Renewable & Green Energy
for the
Hospitality, Manufacturing and Trade
Industry
Payable
Feasible
FinanceableFinanceable
Viable
Profitable
S t i bl
www.greenforce.pro 1 of 20
Sustainable
We e Ge b ed i te tio ll o e tiWe are a German based, internationally operating
company
Specialized in renewable and green energySpecialized in renewable and green energy
for:
 Consultingg
 Monitoring
 Engineering
 Manufacturing Manufacturing
 Supplying
 Operating
www.greenforce.pro 2 of 20
 Management
Local Offices in:
Romania
Switzerland
Jordan
o a a
Morocco
India
B il
Abu Dhabi
Brazil
Egypt
www.greenforce.pro  3 of 20
South Africa
RENEWABLE ENERGY Future World Production
Key reasons to invest in renewable energy
 Rising energy consumption Rising energy consumption
 Increasing energy costsIncreasing energy costs
 Reducing carbon dioxide
Quelle: Deutsches Zentrum für Luft‐ und Raumfahrt
www.greenforce.pro  4 of 20
PARTNERS & ASSOCIATES
www.greenforce.pro  5 of 20
APPLICATION of RENEWABLES in Industry
RENEWABLES for the
Manufacturing and Trade Industry
Efficiency Production Recovery
Lighting Hot Water SteamElectricityA/CHeating
Cooling
Freezing
Desalination
Purification
Repowering
Freezing Purification
For all needs and requirements for
industrial application/premises
one technical
equipment/device/machine forequipment/device/machine for
renewable energy use is available
Wood Steel
Textile &
Leather
Agriculture /
Horticulture
Hotels &
Resorts
Food &
Beverage
Water-
treatment
Plastic &Mining Manufacturing
ALL Types
of
INDUSTRY
Wood Steel Plastic &
Rubber
Mining
Sterilization Pasteurization Drying StainingIroning
Manufacturing
& Machinery
www.greenforce.pro  6 of 20
INDUSTRY
Vulcanization Cleaning Tanning Bleaching
and other
Applications
RENEWABLE ELECTRICITY in Industry
ELECTRICITY
For all types and applications for industrial consumption, electricity cano a types a d app cat o s o dust a co su pt o , e ect c ty ca
be produced on site with the following alternative renewable systems
(recommended by Greenforce.pro):
Ph t lt i S l P l /M d l  PV Photovoltaic Solar Panels/Modules  PV
(Roof or ground mounted)
 Concentrated Solar Photovoltaic Panels  CPV
 Concentrated Solar Power  CSP
www.greenforce.pro  7 of 20
PV CPV CSP
RENEWABLE STEAM in Industry
PROCESS STEAM
For many highly needed industry applications, steam can be produced on siteo a y g y eeded dust y app cat o s, stea ca be p oduced o s te
with the following alternative renewable Concentrated Solar Power systems
(proposed and recommended by Greenforce.pro):
P b li Mi S t  PTC CSP Parabolic Mirror Systems  PTC CSP
(Roof or ground mounted)
 Fresnel Mirror Systems  CLFR CSP
 Sterling Dish Systems  DISH CSP
www.greenforce.pro  8 of 20
PTC CSP CLFR CSP DISH CSP
RENEWABLE PPLICATIONS in Industry
HEATING, COOLING, FREEZING, AIR CONDITIONING
For certain industrial applications, steam can be produced on site to be theno ce ta dust a app cat o s, stea ca be p oduced o s te to be t e
transformed into heating, cooling, A/C and many other applications with the
following alternative renewable systems (proposed and recommended by Greenforce.pro):
S l th l ( lt )  Fl t Pl t / d Solar thermal (ultra vacuum)  Flat Plates or/and
 Evacuated Tubes Collectors
 Concentrated Solar thermal Power Syst.  CSP
 Concentrated Photovoltaic  CPV
www.greenforce.pro  9 of 20
RENEWABLE EFFICIENCY & RECOVERY
Energy EFFICIENCY and waste energy RECOVERY
Many energy consuming devices, equipments and machines for the variousy gy g , q p
industrial applications can be smoothly installed and saving the existing OPEX
(operation and investment) budget:
 Refurbished Refurbished
 ExchangedExchanged
 Modified
 Repowered
 Retrofitted
www.greenforce.pro  10 of 20
to and/or with renewable energy efficiency devices (proposed by Greenforce.pro).
INDUSTRIAL RENEWABLES
Energy EFFICIENCY and waste energy RECOVERY
At the same time, existing heat and waste emissions, which are lost energy for, g , gy
the premises and emitted to the environment, can be technically recovered to:
lower the existing energy consumptions sensibly
 Lower the present monetary energy bill and achieve Lower the present monetary energy bill and achieve
 Have more international recognition and higher ROI
 With the following actions/measures/implementations:With the following actions/measures/implementations:
www.greenforce.pro  11 of 20
RENEWABLE EFFICIENCY
Energy EFFICIENCY and waste energy RECOVERY
 Use of low consumption lighting devices and equipment  LEDp g g q p
 Recovery of lost air/heat waste and waste water heat with Heat Pumps
 Recovery of internal waste exhaust air or outside ambient
air, water, ground, sea, river, lake heat with  ORC Generators
 Storage of the excess of own generated energy by  Batteries or
Latent Thermal – Storage (PCM) or Concrete Block or Salt Storageg g
 Cogeneration (Combined Heat Power units)  CHP
(All these machines, equipment & technology
can be recommended by Greenforce.pro)
www.greenforce.pro  12 of 20
DESALINATION & WATER PURIFICATION
SALT/SEA WATER DESALINATION & WATER TREATMENT
All types of industrial premises need – among others - :yp p g
 Drinking water
 Irrigation water for gardens/parks
 Polluted/black water to be cleaned before
rejected in the public sewage plant system
Greenforce.pro can propose renewable energy based on solar thermal
systems to desalinate, purify and clean water on site/in the premises with:
 RO (Reverse Osmosis) solar thermal water desalination plant
 MED (Multi Effect Distillation) solar thermal water desalination plant or
 Other proven and experienced state-of-the-art water desalination systems
www.greenforce.pro  13 of 20
WATER is what counts!
SALT/SEA WATER DESALINATION & WATER TREATMENT
T i l l th l d t t !
www.greenforce.pro  14 of 20
Typical solar thermal and storage system!
REFERENCE Water DESALINATION
www.greenforce.pro  15 of 20
STANDARD PROCEDURES
 Respect existing and onsite working power/energy supply/production devices
We do:
p g g p / gy pp y/p
 Matches the proposed technical devices to existing running
power production equipment
 Offer always optional hybrid/or and modular solutions,
where and if technically possible, feasible and financially viable
 Enable the customer/client/sponsor to build
 In reasonable time periods
 According to the available budgets
 Related to the legal, fiscal, financial and political national framework
 The hotel’s move / change into renewable energy use/application in
a slow, payable and sustainable way.
 Engage as much as possible local engineering and workforce (local content)
for the execution and implementation of the proposed equipment/devices!
www.greenforce.pro  16 of 20
REQUIREMENTS for COOPERATION
How to proceed best in the below described way, when the hotel
or resort’s responsible are/is interested in receiving a proposal for implementing
renewable energy system/s in the premises:
(1) Technical Due Diligence with the assistance of the hotel/resort
 Sun irradiation at the location (direct and indirect), sun days, average
l l
gy y / p
temperature levels, rain
 Volume/loads/level of needed energy (electricity/steam/other)
 Peak or regular consumption periods of consumption (seasonal curves) Peak or regular consumption, periods of consumption (seasonal curves)
 Possibility of utilisation of existing running power/energy production/sources
(hybrid application)
 Technical feasibility onsite (roof top structures, ground mounted devices),
available space
 Combining/gathering more than one location as energy consumer (industrial Combining/gathering more than one location as energy consumer (industrial
zone)
 Precise description of planned energy applications within the premises (usages)
www.greenforce.pro  17 of 20
 Availability of water (onsite/nearby - fresh, ground, fountain, desalinated)
PROCEDURES of COOPERATION
We usually go on in the below described way, when the hotel or the
project’s responsible are/is interested in receiving a proposal for implementing
renewable energy system/s in the premises:
(2) Financial Due Diligence
 Present and future (public) tariffs of the actually consumed energy
(electricity water others)(electricity, water, others)
 Feed in tariffs, regulatory framework, own consumption of
generated energy possible
 Budgetary constraints / limits of client/sponsor/investor/operator
(Financial levels, temporary limitation)
 ComparisonComparison
 Benchmarking of
levels of present
consumption and
f lfuture supply
www.greenforce.pro  18 of 20
CONCLUSION of COOPERATION
Hence, to conclude in the below described way, when the hotel or
the project’s responsible’s are/is interested in receiving a proposal for
implementing renewable energy system/s in the premises:
(3) Technical and Financial Preliminary Budgetary Proposal
(After reception of all requested and necessary data and figures from the client)
( ) O i i i d h h Ch k f h d
p g gy y / p
(4) Onsite Visit and thorough Check of the Location and Premises
(5) Proposal and Decision of Interfaces and Scope of Works related to local
partner (Engineering, Project Management) between Greenforce.pro and the
Client (Extent of Local Content) Consideration of application / implementation of
Contracting models / possibilities
(6) Final Talks and Negotiations( ) g
(7) Definite and Final Technical and Financial Proposal
(Only after a site visit of industrial premises!)
(8) El b ti d Si t f C t t l A t(8) Elaboration and Signature of Contractual Agreement
incl. execution time, payments schedules and warranty clauses
www.greenforce.pro  19 of 20
GREENFORCE HEADS & Contact
H. Phillip PULVER - Chairman
Mr. Pulver is a reputed and well-established player in the hospitality and sport industry
and a successful entrepreneur. His projects have transformed the environmental
awareness and he has been involved in the set up of several socially relevant initiatives
as part of his commitment to renewable energy Mr Pulver is Greenforce’s guide andas part of his commitment to renewable energy. Mr. Pulver is Greenforce s guide and
advisor, and contributes by way of formulating business strategy and resources
mobilization.
Axel Donald SAUER - Vice Chairman
A well-known management consultant with excellent academic background and
international recognition. Mr. Sauer has more than 30 years of rich experience in
international project development, preopening and managing companies, consultingp j p , p p g g g p , g
institutions and entrepreneurial business. Mr. Sauer looks after organizational and
project development, corporate governance, marketing, operation and legal issues.
Thank You for your interest – we lead – the others will follow!
Greenforce.pro plc
Alfredstrasse 279
45133 ESSEN / Germany
I: www.greenforce.pro
E: info@greenforce.pro
Thank You for your interest – we lead – the others will follow!
Greenforce.pro
Representative:
45133 ESSEN / Germany
Commercial Register
HRB-16435-
Ust.IdNo.-DE813444072-
T: +49 201 95899978
T: +49 2638 8999221
M: +49 177 7422582
M: +49 177 3505152
www.greenforce.pro  20 of 20

More Related Content

Viewers also liked

0096943166122012 (1)
0096943166122012 (1)0096943166122012 (1)
0096943166122012 (1)
Walter Chung
 
The spiritual-brain
The spiritual-brainThe spiritual-brain
The spiritual-brain
fatuhada
 
2014 Townsville North Queensland in Focus - WEB
2014 Townsville North Queensland in Focus - WEB2014 Townsville North Queensland in Focus - WEB
2014 Townsville North Queensland in Focus - WEB
Jodi Hamilton
 
Bericht über die Kinder- und Jugendförderung im Kanton Graubünden
Bericht über die Kinder- und Jugendförderung im Kanton GraubündenBericht über die Kinder- und Jugendförderung im Kanton Graubünden
Bericht über die Kinder- und Jugendförderung im Kanton Graubünden
MediendienstKtGR
 
Montañas de cores
Montañas de coresMontañas de cores
Montañas de cores
iesasorey
 
1. respuesta inmune (19 ago-2013)
1. respuesta inmune (19 ago-2013)1. respuesta inmune (19 ago-2013)
1. respuesta inmune (19 ago-2013)
MedicinaUas
 
Invest plus user manual
Invest plus user manualInvest plus user manual
Invest plus user manual
Invest Plus
 

Viewers also liked (20)

0096943166122012 (1)
0096943166122012 (1)0096943166122012 (1)
0096943166122012 (1)
 
Natur rioja Company
Natur rioja CompanyNatur rioja Company
Natur rioja Company
 
Nefropatía por VIH
Nefropatía por VIHNefropatía por VIH
Nefropatía por VIH
 
The spiritual-brain
The spiritual-brainThe spiritual-brain
The spiritual-brain
 
2014 Townsville North Queensland in Focus - WEB
2014 Townsville North Queensland in Focus - WEB2014 Townsville North Queensland in Focus - WEB
2014 Townsville North Queensland in Focus - WEB
 
Le Temps
Le TempsLe Temps
Le Temps
 
Format endaftaran mgmp
Format endaftaran mgmpFormat endaftaran mgmp
Format endaftaran mgmp
 
Degustación de productos de cocina italiana de la firma Menù
Degustación de productos de cocina italiana de la firma Menù  Degustación de productos de cocina italiana de la firma Menù
Degustación de productos de cocina italiana de la firma Menù
 
2016 NTS-0113
2016 NTS-01132016 NTS-0113
2016 NTS-0113
 
Empro
EmproEmpro
Empro
 
Bericht über die Kinder- und Jugendförderung im Kanton Graubünden
Bericht über die Kinder- und Jugendförderung im Kanton GraubündenBericht über die Kinder- und Jugendförderung im Kanton Graubünden
Bericht über die Kinder- und Jugendförderung im Kanton Graubünden
 
¿Qué buscan los clientes de servicios de traducción? Errores que no se deben ...
¿Qué buscan los clientes de servicios de traducción? Errores que no se deben ...¿Qué buscan los clientes de servicios de traducción? Errores que no se deben ...
¿Qué buscan los clientes de servicios de traducción? Errores que no se deben ...
 
Treinamento comercial
Treinamento comercialTreinamento comercial
Treinamento comercial
 
Montañas de cores
Montañas de coresMontañas de cores
Montañas de cores
 
1. respuesta inmune (19 ago-2013)
1. respuesta inmune (19 ago-2013)1. respuesta inmune (19 ago-2013)
1. respuesta inmune (19 ago-2013)
 
Código de ética daqu de sonora
Código de ética daqu de sonoraCódigo de ética daqu de sonora
Código de ética daqu de sonora
 
eLearning-webconf
eLearning-webconfeLearning-webconf
eLearning-webconf
 
Dioxines, PCB, Furanes et DR-CALUX
Dioxines, PCB, Furanes et DR-CALUXDioxines, PCB, Furanes et DR-CALUX
Dioxines, PCB, Furanes et DR-CALUX
 
Invest plus user manual
Invest plus user manualInvest plus user manual
Invest plus user manual
 
150 Aniversario de la llegada de Jean Pineau a Rioja Alavesa
150 Aniversario de la llegada de Jean Pineau a Rioja Alavesa150 Aniversario de la llegada de Jean Pineau a Rioja Alavesa
150 Aniversario de la llegada de Jean Pineau a Rioja Alavesa
 

Similar to GFP 151111 Presentation Greenforce Renewables HPP

Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy Efficiency
Advit Foundaion
 
Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf
icarb
 
Towards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell DaviesTowards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell Davies
icarb
 
07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik
07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik
07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik
Koeppen Halvart
 
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
Andy Van Horn
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
D.Pawan Kumar
 
CHP and Industrial Applications-FINAL
CHP and Industrial Applications-FINALCHP and Industrial Applications-FINAL
CHP and Industrial Applications-FINAL
Suresh Jambunathan
 

Similar to GFP 151111 Presentation Greenforce Renewables HPP (20)

Wind/Gas Cooptimization
Wind/Gas CooptimizationWind/Gas Cooptimization
Wind/Gas Cooptimization
 
Larry young qualcomm
Larry young qualcommLarry young qualcomm
Larry young qualcomm
 
Center For Community Renewal Hybrid Alternative Energy System
Center For Community Renewal Hybrid Alternative Energy SystemCenter For Community Renewal Hybrid Alternative Energy System
Center For Community Renewal Hybrid Alternative Energy System
 
WtE-Gulf forum presentation
WtE-Gulf forum presentationWtE-Gulf forum presentation
WtE-Gulf forum presentation
 
Advit Foundation - Energy Efficiency
Advit Foundation - Energy EfficiencyAdvit Foundation - Energy Efficiency
Advit Foundation - Energy Efficiency
 
Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf Carbon Accounting Buildings | Sue Roaf
Carbon Accounting Buildings | Sue Roaf
 
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
Sustainable Building Design Lecture: Technical Aspects 2015, Aalto University...
 
6 MW DG Power Plant
6 MW DG Power Plant6 MW DG Power Plant
6 MW DG Power Plant
 
Greensun presentation b2 b eng
Greensun presentation b2 b engGreensun presentation b2 b eng
Greensun presentation b2 b eng
 
The next wave of GreenIT
The next wave of GreenITThe next wave of GreenIT
The next wave of GreenIT
 
LUXEMBOURG CREATIVE 2016 : Plateformes d'échange (3)
LUXEMBOURG CREATIVE 2016 : Plateformes d'échange (3)LUXEMBOURG CREATIVE 2016 : Plateformes d'échange (3)
LUXEMBOURG CREATIVE 2016 : Plateformes d'échange (3)
 
Towards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell DaviesTowards a Standard for Carbon Accounting | Hywell Davies
Towards a Standard for Carbon Accounting | Hywell Davies
 
Renewable Natural Gas
Renewable Natural GasRenewable Natural Gas
Renewable Natural Gas
 
07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik
07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik
07 Pepsi Cola Cooler Sustainability With Hydrocarbons Soykan Dirik
 
NRC _Green Intelligent Buildings
NRC _Green Intelligent BuildingsNRC _Green Intelligent Buildings
NRC _Green Intelligent Buildings
 
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
 
Top 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCTop 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOC
 
CHP and Industrial Applications-FINAL
CHP and Industrial Applications-FINALCHP and Industrial Applications-FINAL
CHP and Industrial Applications-FINAL
 
Commercial Case Studies
Commercial Case StudiesCommercial Case Studies
Commercial Case Studies
 

GFP 151111 Presentation Greenforce Renewables HPP

  • 1. Renewable & Green Energy for the Hospitality, Manufacturing and Trade Industry Payable Feasible FinanceableFinanceable Viable Profitable S t i bl www.greenforce.pro 1 of 20 Sustainable
  • 2. We e Ge b ed i te tio ll o e tiWe are a German based, internationally operating company Specialized in renewable and green energySpecialized in renewable and green energy for:  Consultingg  Monitoring  Engineering  Manufacturing Manufacturing  Supplying  Operating www.greenforce.pro 2 of 20  Management
  • 3. Local Offices in: Romania Switzerland Jordan o a a Morocco India B il Abu Dhabi Brazil Egypt www.greenforce.pro  3 of 20 South Africa
  • 4. RENEWABLE ENERGY Future World Production Key reasons to invest in renewable energy  Rising energy consumption Rising energy consumption  Increasing energy costsIncreasing energy costs  Reducing carbon dioxide Quelle: Deutsches Zentrum für Luft‐ und Raumfahrt www.greenforce.pro  4 of 20
  • 6. APPLICATION of RENEWABLES in Industry RENEWABLES for the Manufacturing and Trade Industry Efficiency Production Recovery Lighting Hot Water SteamElectricityA/CHeating Cooling Freezing Desalination Purification Repowering Freezing Purification For all needs and requirements for industrial application/premises one technical equipment/device/machine forequipment/device/machine for renewable energy use is available Wood Steel Textile & Leather Agriculture / Horticulture Hotels & Resorts Food & Beverage Water- treatment Plastic &Mining Manufacturing ALL Types of INDUSTRY Wood Steel Plastic & Rubber Mining Sterilization Pasteurization Drying StainingIroning Manufacturing & Machinery www.greenforce.pro  6 of 20 INDUSTRY Vulcanization Cleaning Tanning Bleaching and other Applications
  • 7. RENEWABLE ELECTRICITY in Industry ELECTRICITY For all types and applications for industrial consumption, electricity cano a types a d app cat o s o dust a co su pt o , e ect c ty ca be produced on site with the following alternative renewable systems (recommended by Greenforce.pro): Ph t lt i S l P l /M d l  PV Photovoltaic Solar Panels/Modules  PV (Roof or ground mounted)  Concentrated Solar Photovoltaic Panels  CPV  Concentrated Solar Power  CSP www.greenforce.pro  7 of 20 PV CPV CSP
  • 8. RENEWABLE STEAM in Industry PROCESS STEAM For many highly needed industry applications, steam can be produced on siteo a y g y eeded dust y app cat o s, stea ca be p oduced o s te with the following alternative renewable Concentrated Solar Power systems (proposed and recommended by Greenforce.pro): P b li Mi S t  PTC CSP Parabolic Mirror Systems  PTC CSP (Roof or ground mounted)  Fresnel Mirror Systems  CLFR CSP  Sterling Dish Systems  DISH CSP www.greenforce.pro  8 of 20 PTC CSP CLFR CSP DISH CSP
  • 9. RENEWABLE PPLICATIONS in Industry HEATING, COOLING, FREEZING, AIR CONDITIONING For certain industrial applications, steam can be produced on site to be theno ce ta dust a app cat o s, stea ca be p oduced o s te to be t e transformed into heating, cooling, A/C and many other applications with the following alternative renewable systems (proposed and recommended by Greenforce.pro): S l th l ( lt )  Fl t Pl t / d Solar thermal (ultra vacuum)  Flat Plates or/and  Evacuated Tubes Collectors  Concentrated Solar thermal Power Syst.  CSP  Concentrated Photovoltaic  CPV www.greenforce.pro  9 of 20
  • 10. RENEWABLE EFFICIENCY & RECOVERY Energy EFFICIENCY and waste energy RECOVERY Many energy consuming devices, equipments and machines for the variousy gy g , q p industrial applications can be smoothly installed and saving the existing OPEX (operation and investment) budget:  Refurbished Refurbished  ExchangedExchanged  Modified  Repowered  Retrofitted www.greenforce.pro  10 of 20 to and/or with renewable energy efficiency devices (proposed by Greenforce.pro).
  • 11. INDUSTRIAL RENEWABLES Energy EFFICIENCY and waste energy RECOVERY At the same time, existing heat and waste emissions, which are lost energy for, g , gy the premises and emitted to the environment, can be technically recovered to: lower the existing energy consumptions sensibly  Lower the present monetary energy bill and achieve Lower the present monetary energy bill and achieve  Have more international recognition and higher ROI  With the following actions/measures/implementations:With the following actions/measures/implementations: www.greenforce.pro  11 of 20
  • 12. RENEWABLE EFFICIENCY Energy EFFICIENCY and waste energy RECOVERY  Use of low consumption lighting devices and equipment  LEDp g g q p  Recovery of lost air/heat waste and waste water heat with Heat Pumps  Recovery of internal waste exhaust air or outside ambient air, water, ground, sea, river, lake heat with  ORC Generators  Storage of the excess of own generated energy by  Batteries or Latent Thermal – Storage (PCM) or Concrete Block or Salt Storageg g  Cogeneration (Combined Heat Power units)  CHP (All these machines, equipment & technology can be recommended by Greenforce.pro) www.greenforce.pro  12 of 20
  • 13. DESALINATION & WATER PURIFICATION SALT/SEA WATER DESALINATION & WATER TREATMENT All types of industrial premises need – among others - :yp p g  Drinking water  Irrigation water for gardens/parks  Polluted/black water to be cleaned before rejected in the public sewage plant system Greenforce.pro can propose renewable energy based on solar thermal systems to desalinate, purify and clean water on site/in the premises with:  RO (Reverse Osmosis) solar thermal water desalination plant  MED (Multi Effect Distillation) solar thermal water desalination plant or  Other proven and experienced state-of-the-art water desalination systems www.greenforce.pro  13 of 20
  • 14. WATER is what counts! SALT/SEA WATER DESALINATION & WATER TREATMENT T i l l th l d t t ! www.greenforce.pro  14 of 20 Typical solar thermal and storage system!
  • 16. STANDARD PROCEDURES  Respect existing and onsite working power/energy supply/production devices We do: p g g p / gy pp y/p  Matches the proposed technical devices to existing running power production equipment  Offer always optional hybrid/or and modular solutions, where and if technically possible, feasible and financially viable  Enable the customer/client/sponsor to build  In reasonable time periods  According to the available budgets  Related to the legal, fiscal, financial and political national framework  The hotel’s move / change into renewable energy use/application in a slow, payable and sustainable way.  Engage as much as possible local engineering and workforce (local content) for the execution and implementation of the proposed equipment/devices! www.greenforce.pro  16 of 20
  • 17. REQUIREMENTS for COOPERATION How to proceed best in the below described way, when the hotel or resort’s responsible are/is interested in receiving a proposal for implementing renewable energy system/s in the premises: (1) Technical Due Diligence with the assistance of the hotel/resort  Sun irradiation at the location (direct and indirect), sun days, average l l gy y / p temperature levels, rain  Volume/loads/level of needed energy (electricity/steam/other)  Peak or regular consumption periods of consumption (seasonal curves) Peak or regular consumption, periods of consumption (seasonal curves)  Possibility of utilisation of existing running power/energy production/sources (hybrid application)  Technical feasibility onsite (roof top structures, ground mounted devices), available space  Combining/gathering more than one location as energy consumer (industrial Combining/gathering more than one location as energy consumer (industrial zone)  Precise description of planned energy applications within the premises (usages) www.greenforce.pro  17 of 20  Availability of water (onsite/nearby - fresh, ground, fountain, desalinated)
  • 18. PROCEDURES of COOPERATION We usually go on in the below described way, when the hotel or the project’s responsible are/is interested in receiving a proposal for implementing renewable energy system/s in the premises: (2) Financial Due Diligence  Present and future (public) tariffs of the actually consumed energy (electricity water others)(electricity, water, others)  Feed in tariffs, regulatory framework, own consumption of generated energy possible  Budgetary constraints / limits of client/sponsor/investor/operator (Financial levels, temporary limitation)  ComparisonComparison  Benchmarking of levels of present consumption and f lfuture supply www.greenforce.pro  18 of 20
  • 19. CONCLUSION of COOPERATION Hence, to conclude in the below described way, when the hotel or the project’s responsible’s are/is interested in receiving a proposal for implementing renewable energy system/s in the premises: (3) Technical and Financial Preliminary Budgetary Proposal (After reception of all requested and necessary data and figures from the client) ( ) O i i i d h h Ch k f h d p g gy y / p (4) Onsite Visit and thorough Check of the Location and Premises (5) Proposal and Decision of Interfaces and Scope of Works related to local partner (Engineering, Project Management) between Greenforce.pro and the Client (Extent of Local Content) Consideration of application / implementation of Contracting models / possibilities (6) Final Talks and Negotiations( ) g (7) Definite and Final Technical and Financial Proposal (Only after a site visit of industrial premises!) (8) El b ti d Si t f C t t l A t(8) Elaboration and Signature of Contractual Agreement incl. execution time, payments schedules and warranty clauses www.greenforce.pro  19 of 20
  • 20. GREENFORCE HEADS & Contact H. Phillip PULVER - Chairman Mr. Pulver is a reputed and well-established player in the hospitality and sport industry and a successful entrepreneur. His projects have transformed the environmental awareness and he has been involved in the set up of several socially relevant initiatives as part of his commitment to renewable energy Mr Pulver is Greenforce’s guide andas part of his commitment to renewable energy. Mr. Pulver is Greenforce s guide and advisor, and contributes by way of formulating business strategy and resources mobilization. Axel Donald SAUER - Vice Chairman A well-known management consultant with excellent academic background and international recognition. Mr. Sauer has more than 30 years of rich experience in international project development, preopening and managing companies, consultingp j p , p p g g g p , g institutions and entrepreneurial business. Mr. Sauer looks after organizational and project development, corporate governance, marketing, operation and legal issues. Thank You for your interest – we lead – the others will follow! Greenforce.pro plc Alfredstrasse 279 45133 ESSEN / Germany I: www.greenforce.pro E: info@greenforce.pro Thank You for your interest – we lead – the others will follow! Greenforce.pro Representative: 45133 ESSEN / Germany Commercial Register HRB-16435- Ust.IdNo.-DE813444072- T: +49 201 95899978 T: +49 2638 8999221 M: +49 177 7422582 M: +49 177 3505152 www.greenforce.pro  20 of 20