SlideShare a Scribd company logo
Process for
developing a
20% BNG policy
Introduction
• Local Plan: Strategy and Sites 2019
• General requirement for biodiversity net gain
• Local Plan: Development Management Policies
• Policy P7 – Biodiversity in New Development
• Sets standards and rules for biodiversity in new development
• Includes 20% BNG that uses national methodology
Why have a BNG policy?
• NPPF 179b: plans should identify and pursue opportunities for
securing measurable net gains for biodiversity
Also, having a biodiversity policy will deliver:
• NPPF 15: Positive vision and framework for addressing environmental
priorities (biodiversity recovery is local and national priority)
• NPPF 93: Policy for shared/open space should enhance sustainability
of communities and resi. environments
• NPPF 169: Multifunctional use of SuDS
• NPPF 145: Enhance the beneficial use of Green Belts, opportunities
to retain and enhance biodiversity – offsite habitat banks
• NPPG: Set out a suitable approach to BNG and how it will be
achieved.
Why go above 10%
• Can go higher
• Govt - 10% is a minimum not a cap, LPAs can go further
• 10% national target - necessarily cautious due to differing local viability and
context.
• Defra Impact Assessment: 10% is “the most achievable” level of net
gain that could be confidently expected to deliver genuine net gain, or
“at least no net loss”
• ‘No net loss’ not compliant with NPPF 179
• NPPF 16: plans must be aspirational but deliverable
• Local need
• Local species loss is higher than national (same everywhere).
• SyNP recommend 20% for Surrey – SyNP mandated by govt to lead on
biodiversity recovery.
• EA and NE supported.
Challenges from developers
• No justification for local divergence
• Not viable
• Not feasible onsite
• Not ready to proceed (e.g. no BNG regs)
• Inspector:
• New to BNG. Very cautious. Probably discussed with MV inspector.
• Very interested in specific local need for BNG
• Not interested in “at least no net loss” issue
• Concerned about impact on delivery
• Concerned about lack of BNG regulations at commencement
Justification: Local need
• Surrey Nature Partnership (SyNP) – have a status in
planning system
• SyNP recommendation for 20% BNG:
• high degree of habitat loss/fragmentation due to
• routine wildlife persecution
• intensification of agriculture and eutrophication of soils and
water.
• SyNP: The State of Surrey's Nature – Surrey extinction rate
over 5x national rate
• s.41 species loss worse for Guildford than Surrey
Viability (1)
• 20% not a huge increase over 10%
• 110% provision vs 120% provision (9% uplift)
• Defra Impact Assessment: ‘level of gain makes little difference to
costs’
• Developers: Defra’s costs which we used in plan viability
assessment were unreasonable
• Key issues
• How many offsite credits would development need?
• How much will they cost?
• Commissioned additional studies from Stantec ecology
• Development Sites Study
• Tyting Habitat Bank Study
Sites study (1)
• BNG potential on 3 permitted sites
• Keen’s Lane (large greenfield, urban edge)
• Clockbarn Nursery (medium, constrained greenfield, outside a village).
• Just Tyres (small brownfield)
• Conservative approach – didn’t redesign the sites
• Limited dataset, but aligned with data from
• Defra Impact Assessment
• Emerging schemes/planning apps
Sites study (2)
• Conclusions:
• Brownfield sites with a low baseline biodiversity value can exceed
20% BNG easily (Just Tyres >4000%, North Street c. 730%)
• Strategic sites with bespoke SANGs that are capable of hosting
distinct BNG measures can exceed 20%
• Many greenfield sites will be able to achieve no net loss plus a
level of BNG
• Constrained greenfield sites will have a biodiversity loss onsite
BUT this is true at both 10% and 20% BNG. Uplift results in a small
increase in credits needed
• See Matter 3 statement for details – sets out evidence and
arguments for examiner.
Tyting Farm habitat Bank study (1)
• Study consisting of 2 documents:
• Tyting Farm Biodiversity Net Gain – Baseline Report (based on
proposed SANG)
• Tyting Farm Biodiversity Net Gain Plan (proposed additional
uplift)
• Would provide 140 habitat credits and 30 linear credits
• Total cost divided by 170 credits:
• Using Green Book projections (best practice) – c.£7,500
• Using conservative model – c.£10,500 per credit
• Demonstrates that costs used in the viability study are
realistic
Tyting Farm habitat Bank study (2)
Before
Mainly poor/moderate condition
After
Mainly moderate/good condition
Tyting Farm habitat Bank study (3)
Viability (2)
Inspector seemed satisfied that 20% BNG was viable
HOWEVER
Added caveat to policy repeating NPPF 58 (planning application
“particular circumstances” viability assessment)
In the event BNG not viable, requirement will drop from 20% to
10%.
Limited viability impact – a few hundred £ per house.
Feasibility
• Loss of development land to BNG
• Viability assessment: 15-30% of land set aside in addition to Open Space
• Inspector not concerned once credits shown to be viable.
• Speed of implementation
• Concerned the BNG Regulations unavailable
• Concerned about speed of delivery of Tyting habitat bank (or other banks)
• Modified policy to commence alongside national 10%
Guildford BC BNG Policy June 2023.pdf

More Related Content

Similar to Guildford BC BNG Policy June 2023.pdf

RK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptxRK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptx
NAZMUSSAKIB917684
 
Carwg afolu project development presentation v2
Carwg afolu project development presentation v2Carwg afolu project development presentation v2
Carwg afolu project development presentation v2
African Conservation Tillage Network
 
PAS Biodiversity Net Gain and Nature Recovery update for members
PAS Biodiversity Net Gain and Nature Recovery update for membersPAS Biodiversity Net Gain and Nature Recovery update for members
PAS Biodiversity Net Gain and Nature Recovery update for members
PAS_Team
 
PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...
PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...
PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...
PAS_Team
 
CAP Reform - Current Policy & Potential Implications
CAP Reform - Current Policy & Potential ImplicationsCAP Reform - Current Policy & Potential Implications
CAP Reform - Current Policy & Potential Implications
Countryside and Community Research Institute
 
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
Iwl Pcu
 
Soil carbon: A silver bullet for climate change mitigation? Finding a middle way
Soil carbon: A silver bullet for climate change mitigation? Finding a middle waySoil carbon: A silver bullet for climate change mitigation? Finding a middle way
Soil carbon: A silver bullet for climate change mitigation? Finding a middle way
CCAFS | CGIAR Research Program on Climate Change, Agriculture and Food Security
 
PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy
PAS_Team
 
Chris Stephenson SHAMBA
Chris Stephenson SHAMBAChris Stephenson SHAMBA
Chris Stephenson SHAMBA
PlanVivo1
 
Common Guidelines for Watershed Development Projects-2008 (NRAA)
Common Guidelines  for Watershed Development Projects-2008 (NRAA)Common Guidelines  for Watershed Development Projects-2008 (NRAA)
Common Guidelines for Watershed Development Projects-2008 (NRAA)Dr. Ramdas Samarth
 
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
PAS_Team
 
Options for Mitigation in Agriculture
Options for Mitigation in AgricultureOptions for Mitigation in Agriculture
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&EModule 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
CCAFS | CGIAR Research Program on Climate Change, Agriculture and Food Security
 
Niger community action project for climate relssilience | World Bank
Niger community action project for climate relssilience | World BankNiger community action project for climate relssilience | World Bank
Niger community action project for climate relssilience | World Bank
CCAFS | CGIAR Research Program on Climate Change, Agriculture and Food Security
 
Carbon management and rural livelihoods | Elaine Muir
Carbon management and rural livelihoods | Elaine MuirCarbon management and rural livelihoods | Elaine Muir
Carbon management and rural livelihoods | Elaine Muir
icarb
 
Zippin_ACES_12-09-14
Zippin_ACES_12-09-14Zippin_ACES_12-09-14
Zippin_ACES_12-09-14David Zippin
 
Enhancing investment in soil health and carbon storage: Frontiers for linking...
Enhancing investment in soil health and carbon storage: Frontiers for linking...Enhancing investment in soil health and carbon storage: Frontiers for linking...
Enhancing investment in soil health and carbon storage: Frontiers for linking...
CCAFS | CGIAR Research Program on Climate Change, Agriculture and Food Security
 
27 september 2010- 7 wwf mozambique rca presentation 260910
27 september 2010- 7 wwf mozambique    rca presentation  26091027 september 2010- 7 wwf mozambique    rca presentation  260910
27 september 2010- 7 wwf mozambique rca presentation 260910Daey Ouwens Fund
 
Rethinking Agriculture for the 21st Century: Climate change mitigation opport...
Rethinking Agriculture for the 21st Century: Climate change mitigation opport...Rethinking Agriculture for the 21st Century: Climate change mitigation opport...
Rethinking Agriculture for the 21st Century: Climate change mitigation opport...
CCAFS | CGIAR Research Program on Climate Change, Agriculture and Food Security
 
Integrating Agriculture into Regional Climate Action Plans
Integrating Agriculture into Regional Climate Action Plans Integrating Agriculture into Regional Climate Action Plans
Integrating Agriculture into Regional Climate Action Plans
National Association of Conservation Districts
 

Similar to Guildford BC BNG Policy June 2023.pdf (20)

RK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptxRK DEV 604 Final Lecture.pptx
RK DEV 604 Final Lecture.pptx
 
Carwg afolu project development presentation v2
Carwg afolu project development presentation v2Carwg afolu project development presentation v2
Carwg afolu project development presentation v2
 
PAS Biodiversity Net Gain and Nature Recovery update for members
PAS Biodiversity Net Gain and Nature Recovery update for membersPAS Biodiversity Net Gain and Nature Recovery update for members
PAS Biodiversity Net Gain and Nature Recovery update for members
 
PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...
PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...
PAS Biodiversity Net Gain and the Environment Bill - what does it mean for LP...
 
CAP Reform - Current Policy & Potential Implications
CAP Reform - Current Policy & Potential ImplicationsCAP Reform - Current Policy & Potential Implications
CAP Reform - Current Policy & Potential Implications
 
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
 
Soil carbon: A silver bullet for climate change mitigation? Finding a middle way
Soil carbon: A silver bullet for climate change mitigation? Finding a middle waySoil carbon: A silver bullet for climate change mitigation? Finding a middle way
Soil carbon: A silver bullet for climate change mitigation? Finding a middle way
 
PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy
 
Chris Stephenson SHAMBA
Chris Stephenson SHAMBAChris Stephenson SHAMBA
Chris Stephenson SHAMBA
 
Common Guidelines for Watershed Development Projects-2008 (NRAA)
Common Guidelines  for Watershed Development Projects-2008 (NRAA)Common Guidelines  for Watershed Development Projects-2008 (NRAA)
Common Guidelines for Watershed Development Projects-2008 (NRAA)
 
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
PAS biodiversity net gain and nature recovery update for LPA officers (20 Oct...
 
Options for Mitigation in Agriculture
Options for Mitigation in AgricultureOptions for Mitigation in Agriculture
Options for Mitigation in Agriculture
 
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&EModule 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
Module 6: Measurement, Reporting and Verification (MRV) and adaptation M&E
 
Niger community action project for climate relssilience | World Bank
Niger community action project for climate relssilience | World BankNiger community action project for climate relssilience | World Bank
Niger community action project for climate relssilience | World Bank
 
Carbon management and rural livelihoods | Elaine Muir
Carbon management and rural livelihoods | Elaine MuirCarbon management and rural livelihoods | Elaine Muir
Carbon management and rural livelihoods | Elaine Muir
 
Zippin_ACES_12-09-14
Zippin_ACES_12-09-14Zippin_ACES_12-09-14
Zippin_ACES_12-09-14
 
Enhancing investment in soil health and carbon storage: Frontiers for linking...
Enhancing investment in soil health and carbon storage: Frontiers for linking...Enhancing investment in soil health and carbon storage: Frontiers for linking...
Enhancing investment in soil health and carbon storage: Frontiers for linking...
 
27 september 2010- 7 wwf mozambique rca presentation 260910
27 september 2010- 7 wwf mozambique    rca presentation  26091027 september 2010- 7 wwf mozambique    rca presentation  260910
27 september 2010- 7 wwf mozambique rca presentation 260910
 
Rethinking Agriculture for the 21st Century: Climate change mitigation opport...
Rethinking Agriculture for the 21st Century: Climate change mitigation opport...Rethinking Agriculture for the 21st Century: Climate change mitigation opport...
Rethinking Agriculture for the 21st Century: Climate change mitigation opport...
 
Integrating Agriculture into Regional Climate Action Plans
Integrating Agriculture into Regional Climate Action Plans Integrating Agriculture into Regional Climate Action Plans
Integrating Agriculture into Regional Climate Action Plans
 

More from PAS_Team

231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf
PAS_Team
 
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
PAS_Team
 
PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023
PAS_Team
 
BNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfBNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdf
PAS_Team
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS_Team
 
Leeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxLeeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptx
PAS_Team
 
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
PAS_Team
 
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
PAS_Team
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
PAS_Team
 
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS_Team
 
EOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxEOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptx
PAS_Team
 
230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx
PAS_Team
 
PAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdf
PAS_Team
 
CBC Monitoring Review.pptx
CBC Monitoring  Review.pptxCBC Monitoring  Review.pptx
CBC Monitoring Review.pptx
PAS_Team
 
PAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptx
PAS_Team
 
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS_Team
 
PAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptx
PAS_Team
 
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS_Team
 
PAS Biodiversity Net Gain essentials for officers 8 November
PAS Biodiversity Net Gain essentials for officers 8 NovemberPAS Biodiversity Net Gain essentials for officers 8 November
PAS Biodiversity Net Gain essentials for officers 8 November
PAS_Team
 
Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub
PAS_Team
 

More from PAS_Team (20)

231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf
 
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
 
PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023
 
BNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfBNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdf
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
 
Leeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxLeeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptx
 
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
 
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
 
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23
 
EOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxEOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptx
 
230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx
 
PAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdf
 
CBC Monitoring Review.pptx
CBC Monitoring  Review.pptxCBC Monitoring  Review.pptx
CBC Monitoring Review.pptx
 
PAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptx
 
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
 
PAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptx
 
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
 
PAS Biodiversity Net Gain essentials for officers 8 November
PAS Biodiversity Net Gain essentials for officers 8 NovemberPAS Biodiversity Net Gain essentials for officers 8 November
PAS Biodiversity Net Gain essentials for officers 8 November
 
Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub Constructed Wetland Guidance & Hub
Constructed Wetland Guidance & Hub
 

Recently uploaded

PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 

Recently uploaded (20)

PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 

Guildford BC BNG Policy June 2023.pdf

  • 2. Introduction • Local Plan: Strategy and Sites 2019 • General requirement for biodiversity net gain • Local Plan: Development Management Policies • Policy P7 – Biodiversity in New Development • Sets standards and rules for biodiversity in new development • Includes 20% BNG that uses national methodology
  • 3. Why have a BNG policy? • NPPF 179b: plans should identify and pursue opportunities for securing measurable net gains for biodiversity Also, having a biodiversity policy will deliver: • NPPF 15: Positive vision and framework for addressing environmental priorities (biodiversity recovery is local and national priority) • NPPF 93: Policy for shared/open space should enhance sustainability of communities and resi. environments • NPPF 169: Multifunctional use of SuDS • NPPF 145: Enhance the beneficial use of Green Belts, opportunities to retain and enhance biodiversity – offsite habitat banks • NPPG: Set out a suitable approach to BNG and how it will be achieved.
  • 4. Why go above 10% • Can go higher • Govt - 10% is a minimum not a cap, LPAs can go further • 10% national target - necessarily cautious due to differing local viability and context. • Defra Impact Assessment: 10% is “the most achievable” level of net gain that could be confidently expected to deliver genuine net gain, or “at least no net loss” • ‘No net loss’ not compliant with NPPF 179 • NPPF 16: plans must be aspirational but deliverable • Local need • Local species loss is higher than national (same everywhere). • SyNP recommend 20% for Surrey – SyNP mandated by govt to lead on biodiversity recovery. • EA and NE supported.
  • 5. Challenges from developers • No justification for local divergence • Not viable • Not feasible onsite • Not ready to proceed (e.g. no BNG regs) • Inspector: • New to BNG. Very cautious. Probably discussed with MV inspector. • Very interested in specific local need for BNG • Not interested in “at least no net loss” issue • Concerned about impact on delivery • Concerned about lack of BNG regulations at commencement
  • 6. Justification: Local need • Surrey Nature Partnership (SyNP) – have a status in planning system • SyNP recommendation for 20% BNG: • high degree of habitat loss/fragmentation due to • routine wildlife persecution • intensification of agriculture and eutrophication of soils and water. • SyNP: The State of Surrey's Nature – Surrey extinction rate over 5x national rate • s.41 species loss worse for Guildford than Surrey
  • 7. Viability (1) • 20% not a huge increase over 10% • 110% provision vs 120% provision (9% uplift) • Defra Impact Assessment: ‘level of gain makes little difference to costs’ • Developers: Defra’s costs which we used in plan viability assessment were unreasonable • Key issues • How many offsite credits would development need? • How much will they cost? • Commissioned additional studies from Stantec ecology • Development Sites Study • Tyting Habitat Bank Study
  • 8. Sites study (1) • BNG potential on 3 permitted sites • Keen’s Lane (large greenfield, urban edge) • Clockbarn Nursery (medium, constrained greenfield, outside a village). • Just Tyres (small brownfield) • Conservative approach – didn’t redesign the sites • Limited dataset, but aligned with data from • Defra Impact Assessment • Emerging schemes/planning apps
  • 9. Sites study (2) • Conclusions: • Brownfield sites with a low baseline biodiversity value can exceed 20% BNG easily (Just Tyres >4000%, North Street c. 730%) • Strategic sites with bespoke SANGs that are capable of hosting distinct BNG measures can exceed 20% • Many greenfield sites will be able to achieve no net loss plus a level of BNG • Constrained greenfield sites will have a biodiversity loss onsite BUT this is true at both 10% and 20% BNG. Uplift results in a small increase in credits needed • See Matter 3 statement for details – sets out evidence and arguments for examiner.
  • 10. Tyting Farm habitat Bank study (1) • Study consisting of 2 documents: • Tyting Farm Biodiversity Net Gain – Baseline Report (based on proposed SANG) • Tyting Farm Biodiversity Net Gain Plan (proposed additional uplift) • Would provide 140 habitat credits and 30 linear credits • Total cost divided by 170 credits: • Using Green Book projections (best practice) – c.£7,500 • Using conservative model – c.£10,500 per credit • Demonstrates that costs used in the viability study are realistic
  • 11. Tyting Farm habitat Bank study (2) Before Mainly poor/moderate condition After Mainly moderate/good condition
  • 12. Tyting Farm habitat Bank study (3)
  • 13. Viability (2) Inspector seemed satisfied that 20% BNG was viable HOWEVER Added caveat to policy repeating NPPF 58 (planning application “particular circumstances” viability assessment) In the event BNG not viable, requirement will drop from 20% to 10%. Limited viability impact – a few hundred £ per house.
  • 14. Feasibility • Loss of development land to BNG • Viability assessment: 15-30% of land set aside in addition to Open Space • Inspector not concerned once credits shown to be viable. • Speed of implementation • Concerned the BNG Regulations unavailable • Concerned about speed of delivery of Tyting habitat bank (or other banks) • Modified policy to commence alongside national 10%