Sr.
No
Stage Assessment Clearance Status
Non conformance
Status
conformance
1 Eligibility Eligibility
Criteria
Mandatory
100%
Not Eligible Eligible
2 Qualification Qualification
Criteria
Threshold
Passing Marks
Disqualified Qualified
3 Bid
Submission
Method Mandatory
100%
Returned Submitted
4 Bid
Opening
Preliminary
Examination
Mandatory
100%
Non
Responsive
Responsive
5 Technical
Evaluation
Specifications Mandatory
100%
Technically
Rejected
Responsive
6 Technical
Evaluation
Technical
Evaluation
Criteria
Threshold
Passing Marks
Technically
Rejected
Technically
Accepted
7 Financial
Evaluation
Financial
Evaluation
Criteria
Mandatory
100%
Financially
Rejected
Financially
Accepted
8 Price or Cost
Comparison
Whole Life
Cost
Cost Effective Financially
Accepted
Lowest
Evaluated Bid
Sr.
No
Fields Marks Assigned Marks Obtained
50% marks
each category
1 Relevant Experience
a) General Experience
b) Specific Experience
20
10
10
2 Performance
a) Similar Nature of work in past
b) Similar Nature of work in Hand
20
10
10
3 Financial Position
a) Audited reports for last 3 years
b) Bank statements for last 3 years
20
10
10
4 Resources
a) Equipment/Plants
b) Work Force/ Key Personnel's
20
10
10
5 Managerial Capabilities
a) Time Line of past projects
b) Satisfaction Certificates
20
10
10
Evaluation Criteria Prequalification
EXAMPLE OF PRELIMINARY EXAMINATION
Bidder
(a)
Verification
(b)
Eligibility
(c)
Bid Security
(d)
Completene
ss of Bid
(e)
Substantial
Responsiven
ess
(f)
Acceptance
for Detailed
Examination
(g)
Bidder A Yes Yes Yes Yes Yes Yes
Bidder B No1 Yes Yes Yes Yes2 No
Bidder C Yes Yes Yes Yes Yes Yes
Bidder D Yes Yes No3 No Yes No
Bidder E Yes No No4 Yes Yes No
Bidder F Yes Yes Yes Yes Yes Yes
Bidder G Yes Yes Yes Yes Yes Yes
Bidder H Yes Yes Yes Yes Yes Yes
1. Joint Venture agreement missing.
2. Requires 25 percent mobilization advance; bid document states maximum of 15 percent.
Deviation is minor or major depending on the resources of Employer.
3. Bid security not in required amount/format.
4. Required validity period of security not met ( 8 weeks instead of 12 weeks ).
Sr.
No
Fields Marks
Assigned
Marks
Obtained
Weight
80
1 Quality
a) Certificates
b)Inspections
c) Tests/Samples
40
10
10
20
M x
0.8 =
2 After Sale Service
a) Warranties
b)Guarantees
c) Backup Support
40
10
10
20
3 Reliability
a) Proof of Past Performance
b)Insurance
20
10
10
4 Whole Life Cost 20
Technical Evaluation Criteria
Whole Life Cost
Sr.
No
Components Marks Obtained Weight
1 Price of Product 50
2 Price of Spares 20
3 Transport Charges 10
4 Installation Charges 10
5 Maintenance Charges 10
S No
Name of
Firm or
Bidder
Cost
offered
by the
Bidder
Ranking
in terms
of cost
Comparis
on with
Estimated
cost
Reasons for
acceptance
/
rejection
Remarks
0 1 2 3 4 5 6
1. A
2. B
3. C
4. D
Bid Evaluation Report:
Sr.
No
Fields Marks Assigned Marks Obtained
1 Company profile
a) Year of incorporation
b) Employees
10
5
5
2 Qualification of Key Staff
a) PhD
b) M. Phil
c) Maters
30
15
10
5
3 Relevant Experience
a) General Experience
b) Specific Experience
20
10
10
4 Performance
a) Similar Nature of work in past
b) Similar Nature of work in Hand
20
15
5
5 Financial report
a) Audited reports for last 3 years
b) Bank statements for last 3 years
20
10
10
Expression of Interest
Sr.
No
Fields Marks
Assigned
Marks
Obtained
Weight
80
1 Approach
a) Understanding
b) Innovation
c) Risk assessment
20
10
5
5
M x 0.8 =
2 Methodology
a) Tools
b) Techniques
c) Cost Effectiveness
30
10
10
10
3 Work Plan
a) Timelines
b) Milestones
20
10
10
4 Quality Management
a) KPIs
b) KRIs
20
10
10
5 Key Staff
a) Qualification
b) Relevant Experiance
20
10
10
Request for Proposal
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx
How to Evaluate Bids in procurement.pptx

More Related Content

Similar to How to Evaluate Bids in procurement.pptx

ISTQB Foundation Level Certification - Intruduction
ISTQB Foundation Level Certification - IntruductionISTQB Foundation Level Certification - Intruduction
ISTQB Foundation Level Certification - IntruductionQA Guards
 
Measurement of project quality performance
Measurement of project quality performanceMeasurement of project quality performance
Measurement of project quality performanceK.K. PATHAK
 
Day 2 1135 - 1220 - pearl 1 - avinash kumar
Day 2   1135 - 1220 - pearl 1 - avinash kumarDay 2   1135 - 1220 - pearl 1 - avinash kumar
Day 2 1135 - 1220 - pearl 1 - avinash kumarPMI2011
 
Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...
Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...
Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...PMI_IREP_TP
 
Managing Quality
Managing QualityManaging Quality
Managing Qualityknksmart
 
BB Project on AHT .pptx
BB Project on AHT .pptxBB Project on AHT .pptx
BB Project on AHT .pptxPankaj Kumar
 
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing John William
 
Service Encounters Grading Rubric  Must be attached .docx
Service Encounters Grading Rubric   Must be attached .docxService Encounters Grading Rubric   Must be attached .docx
Service Encounters Grading Rubric  Must be attached .docxlesleyryder69361
 
Effective Specification Writing
Effective Specification WritingEffective Specification Writing
Effective Specification WritingDr Gordon Murray
 
104vendor appraisal
104vendor appraisal104vendor appraisal
104vendor appraisalbtecexpert
 
Request for-proposals-fundamentals4957
Request for-proposals-fundamentals4957Request for-proposals-fundamentals4957
Request for-proposals-fundamentals49570607ashley
 
Governance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabsGovernance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabsVIJAYA BHASKARA VARMA YARAKARAJU
 
Managing Quality
Managing QualityManaging Quality
Managing QualityAli BARAN
 
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_PublicChanmo James Choi
 
Raising Supplier Relationship Management In Emerging Countries
Raising Supplier Relationship Management In Emerging CountriesRaising Supplier Relationship Management In Emerging Countries
Raising Supplier Relationship Management In Emerging CountriesIselle Akwoue Dimas Ekoh
 
Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1SacramentoNCMA Gold Rush
 
MTI Development Award Program
MTI Development Award ProgramMTI Development Award Program
MTI Development Award Programjgogan8
 

Similar to How to Evaluate Bids in procurement.pptx (20)

ISTQB Foundation Level Certification - Intruduction
ISTQB Foundation Level Certification - IntruductionISTQB Foundation Level Certification - Intruduction
ISTQB Foundation Level Certification - Intruduction
 
Measurement of project quality performance
Measurement of project quality performanceMeasurement of project quality performance
Measurement of project quality performance
 
Implementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project ManagementImplementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project Management
 
Shipmanagement System Selection Process
Shipmanagement System Selection ProcessShipmanagement System Selection Process
Shipmanagement System Selection Process
 
Day 2 1135 - 1220 - pearl 1 - avinash kumar
Day 2   1135 - 1220 - pearl 1 - avinash kumarDay 2   1135 - 1220 - pearl 1 - avinash kumar
Day 2 1135 - 1220 - pearl 1 - avinash kumar
 
Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...
Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...
Day 202-20-201135-20-201220-20-20pearl-201-20-20avinash-20kumar-131008015752-...
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
BB Project on AHT .pptx
BB Project on AHT .pptxBB Project on AHT .pptx
BB Project on AHT .pptx
 
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
 
Service Encounters Grading Rubric  Must be attached .docx
Service Encounters Grading Rubric   Must be attached .docxService Encounters Grading Rubric   Must be attached .docx
Service Encounters Grading Rubric  Must be attached .docx
 
Effective Specification Writing
Effective Specification WritingEffective Specification Writing
Effective Specification Writing
 
Moments of truth
Moments of truthMoments of truth
Moments of truth
 
104vendor appraisal
104vendor appraisal104vendor appraisal
104vendor appraisal
 
Request for-proposals-fundamentals4957
Request for-proposals-fundamentals4957Request for-proposals-fundamentals4957
Request for-proposals-fundamentals4957
 
Governance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabsGovernance, Management And Testing In An Outsourced Model From AppLabs
Governance, Management And Testing In An Outsourced Model From AppLabs
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
 
Raising Supplier Relationship Management In Emerging Countries
Raising Supplier Relationship Management In Emerging CountriesRaising Supplier Relationship Management In Emerging Countries
Raising Supplier Relationship Management In Emerging Countries
 
Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1
 
MTI Development Award Program
MTI Development Award ProgramMTI Development Award Program
MTI Development Award Program
 

Recently uploaded

如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书Fir L
 
INVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptxINVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptxnyabatejosphat1
 
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书Fs Las
 
Mediation ppt for study materials. notes
Mediation ppt for study materials. notesMediation ppt for study materials. notes
Mediation ppt for study materials. notesPRATIKNAYAK31
 
CAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsCAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsAurora Consulting
 
Transferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptxTransferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptx2020000445musaib
 
一比一原版西澳大学毕业证学位证书
 一比一原版西澳大学毕业证学位证书 一比一原版西澳大学毕业证学位证书
一比一原版西澳大学毕业证学位证书SS A
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书FS LS
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书Fir L
 
一比一原版旧金山州立大学毕业证学位证书
 一比一原版旧金山州立大学毕业证学位证书 一比一原版旧金山州立大学毕业证学位证书
一比一原版旧金山州立大学毕业证学位证书SS A
 
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in IndiaLegal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in IndiaFinlaw Consultancy Pvt Ltd
 
PPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxPPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxRRR Chambers
 
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhaiShashankKumar441258
 
Debt Collection in India - General Procedure
Debt Collection in India  - General ProcedureDebt Collection in India  - General Procedure
Debt Collection in India - General ProcedureBridgeWest.eu
 
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书Sir Lt
 
Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126Oishi8
 
Ricky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in MidlothianRicky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in MidlothianRicky French
 
一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书E LSS
 

Recently uploaded (20)

如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
 
INVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptxINVOLUNTARY TRANSFERS Kenya school of law.pptx
INVOLUNTARY TRANSFERS Kenya school of law.pptx
 
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
如何办理(Lincoln文凭证书)林肯大学毕业证学位证书
 
Russian Call Girls Rohini Sector 6 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 6 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 6 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 6 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
Mediation ppt for study materials. notes
Mediation ppt for study materials. notesMediation ppt for study materials. notes
Mediation ppt for study materials. notes
 
CAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsCAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction Fails
 
Transferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptxTransferable and Non-Transferable Property.pptx
Transferable and Non-Transferable Property.pptx
 
一比一原版西澳大学毕业证学位证书
 一比一原版西澳大学毕业证学位证书 一比一原版西澳大学毕业证学位证书
一比一原版西澳大学毕业证学位证书
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
 
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
Russian Call Girls Rohini Sector 7 💓 Delhi 9999965857 @Sabina Modi VVIP MODEL...
 
如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书如何办理提赛德大学毕业证(本硕)Teesside学位证书
如何办理提赛德大学毕业证(本硕)Teesside学位证书
 
一比一原版旧金山州立大学毕业证学位证书
 一比一原版旧金山州立大学毕业证学位证书 一比一原版旧金山州立大学毕业证学位证书
一比一原版旧金山州立大学毕业证学位证书
 
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in IndiaLegal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
 
PPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxPPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptx
 
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
 
Debt Collection in India - General Procedure
Debt Collection in India  - General ProcedureDebt Collection in India  - General Procedure
Debt Collection in India - General Procedure
 
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
 
Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126Indemnity Guarantee Section 124 125 and 126
Indemnity Guarantee Section 124 125 and 126
 
Ricky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in MidlothianRicky French: Championing Truth and Change in Midlothian
Ricky French: Championing Truth and Change in Midlothian
 
一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书
 

How to Evaluate Bids in procurement.pptx

  • 1. Sr. No Stage Assessment Clearance Status Non conformance Status conformance 1 Eligibility Eligibility Criteria Mandatory 100% Not Eligible Eligible 2 Qualification Qualification Criteria Threshold Passing Marks Disqualified Qualified 3 Bid Submission Method Mandatory 100% Returned Submitted 4 Bid Opening Preliminary Examination Mandatory 100% Non Responsive Responsive 5 Technical Evaluation Specifications Mandatory 100% Technically Rejected Responsive 6 Technical Evaluation Technical Evaluation Criteria Threshold Passing Marks Technically Rejected Technically Accepted 7 Financial Evaluation Financial Evaluation Criteria Mandatory 100% Financially Rejected Financially Accepted 8 Price or Cost Comparison Whole Life Cost Cost Effective Financially Accepted Lowest Evaluated Bid
  • 2. Sr. No Fields Marks Assigned Marks Obtained 50% marks each category 1 Relevant Experience a) General Experience b) Specific Experience 20 10 10 2 Performance a) Similar Nature of work in past b) Similar Nature of work in Hand 20 10 10 3 Financial Position a) Audited reports for last 3 years b) Bank statements for last 3 years 20 10 10 4 Resources a) Equipment/Plants b) Work Force/ Key Personnel's 20 10 10 5 Managerial Capabilities a) Time Line of past projects b) Satisfaction Certificates 20 10 10 Evaluation Criteria Prequalification
  • 3. EXAMPLE OF PRELIMINARY EXAMINATION Bidder (a) Verification (b) Eligibility (c) Bid Security (d) Completene ss of Bid (e) Substantial Responsiven ess (f) Acceptance for Detailed Examination (g) Bidder A Yes Yes Yes Yes Yes Yes Bidder B No1 Yes Yes Yes Yes2 No Bidder C Yes Yes Yes Yes Yes Yes Bidder D Yes Yes No3 No Yes No Bidder E Yes No No4 Yes Yes No Bidder F Yes Yes Yes Yes Yes Yes Bidder G Yes Yes Yes Yes Yes Yes Bidder H Yes Yes Yes Yes Yes Yes 1. Joint Venture agreement missing. 2. Requires 25 percent mobilization advance; bid document states maximum of 15 percent. Deviation is minor or major depending on the resources of Employer. 3. Bid security not in required amount/format. 4. Required validity period of security not met ( 8 weeks instead of 12 weeks ).
  • 4. Sr. No Fields Marks Assigned Marks Obtained Weight 80 1 Quality a) Certificates b)Inspections c) Tests/Samples 40 10 10 20 M x 0.8 = 2 After Sale Service a) Warranties b)Guarantees c) Backup Support 40 10 10 20 3 Reliability a) Proof of Past Performance b)Insurance 20 10 10 4 Whole Life Cost 20 Technical Evaluation Criteria
  • 5. Whole Life Cost Sr. No Components Marks Obtained Weight 1 Price of Product 50 2 Price of Spares 20 3 Transport Charges 10 4 Installation Charges 10 5 Maintenance Charges 10
  • 6. S No Name of Firm or Bidder Cost offered by the Bidder Ranking in terms of cost Comparis on with Estimated cost Reasons for acceptance / rejection Remarks 0 1 2 3 4 5 6 1. A 2. B 3. C 4. D Bid Evaluation Report:
  • 7. Sr. No Fields Marks Assigned Marks Obtained 1 Company profile a) Year of incorporation b) Employees 10 5 5 2 Qualification of Key Staff a) PhD b) M. Phil c) Maters 30 15 10 5 3 Relevant Experience a) General Experience b) Specific Experience 20 10 10 4 Performance a) Similar Nature of work in past b) Similar Nature of work in Hand 20 15 5 5 Financial report a) Audited reports for last 3 years b) Bank statements for last 3 years 20 10 10 Expression of Interest
  • 8. Sr. No Fields Marks Assigned Marks Obtained Weight 80 1 Approach a) Understanding b) Innovation c) Risk assessment 20 10 5 5 M x 0.8 = 2 Methodology a) Tools b) Techniques c) Cost Effectiveness 30 10 10 10 3 Work Plan a) Timelines b) Milestones 20 10 10 4 Quality Management a) KPIs b) KRIs 20 10 10 5 Key Staff a) Qualification b) Relevant Experiance 20 10 10 Request for Proposal