SlideShare a Scribd company logo
Project Name : When North Gold Project, Zimbabwe
TECHNICAL REVIEW
Project Name: When North Gold Claims
Reviewed by: Lovemore (Freddie) Mauled
Date: 07/07/15
For Office Use
Important
Please tick what has been availed together with the other information that has been brought. CHECKED
1 Applicable prospecting / mining license; X
2 Locality/ Location data (including maps, co-odinates etc) X
3 Supporting geological, exploration or mining/production data X
4 Deal Terms X
5 Name and contact details of promoter X
**Request for missing required information.
Project Name : When North Gold Project, Zimbabwe
CATEGORY FACTOR COMMENTS
Location Country Zimbabwe, Africa
Investment
Sought/ Cost
US$ 4 000 000 (Four million United States Dollar)
Location Province : Matebeleland North
 Project is located in Motapa, Sijauke village which is 120km North west of City of Bulawayo.
Access is gained by taking Bulawayo – Nkayi road(strip tarred road) which goes to Isabella mine .
About 10km from Nkayi turn off turn left at T- junction(Motapa turn off) to Sijauke village for 6km on gravel road.
Total Project Size: 40 Hectares
Number of gold claims : 4 Gold Claims (10 hectares each).
Infrastructure
 National road (strip tarred) Bulawayo –Nkayi road passing via near the Joshua Nkomo airport
 Gravel road from Motapa turn-off to Mine
- Tenure Name of claim Type size Year registered
When North 2 Mining 10 hecteres 11 January 2011
When North 3 Mining 10 hectares 11 January 2011
When North 4 Mining 10 hectares 11 January 2011
When North 5 Mining 10 hectares 11 January 2011
Note:*** Annual inspection fees of US$ 100 per licence are payable in September of each year.
Project Name : When North Gold Project, Zimbabwe
Ownership Precious Mining Syndicate
Project Name : When North Gold Project, Zimbabwe
Promoter Lovemore Mauled
Cell: + 27 71 980 1399
Email: lovemauled@yahoo.co.uk
Skype: lovemore.mauled
Geology Regional setting
& metallogenesis
When North gold claims are situated on the western margin of Bubi greenstone belt. Other authors say that the claims are
located on the Bulawayo_Filabusi greenstone belt. Generally, a number of archaen greenstone belts host the majority of
gold deposits in Zimbabwe.
Project Name : When North Gold Project, Zimbabwe
 Mineralization is within a broad shear zone cutting through felsic schists close to contact between rocks of the
Bulawayan and Shamvaian group.
 Orebody widths range from 5 metres to 20 metres
 Strike length is 75 to 500 metres
Project Name : When North Gold Project, Zimbabwe
Lithologies  Andesites
 Pillow basalts
 Felsic Schists
Structure  Economic gold mineralization is structurally controlled.
 Regional rock stratigraphy and zone lie roughly parallel to a North East – South East trend,undulating on
dip between 50 degrees and 70 degrees South East
Exploration History  Extensive soil geochemistry, trenching, pitting and drilling activities were done by Anglo American Zimbabwe Ltd.
The data is proprietary
and is not available to the current holders of the claims at the moment.
 The huge open cast Motapa mine, Isabella mine, McCays mines and Bubi mine have been mined by Anglo American .
 Artisanal miners have been active in the area since the closing down of Motapa Mine.
 Exploration activities near the When gold claims led to the discovery of Open pittable resources.
Other Historical
Records
Big mines around the area are:
 Turk Mine,
 Lonely,
 Dawn,
 Isabella Mine incorporating When ,McCays & Bubi mines. Anglo American has the historical production records. The
mines have excellent production records. Turk and Lonely mines are still operating but they are underground
operations.
Surface activities Sampling was done and the rock samples were taken to the following laboratories:-
 Zimbabwe School of Mines (ZSM) and;
 Duration gold mine laboratory
Drilling Extensive drilling was done by Anglo-America,who are the former owners of Isabella mine.
Records of the drilling are not available.
Mineralisati
on
Metal-
association and
style
 Within shear zone there are a number of elongate pods of mineralization which occur as brecciated and Silicified
stock-work zones impregnated with pyrites and arsenopyrites.
Mineralogy  Arsenopyrite
 Pyrite
Project Name : When North Gold Project, Zimbabwe
Controls  Economic gold mineralization is structurally controlled
Strike length  Strike length ranges between 75 to 500 metres
Width and
orientation
 Width ranges from 5metres to 20 metres
 Dip between 50 degrees to 70 degrees
Depth (open pit
potential)
Mineralization on oxidised material on top shows open cast can be done.
Resource Resource Size
and Grade
 These need to determined through exploration activities such as trenching and drilling and laboratory analyses of
samples. Generally an inferred insitu resource of around 11 000 000 tonnes can be expected.
Methodology of
estimation
 To be determined
Upside potential  Potential to peg more gold claims around the property. This will increase the project size as well as life of mine.
Mining Study status  None yet but the area presents open cast potential.
Mining method  Open castable to about 60 metres
Life of mine plan  To be determined.
Mining
infrastructure
 None yet on the site. The project is early stage greenfield.
Historical mining  Small scale gold mining has taken place in and around the claims.
Past Production  The nearby Motapa Mine (now owned by Metallon Gold) produced a total of approximately 300 000 ounces from 2.4
million tonnes of ore at an average grade of 5.4 g/t. However, the mining that occurred in the surrounding areas by
Anglo American Ltd and other companies indicate that the area has potential for gold.
Reserve Not determined yet.
Processing Study status &
test work
 None yet
Processing
method
 At the moment artisanal miners in the vicinity use custom milling at local stamp mill with a concerntrator
Key risks Technical risks De –risk the project by using a phased approach to any exploration program.
Litigation  None known at the moment
Notes  Near surface gold with good grade.
 Open pittable/castable with moderate stripping ratio.
Project Name : When North Gold Project, Zimbabwe
 The project is a potential heap leach operation. The nearby Motapa and Isabella mines are heap leach operations.
 The project presents an excellent exploration and development opportunity.
 Potential for a multi-million once deposit.
 The project can be expanded by obtaining and merging more claims in the area then consolidate them into one big
project. There are some individuals who are willing to relinquish their gold claims upon getting some payment (See
the diagrams on Upside potential below).
 Large gold mining operations such as the Motapa and Isabella mines are less than 10 km away from When Gold
claims.
 Drilling is required in order to define mineralisation.
 Artisanal mining has indicated the presence of mineralisation. However, technical exploration will unearth the full
potential of the area.
 It is located in a geologically good environment. Artisanal miners are found in the area and this is a good indication of
potential.
 The area in which the project lies is a well known gold producing area in Zimbabwe. Successful open cast mining
operations have been carried out by renowned companies such as Anglo American Zimbabwe (Pvt) Ltd.
 Like any project, due diligence is required. A field visit is required.
 Arrangements to purchase any available data relating to the When Gold claims (from Anglo American) must be made.
 An preliminary budget is attached herewith.
 Recommended exploration activities will include Geochemical and Geophysical methods.
Trenching, diamond drilling/or RC or Percussion drilling will need to be done so that a geological model of the
Project can be produced. This will aid the planning of any subsequent exploration programs or the development
of the project into a producing mine.
Data Source Source Project owners
Deal Terms  The owners of the project are seeking for Joint Venture partners in order to explore and develop the project into a
producing mine.
 The project requires an investment in the region of R 3 707 815.00 (which can be rounded off to approximately
US$4 million).
Project Name : When North Gold Project, Zimbabwe
Copy of Claims Licences/ Proof of Ownership
Project Name : When North Gold Project, Zimbabwe
Laboratory Analyses of Samples from When North Gold Claims
Formatted: Indent: Left: 0 cm
Project Name : When North Gold Project, Zimbabwe
AAS ANALYSIS RESULTS CERTIFICATE
Results of the analysis done using the AAS method are shown below. The results are shown in grams
per tonne.
Project Name : When North Gold Project, Zimbabwe
Nearby Mines
Project Name : When North Gold Project, Zimbabwe
Blue Sky Potential.
The following two diagrams show that there is a potential to merge the adjacent gold claims hence consolidating all claims into
one huge gold project.
Project Name : When North Gold Project, Zimbabwe
Possible bluesky potential of When Gold project (continued)
Project Name : When North Gold Project, Zimbabwe
Roads and rail infrastructure near When Gold claims
Project Name : When North Gold Project, Zimbabwe
Project Budget
Exploration
EXPLORATION PLAN & RESOURCE EVALUATION –
ACTIVITIES
 Reconnaissance survey and Field mapping .
 Trenching – Trenches will be dug at 100m intervals across strike, each trench 500m long and samples will be taken in each trench on bed rock
 Diamond Drilling – 16 holes will be drilled on the 4 claims, on a grid of 100m X 100m to investigate gold mineralization and behavior of mineralized sections
with depth, to get dip of ore body, depth and thickness of ore body. Diamond drill boreholes will be drilled to a depth of 60 metres @$150 per metre
Diamond drill cores will be logged and taken for analysis. The analysis envisaged will include Bottle roll and Fire assay.
Diamond Drilling is done to declare Resources and Reserves which assist in projecting the life span of the mine. Mining geological soft wares will be used for
ore Reserves calculations.
 Compilation of a detailed Geological report with all maps, core log sheets, assay results and estimation of Life span of the mine.
 Drawing up of operational plan and pit designs
Motapa (When North 2 -5 claims) EXPLORATION BUDGET
ITEM QUANTITY UNIT PRICE TOTAL (US $)
4 X 4 Bakkie (diesel) 2 $12 000 $24000
Reconnaissance Survey 1 $500 $500
Trench Samples Assaying 100 $18 $1800
Diamond Drilling
Boreholes (60metres)
16 $9 000 $144 000
Core Samples Assaying 200 $18 $3 600
Stationery, internet,
phone
1 $1000 $1000
Sample Bags, Twine String 1 $2000 $2000
Measuring Tape 4 $150 $600
Chisels & Hammers 4 $25 $100
Project Name : When North Gold Project, Zimbabwe
Picks 10 $15 $150
Shovels 10 $10 $100
Tents 5 $300 $1500
Diesel Fuel 10000 $1.50 $15 000
Food 12 $5000 $60000
TOTAL $254 350
NB: Costs to include
hiring of excavator
Labour
Project Manager@4800
per month
12 4800 $57600
Geologist @ $4000 per
month
12 4000 $48000
Geological Assistants
@$30/day for 26 days
2 assistants $1000 $24000
General labour @$250
per month
10 general labour $250 $30000
Cook 1 300 $3600
Resource and Mining
Engineering Consultants
$300 000
TOTAL $163200
LICENCES
Company Registration 1 $300 $300
Bank Account Opening 1 $500 $500
Zimbabwe Investment
Authority Licence
1 $3 000 $3 000
Site of works plan 1 $500 $500
Project Name : When North Gold Project, Zimbabwe
Inspection Fees update 1 $400 $400
Legal fees 1 $1 000 $1 000
Environmental Impact
Assessment
1 $5 000 $5 000
TOTAL $10 700
Totals For Exploration
Field Equipment 1 $242350 $254350
Labour 1 $163200 $163200
Licences 1 $10 700 $10700
Sub Total $428250
10% Contigency $42825
Grand Total $471075
_________________________________________________
PROCESSING PLANT
ITEM QUANTITY UNIT PRICE TOTAL
5 Tonne/hour ball mill 2 $70 000 $140 000
Concentrators 2 $3 500 $7 000
Crusher 1 $10 000 $10 000
Ore bin 1 $8 000 $8 000
Conveyors $12 000
Scrapper Winch 1 $5 000 $5 000
Slurry pumps 2 $500 $1 000
Thickener 1 $30 000 $30 000
100 cubic metre Leach tanks 2 $7 000 $14 000
Carbon Tanks 4 $5 000 $20 000
Elution Plant 1 $35 000 $35 0000
Total $282 000
Project Name : When North Gold Project, Zimbabwe
VEHICLES
ITEM QUANTITY UNIT PRICE TOTAL
Excavator 1 $400 000 $400 000
10 tonne tipper trucks 4 $80 000 $320 000
Front End Loader 1 $250 000 $250 000
Compressors
+jackhammer+hose
4 $10 000 $40 000
7 tonne truck 1 $30 000 $30 000
4X4 Bakkies 4 $25 000 $100 000
Minibus 1 $20 000 $20 000
TOTAL $1 160 000
LICENCES
ITEM QUANTITY UNIT PRICE TOTAL
Rural council fee 1 $1 500 $1 500
Milling permit 1 $3 000 $3 000
Borehole licence 1 $400 $400
TOTAL $4 900
TOOLS
ITEM QUANTITY UNIT PRICE TOTAL
200 kVa Generator 1 $30 000 $30 000
Wheel barrows 10 $120 $1 200
Tool boxes 2 $500 $1 000
Office furniture 1 $10 000 $10 000
TOTAL $42 200
Project Name : When North Gold Project, Zimbabwe
INFRASTRUCTURE DEVELOPMENT
ITEM QUANTITY UNIT PRICE TOTAL
Ball mill installation 2 $5 000 $10 000
Office block 1 $15 000 $15 000
Staff quarters 4 $5 000 $20 000
Borehole +piping 1 $15 000 $15 000
Workshop 1 $5 000 $5 000
Electricity 1 $20 000 $20 000
Electrical tubing 1 $10 000 $10 000
Plumbing 1 $5 000 $5 000
Fencing + signs 1 $5 000 $5 000
Water Reservoirs 2 $1 000 $2 000
Magazine 1 $10 000 $10 000
Guest house/ management house 1 $10 000 $10 000
Fuel storage 1 $5 000 $5 000
TOTAL $132 000
MONTHLY CONSUMABLES
ITEM QUANTITY UNIT PRICE TOTAL
Diesel 20 000 $1.50 $30 000
Electricity $10 000
Explosives 30 boxes $350 $10 500
Drill bits 40 $20 $800
Drill sticks 20 $40 $800
Fertilizer 20x20kg $24 $480
Cyanide 50X50kg 200 $10 000
Carbon 20X25kg $125 $2 500
Solution Tests+Test Tubes $1 000
Stationery $500
Telephone +Internet $2 000
Rock Drill oils $500
Maintenance spare parts $2 000
Canteen supplies $500
Project Name : When North Gold Project, Zimbabwe
Labour (salaries) $46 600
PPE $100 $61 $6 100
TOTAL for 12 months $1491360
Figure 1 below shows artisanal miners on a “Shaft” on the Claims.Rock samples from this shaft were taken and analysed at the laboratory and the fire
assay results obtained are as shown below.
.
Analysis Element Sample Au (ppm) Detection Limit
Fire Assay Gold 2 Top Right Reef 16.1 0.01
Fire Assay Gold Shaft 1 Bottom 0.24 0.01
Fire Assay Gold Shaft 1 Top Left 0.34 0.01
Fire Assay Gold Shaft 2 Bottom and Top 13.64 0.01
Fire Assay Gold Vimila Shaft 11.62 0.01
Fire Assay Gold Vimila South 2 10.08 0.01
Fire Assay Sample Analytical Results By Duration Gold Laboratory.
Project Name : When North Gold Project, Zimbabwe
Figure 1. Artisanal miners
Project Name : When North Gold Project, Zimbabwe
Figure 2. Geologist standing on artisanal miners’ “shaft”

More Related Content

What's hot

Llave oro presentation jul. 2012
Llave oro presentation jul. 2012Llave oro presentation jul. 2012
Llave oro presentation jul. 2012Llave Oro Inc.
 
Corporate Presentation October 2012
Corporate Presentation October 2012Corporate Presentation October 2012
Corporate Presentation October 2012
Llave Oro Inc.
 
Llave oro presentation apr.10.12
Llave oro presentation apr.10.12Llave oro presentation apr.10.12
Llave oro presentation apr.10.12Llave Oro Inc.
 
Llave Oro Presentation March 2012
Llave Oro Presentation March 2012Llave Oro Presentation March 2012
Llave Oro Presentation March 2012Llave Oro Inc.
 
Minaurum Gold Inc. Fall 2013 Corporate Presentation
Minaurum Gold Inc. Fall 2013 Corporate PresentationMinaurum Gold Inc. Fall 2013 Corporate Presentation
Minaurum Gold Inc. Fall 2013 Corporate PresentationAdnet Communications
 
Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12Llave Oro Inc.
 
Fall 2013 - Minauraum Gold Investor Presentation
Fall 2013 - Minauraum Gold Investor PresentationFall 2013 - Minauraum Gold Investor Presentation
Fall 2013 - Minauraum Gold Investor PresentationAdnet Communications
 
20130124 mgg-investor-presentation
20130124 mgg-investor-presentation20130124 mgg-investor-presentation
20130124 mgg-investor-presentationAdnet Communications
 
20130108 mgg-investor-presentation
20130108 mgg-investor-presentation20130108 mgg-investor-presentation
20130108 mgg-investor-presentationAdnet Communications
 
20130117 mgg-investor-presentation
20130117 mgg-investor-presentation20130117 mgg-investor-presentation
20130117 mgg-investor-presentationAdnet Communications
 
20130228 mgg investor_presentation
20130228 mgg investor_presentation20130228 mgg investor_presentation
20130228 mgg investor_presentationAdnet Communications
 
Minaurum Gold Investor Presentation
Minaurum Gold Investor PresentationMinaurum Gold Investor Presentation
Minaurum Gold Investor PresentationAdnet Communications
 
Max resource presentationnov12
Max resource presentationnov12Max resource presentationnov12
Max resource presentationnov12nabarnes
 
Lucky Minerals Presentation
Lucky Minerals PresentationLucky Minerals Presentation
Lucky Minerals Presentation
Khalil Kassam
 
Minaurum Gold Corporate Presentation
Minaurum Gold Corporate PresentationMinaurum Gold Corporate Presentation
Minaurum Gold Corporate PresentationAdnet Communications
 

What's hot (20)

Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Llave oro presentation jul. 2012
Llave oro presentation jul. 2012Llave oro presentation jul. 2012
Llave oro presentation jul. 2012
 
Corporate Presentation October 2012
Corporate Presentation October 2012Corporate Presentation October 2012
Corporate Presentation October 2012
 
Llave oro presentation apr.10.12
Llave oro presentation apr.10.12Llave oro presentation apr.10.12
Llave oro presentation apr.10.12
 
Llave Oro Presentation March 2012
Llave Oro Presentation March 2012Llave Oro Presentation March 2012
Llave Oro Presentation March 2012
 
Minaurum Gold Inc. Fall 2013 Corporate Presentation
Minaurum Gold Inc. Fall 2013 Corporate PresentationMinaurum Gold Inc. Fall 2013 Corporate Presentation
Minaurum Gold Inc. Fall 2013 Corporate Presentation
 
Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12Llave oro Presentation Mar.21.12
Llave oro Presentation Mar.21.12
 
Fall 2013 - Minauraum Gold Investor Presentation
Fall 2013 - Minauraum Gold Investor PresentationFall 2013 - Minauraum Gold Investor Presentation
Fall 2013 - Minauraum Gold Investor Presentation
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
20130124 mgg-investor-presentation
20130124 mgg-investor-presentation20130124 mgg-investor-presentation
20130124 mgg-investor-presentation
 
20130108 mgg-investor-presentation
20130108 mgg-investor-presentation20130108 mgg-investor-presentation
20130108 mgg-investor-presentation
 
20130117 mgg-investor-presentation
20130117 mgg-investor-presentation20130117 mgg-investor-presentation
20130117 mgg-investor-presentation
 
20130228 mgg investor_presentation
20130228 mgg investor_presentation20130228 mgg investor_presentation
20130228 mgg investor_presentation
 
Minaurum Gold Investor Presentation
Minaurum Gold Investor PresentationMinaurum Gold Investor Presentation
Minaurum Gold Investor Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Max resource presentationnov12
Max resource presentationnov12Max resource presentationnov12
Max resource presentationnov12
 
Corporate Presentation Fall 2013
Corporate Presentation Fall 2013Corporate Presentation Fall 2013
Corporate Presentation Fall 2013
 
Lucky Minerals Presentation
Lucky Minerals PresentationLucky Minerals Presentation
Lucky Minerals Presentation
 
Minaurum Gold Corporate Presentation
Minaurum Gold Corporate PresentationMinaurum Gold Corporate Presentation
Minaurum Gold Corporate Presentation
 

Similar to Gold Mining Project Seeks Funding....by Lovemore Mauled

iMetal Resources - IMR.V - Rocks to Riches Report June 2019
iMetal Resources - IMR.V - Rocks to Riches Report June 2019iMetal Resources - IMR.V - Rocks to Riches Report June 2019
iMetal Resources - IMR.V - Rocks to Riches Report June 2019
MomentumPR
 
Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013
RepublicGold
 
NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022
InvestorStream
 
Gold Project In Shurugwi, Zimbabwe Seeks US$160 000 to develop
Gold Project In Shurugwi, Zimbabwe Seeks US$160 000 to developGold Project In Shurugwi, Zimbabwe Seeks US$160 000 to develop
Gold Project In Shurugwi, Zimbabwe Seeks US$160 000 to develop
Lovemore Freddie Mauled (Geologist)
 
Lovemore Mauled Exploration Geologist
Lovemore Mauled  Exploration GeologistLovemore Mauled  Exploration Geologist
Lovemore Mauled Exploration Geologist
Zimbabwe Exploration Geologists Contractors
 
Cooperative Drilling
Cooperative DrillingCooperative Drilling
Cooperative Drilling
NSW Environment and Planning
 
Max Resource - Corporate Presentation
Max Resource - Corporate PresentationMax Resource - Corporate Presentation
Max Resource - Corporate Presentation
Company Spotlight
 
Geology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South SudanGeology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South Sudan
Mining On Top
 
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Symposium
 
IMR - iMetal Resources Corporate Presentation
IMR - iMetal Resources Corporate PresentationIMR - iMetal Resources Corporate Presentation
IMR - iMetal Resources Corporate Presentation
MomentumPR
 
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Symposium
 
Modern Mining article on Botswana Diamonds plc July 2017
Modern Mining article on Botswana Diamonds plc July 2017Modern Mining article on Botswana Diamonds plc July 2017
Modern Mining article on Botswana Diamonds plc July 2017
James AH Campbell
 
Modern Mining June 2018 article on Botswana Diamonds plc
Modern Mining June 2018 article on Botswana Diamonds plcModern Mining June 2018 article on Botswana Diamonds plc
Modern Mining June 2018 article on Botswana Diamonds plc
James AH Campbell
 
Marindi Metals Pty Ltd RRS 2014 Presentation
Marindi Metals Pty Ltd RRS 2014 Presentation Marindi Metals Pty Ltd RRS 2014 Presentation
Marindi Metals Pty Ltd RRS 2014 Presentation
Jeremy Robinson
 
TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.
Kirill Klip
 
TNR Gold Presentation October 2014
TNR Gold Presentation October 2014TNR Gold Presentation October 2014
TNR Gold Presentation October 2014
Kirill Klip
 
Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...
Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...
Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...
Symposium
 
Astral Mining Write Up For Website
Astral Mining Write Up For WebsiteAstral Mining Write Up For Website
Astral Mining Write Up For Website
jetinvesments
 
Southern Gold | ASX:SAU | RIS2014 Broken Hill Investor Presentation
Southern Gold | ASX:SAU | RIS2014 Broken Hill Investor PresentationSouthern Gold | ASX:SAU | RIS2014 Broken Hill Investor Presentation
Southern Gold | ASX:SAU | RIS2014 Broken Hill Investor Presentation
Symposium
 

Similar to Gold Mining Project Seeks Funding....by Lovemore Mauled (20)

iMetal Resources - IMR.V - Rocks to Riches Report June 2019
iMetal Resources - IMR.V - Rocks to Riches Report June 2019iMetal Resources - IMR.V - Rocks to Riches Report June 2019
iMetal Resources - IMR.V - Rocks to Riches Report June 2019
 
Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013
 
NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022
 
Gold Project In Shurugwi, Zimbabwe Seeks US$160 000 to develop
Gold Project In Shurugwi, Zimbabwe Seeks US$160 000 to developGold Project In Shurugwi, Zimbabwe Seeks US$160 000 to develop
Gold Project In Shurugwi, Zimbabwe Seeks US$160 000 to develop
 
Lovemore Mauled Exploration Geologist
Lovemore Mauled  Exploration GeologistLovemore Mauled  Exploration Geologist
Lovemore Mauled Exploration Geologist
 
Cooperative Drilling
Cooperative DrillingCooperative Drilling
Cooperative Drilling
 
Max Resource - Corporate Presentation
Max Resource - Corporate PresentationMax Resource - Corporate Presentation
Max Resource - Corporate Presentation
 
Geology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South SudanGeology and Mineral Investment Opportunities in South Sudan
Geology and Mineral Investment Opportunities in South Sudan
 
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
Investor Presentation | Niuminco Group (ASX:NIU) | Gold Investment Symposium ...
 
IMR - iMetal Resources Corporate Presentation
IMR - iMetal Resources Corporate PresentationIMR - iMetal Resources Corporate Presentation
IMR - iMetal Resources Corporate Presentation
 
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
 
Modern Mining article on Botswana Diamonds plc July 2017
Modern Mining article on Botswana Diamonds plc July 2017Modern Mining article on Botswana Diamonds plc July 2017
Modern Mining article on Botswana Diamonds plc July 2017
 
Modern Mining June 2018 article on Botswana Diamonds plc
Modern Mining June 2018 article on Botswana Diamonds plcModern Mining June 2018 article on Botswana Diamonds plc
Modern Mining June 2018 article on Botswana Diamonds plc
 
Marindi Metals Pty Ltd RRS 2014 Presentation
Marindi Metals Pty Ltd RRS 2014 Presentation Marindi Metals Pty Ltd RRS 2014 Presentation
Marindi Metals Pty Ltd RRS 2014 Presentation
 
Rmc jan2012 v2
Rmc jan2012 v2Rmc jan2012 v2
Rmc jan2012 v2
 
TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.
 
TNR Gold Presentation October 2014
TNR Gold Presentation October 2014TNR Gold Presentation October 2014
TNR Gold Presentation October 2014
 
Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...
Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...
Impact Minerals (ASX:IPT) Company Presentation, Symposium Investor Roadshow A...
 
Astral Mining Write Up For Website
Astral Mining Write Up For WebsiteAstral Mining Write Up For Website
Astral Mining Write Up For Website
 
Southern Gold | ASX:SAU | RIS2014 Broken Hill Investor Presentation
Southern Gold | ASX:SAU | RIS2014 Broken Hill Investor PresentationSouthern Gold | ASX:SAU | RIS2014 Broken Hill Investor Presentation
Southern Gold | ASX:SAU | RIS2014 Broken Hill Investor Presentation
 

More from Lovemore Freddie Mauled (Geologist)

Gold Project In Mashonaland West, Zimbabwe seeks investors
Gold Project In Mashonaland West, Zimbabwe seeks investorsGold Project In Mashonaland West, Zimbabwe seeks investors
Gold Project In Mashonaland West, Zimbabwe seeks investors
Lovemore Freddie Mauled (Geologist)
 
Gold Project in Nyanga, Zimbabwe Seeks Investors to develop and mine
Gold Project in Nyanga, Zimbabwe Seeks Investors to develop and mineGold Project in Nyanga, Zimbabwe Seeks Investors to develop and mine
Gold Project in Nyanga, Zimbabwe Seeks Investors to develop and mine
Lovemore Freddie Mauled (Geologist)
 
Chegutu gold project seeking investors in Zimbabwe
Chegutu gold project seeking investors in ZimbabweChegutu gold project seeking investors in Zimbabwe
Chegutu gold project seeking investors in Zimbabwe
Lovemore Freddie Mauled (Geologist)
 
Lithium Project Seeking Investors In Zimbabwe
Lithium Project Seeking Investors In ZimbabweLithium Project Seeking Investors In Zimbabwe
Lithium Project Seeking Investors In Zimbabwe
Lovemore Freddie Mauled (Geologist)
 
Shopping Mall Development Seeking Investors in Ghana
Shopping Mall Development Seeking Investors in GhanaShopping Mall Development Seeking Investors in Ghana
Shopping Mall Development Seeking Investors in Ghana
Lovemore Freddie Mauled (Geologist)
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled
Lovemore Freddie Mauled (Geologist)
 
Gold project seeks investor/ Joint Venture Partner...by Lovemore Mauled
Gold project seeks investor/ Joint Venture Partner...by Lovemore MauledGold project seeks investor/ Joint Venture Partner...by Lovemore Mauled
Gold project seeks investor/ Joint Venture Partner...by Lovemore Mauled
Lovemore Freddie Mauled (Geologist)
 
10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...
10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...
10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...
Lovemore Freddie Mauled (Geologist)
 
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie MauledSolar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Lovemore Freddie Mauled (Geologist)
 

More from Lovemore Freddie Mauled (Geologist) (9)

Gold Project In Mashonaland West, Zimbabwe seeks investors
Gold Project In Mashonaland West, Zimbabwe seeks investorsGold Project In Mashonaland West, Zimbabwe seeks investors
Gold Project In Mashonaland West, Zimbabwe seeks investors
 
Gold Project in Nyanga, Zimbabwe Seeks Investors to develop and mine
Gold Project in Nyanga, Zimbabwe Seeks Investors to develop and mineGold Project in Nyanga, Zimbabwe Seeks Investors to develop and mine
Gold Project in Nyanga, Zimbabwe Seeks Investors to develop and mine
 
Chegutu gold project seeking investors in Zimbabwe
Chegutu gold project seeking investors in ZimbabweChegutu gold project seeking investors in Zimbabwe
Chegutu gold project seeking investors in Zimbabwe
 
Lithium Project Seeking Investors In Zimbabwe
Lithium Project Seeking Investors In ZimbabweLithium Project Seeking Investors In Zimbabwe
Lithium Project Seeking Investors In Zimbabwe
 
Shopping Mall Development Seeking Investors in Ghana
Shopping Mall Development Seeking Investors in GhanaShopping Mall Development Seeking Investors in Ghana
Shopping Mall Development Seeking Investors in Ghana
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled
 
Gold project seeks investor/ Joint Venture Partner...by Lovemore Mauled
Gold project seeks investor/ Joint Venture Partner...by Lovemore MauledGold project seeks investor/ Joint Venture Partner...by Lovemore Mauled
Gold project seeks investor/ Joint Venture Partner...by Lovemore Mauled
 
10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...
10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...
10 MegaWatt Solar PV project IN Randfontein , South Africa seeks Funding..by ...
 
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie MauledSolar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
 

Recently uploaded

Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
a0966109726
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
AhmadKhan917612
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
sidjena70
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
Robin Grant
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
punit537210
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
JulietMogola
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
Open Access Research Paper
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
laozhuseo02
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Innovation and Technology for Development Centre
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
World Resources Institute (WRI)
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
MMariSelvam4
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
Robin Grant
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
chaitaliambole
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
CECOS University Peshawar, Pakistan
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
CIFOR-ICRAF
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
Piermenotti Mauro
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
zm9ajxup
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
RaniJaiswal16
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
rohankumarsinghrore1
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
yasmindemoraes1
 

Recently uploaded (20)

Daan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like itDaan Park Hydrangea flower season I like it
Daan Park Hydrangea flower season I like it
 
Environmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. SinghEnvironmental Science Book By Dr. Y.K. Singh
Environmental Science Book By Dr. Y.K. Singh
 
Natural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptxNatural farming @ Dr. Siddhartha S. Jena.pptx
Natural farming @ Dr. Siddhartha S. Jena.pptx
 
DRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving togetherDRAFT NRW Recreation Strategy - People and Nature thriving together
DRAFT NRW Recreation Strategy - People and Nature thriving together
 
Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024Artificial Reefs by Kuddle Life Foundation - May 2024
Artificial Reefs by Kuddle Life Foundation - May 2024
 
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdfUNDERSTANDING WHAT GREEN WASHING IS!.pdf
UNDERSTANDING WHAT GREEN WASHING IS!.pdf
 
Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...Characterization and the Kinetics of drying at the drying oven and with micro...
Characterization and the Kinetics of drying at the drying oven and with micro...
 
International+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shopInternational+e-Commerce+Platform-www.cfye-commerce.shop
International+e-Commerce+Platform-www.cfye-commerce.shop
 
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdfPresentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
Presentación Giulio Quaggiotto-Diálogo improbable .pptx.pdf
 
Q&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service PlaybookQ&A with the Experts: The Food Service Playbook
Q&A with the Experts: The Food Service Playbook
 
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for..."Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
"Understanding the Carbon Cycle: Processes, Human Impacts, and Strategies for...
 
NRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation StrategyNRW Board Paper - DRAFT NRW Recreation Strategy
NRW Board Paper - DRAFT NRW Recreation Strategy
 
Sustainable farming practices in India .pptx
Sustainable farming  practices in India .pptxSustainable farming  practices in India .pptx
Sustainable farming practices in India .pptx
 
alhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptxalhambra case study Islamic gardens part-2.pptx
alhambra case study Islamic gardens part-2.pptx
 
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian AmazonAlert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
Alert-driven Community-based Forest monitoring: A case of the Peruvian Amazon
 
Navigating the complex landscape of AI governance
Navigating the complex landscape of AI governanceNavigating the complex landscape of AI governance
Navigating the complex landscape of AI governance
 
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
一比一原版(UMTC毕业证书)明尼苏达大学双城分校毕业证如何办理
 
ppt on beauty of the nature by Palak.pptx
ppt on  beauty of the nature by Palak.pptxppt on  beauty of the nature by Palak.pptx
ppt on beauty of the nature by Palak.pptx
 
Celebrating World-environment-day-2024.pdf
Celebrating  World-environment-day-2024.pdfCelebrating  World-environment-day-2024.pdf
Celebrating World-environment-day-2024.pdf
 
Summary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of AustraliaSummary of the Climate and Energy Policy of Australia
Summary of the Climate and Energy Policy of Australia
 

Gold Mining Project Seeks Funding....by Lovemore Mauled

  • 1. Project Name : When North Gold Project, Zimbabwe TECHNICAL REVIEW Project Name: When North Gold Claims Reviewed by: Lovemore (Freddie) Mauled Date: 07/07/15 For Office Use Important Please tick what has been availed together with the other information that has been brought. CHECKED 1 Applicable prospecting / mining license; X 2 Locality/ Location data (including maps, co-odinates etc) X 3 Supporting geological, exploration or mining/production data X 4 Deal Terms X 5 Name and contact details of promoter X **Request for missing required information.
  • 2. Project Name : When North Gold Project, Zimbabwe CATEGORY FACTOR COMMENTS Location Country Zimbabwe, Africa Investment Sought/ Cost US$ 4 000 000 (Four million United States Dollar) Location Province : Matebeleland North  Project is located in Motapa, Sijauke village which is 120km North west of City of Bulawayo. Access is gained by taking Bulawayo – Nkayi road(strip tarred road) which goes to Isabella mine . About 10km from Nkayi turn off turn left at T- junction(Motapa turn off) to Sijauke village for 6km on gravel road. Total Project Size: 40 Hectares Number of gold claims : 4 Gold Claims (10 hectares each). Infrastructure  National road (strip tarred) Bulawayo –Nkayi road passing via near the Joshua Nkomo airport  Gravel road from Motapa turn-off to Mine - Tenure Name of claim Type size Year registered When North 2 Mining 10 hecteres 11 January 2011 When North 3 Mining 10 hectares 11 January 2011 When North 4 Mining 10 hectares 11 January 2011 When North 5 Mining 10 hectares 11 January 2011 Note:*** Annual inspection fees of US$ 100 per licence are payable in September of each year.
  • 3. Project Name : When North Gold Project, Zimbabwe Ownership Precious Mining Syndicate
  • 4. Project Name : When North Gold Project, Zimbabwe Promoter Lovemore Mauled Cell: + 27 71 980 1399 Email: lovemauled@yahoo.co.uk Skype: lovemore.mauled Geology Regional setting & metallogenesis When North gold claims are situated on the western margin of Bubi greenstone belt. Other authors say that the claims are located on the Bulawayo_Filabusi greenstone belt. Generally, a number of archaen greenstone belts host the majority of gold deposits in Zimbabwe.
  • 5. Project Name : When North Gold Project, Zimbabwe  Mineralization is within a broad shear zone cutting through felsic schists close to contact between rocks of the Bulawayan and Shamvaian group.  Orebody widths range from 5 metres to 20 metres  Strike length is 75 to 500 metres
  • 6. Project Name : When North Gold Project, Zimbabwe Lithologies  Andesites  Pillow basalts  Felsic Schists Structure  Economic gold mineralization is structurally controlled.  Regional rock stratigraphy and zone lie roughly parallel to a North East – South East trend,undulating on dip between 50 degrees and 70 degrees South East Exploration History  Extensive soil geochemistry, trenching, pitting and drilling activities were done by Anglo American Zimbabwe Ltd. The data is proprietary and is not available to the current holders of the claims at the moment.  The huge open cast Motapa mine, Isabella mine, McCays mines and Bubi mine have been mined by Anglo American .  Artisanal miners have been active in the area since the closing down of Motapa Mine.  Exploration activities near the When gold claims led to the discovery of Open pittable resources. Other Historical Records Big mines around the area are:  Turk Mine,  Lonely,  Dawn,  Isabella Mine incorporating When ,McCays & Bubi mines. Anglo American has the historical production records. The mines have excellent production records. Turk and Lonely mines are still operating but they are underground operations. Surface activities Sampling was done and the rock samples were taken to the following laboratories:-  Zimbabwe School of Mines (ZSM) and;  Duration gold mine laboratory Drilling Extensive drilling was done by Anglo-America,who are the former owners of Isabella mine. Records of the drilling are not available. Mineralisati on Metal- association and style  Within shear zone there are a number of elongate pods of mineralization which occur as brecciated and Silicified stock-work zones impregnated with pyrites and arsenopyrites. Mineralogy  Arsenopyrite  Pyrite
  • 7. Project Name : When North Gold Project, Zimbabwe Controls  Economic gold mineralization is structurally controlled Strike length  Strike length ranges between 75 to 500 metres Width and orientation  Width ranges from 5metres to 20 metres  Dip between 50 degrees to 70 degrees Depth (open pit potential) Mineralization on oxidised material on top shows open cast can be done. Resource Resource Size and Grade  These need to determined through exploration activities such as trenching and drilling and laboratory analyses of samples. Generally an inferred insitu resource of around 11 000 000 tonnes can be expected. Methodology of estimation  To be determined Upside potential  Potential to peg more gold claims around the property. This will increase the project size as well as life of mine. Mining Study status  None yet but the area presents open cast potential. Mining method  Open castable to about 60 metres Life of mine plan  To be determined. Mining infrastructure  None yet on the site. The project is early stage greenfield. Historical mining  Small scale gold mining has taken place in and around the claims. Past Production  The nearby Motapa Mine (now owned by Metallon Gold) produced a total of approximately 300 000 ounces from 2.4 million tonnes of ore at an average grade of 5.4 g/t. However, the mining that occurred in the surrounding areas by Anglo American Ltd and other companies indicate that the area has potential for gold. Reserve Not determined yet. Processing Study status & test work  None yet Processing method  At the moment artisanal miners in the vicinity use custom milling at local stamp mill with a concerntrator Key risks Technical risks De –risk the project by using a phased approach to any exploration program. Litigation  None known at the moment Notes  Near surface gold with good grade.  Open pittable/castable with moderate stripping ratio.
  • 8. Project Name : When North Gold Project, Zimbabwe  The project is a potential heap leach operation. The nearby Motapa and Isabella mines are heap leach operations.  The project presents an excellent exploration and development opportunity.  Potential for a multi-million once deposit.  The project can be expanded by obtaining and merging more claims in the area then consolidate them into one big project. There are some individuals who are willing to relinquish their gold claims upon getting some payment (See the diagrams on Upside potential below).  Large gold mining operations such as the Motapa and Isabella mines are less than 10 km away from When Gold claims.  Drilling is required in order to define mineralisation.  Artisanal mining has indicated the presence of mineralisation. However, technical exploration will unearth the full potential of the area.  It is located in a geologically good environment. Artisanal miners are found in the area and this is a good indication of potential.  The area in which the project lies is a well known gold producing area in Zimbabwe. Successful open cast mining operations have been carried out by renowned companies such as Anglo American Zimbabwe (Pvt) Ltd.  Like any project, due diligence is required. A field visit is required.  Arrangements to purchase any available data relating to the When Gold claims (from Anglo American) must be made.  An preliminary budget is attached herewith.  Recommended exploration activities will include Geochemical and Geophysical methods. Trenching, diamond drilling/or RC or Percussion drilling will need to be done so that a geological model of the Project can be produced. This will aid the planning of any subsequent exploration programs or the development of the project into a producing mine. Data Source Source Project owners Deal Terms  The owners of the project are seeking for Joint Venture partners in order to explore and develop the project into a producing mine.  The project requires an investment in the region of R 3 707 815.00 (which can be rounded off to approximately US$4 million).
  • 9. Project Name : When North Gold Project, Zimbabwe Copy of Claims Licences/ Proof of Ownership
  • 10. Project Name : When North Gold Project, Zimbabwe Laboratory Analyses of Samples from When North Gold Claims Formatted: Indent: Left: 0 cm
  • 11. Project Name : When North Gold Project, Zimbabwe AAS ANALYSIS RESULTS CERTIFICATE Results of the analysis done using the AAS method are shown below. The results are shown in grams per tonne.
  • 12. Project Name : When North Gold Project, Zimbabwe Nearby Mines
  • 13. Project Name : When North Gold Project, Zimbabwe Blue Sky Potential. The following two diagrams show that there is a potential to merge the adjacent gold claims hence consolidating all claims into one huge gold project.
  • 14. Project Name : When North Gold Project, Zimbabwe Possible bluesky potential of When Gold project (continued)
  • 15. Project Name : When North Gold Project, Zimbabwe Roads and rail infrastructure near When Gold claims
  • 16. Project Name : When North Gold Project, Zimbabwe Project Budget Exploration EXPLORATION PLAN & RESOURCE EVALUATION – ACTIVITIES  Reconnaissance survey and Field mapping .  Trenching – Trenches will be dug at 100m intervals across strike, each trench 500m long and samples will be taken in each trench on bed rock  Diamond Drilling – 16 holes will be drilled on the 4 claims, on a grid of 100m X 100m to investigate gold mineralization and behavior of mineralized sections with depth, to get dip of ore body, depth and thickness of ore body. Diamond drill boreholes will be drilled to a depth of 60 metres @$150 per metre Diamond drill cores will be logged and taken for analysis. The analysis envisaged will include Bottle roll and Fire assay. Diamond Drilling is done to declare Resources and Reserves which assist in projecting the life span of the mine. Mining geological soft wares will be used for ore Reserves calculations.  Compilation of a detailed Geological report with all maps, core log sheets, assay results and estimation of Life span of the mine.  Drawing up of operational plan and pit designs Motapa (When North 2 -5 claims) EXPLORATION BUDGET ITEM QUANTITY UNIT PRICE TOTAL (US $) 4 X 4 Bakkie (diesel) 2 $12 000 $24000 Reconnaissance Survey 1 $500 $500 Trench Samples Assaying 100 $18 $1800 Diamond Drilling Boreholes (60metres) 16 $9 000 $144 000 Core Samples Assaying 200 $18 $3 600 Stationery, internet, phone 1 $1000 $1000 Sample Bags, Twine String 1 $2000 $2000 Measuring Tape 4 $150 $600 Chisels & Hammers 4 $25 $100
  • 17. Project Name : When North Gold Project, Zimbabwe Picks 10 $15 $150 Shovels 10 $10 $100 Tents 5 $300 $1500 Diesel Fuel 10000 $1.50 $15 000 Food 12 $5000 $60000 TOTAL $254 350 NB: Costs to include hiring of excavator Labour Project Manager@4800 per month 12 4800 $57600 Geologist @ $4000 per month 12 4000 $48000 Geological Assistants @$30/day for 26 days 2 assistants $1000 $24000 General labour @$250 per month 10 general labour $250 $30000 Cook 1 300 $3600 Resource and Mining Engineering Consultants $300 000 TOTAL $163200 LICENCES Company Registration 1 $300 $300 Bank Account Opening 1 $500 $500 Zimbabwe Investment Authority Licence 1 $3 000 $3 000 Site of works plan 1 $500 $500
  • 18. Project Name : When North Gold Project, Zimbabwe Inspection Fees update 1 $400 $400 Legal fees 1 $1 000 $1 000 Environmental Impact Assessment 1 $5 000 $5 000 TOTAL $10 700 Totals For Exploration Field Equipment 1 $242350 $254350 Labour 1 $163200 $163200 Licences 1 $10 700 $10700 Sub Total $428250 10% Contigency $42825 Grand Total $471075 _________________________________________________ PROCESSING PLANT ITEM QUANTITY UNIT PRICE TOTAL 5 Tonne/hour ball mill 2 $70 000 $140 000 Concentrators 2 $3 500 $7 000 Crusher 1 $10 000 $10 000 Ore bin 1 $8 000 $8 000 Conveyors $12 000 Scrapper Winch 1 $5 000 $5 000 Slurry pumps 2 $500 $1 000 Thickener 1 $30 000 $30 000 100 cubic metre Leach tanks 2 $7 000 $14 000 Carbon Tanks 4 $5 000 $20 000 Elution Plant 1 $35 000 $35 0000 Total $282 000
  • 19. Project Name : When North Gold Project, Zimbabwe VEHICLES ITEM QUANTITY UNIT PRICE TOTAL Excavator 1 $400 000 $400 000 10 tonne tipper trucks 4 $80 000 $320 000 Front End Loader 1 $250 000 $250 000 Compressors +jackhammer+hose 4 $10 000 $40 000 7 tonne truck 1 $30 000 $30 000 4X4 Bakkies 4 $25 000 $100 000 Minibus 1 $20 000 $20 000 TOTAL $1 160 000 LICENCES ITEM QUANTITY UNIT PRICE TOTAL Rural council fee 1 $1 500 $1 500 Milling permit 1 $3 000 $3 000 Borehole licence 1 $400 $400 TOTAL $4 900 TOOLS ITEM QUANTITY UNIT PRICE TOTAL 200 kVa Generator 1 $30 000 $30 000 Wheel barrows 10 $120 $1 200 Tool boxes 2 $500 $1 000 Office furniture 1 $10 000 $10 000 TOTAL $42 200
  • 20. Project Name : When North Gold Project, Zimbabwe INFRASTRUCTURE DEVELOPMENT ITEM QUANTITY UNIT PRICE TOTAL Ball mill installation 2 $5 000 $10 000 Office block 1 $15 000 $15 000 Staff quarters 4 $5 000 $20 000 Borehole +piping 1 $15 000 $15 000 Workshop 1 $5 000 $5 000 Electricity 1 $20 000 $20 000 Electrical tubing 1 $10 000 $10 000 Plumbing 1 $5 000 $5 000 Fencing + signs 1 $5 000 $5 000 Water Reservoirs 2 $1 000 $2 000 Magazine 1 $10 000 $10 000 Guest house/ management house 1 $10 000 $10 000 Fuel storage 1 $5 000 $5 000 TOTAL $132 000 MONTHLY CONSUMABLES ITEM QUANTITY UNIT PRICE TOTAL Diesel 20 000 $1.50 $30 000 Electricity $10 000 Explosives 30 boxes $350 $10 500 Drill bits 40 $20 $800 Drill sticks 20 $40 $800 Fertilizer 20x20kg $24 $480 Cyanide 50X50kg 200 $10 000 Carbon 20X25kg $125 $2 500 Solution Tests+Test Tubes $1 000 Stationery $500 Telephone +Internet $2 000 Rock Drill oils $500 Maintenance spare parts $2 000 Canteen supplies $500
  • 21. Project Name : When North Gold Project, Zimbabwe Labour (salaries) $46 600 PPE $100 $61 $6 100 TOTAL for 12 months $1491360 Figure 1 below shows artisanal miners on a “Shaft” on the Claims.Rock samples from this shaft were taken and analysed at the laboratory and the fire assay results obtained are as shown below. . Analysis Element Sample Au (ppm) Detection Limit Fire Assay Gold 2 Top Right Reef 16.1 0.01 Fire Assay Gold Shaft 1 Bottom 0.24 0.01 Fire Assay Gold Shaft 1 Top Left 0.34 0.01 Fire Assay Gold Shaft 2 Bottom and Top 13.64 0.01 Fire Assay Gold Vimila Shaft 11.62 0.01 Fire Assay Gold Vimila South 2 10.08 0.01 Fire Assay Sample Analytical Results By Duration Gold Laboratory.
  • 22. Project Name : When North Gold Project, Zimbabwe Figure 1. Artisanal miners
  • 23. Project Name : When North Gold Project, Zimbabwe Figure 2. Geologist standing on artisanal miners’ “shaft”