Synchronization and ATS at Smart Grid
Group No: 34
Project Advisor: Dr. Sohail Aftab Qureshi
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Team Introduction
Hira Mahmood(Team Leader)
2014-EE-157
Specialization: Power
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Sana Amer
2014-EE-160
Specialization: Power
Sumbal Mehmood
2014-EE-161
Specialization: Power
Ahmed Khan
2014-EE-185
Specialization: Power
Problem Statement
• As Load shedding is very high in our country, we do
not want our supply to be interrupted every time when
power outage occurs. In general, when WAPDA supply
goes off their is an interruption in the supply and after a
specific interval of time, the generator starts working.
• However we want to have an uninterrupted supply even
when the WAPDA supply is available or not.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Proposed Solution
ATS Synchronization approach is implemented in this
project.
• Using automatic transfer switch ATS, a seamless
transition between two sources is obtained to ensure
continuous electrical supply to avoid blackouts.
• According to load demand the utility grid and genset
are synchronized through module and hence
uninterrupted supply is available to the load.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Automatic Transfer Switch
An automatic transfer switch (ATS) is an electrical switch
that switches a load between two sources.
• A transfer switch in general seeks to simplify and
provide safety when making use of a generator [1].
• The transfer switch diverts power from your utility to
your generator quickly and easily.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
• In the case of a manual switch, this is done, of course,
manually through a lever or similar device.
• But in the case of an automatic switch, the entire
process occurs instantly, providing you generator power
in the split of a second in the event of an outage.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Synchronization
For a generator to be synchronized with grid following
conditions are checked.
• Voltage Magnitude
• Frequency
• Phase Angle
• Phase Sequence
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Now the question is why synchronization is needed. The
answer is
• When a single load is more than the capacity of
feeding Genset either during running or during starting.
• When load has to be transferred from one Genset to
other without interruption.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Soft Loading
A Soft Load is a type of closed transition in which the
switch synchronizes the two power sources and then
makes connects them in parallel so that an uninterrupted
supply of power can be generated for the sensitive or
critical loads [2].
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Block Diagram
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Control Signals
Basic Components
• Current Transformers
• Miniature Circuit Breaker(MCBs)
• Molded Case Circuit Breaker(MCCBs)
• Magnetic Contactors
• Synchronization module-GC-400(mains)
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Current Transformers
• Level transformation
• Metering CTs-to monitor current provided to load
• 1 CT with main power source
• 3 CTs with the alternative source i.e. generator
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
MCCB
• Protects during abnormal working of the Power circuit
(high power requirement)
• Operate as automatic switch that opens in case of high
current flow
• Adjustable tripping characteristics
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
MCB
• Provide protection during abnormal working of the
control circuit (low power requirement)
• operates as switch that opens in the event of excessive
current flow once the circuit returns to normal, it can be
reclosed automatically.
• Non-adjustable tripping characteristics
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Magnetic Contactor
• Electrically controlled switch used for switching more
than 15 A
• Similar to a relay except with high current ratings
• Control and suppress arc produced when interrupting
heavy current
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Synchronization Module
• Synchronization module-GC-400 mains
• Used for synchronization of the main power source and
alternative source
• To provide an un-interrupted power supply
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Flow
Diagram
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Incoming
from
WAPDA
24 V DC
Charger
Incoming
from
Generator
MCCB MCB
CT CT
MODULE
Magnetic
Contactor
Magnetic
Contactor
CT
Load
3x
CT
1x
CT
3x
MCB
3x
MCB
3x
CT
MCCBMCB
• Two incoming terminals are provided one for the mains
and the other for the emergency source.
• A 24 V DC Charger is also provided to energize the
ATS and load sharing module.
• The current transformers scale the large value current
to small, standardized value of 5 A.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
• The CTs and MCCBs are used in power circuit whereas
the MCBs are used to send control signals to the
module.
• The module further controls the magnetic contactors
such that the load is supplied by either of the two
sources or by synchronism of the two sources if
demand increases.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Transfer sequence steps
• A short while before normal power source fails; the
genset is synchronized with the main power supply.
• When the main power source fails the transfer switch
breaks its connection to the mains and shifts the
electrical load to the genset.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
• When main power is restored, the transfer switch
returns the load from the generator to the normal one.
• In this way any blackout or power interruption to the
load is avoided.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
What we have done so far?
So far we are done with
• Power circuit of hardware
• Wiring of control circuit
• Working on module Programming
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Hardware Developed
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Applications
Un-interruptible Power Supply
• Power blackout protection
• No hindrance
Shift to Automation
• Manual to Automatic
• Reliability
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Applications
Load-Sharing Function
• Managing Heavy Loads
• Optimizing Voltage
Accident Avoiding System
• Less chances of damage
• Avoiding Damages Due To
Manual Operation
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Applications
Seamless transition between two sources
• Smooth flow of Power
• No Sparking.
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Future Deliverables
• Remote
Management of
Power Events
• Control through
mobile phone
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
Gantt Chart
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
3/28/2018
4/25/2018
11
16
REMOTE MANAGMET
CONTROL THROUGH MOBILE
PHONE
Gantt Chart
References
• [1]"Eaton's automatic transfer switch line for
emergency power", Eaton.com, 2018. [Online].
Available:
http://www.eaton.com/Eaton/ProductsServices/Electric
al/ProductsandServices/ElectricalDistribution/ANSINE
MAPowerDistributionandControlSystems/ATS/index.h
tm. [Accessed: 31- Mar- 2018]
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
References
Undergraduate Final Year Project Presentation
Dated: 5th April, 2018
• [2]"Soft Loading Transfer Switch", Electrical
engineering Community, 2018. [Online].
Available: http://engineering.electrical-
equipment.org/panel-building/soft-loading-
transfer-switch.html. [Accessed: 31- Mar-
2018].

More Related Content

Similar to Group 34 fyp_presentation

Project presentation
Project presentationProject presentation
Project presentation
KayDrive
 
Fyp presentations g29
Fyp presentations g29Fyp presentations g29
Fyp presentations g29
KayDrive
 
Group 07 fyp_presentation
Group 07 fyp_presentationGroup 07 fyp_presentation
Group 07 fyp_presentation
KayDrive
 
Optimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected ConvertersOptimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected Converters
KayDrive
 
2014 fyp-37
2014 fyp-372014 fyp-37
2014 fyp-37
KayDrive
 
DC-AC Inverter Topology for the Control and Stable Operation of HVDC
DC-AC Inverter Topology for the Control and Stable Operation of HVDCDC-AC Inverter Topology for the Control and Stable Operation of HVDC
DC-AC Inverter Topology for the Control and Stable Operation of HVDC
KayDrive
 
Fyp presentation
Fyp presentationFyp presentation
Fyp presentation
KayDrive
 
Fyp presentations format
Fyp presentations formatFyp presentations format
Fyp presentations format
KayDrive
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
Power System Operation
 
Final ppt
Final pptFinal ppt
Advance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsAdvance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy Systems
Texas A&M University
 
asas
asasasas
asas
KayDrive
 
AUTOMATIC THREE PHASE SUPPLY CHANGOVER
AUTOMATIC THREE PHASE SUPPLY CHANGOVERAUTOMATIC THREE PHASE SUPPLY CHANGOVER
AUTOMATIC THREE PHASE SUPPLY CHANGOVER
shiv kapil
 
PLC Based Load Sharing System
PLC Based Load Sharing SystemPLC Based Load Sharing System
PLC Based Load Sharing System
IRJET Journal
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover
IJSRED
 
ELECTRIC POWER GENERATION FROM TRAFFIC
ELECTRIC  POWER GENERATION  FROM TRAFFICELECTRIC  POWER GENERATION  FROM TRAFFIC
ELECTRIC POWER GENERATION FROM TRAFFIC
rajesharayankara
 
Power electronics in Wind Turbine Systems
Power electronics in Wind Turbine SystemsPower electronics in Wind Turbine Systems
Power electronics in Wind Turbine Systems
Manasa K
 
PPT for Internship for power electronics
PPT for Internship for power electronicsPPT for Internship for power electronics
PPT for Internship for power electronics
TechLover5
 
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET Journal
 
L28 - Measurement of Electrical Energy.pptx
L28 - Measurement of Electrical Energy.pptxL28 - Measurement of Electrical Energy.pptx
L28 - Measurement of Electrical Energy.pptx
happycocoman
 

Similar to Group 34 fyp_presentation (20)

Project presentation
Project presentationProject presentation
Project presentation
 
Fyp presentations g29
Fyp presentations g29Fyp presentations g29
Fyp presentations g29
 
Group 07 fyp_presentation
Group 07 fyp_presentationGroup 07 fyp_presentation
Group 07 fyp_presentation
 
Optimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected ConvertersOptimum Energy Management of Multi-Input based Grid Connected Converters
Optimum Energy Management of Multi-Input based Grid Connected Converters
 
2014 fyp-37
2014 fyp-372014 fyp-37
2014 fyp-37
 
DC-AC Inverter Topology for the Control and Stable Operation of HVDC
DC-AC Inverter Topology for the Control and Stable Operation of HVDCDC-AC Inverter Topology for the Control and Stable Operation of HVDC
DC-AC Inverter Topology for the Control and Stable Operation of HVDC
 
Fyp presentation
Fyp presentationFyp presentation
Fyp presentation
 
Fyp presentations format
Fyp presentations formatFyp presentations format
Fyp presentations format
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
Final ppt
Final pptFinal ppt
Final ppt
 
Advance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsAdvance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy Systems
 
asas
asasasas
asas
 
AUTOMATIC THREE PHASE SUPPLY CHANGOVER
AUTOMATIC THREE PHASE SUPPLY CHANGOVERAUTOMATIC THREE PHASE SUPPLY CHANGOVER
AUTOMATIC THREE PHASE SUPPLY CHANGOVER
 
PLC Based Load Sharing System
PLC Based Load Sharing SystemPLC Based Load Sharing System
PLC Based Load Sharing System
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover
 
ELECTRIC POWER GENERATION FROM TRAFFIC
ELECTRIC  POWER GENERATION  FROM TRAFFICELECTRIC  POWER GENERATION  FROM TRAFFIC
ELECTRIC POWER GENERATION FROM TRAFFIC
 
Power electronics in Wind Turbine Systems
Power electronics in Wind Turbine SystemsPower electronics in Wind Turbine Systems
Power electronics in Wind Turbine Systems
 
PPT for Internship for power electronics
PPT for Internship for power electronicsPPT for Internship for power electronics
PPT for Internship for power electronics
 
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
 
L28 - Measurement of Electrical Energy.pptx
L28 - Measurement of Electrical Energy.pptxL28 - Measurement of Electrical Energy.pptx
L28 - Measurement of Electrical Energy.pptx
 

More from KayDrive

Microfluidic Flow Control using Magnetohydrodynamics
Microfluidic Flow Control using  Magnetohydrodynamics Microfluidic Flow Control using  Magnetohydrodynamics
Microfluidic Flow Control using Magnetohydrodynamics
KayDrive
 
4 city spot
4 city spot4 city spot
4 city spot
KayDrive
 
Ring Spinning Machine
Ring Spinning Machine Ring Spinning Machine
Ring Spinning Machine
KayDrive
 
FYP presentation - Saad
FYP presentation - SaadFYP presentation - Saad
FYP presentation - Saad
KayDrive
 
Pegasus fyp presentation
Pegasus fyp presentationPegasus fyp presentation
Pegasus fyp presentation
KayDrive
 
Fyp presentation (1)
Fyp presentation (1)Fyp presentation (1)
Fyp presentation (1)
KayDrive
 
V track ppt
V track pptV track ppt
V track ppt
KayDrive
 
Presentation (1)qq
Presentation (1)qqPresentation (1)qq
Presentation (1)qq
KayDrive
 
Fyp presentationa
Fyp presentationaFyp presentationa
Fyp presentationa
KayDrive
 
Presentation
PresentationPresentation
Presentation
KayDrive
 
Go spark presentation fyp fall 2017
Go spark presentation  fyp fall 2017Go spark presentation  fyp fall 2017
Go spark presentation fyp fall 2017
KayDrive
 
Presentation
PresentationPresentation
Presentation
KayDrive
 
Presentationa
PresentationaPresentationa
Presentationa
KayDrive
 
Fyp final presentation
Fyp final presentationFyp final presentation
Fyp final presentation
KayDrive
 
Shift presentation
Shift presentationShift presentation
Shift presentation
KayDrive
 
Final year project
Final year projectFinal year project
Final year project
KayDrive
 
Presentation
PresentationPresentation
Presentation
KayDrive
 
Project presentation
Project presentationProject presentation
Project presentation
KayDrive
 
Fyp presentation
Fyp presentationFyp presentation
Fyp presentation
KayDrive
 
Marketmizer
MarketmizerMarketmizer
Marketmizer
KayDrive
 

More from KayDrive (20)

Microfluidic Flow Control using Magnetohydrodynamics
Microfluidic Flow Control using  Magnetohydrodynamics Microfluidic Flow Control using  Magnetohydrodynamics
Microfluidic Flow Control using Magnetohydrodynamics
 
4 city spot
4 city spot4 city spot
4 city spot
 
Ring Spinning Machine
Ring Spinning Machine Ring Spinning Machine
Ring Spinning Machine
 
FYP presentation - Saad
FYP presentation - SaadFYP presentation - Saad
FYP presentation - Saad
 
Pegasus fyp presentation
Pegasus fyp presentationPegasus fyp presentation
Pegasus fyp presentation
 
Fyp presentation (1)
Fyp presentation (1)Fyp presentation (1)
Fyp presentation (1)
 
V track ppt
V track pptV track ppt
V track ppt
 
Presentation (1)qq
Presentation (1)qqPresentation (1)qq
Presentation (1)qq
 
Fyp presentationa
Fyp presentationaFyp presentationa
Fyp presentationa
 
Presentation
PresentationPresentation
Presentation
 
Go spark presentation fyp fall 2017
Go spark presentation  fyp fall 2017Go spark presentation  fyp fall 2017
Go spark presentation fyp fall 2017
 
Presentation
PresentationPresentation
Presentation
 
Presentationa
PresentationaPresentationa
Presentationa
 
Fyp final presentation
Fyp final presentationFyp final presentation
Fyp final presentation
 
Shift presentation
Shift presentationShift presentation
Shift presentation
 
Final year project
Final year projectFinal year project
Final year project
 
Presentation
PresentationPresentation
Presentation
 
Project presentation
Project presentationProject presentation
Project presentation
 
Fyp presentation
Fyp presentationFyp presentation
Fyp presentation
 
Marketmizer
MarketmizerMarketmizer
Marketmizer
 

Recently uploaded

办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
uehowe
 
Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?
Paul Walk
 
Ready to Unlock the Power of Blockchain!
Ready to Unlock the Power of Blockchain!Ready to Unlock the Power of Blockchain!
Ready to Unlock the Power of Blockchain!
Toptal Tech
 
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
vmemo1
 
Design Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptxDesign Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptx
saathvikreddy2003
 
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
xjq03c34
 
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
cuobya
 
Gen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needsGen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needs
Laura Szabó
 
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaalmanuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
wolfsoftcompanyco
 
Search Result Showing My Post is Now Buried
Search Result Showing My Post is Now BuriedSearch Result Showing My Post is Now Buried
Search Result Showing My Post is Now Buried
Trish Parr
 
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
cuobya
 
Discover the benefits of outsourcing SEO to India
Discover the benefits of outsourcing SEO to IndiaDiscover the benefits of outsourcing SEO to India
Discover the benefits of outsourcing SEO to India
davidjhones387
 
[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024
hackersuli
 
国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理
国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理
国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理
zoowe
 
不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作
不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作
不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作
bseovas
 
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
cuobya
 
7 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 20247 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 2024
Danica Gill
 
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
uehowe
 
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
ysasp1
 
Azure EA Sponsorship - Customer Guide.pdf
Azure EA Sponsorship - Customer Guide.pdfAzure EA Sponsorship - Customer Guide.pdf
Azure EA Sponsorship - Customer Guide.pdf
AanSulistiyo
 

Recently uploaded (20)

办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
办理毕业证(NYU毕业证)纽约大学毕业证成绩单官方原版办理
 
Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?Should Repositories Participate in the Fediverse?
Should Repositories Participate in the Fediverse?
 
Ready to Unlock the Power of Blockchain!
Ready to Unlock the Power of Blockchain!Ready to Unlock the Power of Blockchain!
Ready to Unlock the Power of Blockchain!
 
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
重新申请毕业证书(RMIT毕业证)皇家墨尔本理工大学毕业证成绩单精仿办理
 
Design Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptxDesign Thinking NETFLIX using all techniques.pptx
Design Thinking NETFLIX using all techniques.pptx
 
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
办理新西兰奥克兰大学毕业证学位证书范本原版一模一样
 
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
假文凭国外(Adelaide毕业证)澳大利亚国立大学毕业证成绩单办理
 
Gen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needsGen Z and the marketplaces - let's translate their needs
Gen Z and the marketplaces - let's translate their needs
 
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaalmanuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
manuaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaal
 
Search Result Showing My Post is Now Buried
Search Result Showing My Post is Now BuriedSearch Result Showing My Post is Now Buried
Search Result Showing My Post is Now Buried
 
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
制作毕业证书(ANU毕业证)莫纳什大学毕业证成绩单官方原版办理
 
Discover the benefits of outsourcing SEO to India
Discover the benefits of outsourcing SEO to IndiaDiscover the benefits of outsourcing SEO to India
Discover the benefits of outsourcing SEO to India
 
[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024[HUN][hackersuli] Red Teaming alapok 2024
[HUN][hackersuli] Red Teaming alapok 2024
 
国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理
国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理
国外证书(Lincoln毕业证)新西兰林肯大学毕业证成绩单不能毕业办理
 
不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作
不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作
不能毕业如何获得(USYD毕业证)悉尼大学毕业证成绩单一比一原版制作
 
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
可查真实(Monash毕业证)西澳大学毕业证成绩单退学买
 
7 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 20247 Best Cloud Hosting Services to Try Out in 2024
7 Best Cloud Hosting Services to Try Out in 2024
 
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
留学挂科(UofM毕业证)明尼苏达大学毕业证成绩单复刻办理
 
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
成绩单ps(UST毕业证)圣托马斯大学毕业证成绩单快速办理
 
Azure EA Sponsorship - Customer Guide.pdf
Azure EA Sponsorship - Customer Guide.pdfAzure EA Sponsorship - Customer Guide.pdf
Azure EA Sponsorship - Customer Guide.pdf
 

Group 34 fyp_presentation

  • 1. Department of Electrical Engineering, University of Engineering and Technology, Lahore Synchronization and ATS at Smart Grid Group No: 34 Project Advisor: Dr. Sohail Aftab Qureshi Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 2. Team Introduction Hira Mahmood(Team Leader) 2014-EE-157 Specialization: Power Undergraduate Final Year Project Presentation Dated: 5th April, 2018 Sana Amer 2014-EE-160 Specialization: Power Sumbal Mehmood 2014-EE-161 Specialization: Power Ahmed Khan 2014-EE-185 Specialization: Power
  • 3. Problem Statement • As Load shedding is very high in our country, we do not want our supply to be interrupted every time when power outage occurs. In general, when WAPDA supply goes off their is an interruption in the supply and after a specific interval of time, the generator starts working. • However we want to have an uninterrupted supply even when the WAPDA supply is available or not. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 4. Proposed Solution ATS Synchronization approach is implemented in this project. • Using automatic transfer switch ATS, a seamless transition between two sources is obtained to ensure continuous electrical supply to avoid blackouts. • According to load demand the utility grid and genset are synchronized through module and hence uninterrupted supply is available to the load. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 5. Automatic Transfer Switch An automatic transfer switch (ATS) is an electrical switch that switches a load between two sources. • A transfer switch in general seeks to simplify and provide safety when making use of a generator [1]. • The transfer switch diverts power from your utility to your generator quickly and easily. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 6. • In the case of a manual switch, this is done, of course, manually through a lever or similar device. • But in the case of an automatic switch, the entire process occurs instantly, providing you generator power in the split of a second in the event of an outage. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 7. Synchronization For a generator to be synchronized with grid following conditions are checked. • Voltage Magnitude • Frequency • Phase Angle • Phase Sequence Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 8. Now the question is why synchronization is needed. The answer is • When a single load is more than the capacity of feeding Genset either during running or during starting. • When load has to be transferred from one Genset to other without interruption. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 9. Soft Loading A Soft Load is a type of closed transition in which the switch synchronizes the two power sources and then makes connects them in parallel so that an uninterrupted supply of power can be generated for the sensitive or critical loads [2]. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 10. Block Diagram Undergraduate Final Year Project Presentation Dated: 5th April, 2018 Control Signals
  • 11. Basic Components • Current Transformers • Miniature Circuit Breaker(MCBs) • Molded Case Circuit Breaker(MCCBs) • Magnetic Contactors • Synchronization module-GC-400(mains) Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 12. Current Transformers • Level transformation • Metering CTs-to monitor current provided to load • 1 CT with main power source • 3 CTs with the alternative source i.e. generator Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 13. MCCB • Protects during abnormal working of the Power circuit (high power requirement) • Operate as automatic switch that opens in case of high current flow • Adjustable tripping characteristics Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 14. MCB • Provide protection during abnormal working of the control circuit (low power requirement) • operates as switch that opens in the event of excessive current flow once the circuit returns to normal, it can be reclosed automatically. • Non-adjustable tripping characteristics Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 15. Magnetic Contactor • Electrically controlled switch used for switching more than 15 A • Similar to a relay except with high current ratings • Control and suppress arc produced when interrupting heavy current Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 16. Synchronization Module • Synchronization module-GC-400 mains • Used for synchronization of the main power source and alternative source • To provide an un-interrupted power supply Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 17. Flow Diagram Undergraduate Final Year Project Presentation Dated: 5th April, 2018 Incoming from WAPDA 24 V DC Charger Incoming from Generator MCCB MCB CT CT MODULE Magnetic Contactor Magnetic Contactor CT Load 3x CT 1x CT 3x MCB 3x MCB 3x CT MCCBMCB
  • 18. • Two incoming terminals are provided one for the mains and the other for the emergency source. • A 24 V DC Charger is also provided to energize the ATS and load sharing module. • The current transformers scale the large value current to small, standardized value of 5 A. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 19. • The CTs and MCCBs are used in power circuit whereas the MCBs are used to send control signals to the module. • The module further controls the magnetic contactors such that the load is supplied by either of the two sources or by synchronism of the two sources if demand increases. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 20. Transfer sequence steps • A short while before normal power source fails; the genset is synchronized with the main power supply. • When the main power source fails the transfer switch breaks its connection to the mains and shifts the electrical load to the genset. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 21. • When main power is restored, the transfer switch returns the load from the generator to the normal one. • In this way any blackout or power interruption to the load is avoided. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 22. What we have done so far? So far we are done with • Power circuit of hardware • Wiring of control circuit • Working on module Programming Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 23. Hardware Developed Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 24. Applications Un-interruptible Power Supply • Power blackout protection • No hindrance Shift to Automation • Manual to Automatic • Reliability Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 25. Applications Load-Sharing Function • Managing Heavy Loads • Optimizing Voltage Accident Avoiding System • Less chances of damage • Avoiding Damages Due To Manual Operation Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 26. Applications Seamless transition between two sources • Smooth flow of Power • No Sparking. Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 27. Future Deliverables • Remote Management of Power Events • Control through mobile phone Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 28. Gantt Chart Undergraduate Final Year Project Presentation Dated: 5th April, 2018 3/28/2018 4/25/2018 11 16 REMOTE MANAGMET CONTROL THROUGH MOBILE PHONE Gantt Chart
  • 29. References • [1]"Eaton's automatic transfer switch line for emergency power", Eaton.com, 2018. [Online]. Available: http://www.eaton.com/Eaton/ProductsServices/Electric al/ProductsandServices/ElectricalDistribution/ANSINE MAPowerDistributionandControlSystems/ATS/index.h tm. [Accessed: 31- Mar- 2018] Undergraduate Final Year Project Presentation Dated: 5th April, 2018
  • 30. References Undergraduate Final Year Project Presentation Dated: 5th April, 2018 • [2]"Soft Loading Transfer Switch", Electrical engineering Community, 2018. [Online]. Available: http://engineering.electrical- equipment.org/panel-building/soft-loading- transfer-switch.html. [Accessed: 31- Mar- 2018].