HBE    HAS   GROWN       FROM      A   SMALL   CONSTRUCTION       COMPANY

TO    A    NATIONAL      CORPORATION        THAT   IS   A   MAJOR   FORCE

IN    CHANGING          THE     HIGHLY      FRAGMENTED      ENGINEERING,

ARCHITECTURAL           DESIGN     AND      CONSTRUCTION       INDUSTRIES.

OUR SINGLE-SOURCE APPROACH TO THE PLANNING, DESIGNING,

AND BUILDING OF PROJECTS HAS ESTABLISHED STANDARDS

OF EFFICIENCY AND VALUE UNMATCHED IN THE MARKETS

WE SERVE. HBE TODAY RANKS AS THE NATION’S LARGEST AND

MOST       EXPERIENCED         PLANNER,      DESIGNER,      AND   BUILDER

OF        HEALTHCARE          FACILITIES.    WE      HAVE      COMPLETED

HUNDREDS           OF     HOSPITALS         ACROSS       THE      COUNTRY

AND GAINED A NATIONAL REPUTATION AS AN ORGANIZATION

CAPABLE       OF    EXECUTING          COMPLICATED       PROJECTS    WITH

HIGH        QUALITY,          INNOVATIVE       DESIGN,      ENGINEERING,

AND CONSTRUCTION TECHNIQUES.

                                                                             3
HBE DESIGNED AND BUILT


                                                                            HUNDREDS OF HOSPITAL


                                                                            AND HEALTHCARE PROJECTS


    BACKGROUND AND QUALIFICATIONS                                           ACROSS THE COUNTRY.

    Projects have ranged in size from facilities with as few as 21 beds
    to as many as 1,000 beds. HBE also provides planning, design,
    and construction services for medical office buildings, group practice
    clinics, surgicenters, and outpatient clinics. The corporation has
    a strong understanding of the needs of physicians and the growing
    outpatient services area. Combined with its expertise in real estate,
    planning, and financing, HBE has also provided clients with quality
    medical buildings.




4                                                                                                 5
SKILLED MULTI-DISCIPLINARY TEAMS

    Each multi-disciplinary project team coordinates input from a staff
    of professionals who are among the most experienced technicians
    in their fields. The professional staff at HBE includes more than 400
    individuals including architects, engineers, and design/construction
    professionals who work out of the St. Louis headquarters. HBE also
    has healthcare and financial consultants who assist in the planning,
    programming, and development of each project.




6                                                                          7
HBE IS A SINGLE SOURCE


FOR PLANNING, DESIGN,


AND CONSTRUCTION


OF HOSPITALS AND         HBE Corporation, is a single source for all the services required for
                         planning, design, and construction of healthcare facilities. All of the
MEDICAL BUILDINGS.       following services are coordinated and integrated from the inception
                         of every building program.

                         THE SCOPE OF SERVICES INCLUDES:

                         • Planning and Design

                         • Construction Phasing

                         • Certificate of Need–Assistance in Preparation

                         • Architecture and Engineering

                          architecture                 electrical engineering
                          civil engineering            acoustical engineering
                          structural engineering       project management
                          mechanical engineering       construction supervision
                          plumbing engineering         architectural project management
                          fire protection
                         • Estimating

                         • Construction

                         • Interior Design


                         The professionals performing in these disciplines have worked as an
                         integrated team to implement hundreds of building programs. This
                         permits HBE to provide programs with the highest construction quality
                         and ultimate value in the industry. This integration also permits HBE
                         to provide guaranteed firm construction budget figures at each stage
                         of a project’s development.




 8                                                                                                 9
ALL PERSONNEL ARE


                                                                            FULL-TIME EMPLOYEES


                                                                            OF HBE – A TOTALLY

     All personnel are full-time employees of HBE. The entire “in-house”    INTEGRATED ORGANIZATION.
     staff of this totally integrated organization is based in St. Louis.

     ARCHITECTS, ENGINEERS, CONSULTANTS

     - Architects and Architectural Technicians
     - Design Development Architects
     - Mechanical Engineers and Technicians
     - Plumbing
     - Civil Engineers
     - Structural Engineers and Technicians
     - Cost Estimators
     - Healthcare Consultants
     - Hospital Financial Consultants
     - Interior Designers
     - Dietary Consultants
     - Architectural Illustrators/Model Builders

     CONSTRUCTION

     - Operations Managers
     - Regional Managers
     - Job Superintendents
     - Project Engineers – Office
     - Assistant Project Managers – Field
     - Chief Engineers




10                                                                                                11
The HBE design-build project delivery method provides you two key
     advantages over other delivery options.

     1. You will always know exactly what you are getting before
       you pay for it.

     2. At the earliest stage of design, architectural services are
       coordinated with engineering and construction disciplines
       to insure constructability.

     We believe you should know what you are getting before you pay
     for it. That is why we provide you with a conceptual design and
     a guaranteed lump sum price for construction before we ask for
     your commitment.




12                                                                       13
CONSIDER THE ADVANTAGE


OF AN INTEGRATED TEAM


ASSEMBLED AROUND A


TABLE FOR YOUR PROJECT.   Consider the advantage of an integrated team assembled around
                          the table for your project. During planning, conceptual design, and
                          design development, the key individual coordinating activity between
                          HBE and your hospital will be a Vice President of Project Development.

                          Following the signing of the construction contract, a full-time site
                          superintendent will be assigned. This individual will be supported
                          by a regional construction manager, a vice president of operations
                          for construction and an architectural project manager/contract
                          administrator, who will enforce the requirements of the contract
                          through the duration of the project.




 14                                                                                                15
NO FINANCIAL COMMITMENT.

     YOU INCUR NO FINANCIAL OBLIGATION UNTIL

     YOU ARE COMPLETELY SATISFIED WITH OUR

     PROPOSED DESIGN SOLUTION.


     HBE ASSUMES MAJOR UP-FRONT PLANNING AND DESIGN RISK.
                                                                                         1 2
                                                                                      T H E H B E M E T H O D | A N I N T E G R AT E D F O U R P H A S E P R O C E S S




                                                                                         3 4
     AS THE NATION’S LEADING HEALTHCARE DESIGN-B U I L D F I R M ,

     W E A R E N O T O N LY L A R G E E N O U G H T O A S S U M E S U C H R I S K ,

     BUT WE ALSO BELIEVE IT IS THE RIGHT THING TO DO.




16
PHASE 1: ASSESSMENT OF EXISTING BUILDING
      1   PROGRAM/PLAN DEVELOPMENT


          Assessment of existing building program – We begin with a
          detailed and thorough analysis of your existing building program,
          including a review of all existing architectural plans and conditions,
          space and strategic plans, master plans and other planning materials.

          A technical tour of your facility/campus will also be conducted to gain
          an overall perspective of existing conditions and infrastructure.

          Within a compressed time frame, HBE will provide:
          •   Detailed schematic drawings
          •   Project development schedule
          •   Guaranteed lump sum amount for architectural design, engineering,
              Group 1 equipment and construction.




1 2
3 4
                                                                                    19
2   PHASE 2: DESIGN DEVELOPMENT & BUDGET PREPARATION



         Refining the solution – Once you determine there is value in the design
         solution, we will assign appropriate personnel to work directly with
         you as follows:

         1. The vice president of project development will:
           a. coordinate HBE internal technical resources to refine our
           solution so that it is yours and,
           b. price the solution.

         2. A design architect will work with you and your staff to
           assure the design solution meets your organizational needs.

         Letter of Authorization – When you recognize a distinct value in
         HBE’s approach to a design solution and ready to move forward with
         HBE on an exclusive basis, a brief Letter of Authorization (LOA) is all
         that is required.

         This LOA signifies that the hospital and HBE will work through a
         planning process intended to result in a specific project. The LOA
         also clearly spells out the HBE guarantee of “no up-front risk” for
         the hospital.




                                                                                   1 2
                                                                                   3 4
20
3   PHASE 3: CONSTRUCTION DRAWINGS & CONTRACT DOCUMENTS



          1. Once the design and a guaranteed lump sum price are
            agreed upon, working drawings will be developed with
            the hospital’s approval.

          2. Costs for the development of working drawings will be
            billed as the drawings progress.




1 2
3 4
                                                                     23
4   PHASE 4: CONSTRUCTION



         Construction Phase - When you are convinced that your project is
         designed for optimum efficiency and maximizing the value of your
         capital investment, HBE will provide a contract for your review and
         approval to proceed to construction.




                                                                               1 2
                                                                               3 4
24
COST INFLUENCE CURVE
         HIGH




                               COST
                            INFLUENCE


                                                                                   COST
                          HBE GUARANTEED
                          LUMP SUM PRICE
        ABILITY TO                                                                                              CUMULATIVE
     INFLUENCE COST                                                                                            COST OF PROJECT




                                                                         WORKING DRAWINGS
                                                                           85% COMPLETE




         LOW          CONCEPTUAL    SCHEMATIC     FINAL   PROCUREMENT        CONSTRUCTION          OCCUPY            0%
                       PLANNING       DESIGN     DESIGN    BID & AWARD
                                   DEVELOPMENT   PHASE


                                        DESIGN                                     BUILD




             HBE recognizes that the greatest influence on cost is in the early design development of a project.
             It is the integrated approach to architectural design and engineering early in the process that
             produces superior results. In addition, the HBE guaranteed lump sum price allows owners to
             make informed judgments of value.




26                                                                                                                               27
w w w. h b e c o r p . c o m
11330 Olive Boulevard
St. Louis, MO 63141
Phone (314) 567-9000

HBE

  • 2.
    HBE HAS GROWN FROM A SMALL CONSTRUCTION COMPANY TO A NATIONAL CORPORATION THAT IS A MAJOR FORCE IN CHANGING THE HIGHLY FRAGMENTED ENGINEERING, ARCHITECTURAL DESIGN AND CONSTRUCTION INDUSTRIES. OUR SINGLE-SOURCE APPROACH TO THE PLANNING, DESIGNING, AND BUILDING OF PROJECTS HAS ESTABLISHED STANDARDS OF EFFICIENCY AND VALUE UNMATCHED IN THE MARKETS WE SERVE. HBE TODAY RANKS AS THE NATION’S LARGEST AND MOST EXPERIENCED PLANNER, DESIGNER, AND BUILDER OF HEALTHCARE FACILITIES. WE HAVE COMPLETED HUNDREDS OF HOSPITALS ACROSS THE COUNTRY AND GAINED A NATIONAL REPUTATION AS AN ORGANIZATION CAPABLE OF EXECUTING COMPLICATED PROJECTS WITH HIGH QUALITY, INNOVATIVE DESIGN, ENGINEERING, AND CONSTRUCTION TECHNIQUES. 3
  • 3.
    HBE DESIGNED ANDBUILT HUNDREDS OF HOSPITAL AND HEALTHCARE PROJECTS BACKGROUND AND QUALIFICATIONS ACROSS THE COUNTRY. Projects have ranged in size from facilities with as few as 21 beds to as many as 1,000 beds. HBE also provides planning, design, and construction services for medical office buildings, group practice clinics, surgicenters, and outpatient clinics. The corporation has a strong understanding of the needs of physicians and the growing outpatient services area. Combined with its expertise in real estate, planning, and financing, HBE has also provided clients with quality medical buildings. 4 5
  • 4.
    SKILLED MULTI-DISCIPLINARY TEAMS Each multi-disciplinary project team coordinates input from a staff of professionals who are among the most experienced technicians in their fields. The professional staff at HBE includes more than 400 individuals including architects, engineers, and design/construction professionals who work out of the St. Louis headquarters. HBE also has healthcare and financial consultants who assist in the planning, programming, and development of each project. 6 7
  • 5.
    HBE IS ASINGLE SOURCE FOR PLANNING, DESIGN, AND CONSTRUCTION OF HOSPITALS AND HBE Corporation, is a single source for all the services required for planning, design, and construction of healthcare facilities. All of the MEDICAL BUILDINGS. following services are coordinated and integrated from the inception of every building program. THE SCOPE OF SERVICES INCLUDES: • Planning and Design • Construction Phasing • Certificate of Need–Assistance in Preparation • Architecture and Engineering architecture electrical engineering civil engineering acoustical engineering structural engineering project management mechanical engineering construction supervision plumbing engineering architectural project management fire protection • Estimating • Construction • Interior Design The professionals performing in these disciplines have worked as an integrated team to implement hundreds of building programs. This permits HBE to provide programs with the highest construction quality and ultimate value in the industry. This integration also permits HBE to provide guaranteed firm construction budget figures at each stage of a project’s development. 8 9
  • 6.
    ALL PERSONNEL ARE FULL-TIME EMPLOYEES OF HBE – A TOTALLY All personnel are full-time employees of HBE. The entire “in-house” INTEGRATED ORGANIZATION. staff of this totally integrated organization is based in St. Louis. ARCHITECTS, ENGINEERS, CONSULTANTS - Architects and Architectural Technicians - Design Development Architects - Mechanical Engineers and Technicians - Plumbing - Civil Engineers - Structural Engineers and Technicians - Cost Estimators - Healthcare Consultants - Hospital Financial Consultants - Interior Designers - Dietary Consultants - Architectural Illustrators/Model Builders CONSTRUCTION - Operations Managers - Regional Managers - Job Superintendents - Project Engineers – Office - Assistant Project Managers – Field - Chief Engineers 10 11
  • 7.
    The HBE design-buildproject delivery method provides you two key advantages over other delivery options. 1. You will always know exactly what you are getting before you pay for it. 2. At the earliest stage of design, architectural services are coordinated with engineering and construction disciplines to insure constructability. We believe you should know what you are getting before you pay for it. That is why we provide you with a conceptual design and a guaranteed lump sum price for construction before we ask for your commitment. 12 13
  • 8.
    CONSIDER THE ADVANTAGE OFAN INTEGRATED TEAM ASSEMBLED AROUND A TABLE FOR YOUR PROJECT. Consider the advantage of an integrated team assembled around the table for your project. During planning, conceptual design, and design development, the key individual coordinating activity between HBE and your hospital will be a Vice President of Project Development. Following the signing of the construction contract, a full-time site superintendent will be assigned. This individual will be supported by a regional construction manager, a vice president of operations for construction and an architectural project manager/contract administrator, who will enforce the requirements of the contract through the duration of the project. 14 15
  • 9.
    NO FINANCIAL COMMITMENT. YOU INCUR NO FINANCIAL OBLIGATION UNTIL YOU ARE COMPLETELY SATISFIED WITH OUR PROPOSED DESIGN SOLUTION. HBE ASSUMES MAJOR UP-FRONT PLANNING AND DESIGN RISK. 1 2 T H E H B E M E T H O D | A N I N T E G R AT E D F O U R P H A S E P R O C E S S 3 4 AS THE NATION’S LEADING HEALTHCARE DESIGN-B U I L D F I R M , W E A R E N O T O N LY L A R G E E N O U G H T O A S S U M E S U C H R I S K , BUT WE ALSO BELIEVE IT IS THE RIGHT THING TO DO. 16
  • 10.
    PHASE 1: ASSESSMENTOF EXISTING BUILDING 1 PROGRAM/PLAN DEVELOPMENT Assessment of existing building program – We begin with a detailed and thorough analysis of your existing building program, including a review of all existing architectural plans and conditions, space and strategic plans, master plans and other planning materials. A technical tour of your facility/campus will also be conducted to gain an overall perspective of existing conditions and infrastructure. Within a compressed time frame, HBE will provide: • Detailed schematic drawings • Project development schedule • Guaranteed lump sum amount for architectural design, engineering, Group 1 equipment and construction. 1 2 3 4 19
  • 11.
    2 PHASE 2: DESIGN DEVELOPMENT & BUDGET PREPARATION Refining the solution – Once you determine there is value in the design solution, we will assign appropriate personnel to work directly with you as follows: 1. The vice president of project development will: a. coordinate HBE internal technical resources to refine our solution so that it is yours and, b. price the solution. 2. A design architect will work with you and your staff to assure the design solution meets your organizational needs. Letter of Authorization – When you recognize a distinct value in HBE’s approach to a design solution and ready to move forward with HBE on an exclusive basis, a brief Letter of Authorization (LOA) is all that is required. This LOA signifies that the hospital and HBE will work through a planning process intended to result in a specific project. The LOA also clearly spells out the HBE guarantee of “no up-front risk” for the hospital. 1 2 3 4 20
  • 12.
    3 PHASE 3: CONSTRUCTION DRAWINGS & CONTRACT DOCUMENTS 1. Once the design and a guaranteed lump sum price are agreed upon, working drawings will be developed with the hospital’s approval. 2. Costs for the development of working drawings will be billed as the drawings progress. 1 2 3 4 23
  • 13.
    4 PHASE 4: CONSTRUCTION Construction Phase - When you are convinced that your project is designed for optimum efficiency and maximizing the value of your capital investment, HBE will provide a contract for your review and approval to proceed to construction. 1 2 3 4 24
  • 14.
    COST INFLUENCE CURVE HIGH COST INFLUENCE COST HBE GUARANTEED LUMP SUM PRICE ABILITY TO CUMULATIVE INFLUENCE COST COST OF PROJECT WORKING DRAWINGS 85% COMPLETE LOW CONCEPTUAL SCHEMATIC FINAL PROCUREMENT CONSTRUCTION OCCUPY 0% PLANNING DESIGN DESIGN BID & AWARD DEVELOPMENT PHASE DESIGN BUILD HBE recognizes that the greatest influence on cost is in the early design development of a project. It is the integrated approach to architectural design and engineering early in the process that produces superior results. In addition, the HBE guaranteed lump sum price allows owners to make informed judgments of value. 26 27
  • 15.
    w w w.h b e c o r p . c o m 11330 Olive Boulevard St. Louis, MO 63141 Phone (314) 567-9000