+ hospitality design management
Design entices and it sells, but
the complex team needed to
create today’s luxury hotel, spa
or senior living project is large,
expensive, and fragmented –
with multiple design authorities
working toward independent,
often conflicting goals.

The results for the client are
wasted resources, diminished
design team performance, and
diluted design value.

The result for the project is
unrealized design potential.
At one time, the Architect was the Master Builder,
                                and he did everything.
                                What happened?
                                As the science of building evolved, areas of technical
                                expertise (structural, mechanical, etc.) were removed
                                from the Architect’s scope, creating a ‘design team’
                                managed by the architect.
                                As projects became more complex, project
                                management was removed from the architect’s scope,
                                often performed by the owner or a third-party project
                                manager.
                                As the expectations for design quality increased, areas
                                of aesthetic specialization also became separated from
                                the architect’s scope, including landscape design,
                                lighting design, graphic design, and interior design.
                                On many project types, including all high-end hospitality
                                projects, the architecture of the building interior was
                                also removed from the architect’s scope, resulting in the
                                creation of the ‘interior architectural’ design practice.
                                       “In a way, architects gave away the
                                        interiors of their own buildings.”
                                                             Michael Graves, architect
                                When this fundamental change occurred, the
                                active management of the primary design consultants
                                was not replaced.


Fig. 1: Original project team
Fig. 2: Today’s complex project team (idealized)   Fig. 3: Today’s complex project team (reality)
It doesn’t have to be that way.
                                                      The design team’s contracts can be coordinated.
                                                      Evaluation of the design consultants can go deeper
                                                       than “who will be on my team?” Their scope—and
                                                       their documentation—can be tailored to their
                                                       capabilities, and to how they actually work.
                                                      The design team can be actively monitored, and their
                                                       efforts can be intelligently synchronized.
                                                      Issues can be framed to facilitate efficient review and
                                                       approval by ownership and the design team.
                                                      Time wasting conflict and inefficiencies can be
                                                       anticipated, and can be avoided.
                                                      Critical issues can be “walked-through” the approval
                                                       process.
                                                      Design direction and decisions can be documented.
                                                      Design team meetings can be objectively moderated,
                                                       and they can be more productive.
                                                      Procedures for concurrent production of CAD
                                                       drawings can be resolved.
                                                      Design continues during construction, and managing
                                                       the design team can as well.
                                                      The collective design effort can be improved.


Fig. 4: Complex project team with Design Manager
Why Design Management?
Improved Design Team Performance
   Better design. By coordinating scope, minimizing conflicts, and actively monitoring
    progress, the design team spends more time on design.
   Better documentation. Coordinated and comprehensive, with less duplication, fewer
    gaps, and a consistent attention to design detail.
   Designs within budget. Designing to the budget is not only the design team’s
    responsibility, but it is also the best way to ensure time is spent on design – not redesign.
   Deadlines met. Realistic planning, clear communication and active management mean
    presentations, drawings, and submittal reviews are on time.
Improved Project Team Performance
   Efficiency. The singular focus of active design management brings multiple design efforts
    into alignment, and offers a single point of contact for design communication, direction
    and approval.
   Communication. Active, involved communication facilitates the successful design team,
    and regular, succinct communication regarding their efforts keeps the client and the
    project team properly informed.
   Consistency. Design consultants are likely to change from project to project. Design
    management offers a consistent interface even when the design team changes.
Improved Projects
   The quality of a project is always under pressure – even with the most talented
    consultants. It takes constant attention to keep the design effort moving forward
    efficiently. Creative, productive, and efficient.
   What is designed is built. Quality drawings and active monitoring assures that the design
    is not diminished during the construction process – an all too frequent occurrence.
Design Management Services:
Design Contract Coordination
The realistic evaluation of the design consultants’ capabilities and a coordinated delineation
of their scope form a foundation for the hospitality design team’s work. As such, their
individual contracts are more than legal agreements – they are guiding documents for their
collaborative efforts and a fundamental component of their success as a team. Services
include project analysis, consultant team evaluation, and detailed scope assignment to avoid
many typical conflicts before they start.
Design Management
Active and objective design management of the Architect, Interior Designer, and other
primary design consultants is required to meet the measurable goals of budget and schedule
without compromising the equally important design expectations for the project. In addition
to the Contract Coordination services mentioned above, Design Management services
include confirming schedule and staffing, review of design and documentation planning, and
active monitoring of the design effort from Concept Design through Construction – with
proactive intervention as required.
Design Administration
All project teams are different, and in some cases the addition of organized support for a
strong owner, operator or project manager may sufficiently complement an existing design
team to assure maximum design value is achieved. Design Administration services include
active monitoring of design related communication and tasks, and regular communication to
the Client and Project Manager regarding the progress of the design effort.
+ s e e i n g q u a l i t y t h ro u g h




   harris architecture + design management
   5005 greenville ave. #147a
   dallas, texas 75206
   www.harris-adm.com

   Phone:   214.265.7670
   Fax:     214.361.8944

   Email:   info@harris-adm.com

More Related Content

What's hot

K12 200 [a] introduction incremental design
K12 200 [a] introduction incremental designK12 200 [a] introduction incremental design
K12 200 [a] introduction incremental design
Onsanity Solutions S.L.
 
TASK 3 SUBMISSION DOCUMENT
TASK 3 SUBMISSION DOCUMENTTASK 3 SUBMISSION DOCUMENT
TASK 3 SUBMISSION DOCUMENTDavid Vede
 
What It Takes To Be A Good Project
What It Takes To Be A Good ProjectWhat It Takes To Be A Good Project
What It Takes To Be A Good Project
Daniel Lois Cerezo
 
Managing revolving project resources
Managing revolving project resourcesManaging revolving project resources
Managing revolving project resources
Alison Sigmon, M.Ed., PMP
 
Project Management Final Exam
Project Management Final ExamProject Management Final Exam
Project Management Final Exam
Stacey Troup
 
The Art of Building a Process Design Team
The Art of Building a Process Design TeamThe Art of Building a Process Design Team
The Art of Building a Process Design TeamTroy DuMoulin
 
Creative Teams Title Structure
Creative Teams Title StructureCreative Teams Title Structure
Creative Teams Title Structure
Dan Madinabeitia
 

What's hot (19)

K12 200 [a] introduction incremental design
K12 200 [a] introduction incremental designK12 200 [a] introduction incremental design
K12 200 [a] introduction incremental design
 
P761 Public Web
P761 Public WebP761 Public Web
P761 Public Web
 
T375 asmi
T375 asmiT375 asmi
T375 asmi
 
TASK 3 SUBMISSION DOCUMENT
TASK 3 SUBMISSION DOCUMENTTASK 3 SUBMISSION DOCUMENT
TASK 3 SUBMISSION DOCUMENT
 
T348 Pi
T348 PiT348 Pi
T348 Pi
 
What It Takes To Be A Good Project
What It Takes To Be A Good ProjectWhat It Takes To Be A Good Project
What It Takes To Be A Good Project
 
Managing revolving project resources
Managing revolving project resourcesManaging revolving project resources
Managing revolving project resources
 
T348 Asm Iweb
T348 Asm IwebT348 Asm Iweb
T348 Asm Iweb
 
T348 Asm Iweb
T348 Asm IwebT348 Asm Iweb
T348 Asm Iweb
 
E136
E136E136
E136
 
Project Management Final Exam
Project Management Final ExamProject Management Final Exam
Project Management Final Exam
 
W232
W232W232
W232
 
T347 Asm Iweb
T347 Asm IwebT347 Asm Iweb
T347 Asm Iweb
 
T347 Asm Iweb
T347 Asm IwebT347 Asm Iweb
T347 Asm Iweb
 
T375 pi
T375 piT375 pi
T375 pi
 
The Art of Building a Process Design Team
The Art of Building a Process Design TeamThe Art of Building a Process Design Team
The Art of Building a Process Design Team
 
Creative Teams Title Structure
Creative Teams Title StructureCreative Teams Title Structure
Creative Teams Title Structure
 
T359
T359T359
T359
 
Iss 02
Iss 02Iss 02
Iss 02
 

Similar to Hospitality Design Management

Design Management White Paper V5
Design Management White Paper V5Design Management White Paper V5
Design Management White Paper V5
Andrew Newton
 
Comprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction ProjectsComprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction Projects
Chudasama Outsourcing | AutoCAD Drawing and Drafting Services
 
Blue-Crow Architecture V1
Blue-Crow Architecture V1Blue-Crow Architecture V1
Blue-Crow Architecture V1
Salim Sheikh
 
New Sem Architects Brochure
New Sem Architects BrochureNew Sem Architects Brochure
New Sem Architects Brochurek_nilsson
 
Sem Architects Brochure
Sem Architects BrochureSem Architects Brochure
Sem Architects Brochurejnirutna
 
New Sem Architects Brochure
New Sem Architects BrochureNew Sem Architects Brochure
New Sem Architects BrochureGaryRhodes
 
Sem Architects Brochure
Sem Architects BrochureSem Architects Brochure
Sem Architects Brochureguest778c7d0
 
SEM Architects Brochure
SEM Architects BrochureSEM Architects Brochure
SEM Architects Brochurejheiland
 
Sem Architects Brochure
Sem Architects BrochureSem Architects Brochure
Sem Architects Brochurezacharys
 
SEM Architects Brochure
SEM Architects BrochureSEM Architects Brochure
SEM Architects BrochureShannonHulm
 
SEM Architects Brochure
SEM Architects BrochureSEM Architects Brochure
SEM Architects Brochurekkenton
 
BizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan Orme
BizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan OrmeBizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan Orme
BizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan Orme
Mark A
 
SEM brochure 2010
SEM brochure 2010SEM brochure 2010
SEM brochure 2010bmcLennan
 
2008 Fiatech Ceti Awards Smccv
2008   Fiatech Ceti Awards   Smccv2008   Fiatech Ceti Awards   Smccv
2008 Fiatech Ceti Awards Smccv
semdanat
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build Whitepaper
Bethany Jenkins
 
Brochure of our services
Brochure of our servicesBrochure of our services
Brochure of our servicesADM0411
 
Edward t 1
Edward t 1Edward t 1
Edward t 1
david gonzales
 
The tension between agile and architecture
The tension between agile and architectureThe tension between agile and architecture
The tension between agile and architecture
Peter Hendriks
 
Book Edward T White Site Analysis - Landscape Architecture
Book Edward T White Site Analysis - Landscape ArchitectureBook Edward T White Site Analysis - Landscape Architecture
Book Edward T White Site Analysis - Landscape Architecture
AuliyahIsfa
 
Site Analysis Edward t. white
Site Analysis Edward t. whiteSite Analysis Edward t. white
Site Analysis Edward t. white
Dania Abdel-aziz
 

Similar to Hospitality Design Management (20)

Design Management White Paper V5
Design Management White Paper V5Design Management White Paper V5
Design Management White Paper V5
 
Comprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction ProjectsComprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction Projects
 
Blue-Crow Architecture V1
Blue-Crow Architecture V1Blue-Crow Architecture V1
Blue-Crow Architecture V1
 
New Sem Architects Brochure
New Sem Architects BrochureNew Sem Architects Brochure
New Sem Architects Brochure
 
Sem Architects Brochure
Sem Architects BrochureSem Architects Brochure
Sem Architects Brochure
 
New Sem Architects Brochure
New Sem Architects BrochureNew Sem Architects Brochure
New Sem Architects Brochure
 
Sem Architects Brochure
Sem Architects BrochureSem Architects Brochure
Sem Architects Brochure
 
SEM Architects Brochure
SEM Architects BrochureSEM Architects Brochure
SEM Architects Brochure
 
Sem Architects Brochure
Sem Architects BrochureSem Architects Brochure
Sem Architects Brochure
 
SEM Architects Brochure
SEM Architects BrochureSEM Architects Brochure
SEM Architects Brochure
 
SEM Architects Brochure
SEM Architects BrochureSEM Architects Brochure
SEM Architects Brochure
 
BizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan Orme
BizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan OrmeBizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan Orme
BizSpark SF Lightning Talk: "Design Patterns for Designers" by Stephan Orme
 
SEM brochure 2010
SEM brochure 2010SEM brochure 2010
SEM brochure 2010
 
2008 Fiatech Ceti Awards Smccv
2008   Fiatech Ceti Awards   Smccv2008   Fiatech Ceti Awards   Smccv
2008 Fiatech Ceti Awards Smccv
 
Residential Design Build Whitepaper
Residential Design Build WhitepaperResidential Design Build Whitepaper
Residential Design Build Whitepaper
 
Brochure of our services
Brochure of our servicesBrochure of our services
Brochure of our services
 
Edward t 1
Edward t 1Edward t 1
Edward t 1
 
The tension between agile and architecture
The tension between agile and architectureThe tension between agile and architecture
The tension between agile and architecture
 
Book Edward T White Site Analysis - Landscape Architecture
Book Edward T White Site Analysis - Landscape ArchitectureBook Edward T White Site Analysis - Landscape Architecture
Book Edward T White Site Analysis - Landscape Architecture
 
Site Analysis Edward t. white
Site Analysis Edward t. whiteSite Analysis Edward t. white
Site Analysis Edward t. white
 

Recently uploaded

一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
9a93xvy
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
184804
 
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
smpc3nvg
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
Techno Merch
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
Mansi Shah
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
Febless Hernane
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
asuzyq
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
PoojaSaini954651
 

Recently uploaded (20)

一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
 
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
一比一原版(Brunel毕业证书)布鲁内尔大学毕业证成绩单如何办理
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.Technoblade The Legacy of a Minecraft Legend.
Technoblade The Legacy of a Minecraft Legend.
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
White wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva TschoppWhite wonder, Work developed by Eva Tschopp
White wonder, Work developed by Eva Tschopp
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
PDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in NoidaPDF SubmissionDigital Marketing Institute in Noida
PDF SubmissionDigital Marketing Institute in Noida
 

Hospitality Design Management

  • 1. + hospitality design management
  • 2. Design entices and it sells, but the complex team needed to create today’s luxury hotel, spa or senior living project is large, expensive, and fragmented – with multiple design authorities working toward independent, often conflicting goals. The results for the client are wasted resources, diminished design team performance, and diluted design value. The result for the project is unrealized design potential.
  • 3. At one time, the Architect was the Master Builder, and he did everything. What happened? As the science of building evolved, areas of technical expertise (structural, mechanical, etc.) were removed from the Architect’s scope, creating a ‘design team’ managed by the architect. As projects became more complex, project management was removed from the architect’s scope, often performed by the owner or a third-party project manager. As the expectations for design quality increased, areas of aesthetic specialization also became separated from the architect’s scope, including landscape design, lighting design, graphic design, and interior design. On many project types, including all high-end hospitality projects, the architecture of the building interior was also removed from the architect’s scope, resulting in the creation of the ‘interior architectural’ design practice. “In a way, architects gave away the interiors of their own buildings.” Michael Graves, architect When this fundamental change occurred, the active management of the primary design consultants was not replaced. Fig. 1: Original project team
  • 4. Fig. 2: Today’s complex project team (idealized) Fig. 3: Today’s complex project team (reality)
  • 5. It doesn’t have to be that way.  The design team’s contracts can be coordinated.  Evaluation of the design consultants can go deeper than “who will be on my team?” Their scope—and their documentation—can be tailored to their capabilities, and to how they actually work.  The design team can be actively monitored, and their efforts can be intelligently synchronized.  Issues can be framed to facilitate efficient review and approval by ownership and the design team.  Time wasting conflict and inefficiencies can be anticipated, and can be avoided.  Critical issues can be “walked-through” the approval process.  Design direction and decisions can be documented.  Design team meetings can be objectively moderated, and they can be more productive.  Procedures for concurrent production of CAD drawings can be resolved.  Design continues during construction, and managing the design team can as well.  The collective design effort can be improved. Fig. 4: Complex project team with Design Manager
  • 6. Why Design Management? Improved Design Team Performance  Better design. By coordinating scope, minimizing conflicts, and actively monitoring progress, the design team spends more time on design.  Better documentation. Coordinated and comprehensive, with less duplication, fewer gaps, and a consistent attention to design detail.  Designs within budget. Designing to the budget is not only the design team’s responsibility, but it is also the best way to ensure time is spent on design – not redesign.  Deadlines met. Realistic planning, clear communication and active management mean presentations, drawings, and submittal reviews are on time. Improved Project Team Performance  Efficiency. The singular focus of active design management brings multiple design efforts into alignment, and offers a single point of contact for design communication, direction and approval.  Communication. Active, involved communication facilitates the successful design team, and regular, succinct communication regarding their efforts keeps the client and the project team properly informed.  Consistency. Design consultants are likely to change from project to project. Design management offers a consistent interface even when the design team changes. Improved Projects  The quality of a project is always under pressure – even with the most talented consultants. It takes constant attention to keep the design effort moving forward efficiently. Creative, productive, and efficient.  What is designed is built. Quality drawings and active monitoring assures that the design is not diminished during the construction process – an all too frequent occurrence.
  • 7. Design Management Services: Design Contract Coordination The realistic evaluation of the design consultants’ capabilities and a coordinated delineation of their scope form a foundation for the hospitality design team’s work. As such, their individual contracts are more than legal agreements – they are guiding documents for their collaborative efforts and a fundamental component of their success as a team. Services include project analysis, consultant team evaluation, and detailed scope assignment to avoid many typical conflicts before they start. Design Management Active and objective design management of the Architect, Interior Designer, and other primary design consultants is required to meet the measurable goals of budget and schedule without compromising the equally important design expectations for the project. In addition to the Contract Coordination services mentioned above, Design Management services include confirming schedule and staffing, review of design and documentation planning, and active monitoring of the design effort from Concept Design through Construction – with proactive intervention as required. Design Administration All project teams are different, and in some cases the addition of organized support for a strong owner, operator or project manager may sufficiently complement an existing design team to assure maximum design value is achieved. Design Administration services include active monitoring of design related communication and tasks, and regular communication to the Client and Project Manager regarding the progress of the design effort.