M.V.KANNAN  T.No 22010 AEROMy JOURNEY THROUGH SPACE…CHANDRAYAAN-1Over  50 satellites1970-73Nov 1973-31 March 2010 ISROARYABHATTAISSP-Peenya, BangaloreISAC- Airport Road,BangaloreChrompet, Chennai
ManagementPROFILE (POSITIONS)MAR2010Mechanical Systems Area (MSA) -STRUCTURES1973 - 1981:   Engineer, Structural Analysis1981 - 2003:   Head, Experimental Stress Analysis & Structural Testing1981 – 2003:   STRUCTURAL ANALYST -  ANURADHA 3SAN21Project Engineer -  SROSS-1                         Programme Manager -  SROSS-2                         Deputy Project Director - SROSS- C & SROSS-C2                         Deputy Project Director - INSAT-3B                         Deputy Project Director - GSAT-1 From 2003 :   Head ,Projects Division, Programme Planning & Evaluation Group (PPEG)                        Deputy Project Director (Astronaut Training Centre) -   HSP                        Member Secretary - Programme Management Board (Communication Satellites)                         Deputy Project Director (PPEG) - Chandrayaan-1 (PEB)Special Roles: Technical Reviews / Advisory / Management Committees /  Contracts / Event Managements (Seminars, Conference & cultural etc)36YEARSFOURMONTHSSpacecraft ProjectsProgramme Planning & Evaluation GroupNOV1973EngineeringJob Role
CORE COMPETENCEStructural Analysis
Experimental Stress Analysis
 Structural Testing - S/C
 Static Load Tests
 Dynamic Tests
 Project Management  (As DPD)
 Inter - project  coordination
Integrated project planning , scheduling ,Monitoring &   control – Multi-Project Environment
Project prioritization

Gtg final

  • 1.
    M.V.KANNAN T.No22010 AEROMy JOURNEY THROUGH SPACE…CHANDRAYAAN-1Over 50 satellites1970-73Nov 1973-31 March 2010 ISROARYABHATTAISSP-Peenya, BangaloreISAC- Airport Road,BangaloreChrompet, Chennai
  • 2.
    ManagementPROFILE (POSITIONS)MAR2010Mechanical SystemsArea (MSA) -STRUCTURES1973 - 1981: Engineer, Structural Analysis1981 - 2003: Head, Experimental Stress Analysis & Structural Testing1981 – 2003: STRUCTURAL ANALYST - ANURADHA 3SAN21Project Engineer - SROSS-1 Programme Manager - SROSS-2 Deputy Project Director - SROSS- C & SROSS-C2 Deputy Project Director - INSAT-3B Deputy Project Director - GSAT-1 From 2003 : Head ,Projects Division, Programme Planning & Evaluation Group (PPEG) Deputy Project Director (Astronaut Training Centre) - HSP Member Secretary - Programme Management Board (Communication Satellites) Deputy Project Director (PPEG) - Chandrayaan-1 (PEB)Special Roles: Technical Reviews / Advisory / Management Committees / Contracts / Event Managements (Seminars, Conference & cultural etc)36YEARSFOURMONTHSSpacecraft ProjectsProgramme Planning & Evaluation GroupNOV1973EngineeringJob Role
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
    Inter -project coordination
  • 10.
    Integrated project planning, scheduling ,Monitoring & control – Multi-Project Environment
  • 11.

Editor's Notes

  • #12 Chunk related material together. If you get sidetracked you may lose your bearings and get lost within your presentation. If you get sidetracked within a chunk the sea becomes a lake…you can find your way back to shore more easily.