1
Goodbye Micromanagement
A Holland Systems whitepaper
GOODBYE
MICROMANAGEMENT
Ensuring vision fidelity
throughout your SAP project
2
Goodbye Micromanagement
If you’re considering a move
to SAP, you know that big
ERP projects have a dismal
reputation. All too often,
these endeavors begin as
a dream of streamlined
business processes and end as
a nightmare of lost revenue,
missed deadlines, cost
overruns, and finger pointing.
A dizzying number of
large-scale IT projects are
started each year, but a study
by Gartner revealed that just
three causes — functionality
issues, quality issues, and
substantially late delivery 
— are responsible for almost
50% of project failures. Here’s
the puzzle — if we know those
three factors so frequently
cause failure, then why are
they still so frequent?
Functionality,
quality,&late
deliveryare
responsiblefor
50%offailures.
The answer is that they’re
symptoms of a deeper
problem, and that problem is
a failure of vision. Even when
the master plan is perfect,
the vision behind it can get
lost in translation as it is
communicated down through
an organization.
Our goal is to demonstrate
that today’s most popular
ERP planning method is
not only outdated, but also
a contributing factor to
these failures. It leaves team
members with an unclear
understanding of the project’s
guiding vision, and causes
needless confusion and re-
work. We’ll describe a new
methodology for planning,
managing, and evaluating your
SAP projects that keeps your
team focused on the high-level
vision.
SYSTEMIC MYOPIA
Our goal is to demonstrate
that today’s most popular
ERP planning method is
a contributing factor to
implementation failures.
3
Goodbye Micromanagement
If you’ve been a part of ERP
implementations before, you
know that they’re typically
planned and written in a
WBS format. The WBS format
breaks a project down into
a hierarchy of tasks and
deliverables, from the general
down to the specific.
If the executive responsible
gets everything he wants
worked into the plan, he
should see his vision realized
at the end of the project.
So why, after such careful
planning, is the project still
vulnerable to breakdowns?
The answer lies in the
realities of delegation. The
executive cannot make every
decision in the project himself.
He doesn’t have the time or
the technical expertise to do
so, so he must rely on his team
for execution. The problem
with the WBS format, however,
is that it lacks a clear way of
putting individual tasks into a
larger context. As instructions
filter down through the
organization, the original
vision can easily get distorted
or lost.
If that doesn’t seem like
a big deal, imagine a movie
director who sets out to
make a dark, gritty Batman
sequel — but doesn’t make
that vision clear to his team.
Instead, he uses a WBS-style
approach and starts delegating
tasks. He tells them that he
wants an all-star cast, an
iconic CGI monster, physics-
defying vehicles, and an
award-winning soundtrack.
He ends up with Steve Carell
as Batman, Betty White as
Catwoman, and a climactic
scene in which the pair
chases Shrek through the
streets of Gotham in Fred
Flintstone’s car  — all set to a
Broadway score.
The director’s team
followed his instructions
perfectly, but because only he
understood the vision, he got
what he asked for — not what
he wanted.
This example may
sound fatuous, but the WBS
format leaves its creators
vulnerable to the same sort
of breakdowns, because it
doesn’t have an organized
way of spelling out the value
that each task is supposed to
deliver.
THE B MOVIE
Sometimes you get exactly
what you asked for— not
what you wanted.
4
Goodbye Micromanagement
THE WBS MODEL
The WBS format is
designed to convey a series
of requirements, organized
as components of larger
requirements. The ‘what’ is
clear, but the ‘why’ is hard to
decipher.
The thinking behind
each task is rarely
provided — and if so, only
as part of the requirement’s
description. But perhaps
even more concerning
is the lack of defined
hierarchy. Each action
item sits untethered to
the overarching vision, its
relationship to the larger
picture unclear.
WBS # Item Title Operation Q-Gate Deliverable Work Stream
1.1 Prepare Team
Onboarding Document
Prepare the onboarding package for
external consultants from SAP and
partner companies.
Project Guideline PM
1.2 Project Governance Ensure that an efficient management
framework is in place for successful
project execution.
PM
1.2.1 Define Project
Organization
The purpose of this task is to define the
organizational structure, roles, and
responsibilities of the project team.
Steering Committee
Definition, Roles
PM
1.2.2 Communication
Management Plan
Complete the communications
management plan. Outline the
processes required to ensure
distribution, storage, and retrieval of
project information.
Communication Plan PM
Project Launch
WBS # Item Title Description Q-Gate Deliverable Work Stream
2.1 Prepare Project Charter
Document
Collect all input required for the project
charter and document it. Format
suitable for both communication and
sign-off.
Project Charter PM
2.2 Identify Stakeholders Ensure that the correct groupings of
stakeholders have been identified for
the project.
Organizational
Change/PM
2.3 Obtain Project Charter
Sign-off
Achieve a formal sign-off of the project
charter.
PM
2.4 Kick-Off Workshop Kick-off the project/phase and ensure
that all needed information is shared
with the resources.
Phase Kick-Off
Meeting
PM
Project Charter
2
1
5
Goodbye Micromanagement
All executives communicate
their vision at kickoff. But
when their team is down in
the weeds, it’s easily lost—
especially if it’s not baked into
how the plan is documented.
The visionaries are playing a
high-stakes guessing game,
describing their goal as a
series of actions and hoping
their team can figure out what
they want.
For example, when setting
up a new SAP system, many
visionaries want to standardize
their business practices
across the organization and
request that all units use
“out of the box” software, but
soon discover that a large
number of customized objects
have slipped into the project
scope. This happens because
low-level managers have
competing requirements to
juggle. They’re accountable
for making sure their unit
transitions smoothly from the
old system to the new one,
and it’s tempting to request
customization so they don’t
have to learn a whole new
set of practices. The vision
is lost when they prioritize
requirements rather than the
values behind them.
Projects managed by the
traditional method can and
do succeed, but they require
a significant degree of
micromanaging. The purpose
of creating a plan in the first
place is so that everyone
can do their part without
constantly having to go to the
visionary for guidance. Instead
of describing the vision as a
collection of requirements, and
hoping those requirements are
correctly interpreted, wouldn’t
it be great if plans could have
that vision built in?
As it turns out, they can.
Instead of merely listing
action items, consider a value-
cognitive approach to project
planning. A value-cognitive
plan includes most of the
same information that a WBS
plan contains, but tasks are
organized into a hierarchy
according to how they
contribute to the overall vision,
and this thinking is spelled out
explicitly at every level.
MAKING THE SHIFT
Instead of merely listing
requirements, consider a
value-cognitive approach
to project planning.
6
Goodbye Micromanagement
THE VALUE-COGNITIVE MODEL
You’ll notice a few things
are different in the value-
cognitive model.
First, the rationale
behind a particular task isn’t
hidden somewhere in the
description — it’s the first
thing you see, and it’s in the
same place for every task.
Second, the hierarchy is
clearly laid out. A reader can
see at a glance how each
element relates to the bigger
picture — creating value, and
supporting the vision — so
it’s easy to understand
what to prioritize when
interpreting instructions.
Third, the value-cognitive
model offers a flexible
system for communicating
business requirements. Each
requirement can map to one
or more operations, creating
an additional layer of insight
for team members as they
navigate tough decisions.
Rationale
Increasing market share
will generate capital to
form a new business
division
Rationale
We’ve lost business to our
competition because we
can’t fulfill orders
Rationale
We have too many vendors
in our supply chain, and
can’t enforce standards
Vision
Strategy
Operation
Increase market share by
15% over a five-year period
Address supply chain
deficiencies
Rationale
CRM processes are failing
because the master data is
inaccurate, preventing us
from opening new accounts
Strategy
Improve accuracy of our
sales data
Consolidate vendors to
improve pricing and
demand faster turnaround
Rationale
Our internal procurement
process is time consuming
and prone to errors
Operation
Simplify our lengthy
workflow process for
procurement
Rationale
Duplicate data is causing
our reports to generate
inaccurate numbers
Operation
Centralize our master data
management across the
enterprise
Rationale
Existing business systems is
a hybrid of ERP and non-ERP
systems.
Business Requirement
Business Requirement
Must support a data model
of both ERP and non-ERP
systems
Rationale
Sales teams have lost prospects
because of inability to convert a
prospect into a customer rapidly
Integration to business
systems must be near-real
time
Value Defined Value Planned Value Executed Value Ensured
7
Goodbye Micromanagement
Value-cognitive planning
offers a number of benefits.
First, it reduces uncertainty
by explaining the purpose of
every requirement. Second,
it streamlines decision
making. For instance, if a team
member is choosing between a
customized solution with more
functionality or an off-the-shelf
solution that will plug right in,
he can check the plan to see
which one is more in line with
the project’s underlying goals.
ASAP 8 recommends value-
based deliverables instead
of technical deliverables, so
value-cognitive planning is
philosophically consistent with
ASAP 8, and maps smoothly
onto SAP’s recommended
implementation strategy.
Finally, it’s a useful tool as
part of a larger organizational
strategy to empower your
team members to act if
they see a better way of
contributing to the vision, or
if circumstances change. With
a clear understanding of the
overall picture, they can adapt
and respond intelligently.
By organizing a clear
hierarchy and making it
integral to the plan, value-
cognitive planning gives a
clear understanding of the
rationale for every task — and
it does so without changing
the way you use any of your
existing planning tools. It
empowers your team to make
vision-based decisions in
your absence, and makes
everyone accountable for
delivering what’s needed, not
just what was asked for. In
both cases, a subtle change
in focus produces a dramatic
improvement in results.
SAP’s new methodology,
ASAP 8, offers a new way of
running projects. Instead
of tracking technical
deliverables, we now look
at business processes
holistically, and what value
they bring to the table.
Today
Using the new
ASAP framework
Testing
Yesterday
Project Mgmt
Configuration
Enhancements
Solution
Mgmt
Value Mgmt
Business
Process Mgmt
Program &
Change Mgmt
8
Goodbye Micromanagement
WBS # Item Title Q-Gate Deliverable Work Stream
1.1
1.2
2.1
Allocate Resources
Prepare Team
Onboarding Document
Define Project
Organization
Project Guideline PM
Project Guideline PM
Project Guideline PM
Supply Chain
Reform
1
Rationale
Increasing market share will generate capital to
form a new business division
Rationale
We’ve lost business to our
competition because we
can’t fulfill orders
Rationale
We have too many vendors
in our supply chain, and
can’t enforce standards
Strategy Operation
Vision
Increase market share by
15% over a five-year period
Address supply chain
deficiencies
Rationale
CRM processes are failing
because the master data is
inaccurate, preventing us
from opening new accounts
Improve accuracy of our
sales data
Consolidate vendors to
improve pricing and
demand faster turnaround
Rationale
With millions of records, we
don't have the man-power
to analyze records by hand
Technology must support
automated consolidation,
based on business rules
Rationale
Our internal procurement
process is time consuming
and prone to errors
Simplify our lengthy
workflow process for
procurement
Rationale
Duplicate data is causing
our reports to generate
inaccurate numbers
Centralize our master data
management across the
enterprise
Rationale
Existing business systems is
a hybrid of ERP and non-ERP
systems
Business Requirement
WBS # Item Title Q-Gate Deliverable Work Stream
2 Strategy Operation Business Requirement
Must support a data model
of both ERP and non-ERP
systems
Rationale
Sales teams have lost prospects
because of inability to convert a
prospect into a customer rapidly
Integration to business
systems must be near-real
time
It’s important to note that
value-cognitive planning
is more than just a
philosophy. It’s a strategy
that can be dovetailed
with your existing suite
of tools. Whether you use
Microsoft® SharePoint®,
spreadsheets, or another
system altogether, you can
apply this approach to flesh
out your plan into a living,
tangible asset—one that
ferries your vision to final
success, not a string of dead
ends.
9
Goodbye Micromanagement
When writing a value,
keep in mind that their
purpose is to empower
team members to make the
decision you would make if
you were in their place.
In general, it’s better
to define each element as
broadly as possible, because
it gives your team more
freedom to pick the solution
that best advances the
vision. “I want to be focused
and alert when I get to
work” opens up a lot more
options than “Make coffee
by 6:45 am.” That said, don’t
be afraid to be very specific
if that’s what the vision
requires.
Rationale
Being alert will increase
productivity and
decrease stress
Rationale
My circadian rhythm is
out of balance making
restful sleep difficult
Rationale
I tend to stay up reading
for too long
Rationale
Reading is more relaxing
than watching TV
Vision Strategy Business RequirementOperation 1.1
I want to be focused and
alert when I get to work
Standardize sleep
regimen
Strategy
Use caffeine to boost
alertness...
Rationale
An extra .5 hours of
morning sleep can be
gained
Make lunches the night
before
Read book before bedSet a reminder alarm to
get ready for bed at 11pm
Rationale
School cafeteria food is
expensive and low in
nutrition
Business Requirement
Make lunch for kids
Operation 1.2
Value Defined Value Planned Value Executed Value Ensured
WRITING IT DOWN
10
Goodbye Micromanagement
ORGANIZATIONAL IMPACT
We’ve outlined the benefits
inherent to value-cognitive
planning. By clarifying the
rationale for each task, it helps
the team accurately deliver
results that are consistent with
the overall vision.
It also streamlines decision
making by organizing these
elements into a hierarchy,
so it’s clear how to prioritize
alternative courses of action.
But value-cognitive
planning offers other
advantages as well. An
implementation partner who
can skillfully execute a value-
cognitive plan can eliminate
needless re-work and delays
by building deliverables that
fit the guiding vision on the
first try. With their specific
technical experience, they can
propose alternative solutions
that may deliver better results
than the method outlined
within the plan. Most of all,
they can smoothly adjust to
changing circumstances by
keeping the overall vision in
mind, and adjusting methods
accordingly.
Unfortunately, not every
implementation partner is
optimized for a value-cognitive
approach. Most consultants
are honest, hard-working
people, but as long as they are
providing their deliverables,
they get paid whether the
overall project succeeds or not.
Consultants prefer projects
planned in the traditional
format because it generates a
straightforward list of tasks to
fulfill. But as we’ve previously
demonstrated, this approach
leaves the project vulnerable
to many preventable errors.
Changing your planning
format can be daunting,
particularly when it requires a
bit more legwork at the outset.
However, the simple act of
defining and organizing your
vision will bring immediate,
tangible benefits. Your
implementation team will
have a clear understanding
of the bigger picture, they’ll
be able to make the correct
calls without having to consult
you directly, and they’ll be
empowered to capitalize
on available opportunities
and respond intelligently to
unexpected challenges. Use
value-cognitive planning to
define your vision, and watch
that vision become a reality.
11
Goodbye Micromanagement
Ready. Set. Go Live.
www.hollandsystems.com
454 Irwin Street NE Suite #5, Atlanta, GA 30312
How do you align the executive vision with detailed deliverables in your project plan?
How can you ensure that your proposed SAP roadmap is in line with the vision statement?
What are the key elements to executing change management during an SAP implementation?
If adjustments to the project plan and/or scope are necessary, how is this managed to ensure quick but
accurate changes?
How do you identify problems with the project execution?
Here is a list of questions
you can ask prospective
partners to help determine
if they are able to execute
value-cognitive plans.

GoodbyeMicromanagement

  • 1.
    1 Goodbye Micromanagement A HollandSystems whitepaper GOODBYE MICROMANAGEMENT Ensuring vision fidelity throughout your SAP project
  • 2.
    2 Goodbye Micromanagement If you’reconsidering a move to SAP, you know that big ERP projects have a dismal reputation. All too often, these endeavors begin as a dream of streamlined business processes and end as a nightmare of lost revenue, missed deadlines, cost overruns, and finger pointing. A dizzying number of large-scale IT projects are started each year, but a study by Gartner revealed that just three causes — functionality issues, quality issues, and substantially late delivery  — are responsible for almost 50% of project failures. Here’s the puzzle — if we know those three factors so frequently cause failure, then why are they still so frequent? Functionality, quality,&late deliveryare responsiblefor 50%offailures. The answer is that they’re symptoms of a deeper problem, and that problem is a failure of vision. Even when the master plan is perfect, the vision behind it can get lost in translation as it is communicated down through an organization. Our goal is to demonstrate that today’s most popular ERP planning method is not only outdated, but also a contributing factor to these failures. It leaves team members with an unclear understanding of the project’s guiding vision, and causes needless confusion and re- work. We’ll describe a new methodology for planning, managing, and evaluating your SAP projects that keeps your team focused on the high-level vision. SYSTEMIC MYOPIA Our goal is to demonstrate that today’s most popular ERP planning method is a contributing factor to implementation failures.
  • 3.
    3 Goodbye Micromanagement If you’vebeen a part of ERP implementations before, you know that they’re typically planned and written in a WBS format. The WBS format breaks a project down into a hierarchy of tasks and deliverables, from the general down to the specific. If the executive responsible gets everything he wants worked into the plan, he should see his vision realized at the end of the project. So why, after such careful planning, is the project still vulnerable to breakdowns? The answer lies in the realities of delegation. The executive cannot make every decision in the project himself. He doesn’t have the time or the technical expertise to do so, so he must rely on his team for execution. The problem with the WBS format, however, is that it lacks a clear way of putting individual tasks into a larger context. As instructions filter down through the organization, the original vision can easily get distorted or lost. If that doesn’t seem like a big deal, imagine a movie director who sets out to make a dark, gritty Batman sequel — but doesn’t make that vision clear to his team. Instead, he uses a WBS-style approach and starts delegating tasks. He tells them that he wants an all-star cast, an iconic CGI monster, physics- defying vehicles, and an award-winning soundtrack. He ends up with Steve Carell as Batman, Betty White as Catwoman, and a climactic scene in which the pair chases Shrek through the streets of Gotham in Fred Flintstone’s car  — all set to a Broadway score. The director’s team followed his instructions perfectly, but because only he understood the vision, he got what he asked for — not what he wanted. This example may sound fatuous, but the WBS format leaves its creators vulnerable to the same sort of breakdowns, because it doesn’t have an organized way of spelling out the value that each task is supposed to deliver. THE B MOVIE Sometimes you get exactly what you asked for— not what you wanted.
  • 4.
    4 Goodbye Micromanagement THE WBSMODEL The WBS format is designed to convey a series of requirements, organized as components of larger requirements. The ‘what’ is clear, but the ‘why’ is hard to decipher. The thinking behind each task is rarely provided — and if so, only as part of the requirement’s description. But perhaps even more concerning is the lack of defined hierarchy. Each action item sits untethered to the overarching vision, its relationship to the larger picture unclear. WBS # Item Title Operation Q-Gate Deliverable Work Stream 1.1 Prepare Team Onboarding Document Prepare the onboarding package for external consultants from SAP and partner companies. Project Guideline PM 1.2 Project Governance Ensure that an efficient management framework is in place for successful project execution. PM 1.2.1 Define Project Organization The purpose of this task is to define the organizational structure, roles, and responsibilities of the project team. Steering Committee Definition, Roles PM 1.2.2 Communication Management Plan Complete the communications management plan. Outline the processes required to ensure distribution, storage, and retrieval of project information. Communication Plan PM Project Launch WBS # Item Title Description Q-Gate Deliverable Work Stream 2.1 Prepare Project Charter Document Collect all input required for the project charter and document it. Format suitable for both communication and sign-off. Project Charter PM 2.2 Identify Stakeholders Ensure that the correct groupings of stakeholders have been identified for the project. Organizational Change/PM 2.3 Obtain Project Charter Sign-off Achieve a formal sign-off of the project charter. PM 2.4 Kick-Off Workshop Kick-off the project/phase and ensure that all needed information is shared with the resources. Phase Kick-Off Meeting PM Project Charter 2 1
  • 5.
    5 Goodbye Micromanagement All executivescommunicate their vision at kickoff. But when their team is down in the weeds, it’s easily lost— especially if it’s not baked into how the plan is documented. The visionaries are playing a high-stakes guessing game, describing their goal as a series of actions and hoping their team can figure out what they want. For example, when setting up a new SAP system, many visionaries want to standardize their business practices across the organization and request that all units use “out of the box” software, but soon discover that a large number of customized objects have slipped into the project scope. This happens because low-level managers have competing requirements to juggle. They’re accountable for making sure their unit transitions smoothly from the old system to the new one, and it’s tempting to request customization so they don’t have to learn a whole new set of practices. The vision is lost when they prioritize requirements rather than the values behind them. Projects managed by the traditional method can and do succeed, but they require a significant degree of micromanaging. The purpose of creating a plan in the first place is so that everyone can do their part without constantly having to go to the visionary for guidance. Instead of describing the vision as a collection of requirements, and hoping those requirements are correctly interpreted, wouldn’t it be great if plans could have that vision built in? As it turns out, they can. Instead of merely listing action items, consider a value- cognitive approach to project planning. A value-cognitive plan includes most of the same information that a WBS plan contains, but tasks are organized into a hierarchy according to how they contribute to the overall vision, and this thinking is spelled out explicitly at every level. MAKING THE SHIFT Instead of merely listing requirements, consider a value-cognitive approach to project planning.
  • 6.
    6 Goodbye Micromanagement THE VALUE-COGNITIVEMODEL You’ll notice a few things are different in the value- cognitive model. First, the rationale behind a particular task isn’t hidden somewhere in the description — it’s the first thing you see, and it’s in the same place for every task. Second, the hierarchy is clearly laid out. A reader can see at a glance how each element relates to the bigger picture — creating value, and supporting the vision — so it’s easy to understand what to prioritize when interpreting instructions. Third, the value-cognitive model offers a flexible system for communicating business requirements. Each requirement can map to one or more operations, creating an additional layer of insight for team members as they navigate tough decisions. Rationale Increasing market share will generate capital to form a new business division Rationale We’ve lost business to our competition because we can’t fulfill orders Rationale We have too many vendors in our supply chain, and can’t enforce standards Vision Strategy Operation Increase market share by 15% over a five-year period Address supply chain deficiencies Rationale CRM processes are failing because the master data is inaccurate, preventing us from opening new accounts Strategy Improve accuracy of our sales data Consolidate vendors to improve pricing and demand faster turnaround Rationale Our internal procurement process is time consuming and prone to errors Operation Simplify our lengthy workflow process for procurement Rationale Duplicate data is causing our reports to generate inaccurate numbers Operation Centralize our master data management across the enterprise Rationale Existing business systems is a hybrid of ERP and non-ERP systems. Business Requirement Business Requirement Must support a data model of both ERP and non-ERP systems Rationale Sales teams have lost prospects because of inability to convert a prospect into a customer rapidly Integration to business systems must be near-real time Value Defined Value Planned Value Executed Value Ensured
  • 7.
    7 Goodbye Micromanagement Value-cognitive planning offersa number of benefits. First, it reduces uncertainty by explaining the purpose of every requirement. Second, it streamlines decision making. For instance, if a team member is choosing between a customized solution with more functionality or an off-the-shelf solution that will plug right in, he can check the plan to see which one is more in line with the project’s underlying goals. ASAP 8 recommends value- based deliverables instead of technical deliverables, so value-cognitive planning is philosophically consistent with ASAP 8, and maps smoothly onto SAP’s recommended implementation strategy. Finally, it’s a useful tool as part of a larger organizational strategy to empower your team members to act if they see a better way of contributing to the vision, or if circumstances change. With a clear understanding of the overall picture, they can adapt and respond intelligently. By organizing a clear hierarchy and making it integral to the plan, value- cognitive planning gives a clear understanding of the rationale for every task — and it does so without changing the way you use any of your existing planning tools. It empowers your team to make vision-based decisions in your absence, and makes everyone accountable for delivering what’s needed, not just what was asked for. In both cases, a subtle change in focus produces a dramatic improvement in results. SAP’s new methodology, ASAP 8, offers a new way of running projects. Instead of tracking technical deliverables, we now look at business processes holistically, and what value they bring to the table. Today Using the new ASAP framework Testing Yesterday Project Mgmt Configuration Enhancements Solution Mgmt Value Mgmt Business Process Mgmt Program & Change Mgmt
  • 8.
    8 Goodbye Micromanagement WBS #Item Title Q-Gate Deliverable Work Stream 1.1 1.2 2.1 Allocate Resources Prepare Team Onboarding Document Define Project Organization Project Guideline PM Project Guideline PM Project Guideline PM Supply Chain Reform 1 Rationale Increasing market share will generate capital to form a new business division Rationale We’ve lost business to our competition because we can’t fulfill orders Rationale We have too many vendors in our supply chain, and can’t enforce standards Strategy Operation Vision Increase market share by 15% over a five-year period Address supply chain deficiencies Rationale CRM processes are failing because the master data is inaccurate, preventing us from opening new accounts Improve accuracy of our sales data Consolidate vendors to improve pricing and demand faster turnaround Rationale With millions of records, we don't have the man-power to analyze records by hand Technology must support automated consolidation, based on business rules Rationale Our internal procurement process is time consuming and prone to errors Simplify our lengthy workflow process for procurement Rationale Duplicate data is causing our reports to generate inaccurate numbers Centralize our master data management across the enterprise Rationale Existing business systems is a hybrid of ERP and non-ERP systems Business Requirement WBS # Item Title Q-Gate Deliverable Work Stream 2 Strategy Operation Business Requirement Must support a data model of both ERP and non-ERP systems Rationale Sales teams have lost prospects because of inability to convert a prospect into a customer rapidly Integration to business systems must be near-real time It’s important to note that value-cognitive planning is more than just a philosophy. It’s a strategy that can be dovetailed with your existing suite of tools. Whether you use Microsoft® SharePoint®, spreadsheets, or another system altogether, you can apply this approach to flesh out your plan into a living, tangible asset—one that ferries your vision to final success, not a string of dead ends.
  • 9.
    9 Goodbye Micromanagement When writinga value, keep in mind that their purpose is to empower team members to make the decision you would make if you were in their place. In general, it’s better to define each element as broadly as possible, because it gives your team more freedom to pick the solution that best advances the vision. “I want to be focused and alert when I get to work” opens up a lot more options than “Make coffee by 6:45 am.” That said, don’t be afraid to be very specific if that’s what the vision requires. Rationale Being alert will increase productivity and decrease stress Rationale My circadian rhythm is out of balance making restful sleep difficult Rationale I tend to stay up reading for too long Rationale Reading is more relaxing than watching TV Vision Strategy Business RequirementOperation 1.1 I want to be focused and alert when I get to work Standardize sleep regimen Strategy Use caffeine to boost alertness... Rationale An extra .5 hours of morning sleep can be gained Make lunches the night before Read book before bedSet a reminder alarm to get ready for bed at 11pm Rationale School cafeteria food is expensive and low in nutrition Business Requirement Make lunch for kids Operation 1.2 Value Defined Value Planned Value Executed Value Ensured WRITING IT DOWN
  • 10.
    10 Goodbye Micromanagement ORGANIZATIONAL IMPACT We’veoutlined the benefits inherent to value-cognitive planning. By clarifying the rationale for each task, it helps the team accurately deliver results that are consistent with the overall vision. It also streamlines decision making by organizing these elements into a hierarchy, so it’s clear how to prioritize alternative courses of action. But value-cognitive planning offers other advantages as well. An implementation partner who can skillfully execute a value- cognitive plan can eliminate needless re-work and delays by building deliverables that fit the guiding vision on the first try. With their specific technical experience, they can propose alternative solutions that may deliver better results than the method outlined within the plan. Most of all, they can smoothly adjust to changing circumstances by keeping the overall vision in mind, and adjusting methods accordingly. Unfortunately, not every implementation partner is optimized for a value-cognitive approach. Most consultants are honest, hard-working people, but as long as they are providing their deliverables, they get paid whether the overall project succeeds or not. Consultants prefer projects planned in the traditional format because it generates a straightforward list of tasks to fulfill. But as we’ve previously demonstrated, this approach leaves the project vulnerable to many preventable errors. Changing your planning format can be daunting, particularly when it requires a bit more legwork at the outset. However, the simple act of defining and organizing your vision will bring immediate, tangible benefits. Your implementation team will have a clear understanding of the bigger picture, they’ll be able to make the correct calls without having to consult you directly, and they’ll be empowered to capitalize on available opportunities and respond intelligently to unexpected challenges. Use value-cognitive planning to define your vision, and watch that vision become a reality.
  • 11.
    11 Goodbye Micromanagement Ready. Set.Go Live. www.hollandsystems.com 454 Irwin Street NE Suite #5, Atlanta, GA 30312 How do you align the executive vision with detailed deliverables in your project plan? How can you ensure that your proposed SAP roadmap is in line with the vision statement? What are the key elements to executing change management during an SAP implementation? If adjustments to the project plan and/or scope are necessary, how is this managed to ensure quick but accurate changes? How do you identify problems with the project execution? Here is a list of questions you can ask prospective partners to help determine if they are able to execute value-cognitive plans.