Hemraj Parate holds a Master's degree in Civil Engineering from the University of Texas at El Paso. He has over 2 years of experience working on TxDOT heavy civil bridge projects as a project engineer. His responsibilities include estimating quantities, preparing monthly bills, subcontractor billing, processing RFIs and submittals, approving daily reports, labor costs and cost data management using Primavera P3 & P6, AutoCAD, Viewpoint and other software. He also has experience in construction analysis, planning, scheduling, cost estimation and project management.
A Suitable Challenging Position To Improve The Work Efficiency Leading To More Success, And Also To Enhance My Potentials And Further Sharpen My Skill That Suit My Qualifications Mentioned In My CV.
A Suitable Challenging Position To Improve The Work Efficiency Leading To More Success, And Also To Enhance My Potentials And Further Sharpen My Skill That Suit My Qualifications Mentioned In My CV.
Designer Diamond gents rings from www.djewels.org
Thousands of Stunning Diamond Jewellery Designs including Rings, Earrings Bangles, Polki Jewellery and much more. Every piece is Hallmarked and Certfied
• Built data mining methods of CART, bagging and random forest to evaluate the quality of Portuguese "Vinho Verde" red wine;
• Found out test error rate decreased by 7% by using random forest over CART methods and the red wine quality were mainly determined by the physicochemical factors, alcohol and sulphates.
Currently working in Saudi Arabia.
4.5 Years Work Experience in Infrastructure [Roads & Utilities(Pipelines and Water Reservoirs), Bridges and High rise Building Structure].
1. 1 | P a g e
HEMRAJ R PARATE
1532 Upson Drive, El Paso, TX 79902
PH - (915) 261-6852, hemrajrparate@gmail.com
SUMMARY
I am a self-motivated and result driven professionalholding a Master’s degree in Civil Engineering from University of Texas at El
Paso,with advanced organizationaland multitasking abilities Iamwell acknowledgedwith Microsoft office package andothercivil
engineering software.
I have more than 2 years of job experience on “TXDOT” HEAVYCIVIL BRIDGE PROJECTS..
I have good knowledge of Field execution work, Construction Analysis (Time Study), Construction Management, Structural
designing,Planning andscheduling of project, Client and Sub-contractors billing, Cost estimation, Material estimation, Quantity
take-offs, project cost forecasting, Project monitoring and Quantity surveying. I have basic knowledge of Project management
software Primavera P3 & P6, and AutoCAD.
Experience of working in Heavy Civil Constructions like Bridges and Highway Projects, Tunnels, Culverts, Tank Trails (Fort
Bliss), Solar Power Plants, Construction of storage.
EDUCATION
The University Of Texas at El Paso (UTEP) Dec 2012
Masters in Civil Engineering
Y. C. College of Engineering (Nagpur University, India) May 2007
Bachelor in Civil Engineering
PROFESSIONAL EXPERIENCE
Haydon Building Corp., El Paso, Texas
Project Engineer Nov’13 - Present
Projects:
Owner: Texas Department of Transportation (TxDOT)
Spur 1966 Project:-
The Spur1966 project is a connectionbetween Schuster Avenue on the UTEP campus and Paisano Drive via a bridge over I-10.
The project length is approximately 0.7 miles. The Project is dedicated to improving connectivity and mobility.
Improve connections and traffic flow between the UTEP campus, surrounding medical facilities and Mesa Street with Paisano
Drive.
Create an additional route to and fromthe downtown area.
Eliminate the need forUTEP-bound traffic to cut throughthe adjacent Sunset Heights neighborhood to access the UTEP facility.
I10 Americas Interchange TxDOT Phase 3:-
TXDOT I-10 & LP-375 (Americas) Interchange Phase 3, LP-375 Southbound to Eastbound & Northbound to Eastbound.
Work for Phase 3 includes two direct connectors built with both steel and concrete girders.
Demolition and reconstructionofthree boxbeambridges,rebuilding both the west-and eastbound I-10 frontage roads east of the
Interchange.
80,000 CY of embankment,10,000 SF ofMSE walls, stormdrain,and relocation ofTxDOT’s ITS system,overhead s igns,lighting,
and delineation.
Responsibilities:
Estimating various project quantities.
Preparing monthly bill for submitting to TxDOT.
Subcontractor Billing.
Processing RFI’s and Submittals, Updating red lines.
Approving Daily Reports on Onbase and Datamax
Working on Viewpoint Software for managing project quantities, billing, projection, etc.
Labor Costs & Cost Data on Timberline.
Submitting Monthly requirement forms for TxDOT i.e. SBE, DBE, Prompt Payment Application.
Submitting On the Job Training (OJT) documents every month to TxDOT.
Handling all the human resources and administrative work for the project.
Traffic Control/ Detour planning for I-10 Closures.
Quantities on Viewpoint
Daily Costs & Yields for concrete
2. 2 | P a g e
Making Change Orders & Negotiating with Owner & Subcontractors.
Chevron Renewable Energy Presidio, Texas
Construction Analyst Dec’12 – Nov’13
Projects:
ACACIA Solar PowerPlant (10MW Single Axis trackers),Presidio,Texas
Responsibilities:
Evaluated and monitor the performance and efficiency of the Man-power and Machineries.
Maintained data and prepare analyses – utilized for operations assessments, future project bidding business planning, etc.
Coordinated with corporate departments to collect and analyze data to prepare reports required by senior management.
Attended regular meetings with the Project Team, record meeting notes, and follow up on key iss ues for Senior Management.
Executed personally and direct subcontractorson solartrackerinstallation(assembly,transport, and erection), commissioning and
testing.
Managed subcontractor RFI’s & submittals.
Negotiated and processed change orders, invoices and associated documentation.
Tug Hill Construction, Fort Bliss / El Paso
Civil Engineering Intern May’11– Sept’11
Projects:
Repairing TankTrails at the McGregorRange Camp
Responsibilities:
Repairing Tank Trails at the McGregor Range Camp, while remaining within strict environmental regulations.
Assistedthe Project Engineerin scheduling,completingofficialsubmittals and everydaypaperworkranging fromCertified Payrolls
to directing weekly briefings to the US Army Corp of Engineers.
Assisted the Quality Control Manager.
Gained experience working on the construction site.
Contractor and vendor’s Billing.
Executed the internal Project Close Out
RFI & Submittals.
Hindustan Construction Company (Mumbai, India) Assam, India
Graduate Engineer June’07 - May’10
Projects:
National Highway-54 Part AS-23 (13kmroad with 1km tunnel)
North-South–East-West Corridor (NS-EW) is the largest ongoing highway project in India
The NS–EW project is managed by the National Highways Authority of India under the Ministry of Road, Transport and Highways.
Responsibilities:
Quantity take-off, construction projects estimations. Contractor and client Bills. Actual Execution of various road construction
activities.
Quantity Estimation for steel, Cement and excavated earth for purpose of billing.
To performdifferent quality test required as per technical specifications. Cost estimates of pre-bid projects.
TECHNICAL SKILLS
[Skill level:beginner – intermediate – good – excellent]
M.S Office (Excellent ; Datamax- Excellent ; Timberline- (Excellent) ; MATLAB (Intermediate)); AutoCAD (Good); C language
(Intermediate); Staad pro (Beginner); Primavera project planner (p3.0 / p6.0) (Intermediate); M. S. Project Planner (Intermediate),
VISSIM (Beginner), MathCAD (Good), Microstation (Beginner), GeoPak (beginner), Civil 3D (Beginner); Viewpoint (Excellent);
Onbase (Excellent)
CERTIFICATION, PUBLICATIONS, AWARDS & ACHIEVEMENTS
Memberof “Institute ofEngineers”organization.
Participated in NationalLevel PosterCompetitions on topics like” renewable energy sources” and“recent trends in foundation
engineering”.
Active participationin NationalLevelPaperpresentationcompetition on CivilEngineering related topics.
Played in SchoolLevelCricket Competitions (Sports).
Participated in InternationalLevelBridge Design competition to design a bridge, made out of Balsa wood, glue, thread and other
materials. The minimum load was 10 kg. The increment in the loads will be in steps of 2 kg up to failure.
*References available on request.