1. Hero
Coatings
People Lighting
100% Increase in Light Levels
Improved Ambient Color Upgrade
Improved Employee Mood
Increase in Employee Safety
Improved Product Quality
Situation:
Planet Inefficient and ineffective
62% Reduction in Electricity Facility Lighting System
58.9 Metric Tons of CO2 Removed Annually Energy Costs Too High,
Equivalent to: Operating Environment Poor
135 barrels of oil
11.3 passenger vehicles
7.2 homes
Solution:
Profit Retrofit with T8 and T5
Energy and Maintenance Savings Fluorescent Technology
Project Investment Return in 11.6 months Taking Advantage of Available
Utility Rebates
2. Hero Coatings
Lighting Upgrade
With an initial investment that will
pay for itself in less than a
year, Hero Coatings, with the help
of AmRESS LLC, was been able to
make improvements to their Hero Coatings, a Newburyport, MA
business, their employees, and the based business that develops and
manufactures solvent-based
planet. adhesives, was faced with the realization
that their lighting system was both
Hero Coatings turned to AmRESS LLC to help inefficient and ineffective. The impact
them upgrade their traditional but outdated was threefold:
lighting system. The high energy costs had a negative
impact on their bottom line. The lighting
Taking advantage of available utility system also created a poor working
rebates, the upgrade will pay for itself in less than environment for their employees, and a
one year. greater than necessary stress on the
Hero Coatings expects to save approximately environment.
$13,000.00 per year in energy and maintenance “AmRESS recommended a great lighting
costs, which will directly affect the company’s solution, managing the project from design through
profit margin. installation, including making sure that I received my utility
rebate.”
Stephen R. Lynch,
However, the real advantages of the upgrade President Hero Coatings Inc.
will be realized in benefits to their people and
the planet.