HIGH VOLTAGE FUSE BLOWN INDICATOR
              WITH AUTOMATIC FUSE ROLL SYSTEM

ABSTRACT

Now a day the major problem in the distribution side of the transformer is burning of fuses.
Whenever the fuse has been flown in the transformer, due to any temporary fault in the load
side, the corresponding wireman has to come to recover the fuse. These may cause long time
delay which gives uncomfortable to the customers.

To rectify this problem in the in the distribution side, our project introduces the automatic
fuse recovery in the secondary side of the transformer. Our auto fuse recover system will
automatically put the blown fuse if it is temporary fault. In case of permanent fault, then the
system inform the fault to the corresponding substation and to the nearby wire man.

Whenever the fuse has blown the auto fuse recover system try 1st attempt to put fuse, if the
fuse has again blown within a particular time limit then it tries the second attempt and in it
will send a message to the substation by the control of microprocessor.

Hence our project reduces the manual work in the recovery of fuse and it also avoids the time
delay occurs in the fuse recovery. Another important advantage in this system is the system
will immediately inform the fault to the substation which helps us to reduce the unwanted
accidents.
BLOCK DIAGRAM

More Related Content

Similar to High voltage fuse blown indicator with automatic fuse roll system

Pq unit ii
Pq unit iiPq unit ii
Pq unit iivenki249
 
Iintelligence braking system
Iintelligence braking system Iintelligence braking system
Iintelligence braking system paras gupta
 
Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...Power System Operation
 
intelligence Ambulance project report
intelligence Ambulance project reportintelligence Ambulance project report
intelligence Ambulance project reportRitesh Kumar
 
Local back up protection for an electric power system
Local back up protection for an electric power systemLocal back up protection for an electric power system
Local back up protection for an electric power systemsaad karboua
 
automatic braking system and brake actuation before collison
automatic braking system and brake actuation before collisonautomatic braking system and brake actuation before collison
automatic braking system and brake actuation before collisonashutosh singh
 
project report on automatic rain wiper
project report on automatic rain wiperproject report on automatic rain wiper
project report on automatic rain wiperSudhanshu Saurav
 
IRJET- Implementation of Building Management System using Renewable Energ...
IRJET-  	  Implementation of Building Management System using Renewable Energ...IRJET-  	  Implementation of Building Management System using Renewable Energ...
IRJET- Implementation of Building Management System using Renewable Energ...IRJET Journal
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarjavid iqbal sodagar
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarjavid iqbal sodagar
 
Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows
Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows
Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows IJECEIAES
 
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...IRJET Journal
 
Fire Detection and Alerting System for Train Using Zigbee Communication
Fire Detection and Alerting System for Train Using Zigbee CommunicationFire Detection and Alerting System for Train Using Zigbee Communication
Fire Detection and Alerting System for Train Using Zigbee CommunicationIRJET Journal
 
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...IRJET Journal
 
IRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking System
IRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking SystemIRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking System
IRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking SystemIRJET Journal
 
Automatic breaking system.docx
Automatic breaking system.docxAutomatic breaking system.docx
Automatic breaking system.docxPraveenYadav581556
 

Similar to High voltage fuse blown indicator with automatic fuse roll system (20)

Pq unit ii
Pq unit iiPq unit ii
Pq unit ii
 
Iintelligence braking system
Iintelligence braking system Iintelligence braking system
Iintelligence braking system
 
Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...
 
intelligence Ambulance project report
intelligence Ambulance project reportintelligence Ambulance project report
intelligence Ambulance project report
 
B04100611
B04100611B04100611
B04100611
 
Local back up protection for an electric power system
Local back up protection for an electric power systemLocal back up protection for an electric power system
Local back up protection for an electric power system
 
automatic braking system and brake actuation before collison
automatic braking system and brake actuation before collisonautomatic braking system and brake actuation before collison
automatic braking system and brake actuation before collison
 
project report on automatic rain wiper
project report on automatic rain wiperproject report on automatic rain wiper
project report on automatic rain wiper
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
IRJET- Implementation of Building Management System using Renewable Energ...
IRJET-  	  Implementation of Building Management System using Renewable Energ...IRJET-  	  Implementation of Building Management System using Renewable Energ...
IRJET- Implementation of Building Management System using Renewable Energ...
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagar
 
Protection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagarProtection of alternators javid iqbal sodagar
Protection of alternators javid iqbal sodagar
 
Carrier_Protn_08_01_16 - Copy.pdf
Carrier_Protn_08_01_16 - Copy.pdfCarrier_Protn_08_01_16 - Copy.pdf
Carrier_Protn_08_01_16 - Copy.pdf
 
Carrier_Protn_08_01_16.pdf
Carrier_Protn_08_01_16.pdfCarrier_Protn_08_01_16.pdf
Carrier_Protn_08_01_16.pdf
 
Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows
Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows
Automatic Threshold on Current based Anti-pinch Mechanism for Power Windows
 
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...IRJET -  	  An Automatic Phase Selector from Any Available Three Phase Supply...
IRJET - An Automatic Phase Selector from Any Available Three Phase Supply...
 
Fire Detection and Alerting System for Train Using Zigbee Communication
Fire Detection and Alerting System for Train Using Zigbee CommunicationFire Detection and Alerting System for Train Using Zigbee Communication
Fire Detection and Alerting System for Train Using Zigbee Communication
 
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
 
IRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking System
IRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking SystemIRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking System
IRJET- Automatic Pneumatic Bumper Shock Absorber and Breaking System
 
Automatic breaking system.docx
Automatic breaking system.docxAutomatic breaking system.docx
Automatic breaking system.docx
 

High voltage fuse blown indicator with automatic fuse roll system

  • 1. HIGH VOLTAGE FUSE BLOWN INDICATOR WITH AUTOMATIC FUSE ROLL SYSTEM ABSTRACT Now a day the major problem in the distribution side of the transformer is burning of fuses. Whenever the fuse has been flown in the transformer, due to any temporary fault in the load side, the corresponding wireman has to come to recover the fuse. These may cause long time delay which gives uncomfortable to the customers. To rectify this problem in the in the distribution side, our project introduces the automatic fuse recovery in the secondary side of the transformer. Our auto fuse recover system will automatically put the blown fuse if it is temporary fault. In case of permanent fault, then the system inform the fault to the corresponding substation and to the nearby wire man. Whenever the fuse has blown the auto fuse recover system try 1st attempt to put fuse, if the fuse has again blown within a particular time limit then it tries the second attempt and in it will send a message to the substation by the control of microprocessor. Hence our project reduces the manual work in the recovery of fuse and it also avoids the time delay occurs in the fuse recovery. Another important advantage in this system is the system will immediately inform the fault to the substation which helps us to reduce the unwanted accidents.