Glenn E. Martin
November 2016 to December 2016
M. A. Patout and Sons / FSE Energy
Jeanerette, La.
Operations Support
Operated and then trained Operators on a 300 KPPH FSE Energy bagasse boiler.
Also helped tune the boiler for emissions testing.
April 2016 to October 2016
Kendall Reconfiguration Project
Cambridge, Mass.
Power Energy Systems
Mechanical Commissioning Engineer
Commissioned a Shin Nippon back pressure steam turbine with an Air Cooled Heat Exchanger
and an Aux Cooling System with an Alfa Laval Fin Fan Cooler.
February2015 to June 2015
LutechResources-CBI
EntergyMATS projectsat Newarkand Red Bluffs, AR
Mechanical CommissioningLead
Commissionedthe CBRandActivatedCarbonsystems.
August2014 to February2015
BluewaterEnergySolutions-Kiewit
IPL Units1-4 Environmental Project
Petersburg,Indiana
Loto, Commissioning,OperationsSpecialist
Managed the Loto office duringPrecipitatorupgrades, ActivatedCarbon,
CBR system,SBSsystemandBag house commissioning.
June 2013 to April 2014
BluewaterEnergySolutions
2. Allandale,SC
Startup Mechanical Lead-Control Room Supervisor
The plant consistsof an FSE BiomassBoileranda23MW GE Turbine.
Commissionedthe plantandthensupervisedthe control roomforthe durationof
The project.
April 2012 to May 2013
PrecisionResourcesCo. -Zachery
PiedmontGreenPower
Barnesville,GA
OperationsEngineer
Plantconsistsof one EPI 60 MW BiomassboilerwithaSiemensaxialflow turbine generator.Duties
includedMechanical Commissioning,Control RoomSupervisor,andOperatorTraining.
August2011 to April 2012
Caliper
VCHEC HybridEnergy Center
VirginiaCity,VA
CommissioningEngineer5
Plantconsistsof twoFosterWheeler Gob/BiomassfiredCFBs,supplyingsteamtoa Toshiba660MW
turbine/aircooledcondenser.DutiesincludeMechanical Commissioning,ControlRoomSupervisor and
OperatorTraining.
August2010 to April 2011
HeadwayCorp.
TVA Lagoon CreekCombinedCycleProject
Brownsville,TN
CombinedCycle Tech
The plant isa two on one withMitsubishi 501Fcombustionturbines,Nooter/Eriksenboilersanda GE
D11 steamturbine.The controlsare OvationandMark 6.
March 2010 to April 2010
Luminant
LuminantSandowUnit5
Rockdale,TX
Outage Loto Coordinator
Setup the Loto program forthe firstannual plantmajoroutage ina TaglinkSystem.The plantconsisted
of twoFosterWheelerCFBboilers,burningligniteandanAlstom630 MW turbine generator.
October2009 to February2010
Bechtel PowerCorporation
Trimble CountyUnit2
Bedford,KY
Startup OperationsShiftEngineer
Coordinatedworkbetweenconstruction,startupandthe clientsplantoperators.FilledinasLoto
Coordinatorinhisabsence.Directedthe plantoperators.The plantconsistedof one 750 MW babcock
and Doosansupercritical boileranda Mitsubishi 750 MW turbine generator.
3. August2008 to October2009
Bechtel PowerCorporation
Luminant’sSandowUnit5 Project
Rockdale,TX
Startup OperationsShiftEngineer
CoordinatedworkbetweenConstruction,Startupandthe Client’splantoperators.FilledinasLoto
Coordinatorinhisabsence. Directedthe plantoperatorsinthe operationof the plant.Iwasalsothe
designatedsafetyrepresentative.Plantconsistedof twoFosterWheelerCFBboilers,burninglignite and
an Alstom630 MW turbine generator.
October2007 to April 2006,
TASC-CH2MHill
SierraPacificTraceyCombinedCycle Project
McCarren, NV
Mechanical Commissioning,Startup ShiftSupervisor
Assistedwiththe startupof a GE 7FA two intoone.The steamturbine isa D11 and the boilers are
Nooter-Ericson. The feedpumpsandthe condensate pumpsare Flowserve.Icommissionedthe feed
pumps,condensate pumpsandthe SCRSystem.IworkedwithVieoliaonthe Boilerchemclean,ACC
cleanupandsteamblows.
August2007 to October2007
Rev.1 PowerStaffing
FloridaPowerandLight,PortEvergladesPlant
Fort Lauderdale,FLA
Outage Contract Coordinator
SupervisedcontractorsworkingonUnit2 outage while overseeingthe change outof condenser,
circulatingwaterpumpandfeedwaterheaterlevel control valvesandtransmitters.Ialsosupervised
valve repairsandcirc waterintake cleaningandconcrete repairs.ResponsibleforScope Changesand
Safety.
May 2006 to July2007
BluewaterEnergySolutions
Corn Products,BedfordPark,III.
Startup ShiftSupervisor,Mechanical CommissioningTech,Operator Trainer
Assistedwithstartupof aFosterWheeler 1100 KPPHCFB Boiler.Performedpipingcompletionsurveys,
systempunchlists,andworkedwithMechanical Commissioningdoingequipmentcheckout,startup,
systemflushesandhydrotesting.
September2005 to March 2006
NorthAmericanContractEmployee Services
San JuanGeneratingStation
Waterflow,NM
Procedure Writer
Reviewedandupdatedoperationproceduresatthe San JuanGeneratingStationinFarmington,NM.
The boilerswere FosterWheelerPC;firedunitsandthe turbines-WestinghouseandGE.StationCapacity
– 1700 MW.
4. August2005 to September2005
NorthAmericanContractEmployee Services
BenningGeneratingStation
Control Room Operator
Employedasa Control RoomOperatorat the BenningGeneratingStationinWashington,DC.The plant
was a peakingplantwithtwo275 MW oil burningunits,supplyingsteamtoteoGeneral Electricturbine
generators.
August2003 to August2005
BuffaloFuel Corp.
TrigenSyracuse Energy
Operationsand Maintenance Manager
Managed the alternative fuelsprocessingplantatTrigenSyracuse EnergyCorp.Processedpaper,wood
and plastictobe burnedinthe plantsBabcock andWilcox PCboilers.Managedthe coal-handling
department.
May to July2003
ThinkEnergyGroup
JohnH. Warden Station
L’anse,Michigan
Control Room Operator
The plant wasrestarteddue to a needforpowercausedbythe temporaryshutdownof a large plant.
The boilerwasa RileyPCthat wasconvertedintogas.
December2002 to April 2003
BuffaloFuel Corp
TrigenEnergyCorp.
Syracuse,NY
Plant ImprovementsConsultant
InitiatedimprovementstoTrigen’sashsystemandcontrol airsystem.Made recommendationstolower
theirhighLOI problem,toreduce pluggingproblemsingeneratingtubesandcoal bunkers.Workedin
AlternativeFuelsDepartmentmakingimprovementstodustcollectionSystem.The plantconsistedof
five,20 MW B-W,PC boilers,a90 MW Toshibaturbine anda 10 MW Elliotbackpressure turbine.
Augustto October2002
Universal Energy
Black HillsPower
Denver,CO
Startup Control Room Operator
Conversationfromsimple tocombinedcycle.NEMboilersanda Dresser-Randsteamturbine were
addedto the twoexistingLM6000 gas turbines.The DCSis Yokogawaandthe steamturbine is
controlledbya505 Woodwardturbine control.
May to August2002
TMP Worldwide
Kendall CountyGenerationFacility
Minooka,Ill.
Operationsand Maintenance Support
5. Plantconsistedof fourGE 7FA gas turbines,FosterWheelerHRSG’s.GEsteamturbinesandGE air
cooled,andHydrogencooledgenerators.Putincharge of the watertreatmentplantwhichconsistedof
raw and wastewaterclarifiers,carbonfilters,mediafilters,ROunitsandmixedbeds.
Nov2001 to May 2002
PowerIndustryConsultants
AES Total EnergyProject
Guayama,PR
CommissioningShiftSupervisor
I completedacontract as a commissioningshiftsupervisorforPowerIndustryConsultantsandthe AES
Total EnergyProject.We commissionedtwo250 MW AlstomCFBboilersandtwoAlstom250 MW
AlstomreheatturbineswithAlstomaircooledgenerators. The WaterTreatmentDepartmentconsists
of mediafilters,makeupandside streamROunits,aclarifierforcoolingtowermakeup,Anionunitsand
mixedbeds. Inaddition,Iworkedwithmechanical commissioningthroughturbine oilflushes,feed
pumpoil flushes,condensate andfeedwaterline flushes,boilerchemical cleaningandsteamblows.I
alsoadministeredthe lock-out,tag-outprocess.
July1999 to Nov2001
CH ResourcesIncorporated
NiagaraFalls,NY
Operationsand Maintenance Manager
Thisfacilityconsistsof one 500 KPPHPyroflow circulatingfluidizedbedboilerwhichsuppliessteamtoa
53 MW Imo-Delaval turbine/generator.The fuel usedwasabituminouscoal andpetroleumcoke and
tire chipmixture.The plantiscontrolledbyaJohnson-YokogawaDCS.The feedwatersystemisfedby
three 250 KPPH KSBelectricdrivenbarrel pumps. Iassisted instartupof the plantafterithad beenidle
for twoyears.I oversawall aspectsof plantmaintenance andoperationsincluding:settinguptraining
programs,proceduresandpoliciesforall personnel,schedulingandplanningof outages,coordinating
withcontractors andensuringall partsneededwere onsite.Iassistedthe plantmanagerwithverifying
that operationsandmaintenance were withinbudgetandinplanningandcarryingoutvarioustestsfor
alternate fuels.Iinvestigatedandrecommendedvariousprocessupgrades.
March 1991 to Sept1998
SouthernEnergy,Inc.
NiagaraFalls,NY
Control Room Operator/Shift Supervisor
While assistingwithMechanical CommissioningandStartUp of thisfacilitymydutiesincluded:
completionof punchlistsonnewsystemsandequipment,writingequipmentstartupandoperating
procedures;administrationof the lock-outtag-outprocedure.Operateda500 KPPHPyroflow circulating
fluidizedbedboilerwhichsuppliedsteamtoa52 MW Imo-Delaval turbine/generator.The fuel usedwas
a bituminouscoal andpetroleumcoke mixture.A Johnson-YokogawaDCScontrolledthe plantandthe
feedwatersystemwasfedbythree 250 KPPHKSB electricdrivenbarrel pumps.
Education
UnitedStatesNavy,GreatLakes,Ill.
BoilerTechnician A School
TrainedinBoilerOperation,Maintenance,E-5BT completionof myenlistment
Trott Vocational HighSchool