HEMRAJ R PARATE
1532 Upson Drive, El Paso, TX 79902
PH - (915) 261-6852, hemrajrparate@gmail.com
SUMMARY
 I am a self-motivated and result driven professionalholding a Master’s degree in Civil Engineering from University of Texas at El
Paso,with advanced organizationaland multitasking abilities Iamwell acknowledgedwith Microsoft office package andothercivil
engineering software.
 I have more than 2 years of job experience on “TXDOT” HEAVYCIVIL BRIDGE PROJECTS..
 I have good knowledge of Field execution work, Construction Analysis (Time Study), Construction Management, Structural
designing,Planning andscheduling of project, Client and Sub-contractors billing, Cost estimation, Material estimation, Quantity
take-offs, project cost forecasting, Project monitoring and Quantity surveying. I have basic knowledge of Project management
software Primavera P3 & P6, and AutoCAD.
 Experience of working in Heavy Civil Constructions like Bridges and Highway Projects, Tunnels, Culverts, Tank Trails (Fort
Bliss), Solar Power Plants, Construction of storage.
EDUCATION
The University Of Texas at El Paso (UTEP) Dec 2012
Masters in Civil Engineering
Y. C. College of Engineering (Nagpur University, India) May 2007
Bachelor in Civil Engineering
PROFESSIONAL EXPERIENCE
Haydon Building Corp., El Paso, Texas
Project Engineer Nov’13 - Present
Projects:
Owner: Texas Department of Transportation (TxDOT)
Spur 1966 Project:-
 The Spur1966 project is a connectionbetween Schuster Avenue on the UTEP campus and Paisano Drive via a bridge over I-10.
 The project length is approximately 0.7 miles. The Project is dedicated to improving connectivity and mobility.
 Improve connections and traffic flow between the UTEP campus, surrounding medical facilities and Mesa Street with Paisano
Drive.
 Create an additional route to and fromthe downtown area.
 Eliminate the need forUTEP-bound traffic to cut throughthe adjacent Sunset Heights neighborhood to access the UTEP facility.
I10 Americas Interchange TxDOT Phase 3:-
 TXDOT I-10 & LP-375 (Americas) Interchange Phase 3, LP-375 Southbound to Eastbound & Northbound to Eastbound.
 Work for Phase 3 includes two direct connectors built with both steel and concrete girders.
 Demolition and reconstructionofthree boxbeambridges,rebuilding both the west-and eastbound I-10 frontage roads east of the
Interchange.
 80,000 CY of embankment,10,000 SF ofMSE walls, stormdrain,and relocation ofTxDOT’s ITS system,overhead s igns,lighting,
and delineation.
Responsibilities:
 Estimating various project quantities.
 Preparing monthly bill for submitting to TxDOT.
 Subcontractor Billing.
 Processing RFI’s and Submittals, Updating red lines.
 Approving Daily Reports on Onbase and Datamax
 Working on Viewpoint Software for managing project quantities, billing, projection, etc.
 Labor Costs & Cost Data on Timberline.
 Submitting Monthly requirement forms for TxDOT i.e. SBE, DBE, Prompt Payment Application.
 Submitting On the Job Training (OJT) documents every month to TxDOT.
 Handling all the human resources and administrative work for the project.
 Traffic Control/ Detour planning for I-10 Closures.
 Quantities on Viewpoint
 Daily Costs & Yields for concrete
2 | P a g e
 Making Change Orders & Negotiating with Owner & Subcontractors.
Chevron Renewable Energy Presidio, Texas
Construction Analyst Dec’12 – Nov’13
Projects:
 ACACIA Solar PowerPlant (10MW Single Axis trackers),Presidio,Texas
Responsibilities:
 Evaluated and monitor the performance and efficiency of the Man-power and Machineries.
 Maintained data and prepare analyses – utilized for operations assessments, future project bidding business planning, etc.
 Coordinated with corporate departments to collect and analyze data to prepare reports required by senior management.
 Attended regular meetings with the Project Team, record meeting notes, and follow up on key iss ues for Senior Management.
 Executed personally and direct subcontractorson solartrackerinstallation(assembly,transport, and erection), commissioning and
testing.
 Managed subcontractor RFI’s & submittals.
 Negotiated and processed change orders, invoices and associated documentation.
Tug Hill Construction, Fort Bliss / El Paso
Civil Engineering Intern May’11– Sept’11
Projects:
 Repairing TankTrails at the McGregorRange Camp
Responsibilities:
 Repairing Tank Trails at the McGregor Range Camp, while remaining within strict environmental regulations.
 Assistedthe Project Engineerin scheduling,completingofficialsubmittals and everydaypaperworkranging fromCertified Payrolls
to directing weekly briefings to the US Army Corp of Engineers.
 Assisted the Quality Control Manager.
 Gained experience working on the construction site.
 Contractor and vendor’s Billing.
 Executed the internal Project Close Out
 RFI & Submittals.
Hindustan Construction Company (Mumbai, India) Assam, India
Graduate Engineer June’07 - May’10
Projects:
National Highway-54 Part AS-23 (13kmroad with 1km tunnel)
North-South–East-West Corridor (NS-EW) is the largest ongoing highway project in India
The NS–EW project is managed by the National Highways Authority of India under the Ministry of Road, Transport and Highways.
Responsibilities:
 Quantity take-off, construction projects estimations. Contractor and client Bills. Actual Execution of various road construction
activities.
 Quantity Estimation for steel, Cement and excavated earth for purpose of billing.
 To performdifferent quality test required as per technical specifications. Cost estimates of pre-bid projects.
TECHNICAL SKILLS
[Skill level:beginner – intermediate – good – excellent]
 M.S Office (Excellent ; Datamax- Excellent ; Timberline- (Excellent) ; MATLAB (Intermediate)); AutoCAD (Good); C language
(Intermediate); Staad pro (Beginner); Primavera project planner (p3.0 / p6.0) (Intermediate); M. S. Project Planner (Intermediate),
VISSIM (Beginner), MathCAD (Good), Microstation (Beginner), GeoPak (beginner), Civil 3D (Beginner); Viewpoint (Excellent);
Onbase (Excellent)
CERTIFICATION, PUBLICATIONS, AWARDS & ACHIEVEMENTS
 Memberof “Institute ofEngineers”organization.
 Participated in NationalLevel PosterCompetitions on topics like” renewable energy sources” and“recent trends in foundation
engineering”.
 Active participationin NationalLevelPaperpresentationcompetition on CivilEngineering related topics.
 Played in SchoolLevelCricket Competitions (Sports).
 Participated in InternationalLevelBridge Design competition to design a bridge, made out of Balsa wood, glue, thread and other
materials. The minimum load was 10 kg. The increment in the loads will be in steps of 2 kg up to failure.
*References available on request.

More Related Content

What's hot

Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 AHMED afifi
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph Raftery
 
Kinney Resume Oct2016
Kinney Resume Oct2016Kinney Resume Oct2016
Kinney Resume Oct2016Kinney Hardin
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016hee siek fung
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
SALEM MOHAMMED
 
Michael Foster 2016 sm
Michael Foster 2016 smMichael Foster 2016 sm
Michael Foster 2016 smmike foster
 
Muhammad naeem (2)
Muhammad naeem (2)Muhammad naeem (2)
Muhammad naeem (2)
M. NAEEM
 
Masoud rahimzadeh cv
Masoud rahimzadeh cvMasoud rahimzadeh cv
Masoud rahimzadeh cv
Masoud Rahimzadeh
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15Sajan Vijayan
 
Jason Lee McGraw Resume (1)
Jason Lee McGraw Resume (1)Jason Lee McGraw Resume (1)
Jason Lee McGraw Resume (1)Jason McGraw
 

What's hot (19)

CIVIL ENGINEER
CIVIL ENGINEERCIVIL ENGINEER
CIVIL ENGINEER
 
Logan McDowell Resume
Logan McDowell ResumeLogan McDowell Resume
Logan McDowell Resume
 
Resume dharmendra
Resume dharmendraResume dharmendra
Resume dharmendra
 
CV F 2016
CV  F 2016CV  F 2016
CV F 2016
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
Arul_CV
Arul_CVArul_CV
Arul_CV
 
CV_MPS_Elango_Vadiveloo
CV_MPS_Elango_VadivelooCV_MPS_Elango_Vadiveloo
CV_MPS_Elango_Vadiveloo
 
cv. muhhmd shfqt
cv. muhhmd shfqtcv. muhhmd shfqt
cv. muhhmd shfqt
 
CV-Fidel Zuniga
CV-Fidel ZunigaCV-Fidel Zuniga
CV-Fidel Zuniga
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.
 
Kinney Resume Oct2016
Kinney Resume Oct2016Kinney Resume Oct2016
Kinney Resume Oct2016
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Michael Foster 2016 sm
Michael Foster 2016 smMichael Foster 2016 sm
Michael Foster 2016 sm
 
Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015
 
Muhammad naeem (2)
Muhammad naeem (2)Muhammad naeem (2)
Muhammad naeem (2)
 
Masoud rahimzadeh cv
Masoud rahimzadeh cvMasoud rahimzadeh cv
Masoud rahimzadeh cv
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
Jason Lee McGraw Resume (1)
Jason Lee McGraw Resume (1)Jason Lee McGraw Resume (1)
Jason Lee McGraw Resume (1)
 

Viewers also liked

Bluegrass 2015
Bluegrass 2015Bluegrass 2015
Bluegrass 2015
waterfordTIO
 
Géneros musicales
Géneros musicalesGéneros musicales
Géneros musicales
Diego Castaño H
 
Diamond gents rings
Diamond gents ringsDiamond gents rings
Diamond gents rings
Prabhakar Djewels Pvt Ltd
 
How to Add Guests to IBM Connections
How to Add Guests to IBM ConnectionsHow to Add Guests to IBM Connections
How to Add Guests to IBM Connections
Gavin Bollard
 
Red Wine Quality Assessment
Red Wine Quality AssessmentRed Wine Quality Assessment
Red Wine Quality Assessment
Weiyang (Abbie) Bi
 
Daily routines vocabulary
Daily routines vocabularyDaily routines vocabulary
Daily routines vocabulary
Diego Castaño H
 
Wine presentation
Wine presentation Wine presentation
Wine presentation
Anthimos Georgiou
 

Viewers also liked (9)

Bluegrass 2015
Bluegrass 2015Bluegrass 2015
Bluegrass 2015
 
chitaranjan_Team Effort FLM
chitaranjan_Team Effort FLMchitaranjan_Team Effort FLM
chitaranjan_Team Effort FLM
 
Géneros musicales
Géneros musicalesGéneros musicales
Géneros musicales
 
ITIL 2011 jay-cee
ITIL 2011 jay-ceeITIL 2011 jay-cee
ITIL 2011 jay-cee
 
Diamond gents rings
Diamond gents ringsDiamond gents rings
Diamond gents rings
 
How to Add Guests to IBM Connections
How to Add Guests to IBM ConnectionsHow to Add Guests to IBM Connections
How to Add Guests to IBM Connections
 
Red Wine Quality Assessment
Red Wine Quality AssessmentRed Wine Quality Assessment
Red Wine Quality Assessment
 
Daily routines vocabulary
Daily routines vocabularyDaily routines vocabulary
Daily routines vocabulary
 
Wine presentation
Wine presentation Wine presentation
Wine presentation
 

Similar to Hemraj Parate_Project Engineer

CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intashish saxena
 
Kuduk_Matt_Resume_Draft
Kuduk_Matt_Resume_DraftKuduk_Matt_Resume_Draft
Kuduk_Matt_Resume_DraftMatt Kuduk
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
Haseeb Ahmed
 
Resume - Nick Fuentes
Resume - Nick FuentesResume - Nick Fuentes
Resume - Nick FuentesNick Fuentes
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016Brian Hannigan
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford ResumeDustin Crawford
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaul Blaetz
 
Resume
ResumeResume
Resume
Shiva USA
 

Similar to Hemraj Parate_Project Engineer (20)

Resume-16-3D
Resume-16-3DResume-16-3D
Resume-16-3D
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
gandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Managergandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Manager
 
Resume of Mohammad Kamruzzaman
Resume of Mohammad KamruzzamanResume of Mohammad Kamruzzaman
Resume of Mohammad Kamruzzaman
 
SahanaMuralidharan_resume
SahanaMuralidharan_resumeSahanaMuralidharan_resume
SahanaMuralidharan_resume
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_int
 
Kuduk_Matt_Resume_Draft
Kuduk_Matt_Resume_DraftKuduk_Matt_Resume_Draft
Kuduk_Matt_Resume_Draft
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
 
Resume - Nick Fuentes
Resume - Nick FuentesResume - Nick Fuentes
Resume - Nick Fuentes
 
Brad_Res_2 (2)
Brad_Res_2 (2)Brad_Res_2 (2)
Brad_Res_2 (2)
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016
 
ER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdfER. PRASHANT'S CV pdf
ER. PRASHANT'S CV pdf
 
Jacob Dustin Crawford Resume
Jacob Dustin Crawford  ResumeJacob Dustin Crawford  Resume
Jacob Dustin Crawford Resume
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Resume
ResumeResume
Resume
 
Project Incharge -
Project Incharge -Project Incharge -
Project Incharge -
 
Gerrard Michaels CV 2016
Gerrard Michaels CV 2016Gerrard Michaels CV 2016
Gerrard Michaels CV 2016
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Mathews Ian-CMS-
Mathews Ian-CMS-Mathews Ian-CMS-
Mathews Ian-CMS-
 

Hemraj Parate_Project Engineer

  • 1. 1 | P a g e HEMRAJ R PARATE 1532 Upson Drive, El Paso, TX 79902 PH - (915) 261-6852, hemrajrparate@gmail.com SUMMARY  I am a self-motivated and result driven professionalholding a Master’s degree in Civil Engineering from University of Texas at El Paso,with advanced organizationaland multitasking abilities Iamwell acknowledgedwith Microsoft office package andothercivil engineering software.  I have more than 2 years of job experience on “TXDOT” HEAVYCIVIL BRIDGE PROJECTS..  I have good knowledge of Field execution work, Construction Analysis (Time Study), Construction Management, Structural designing,Planning andscheduling of project, Client and Sub-contractors billing, Cost estimation, Material estimation, Quantity take-offs, project cost forecasting, Project monitoring and Quantity surveying. I have basic knowledge of Project management software Primavera P3 & P6, and AutoCAD.  Experience of working in Heavy Civil Constructions like Bridges and Highway Projects, Tunnels, Culverts, Tank Trails (Fort Bliss), Solar Power Plants, Construction of storage. EDUCATION The University Of Texas at El Paso (UTEP) Dec 2012 Masters in Civil Engineering Y. C. College of Engineering (Nagpur University, India) May 2007 Bachelor in Civil Engineering PROFESSIONAL EXPERIENCE Haydon Building Corp., El Paso, Texas Project Engineer Nov’13 - Present Projects: Owner: Texas Department of Transportation (TxDOT) Spur 1966 Project:-  The Spur1966 project is a connectionbetween Schuster Avenue on the UTEP campus and Paisano Drive via a bridge over I-10.  The project length is approximately 0.7 miles. The Project is dedicated to improving connectivity and mobility.  Improve connections and traffic flow between the UTEP campus, surrounding medical facilities and Mesa Street with Paisano Drive.  Create an additional route to and fromthe downtown area.  Eliminate the need forUTEP-bound traffic to cut throughthe adjacent Sunset Heights neighborhood to access the UTEP facility. I10 Americas Interchange TxDOT Phase 3:-  TXDOT I-10 & LP-375 (Americas) Interchange Phase 3, LP-375 Southbound to Eastbound & Northbound to Eastbound.  Work for Phase 3 includes two direct connectors built with both steel and concrete girders.  Demolition and reconstructionofthree boxbeambridges,rebuilding both the west-and eastbound I-10 frontage roads east of the Interchange.  80,000 CY of embankment,10,000 SF ofMSE walls, stormdrain,and relocation ofTxDOT’s ITS system,overhead s igns,lighting, and delineation. Responsibilities:  Estimating various project quantities.  Preparing monthly bill for submitting to TxDOT.  Subcontractor Billing.  Processing RFI’s and Submittals, Updating red lines.  Approving Daily Reports on Onbase and Datamax  Working on Viewpoint Software for managing project quantities, billing, projection, etc.  Labor Costs & Cost Data on Timberline.  Submitting Monthly requirement forms for TxDOT i.e. SBE, DBE, Prompt Payment Application.  Submitting On the Job Training (OJT) documents every month to TxDOT.  Handling all the human resources and administrative work for the project.  Traffic Control/ Detour planning for I-10 Closures.  Quantities on Viewpoint  Daily Costs & Yields for concrete
  • 2. 2 | P a g e  Making Change Orders & Negotiating with Owner & Subcontractors. Chevron Renewable Energy Presidio, Texas Construction Analyst Dec’12 – Nov’13 Projects:  ACACIA Solar PowerPlant (10MW Single Axis trackers),Presidio,Texas Responsibilities:  Evaluated and monitor the performance and efficiency of the Man-power and Machineries.  Maintained data and prepare analyses – utilized for operations assessments, future project bidding business planning, etc.  Coordinated with corporate departments to collect and analyze data to prepare reports required by senior management.  Attended regular meetings with the Project Team, record meeting notes, and follow up on key iss ues for Senior Management.  Executed personally and direct subcontractorson solartrackerinstallation(assembly,transport, and erection), commissioning and testing.  Managed subcontractor RFI’s & submittals.  Negotiated and processed change orders, invoices and associated documentation. Tug Hill Construction, Fort Bliss / El Paso Civil Engineering Intern May’11– Sept’11 Projects:  Repairing TankTrails at the McGregorRange Camp Responsibilities:  Repairing Tank Trails at the McGregor Range Camp, while remaining within strict environmental regulations.  Assistedthe Project Engineerin scheduling,completingofficialsubmittals and everydaypaperworkranging fromCertified Payrolls to directing weekly briefings to the US Army Corp of Engineers.  Assisted the Quality Control Manager.  Gained experience working on the construction site.  Contractor and vendor’s Billing.  Executed the internal Project Close Out  RFI & Submittals. Hindustan Construction Company (Mumbai, India) Assam, India Graduate Engineer June’07 - May’10 Projects: National Highway-54 Part AS-23 (13kmroad with 1km tunnel) North-South–East-West Corridor (NS-EW) is the largest ongoing highway project in India The NS–EW project is managed by the National Highways Authority of India under the Ministry of Road, Transport and Highways. Responsibilities:  Quantity take-off, construction projects estimations. Contractor and client Bills. Actual Execution of various road construction activities.  Quantity Estimation for steel, Cement and excavated earth for purpose of billing.  To performdifferent quality test required as per technical specifications. Cost estimates of pre-bid projects. TECHNICAL SKILLS [Skill level:beginner – intermediate – good – excellent]  M.S Office (Excellent ; Datamax- Excellent ; Timberline- (Excellent) ; MATLAB (Intermediate)); AutoCAD (Good); C language (Intermediate); Staad pro (Beginner); Primavera project planner (p3.0 / p6.0) (Intermediate); M. S. Project Planner (Intermediate), VISSIM (Beginner), MathCAD (Good), Microstation (Beginner), GeoPak (beginner), Civil 3D (Beginner); Viewpoint (Excellent); Onbase (Excellent) CERTIFICATION, PUBLICATIONS, AWARDS & ACHIEVEMENTS  Memberof “Institute ofEngineers”organization.  Participated in NationalLevel PosterCompetitions on topics like” renewable energy sources” and“recent trends in foundation engineering”.  Active participationin NationalLevelPaperpresentationcompetition on CivilEngineering related topics.  Played in SchoolLevelCricket Competitions (Sports).  Participated in InternationalLevelBridge Design competition to design a bridge, made out of Balsa wood, glue, thread and other materials. The minimum load was 10 kg. The increment in the loads will be in steps of 2 kg up to failure. *References available on request.