November 2016 to December 2016
M. A. Patout and Sons / FSE Energy
Jeanerette, La.
Operations Support
Operated and then trained Operators on a 300 KPPH FSE Energy bagasse boiler.
Also helped tune the boiler for emissions testing.
April 2016 to October 2016
Kendall Reconfiguration Project
Cambridge, Mass.
Power Energy Systems
Mechanical Commissioning Engineer
Commissioned a Shin Nippon back pressure steam turbine with an Air Cooled Heat Exchanger
and an Aux Cooling System with an Alfa Laval Fin Fan Cooler.
February2015 to June 2015
LutechResources-CBI
EntergyMATS projectsat Newarkand Red Bluffs, AR
Mechanical CommissioningLead
Commissionedthe CBRandActivatedCarbonsystems.
August2014 to February2015
BluewaterEnergySolutions-Kiewit
IPL Units1-4 Environmental Project
Petersburg,Indiana
Loto, Commissioning,OperationsSpecialist
Managed the Loto office duringPrecipitatorupgrades, ActivatedCarbon,
CBR system,SBSsystemandBag house commissioning.
June 2013 to April 2014
BluewaterEnergySolutions
Allandale,SC
Startup Mechanical Lead-Control Room Supervisor
The plant consistsof an FSE BiomassBoileranda23MW GE Turbine.
Commissionedthe plantandthensupervisedthe control roomforthe durationof
The project.
April 2012 to May 2013
PrecisionResourcesCo. -Zachery
PiedmontGreenPower
Barnesville,GA
OperationsEngineer
Plantconsistsof one EPI 60 MW BiomassboilerwithaSiemensaxialflow turbine generator.Duties
includedMechanical Commissioning,Control RoomSupervisor,andOperatorTraining.
August2011 to April 2012
Caliper
VCHEC HybridEnergy Center
VirginiaCity,VA
CommissioningEngineer5
Plantconsistsof twoFosterWheeler Gob/BiomassfiredCFBs,supplyingsteamtoa Toshiba660MW
turbine/aircooledcondenser.DutiesincludeMechanical Commissioning,ControlRoomSupervisor and
OperatorTraining.
August2010 to April 2011
HeadwayCorp.
TVA Lagoon CreekCombinedCycleProject
Brownsville,TN
CombinedCycle Tech
The plant isa two on one withMitsubishi 501Fcombustionturbines,Nooter/Eriksenboilersanda GE
D11 steamturbine.The controlsare OvationandMark 6.
March 2010 to April 2010
Luminant
LuminantSandowUnit5
Rockdale,TX
Outage Loto Coordinator
Setup the Loto program forthe firstannual plantmajoroutage ina TaglinkSystem.The plantconsisted
of twoFosterWheelerCFBboilers,burningligniteandanAlstom630 MW turbine generator.
October2009 to February2010
Bechtel PowerCorporation
Trimble CountyUnit2
Bedford,KY
Startup OperationsShiftEngineer
Coordinatedworkbetweenconstruction,startupandthe clientsplantoperators.FilledinasLoto
Coordinatorinhisabsence.Directedthe plantoperators.The plantconsistedof one 750 MW babcock
and Doosansupercritical boileranda Mitsubishi 750 MW turbine generator.
August2008 to October2009
Bechtel PowerCorporation
Luminant’sSandowUnit5 Project
Rockdale,TX
Startup OperationsShiftEngineer
CoordinatedworkbetweenConstruction,Startupandthe Client’splantoperators.FilledinasLoto
Coordinatorinhisabsence. Directedthe plantoperatorsinthe operationof the plant.Iwasalsothe
designatedsafetyrepresentative.Plantconsistedof twoFosterWheelerCFBboilers,burninglignite and
an Alstom630 MW turbine generator.
October2007 to April 2006,
TASC-CH2MHill
SierraPacificTraceyCombinedCycle Project
McCarren, NV
Mechanical Commissioning,Startup ShiftSupervisor
Assistedwiththe startupof a GE 7FA two intoone.The steamturbine isa D11 and the boilers are
Nooter-Ericson. The feedpumpsandthe condensate pumpsare Flowserve.Icommissionedthe feed
pumps,condensate pumpsandthe SCRSystem.IworkedwithVieoliaonthe Boilerchemclean,ACC
cleanupandsteamblows.
August2007 to October2007
Rev.1 PowerStaffing
FloridaPowerandLight,PortEvergladesPlant
Fort Lauderdale,FLA
Outage Contract Coordinator
SupervisedcontractorsworkingonUnit2 outage while overseeingthe change outof condenser,
circulatingwaterpumpandfeedwaterheaterlevel control valvesandtransmitters.Ialsosupervised
valve repairsandcirc waterintake cleaningandconcrete repairs.ResponsibleforScope Changesand
Safety.
May 2006 to July2007
BluewaterEnergySolutions
Corn Products,BedfordPark,III.
Startup ShiftSupervisor,Mechanical CommissioningTech,Operator Trainer
Assistedwithstartupof aFosterWheeler 1100 KPPHCFB Boiler.Performedpipingcompletionsurveys,
systempunchlists,andworkedwithMechanical Commissioningdoingequipmentcheckout,startup,
systemflushesandhydrotesting.
September2005 to March 2006
NorthAmericanContractEmployee Services
San JuanGeneratingStation
Waterflow,NM
Procedure Writer
Reviewedandupdatedoperationproceduresatthe San JuanGeneratingStationinFarmington,NM.
The boilerswere FosterWheelerPC;firedunitsandthe turbines-WestinghouseandGE.StationCapacity
– 1700 MW.
August2005 to September2005
NorthAmericanContractEmployee Services
BenningGeneratingStation
Control Room Operator
Employedasa Control RoomOperatorat the BenningGeneratingStationinWashington,DC.The plant
was a peakingplantwithtwo275 MW oil burningunits,supplyingsteamtoteoGeneral Electricturbine
generators.
August2003 to August2005
BuffaloFuel Corp.
TrigenSyracuse Energy
Operationsand Maintenance Manager
Managed the alternative fuelsprocessingplantatTrigenSyracuse EnergyCorp.Processedpaper,wood
and plastictobe burnedinthe plantsBabcock andWilcox PCboilers.Managedthe coal-handling
department.
May to July2003
ThinkEnergyGroup
JohnH. Warden Station
L’anse,Michigan
Control Room Operator
The plant wasrestarteddue to a needforpowercausedbythe temporaryshutdownof a large plant.
The boilerwasa RileyPCthat wasconvertedintogas.
December2002 to April 2003
BuffaloFuel Corp
TrigenEnergyCorp.
Syracuse,NY
Plant ImprovementsConsultant
InitiatedimprovementstoTrigen’sashsystemandcontrol airsystem.Made recommendationstolower
theirhighLOI problem,toreduce pluggingproblemsingeneratingtubesandcoal bunkers.Workedin
AlternativeFuelsDepartmentmakingimprovementstodustcollectionSystem.The plantconsistedof
five,20 MW B-W,PC boilers,a90 MW Toshibaturbine anda 10 MW Elliotbackpressure turbine.
Augustto October2002
Universal Energy
Black HillsPower
Denver,CO
Startup Control Room Operator
Conversationfromsimple tocombinedcycle.NEMboilersanda Dresser-Randsteamturbine were
addedto the twoexistingLM6000 gas turbines.The DCSis Yokogawaandthe steamturbine is
controlledbya505 Woodwardturbine control.
May to August2002
TMP Worldwide
Kendall CountyGenerationFacility
Minooka,Ill.
Operationsand Maintenance Support
Plantconsistedof fourGE 7FA gas turbines,FosterWheelerHRSG’s.GEsteamturbinesandGE air
cooled,andHydrogencooledgenerators.Putincharge of the watertreatmentplantwhichconsistedof
raw and wastewaterclarifiers,carbonfilters,mediafilters,ROunitsandmixedbeds.
Nov2001 to May 2002
PowerIndustryConsultants
AES Total EnergyProject
Guayama,PR
CommissioningShiftSupervisor
I completedacontract as a commissioningshiftsupervisorforPowerIndustryConsultantsandthe AES
Total EnergyProject.We commissionedtwo250 MW AlstomCFBboilersandtwoAlstom250 MW
AlstomreheatturbineswithAlstomaircooledgenerators. The WaterTreatmentDepartmentconsists
of mediafilters,makeupandside streamROunits,aclarifierforcoolingtowermakeup,Anionunitsand
mixedbeds. Inaddition,Iworkedwithmechanical commissioningthroughturbine oilflushes,feed
pumpoil flushes,condensate andfeedwaterline flushes,boilerchemical cleaningandsteamblows.I
alsoadministeredthe lock-out,tag-outprocess.
July1999 to Nov2001
CH ResourcesIncorporated
NiagaraFalls,NY
Operationsand Maintenance Manager
Thisfacilityconsistsof one 500 KPPHPyroflow circulatingfluidizedbedboilerwhichsuppliessteamtoa
53 MW Imo-Delaval turbine/generator.The fuel usedwasabituminouscoal andpetroleumcoke and
tire chipmixture.The plantiscontrolledbyaJohnson-YokogawaDCS.The feedwatersystemisfedby
three 250 KPPH KSBelectricdrivenbarrel pumps. Iassisted instartupof the plantafterithad beenidle
for twoyears.I oversawall aspectsof plantmaintenance andoperationsincluding:settinguptraining
programs,proceduresandpoliciesforall personnel,schedulingandplanningof outages,coordinating
withcontractors andensuringall partsneededwere onsite.Iassistedthe plantmanagerwithverifying
that operationsandmaintenance were withinbudgetandinplanningandcarryingoutvarioustestsfor
alternate fuels.Iinvestigatedandrecommendedvariousprocessupgrades.
March 1991 to Sept1998
SouthernEnergy,Inc.
NiagaraFalls,NY
Control Room Operator/Shift Supervisor
While assistingwithMechanical CommissioningandStartUp of thisfacilitymydutiesincluded:
completionof punchlistsonnewsystemsandequipment,writingequipmentstartupandoperating
procedures;administrationof the lock-outtag-outprocedure.Operateda500 KPPHPyroflow circulating
fluidizedbedboilerwhichsuppliedsteamtoa52 MW Imo-Delaval turbine/generator.The fuel usedwas
a bituminouscoal andpetroleumcoke mixture.A Johnson-YokogawaDCScontrolledthe plantandthe
feedwatersystemwasfedbythree 250 KPPHKSB electricdrivenbarrel pumps.
Education
UnitedStatesNavy,GreatLakes,Ill.
BoilerTechnician A School
TrainedinBoilerOperation,Maintenance,E-5BT completionof myenlistment
Trott Vocational HighSchool
NiagaraFalls,NY
Major course of studywas Welding
Licenses:
Chief Engineer,Buffalo,NY
Chief Engineer,NiagaraFalls,NY

More Related Content

What's hot (20)

Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 
John Benson CV 2016 1
John Benson CV 2016 1John Benson CV 2016 1
John Benson CV 2016 1
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015
 
DIRK HESEMAN CV
DIRK HESEMAN CV DIRK HESEMAN CV
DIRK HESEMAN CV
 
0001 RICHARD_V_SHAFFER - Latest Resume Jan 2017
0001 RICHARD_V_SHAFFER -  Latest Resume Jan 20170001 RICHARD_V_SHAFFER -  Latest Resume Jan 2017
0001 RICHARD_V_SHAFFER - Latest Resume Jan 2017
 
BDSResume1
BDSResume1BDSResume1
BDSResume1
 
peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017peter.fitzpatrick.cv.2016-2017
peter.fitzpatrick.cv.2016-2017
 
Ahart resume
Ahart resumeAhart resume
Ahart resume
 
Updated CV
Updated CVUpdated CV
Updated CV
 
Project Experience
Project ExperienceProject Experience
Project Experience
 
ahart resume
ahart resumeahart resume
ahart resume
 
Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015Resume Dennis Kehoe 2015
Resume Dennis Kehoe 2015
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016Aaron Fischer Resume-02-2016
Aaron Fischer Resume-02-2016
 
CV - Chris Gibbins
CV - Chris GibbinsCV - Chris Gibbins
CV - Chris Gibbins
 
John Stefanick 2015 resume 5
John Stefanick 2015 resume 5John Stefanick 2015 resume 5
John Stefanick 2015 resume 5
 
Hydrographic construction Cairo Illinois
Hydrographic construction  Cairo IllinoisHydrographic construction  Cairo Illinois
Hydrographic construction Cairo Illinois
 
Resume MEW 2015
Resume MEW 2015 Resume MEW 2015
Resume MEW 2015
 

Similar to Glenn Martin

Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016
Patrick McDuffie
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
Joe Fain
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
Stephen Davidson
 
Breaux,Kyle 9-15-15
Breaux,Kyle  9-15-15Breaux,Kyle  9-15-15
Breaux,Kyle 9-15-15
Kyle Breaux
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
jongguanzon
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015
John Hitt
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
John P. Henderson
 
WTX New Resume (3).pdf-
WTX New Resume (3).pdf-WTX New Resume (3).pdf-
WTX New Resume (3).pdf-
Paul McLin
 
W.O. Place (CV)
W.O. Place (CV)W.O. Place (CV)
W.O. Place (CV)
W O Place
 

Similar to Glenn Martin (20)

Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016Patrick_C._McDuffie CV and EXP 2016
Patrick_C._McDuffie CV and EXP 2016
 
William Resume
William ResumeWilliam Resume
William Resume
 
Rich Mathias CV 2016
Rich Mathias CV 2016Rich Mathias CV 2016
Rich Mathias CV 2016
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
Breaux,Kyle 9-15-15
Breaux,Kyle  9-15-15Breaux,Kyle  9-15-15
Breaux,Kyle 9-15-15
 
Jvs resume' word chronological format r5tasks
Jvs  resume' word chronological format r5tasksJvs  resume' word chronological format r5tasks
Jvs resume' word chronological format r5tasks
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
CBorgland resume
CBorgland resumeCBorgland resume
CBorgland resume
 
resume
resumeresume
resume
 
Resume' 2015
Resume' 2015Resume' 2015
Resume' 2015
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Resume 1
Resume 1 Resume 1
Resume 1
 
Wiiliam CV update
Wiiliam CV updateWiiliam CV update
Wiiliam CV update
 
WTX New Resume (3).pdf-
WTX New Resume (3).pdf-WTX New Resume (3).pdf-
WTX New Resume (3).pdf-
 
W.O. Place (CV)
W.O. Place (CV)W.O. Place (CV)
W.O. Place (CV)
 
2015
20152015
2015
 

Glenn Martin

  • 1. 582 Gable Rd. PO Box 2 Harriet, Ar. 72639 Cell (716) 579-3240 Martinglenn@hotmail.com Glenn E. Martin November 2016 to December 2016 M. A. Patout and Sons / FSE Energy Jeanerette, La. Operations Support Operated and then trained Operators on a 300 KPPH FSE Energy bagasse boiler. Also helped tune the boiler for emissions testing. April 2016 to October 2016 Kendall Reconfiguration Project Cambridge, Mass. Power Energy Systems Mechanical Commissioning Engineer Commissioned a Shin Nippon back pressure steam turbine with an Air Cooled Heat Exchanger and an Aux Cooling System with an Alfa Laval Fin Fan Cooler. February2015 to June 2015 LutechResources-CBI EntergyMATS projectsat Newarkand Red Bluffs, AR Mechanical CommissioningLead Commissionedthe CBRandActivatedCarbonsystems. August2014 to February2015 BluewaterEnergySolutions-Kiewit IPL Units1-4 Environmental Project Petersburg,Indiana Loto, Commissioning,OperationsSpecialist Managed the Loto office duringPrecipitatorupgrades, ActivatedCarbon, CBR system,SBSsystemandBag house commissioning. June 2013 to April 2014 BluewaterEnergySolutions
  • 2. Allandale,SC Startup Mechanical Lead-Control Room Supervisor The plant consistsof an FSE BiomassBoileranda23MW GE Turbine. Commissionedthe plantandthensupervisedthe control roomforthe durationof The project. April 2012 to May 2013 PrecisionResourcesCo. -Zachery PiedmontGreenPower Barnesville,GA OperationsEngineer Plantconsistsof one EPI 60 MW BiomassboilerwithaSiemensaxialflow turbine generator.Duties includedMechanical Commissioning,Control RoomSupervisor,andOperatorTraining. August2011 to April 2012 Caliper VCHEC HybridEnergy Center VirginiaCity,VA CommissioningEngineer5 Plantconsistsof twoFosterWheeler Gob/BiomassfiredCFBs,supplyingsteamtoa Toshiba660MW turbine/aircooledcondenser.DutiesincludeMechanical Commissioning,ControlRoomSupervisor and OperatorTraining. August2010 to April 2011 HeadwayCorp. TVA Lagoon CreekCombinedCycleProject Brownsville,TN CombinedCycle Tech The plant isa two on one withMitsubishi 501Fcombustionturbines,Nooter/Eriksenboilersanda GE D11 steamturbine.The controlsare OvationandMark 6. March 2010 to April 2010 Luminant LuminantSandowUnit5 Rockdale,TX Outage Loto Coordinator Setup the Loto program forthe firstannual plantmajoroutage ina TaglinkSystem.The plantconsisted of twoFosterWheelerCFBboilers,burningligniteandanAlstom630 MW turbine generator. October2009 to February2010 Bechtel PowerCorporation Trimble CountyUnit2 Bedford,KY Startup OperationsShiftEngineer Coordinatedworkbetweenconstruction,startupandthe clientsplantoperators.FilledinasLoto Coordinatorinhisabsence.Directedthe plantoperators.The plantconsistedof one 750 MW babcock and Doosansupercritical boileranda Mitsubishi 750 MW turbine generator.
  • 3. August2008 to October2009 Bechtel PowerCorporation Luminant’sSandowUnit5 Project Rockdale,TX Startup OperationsShiftEngineer CoordinatedworkbetweenConstruction,Startupandthe Client’splantoperators.FilledinasLoto Coordinatorinhisabsence. Directedthe plantoperatorsinthe operationof the plant.Iwasalsothe designatedsafetyrepresentative.Plantconsistedof twoFosterWheelerCFBboilers,burninglignite and an Alstom630 MW turbine generator. October2007 to April 2006, TASC-CH2MHill SierraPacificTraceyCombinedCycle Project McCarren, NV Mechanical Commissioning,Startup ShiftSupervisor Assistedwiththe startupof a GE 7FA two intoone.The steamturbine isa D11 and the boilers are Nooter-Ericson. The feedpumpsandthe condensate pumpsare Flowserve.Icommissionedthe feed pumps,condensate pumpsandthe SCRSystem.IworkedwithVieoliaonthe Boilerchemclean,ACC cleanupandsteamblows. August2007 to October2007 Rev.1 PowerStaffing FloridaPowerandLight,PortEvergladesPlant Fort Lauderdale,FLA Outage Contract Coordinator SupervisedcontractorsworkingonUnit2 outage while overseeingthe change outof condenser, circulatingwaterpumpandfeedwaterheaterlevel control valvesandtransmitters.Ialsosupervised valve repairsandcirc waterintake cleaningandconcrete repairs.ResponsibleforScope Changesand Safety. May 2006 to July2007 BluewaterEnergySolutions Corn Products,BedfordPark,III. Startup ShiftSupervisor,Mechanical CommissioningTech,Operator Trainer Assistedwithstartupof aFosterWheeler 1100 KPPHCFB Boiler.Performedpipingcompletionsurveys, systempunchlists,andworkedwithMechanical Commissioningdoingequipmentcheckout,startup, systemflushesandhydrotesting. September2005 to March 2006 NorthAmericanContractEmployee Services San JuanGeneratingStation Waterflow,NM Procedure Writer Reviewedandupdatedoperationproceduresatthe San JuanGeneratingStationinFarmington,NM. The boilerswere FosterWheelerPC;firedunitsandthe turbines-WestinghouseandGE.StationCapacity – 1700 MW.
  • 4. August2005 to September2005 NorthAmericanContractEmployee Services BenningGeneratingStation Control Room Operator Employedasa Control RoomOperatorat the BenningGeneratingStationinWashington,DC.The plant was a peakingplantwithtwo275 MW oil burningunits,supplyingsteamtoteoGeneral Electricturbine generators. August2003 to August2005 BuffaloFuel Corp. TrigenSyracuse Energy Operationsand Maintenance Manager Managed the alternative fuelsprocessingplantatTrigenSyracuse EnergyCorp.Processedpaper,wood and plastictobe burnedinthe plantsBabcock andWilcox PCboilers.Managedthe coal-handling department. May to July2003 ThinkEnergyGroup JohnH. Warden Station L’anse,Michigan Control Room Operator The plant wasrestarteddue to a needforpowercausedbythe temporaryshutdownof a large plant. The boilerwasa RileyPCthat wasconvertedintogas. December2002 to April 2003 BuffaloFuel Corp TrigenEnergyCorp. Syracuse,NY Plant ImprovementsConsultant InitiatedimprovementstoTrigen’sashsystemandcontrol airsystem.Made recommendationstolower theirhighLOI problem,toreduce pluggingproblemsingeneratingtubesandcoal bunkers.Workedin AlternativeFuelsDepartmentmakingimprovementstodustcollectionSystem.The plantconsistedof five,20 MW B-W,PC boilers,a90 MW Toshibaturbine anda 10 MW Elliotbackpressure turbine. Augustto October2002 Universal Energy Black HillsPower Denver,CO Startup Control Room Operator Conversationfromsimple tocombinedcycle.NEMboilersanda Dresser-Randsteamturbine were addedto the twoexistingLM6000 gas turbines.The DCSis Yokogawaandthe steamturbine is controlledbya505 Woodwardturbine control. May to August2002 TMP Worldwide Kendall CountyGenerationFacility Minooka,Ill. Operationsand Maintenance Support
  • 5. Plantconsistedof fourGE 7FA gas turbines,FosterWheelerHRSG’s.GEsteamturbinesandGE air cooled,andHydrogencooledgenerators.Putincharge of the watertreatmentplantwhichconsistedof raw and wastewaterclarifiers,carbonfilters,mediafilters,ROunitsandmixedbeds. Nov2001 to May 2002 PowerIndustryConsultants AES Total EnergyProject Guayama,PR CommissioningShiftSupervisor I completedacontract as a commissioningshiftsupervisorforPowerIndustryConsultantsandthe AES Total EnergyProject.We commissionedtwo250 MW AlstomCFBboilersandtwoAlstom250 MW AlstomreheatturbineswithAlstomaircooledgenerators. The WaterTreatmentDepartmentconsists of mediafilters,makeupandside streamROunits,aclarifierforcoolingtowermakeup,Anionunitsand mixedbeds. Inaddition,Iworkedwithmechanical commissioningthroughturbine oilflushes,feed pumpoil flushes,condensate andfeedwaterline flushes,boilerchemical cleaningandsteamblows.I alsoadministeredthe lock-out,tag-outprocess. July1999 to Nov2001 CH ResourcesIncorporated NiagaraFalls,NY Operationsand Maintenance Manager Thisfacilityconsistsof one 500 KPPHPyroflow circulatingfluidizedbedboilerwhichsuppliessteamtoa 53 MW Imo-Delaval turbine/generator.The fuel usedwasabituminouscoal andpetroleumcoke and tire chipmixture.The plantiscontrolledbyaJohnson-YokogawaDCS.The feedwatersystemisfedby three 250 KPPH KSBelectricdrivenbarrel pumps. Iassisted instartupof the plantafterithad beenidle for twoyears.I oversawall aspectsof plantmaintenance andoperationsincluding:settinguptraining programs,proceduresandpoliciesforall personnel,schedulingandplanningof outages,coordinating withcontractors andensuringall partsneededwere onsite.Iassistedthe plantmanagerwithverifying that operationsandmaintenance were withinbudgetandinplanningandcarryingoutvarioustestsfor alternate fuels.Iinvestigatedandrecommendedvariousprocessupgrades. March 1991 to Sept1998 SouthernEnergy,Inc. NiagaraFalls,NY Control Room Operator/Shift Supervisor While assistingwithMechanical CommissioningandStartUp of thisfacilitymydutiesincluded: completionof punchlistsonnewsystemsandequipment,writingequipmentstartupandoperating procedures;administrationof the lock-outtag-outprocedure.Operateda500 KPPHPyroflow circulating fluidizedbedboilerwhichsuppliedsteamtoa52 MW Imo-Delaval turbine/generator.The fuel usedwas a bituminouscoal andpetroleumcoke mixture.A Johnson-YokogawaDCScontrolledthe plantandthe feedwatersystemwasfedbythree 250 KPPHKSB electricdrivenbarrel pumps. Education UnitedStatesNavy,GreatLakes,Ill. BoilerTechnician A School TrainedinBoilerOperation,Maintenance,E-5BT completionof myenlistment Trott Vocational HighSchool
  • 6. NiagaraFalls,NY Major course of studywas Welding Licenses: Chief Engineer,Buffalo,NY Chief Engineer,NiagaraFalls,NY