  In Eurostars 2-COD1 roughly 82out of 158 above threshold.  First 70 out of 82 have been funded  In any case, intended project must rank within first 50, whatever the number of project submitted,  If a project fails the first time, you can resubmit. However, from past experience, it is seen that a resubmission receive +- same ranking,  If a resubmission, change the product scope as well as the consortium partnerships (totally new submission may have a better ranking opportunity). 2
  • 3. Funding  The funding of partners is based on the national funding rules. Project partners must demonstrate good financial health. Otherwise project is killed. The content has no real value at all.  The funding of projects is following the ranking list until national budget exhaustion. If project is of mediocre quality (ranking between 50-80), then partner countries (countries which can fund all proposals) must be carefully selected.  All partners must be funded to be a Eurostars project 3
  • 4. Eurostars2: try to cooperate with No.1’s SME’s (and institutions) in their respective countries:  Allows the combination of the best institutions of each country: try to cooperate with an SME with  Links to top research institutions AND  Companies with already strong market presence and good market access  Past: good research background, already patented good technology,  Present: good pre-applications of patented idea, healthy financial structure,  Future:good product marketing planning. 4
  • 5. Basic Assessment - Quality and efficiency of the implementation - 1  1. At least 2 participants that are Eurostars members. Well balanced partnership (no country responsible for more than 75% of the project costs).  2. Consortium Leader must be an R&D-performing SME. The managerial capacity of the project coordinator should be clearly outlined. The coordiantor must have a clear track record of international project management.  3. The consortium must be extremely well balanced. The innovation is embedded within the leading SME + there a high tech research institution backing the technological idea + there is a company already well rooted in the market willing to exploit and/or market the new product. 5
  • 6. Basic Assessment - Quality and efficiency of the implementation -2  4. There must Added Value through cooperation. Cooperation of similar companies should be avoided. Technologically complementary institutions should form the consortium. Also companies already present in the market should be chosen.  5. Methodology and Planning should be detailed. Risks and contingency plans must be clearly described.  6. Milestones and deliverables should be detailed. The work share of the partners in the consortium should be evenly distributed. 6
  • 7. Basic Assessment - Quality and efficiency of the implementation-3  7. Cost and Financing Structure should be detailed. The cost and project financial share and benefits of the partners in the consortium should be evenly distributed. The R&D performing SMEs are undertaking at least 50% of total R&D cost.  How IPR will be expoited usually not well answered.  8. Financial Commitment of each partner should be detailed. 7
  • 8. Product development level must be already mature at time of application  Project duration is less than 3 years  Time to Market: Market introduction is foreseen within 2 years after project completion. 8
  • 9. Technology and Innovation – Excellence -1  Degree of Innovation should be very high. Very recents IPR’s to be well documented/tabulated.  Degree of technical maturity should be low. Not a conglomeration of existing technologies,  Technological risks should be very high,  But all risks must have been properly addressed, 9
  • 10. Technology and Innovation – Excellence -2  Technological achievements should be detailed,  Technological progress for SMEs should be clearly stated,  Geographical or sectorial impact should be very wide. 10
  • 11. Market and Commercialization – Impact -1  1. Market and Commercialisation is most often neglected in project proposal. Actually it is the most important part of the proposal. What is the added value of the proposed product ? What are its strength and weaknesses?. How to correct the weaknesses.  2. Market Size should not be overrealistic. Usually it is described larger than reality. No major already established player should be in the targeted market. Market share should be described.  3. Market access barrier should be low.  4. Return On Investment (ROI) should be correctly calculated. Input parameters and assumptions should be detailed and calculation steps should be presented. 11
  • 12. Market and Commercialization – Impact -2  5. Market potential for SME should be analysed  6. Time to Market should be short (around 2 years)  7. Strategic importance of the new product should be detailed. This will affect market share.  8. Enhanced capabilities/visibility. Stength of the product, presence in the market and market planning should be detailed. 12
  • 13. 2-step evaluation  1.Technical Assessment by 3 experts + NPC cover note  2. Evaluation and Ranking by Independent Evaluation Panel. Very strong statictical data and impartial expert analysis making ranking close to perfect (continued legacy of Eurostars 1)  What is evaluated: be the devils advocate in writing the proposal:  Basic Assessment. Proposal should not only focus on setting up a good consortıum. Timely product idea and how to achieve it should be underlined.  Technology and Innovation. Risky technology is good but risks must be assessed very well. This part of the proposal should be written very easily. If no IPR how to protect it in the marketing phase as well?  Market and Competitiveness. A good time and effort should be dedicated to writing the marketting of the new product. An excellent consortium helps the MC as well. 13