SlideShare a Scribd company logo
#504, Maheswari Chambers,
Somajiguda,
Hyderabad- 500082.
Ph:+91-40-65742613
www.gepinfra.com
E-Mail:gepipl@yahoo.in
GEP Infra
2012
Profile and Capability of GEP Infra
Consultants
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
2
Vision
“To be recognized as the best consultancy organisation in the field of Infrastructure Development for its
people performance, creativity, technical excellence and dedication”.
Mission
Our mission is acquisition and application of knowledge and thereby succeeds in service delivery from
winning the confidence of client through proven performance.
Company Background
GEP Infrastructure Private Limited (GEPIPL) is a professional multidisciplinary consultancy organization
committed to provide quality services in various disciplines of infrastructure and other developments.
GEPIPL is managed by engineers, planners and ably supported by experts in various disciplines of highest
caliber.
The major fields of specialization of GEPIPL relates to Traffic and Transportation systems of various types
which include highways, expressways, rural roads, urban roads, bridges, flyovers, grade-separated
interchanges amongst others and Water Supply and Sewerage Systems Planning and Design.
GEPIPL provides consultancy services in the following disciplines;
 Traffic and Transportation
 Traffic Surveys, Data Analysis, Demand Forecast and Traffic Assignment
 Traffic/Cost Validation Studies
 Pre-Bid Traffic Studies
 Review of traffic forecast for Bankers/ Financial Institutes
 Traffic Engineering and Management Studies
 Traffic Dispersal Scheme
 Design of Junction and Terminal Points
 Freight and Public Transport Studies
 Transportation Planning and System Analysis
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
3
 Road Way Design
 Route Location Studies
 Inventory and Visual Condition Assessment
 Topographic and Hydrographical Survey
 Geotechnical Investigation and Materials Testing
 Road Roughness Measurement
 Benkelman Beam Deflection Test
 Pavement Evaluation and Design
 Geometric Design
 Design of Bridges, Flyovers, Interchanges and other related Structures
 Detail Design of Road, Bridges & Cross Drains
 Public Health Engineering
 Feasibility study of the proposed system with respect to the demand, environment,
supply and other factors Assessment of Water resources & water supply, preparation
of preliminary estimate.
 Design of Drinking water supply and distribution Network
 Design of sewerage and storm water network
 Design of the Sewage treatment plant.
 Pre Tendering Services
 Urban Planning
 Quality Control and Assurance
SCOPE OF SERVICES
GEPIPL renders comprehensive consultancy services starting from initial fact finding and appraisal
studies, project preparation, formulation and concept planning, feasibility study, detailed engineering
and pre contract services. The services include:
 Preliminary Investigations
 Project Identification
 Techno-Economic Feasibility Study
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
4
 Field Surveys/Investigations (Bathymetric, Construction Materials, Geotechnical, Socio-
economic, Topographical, Traffic, etc.) and Analysis.
 Economic and Financial Analysis
 Conceptual Design
 Detailed Design and Engineering of Roads and Highways and Pavement, Infrastructural
development for Township , large commercial complexes, Special Economic Zones(SEZ)
 Preparation of project reports, technical specifications, cost estimates, analysis of rates, tender
documents.
 Detailed Design of Bridges, Culverts and Other Structures
 Quality Control/Assurance
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
5
Board of Directors
P.S.Potchi Reddy
P.S. Potchi Reddy is a graduate in Civil Engineering with Specialization in Transportation Planning with 20
years of experience in the field of traffic engineering and transport planning. He has experience in
organizing and conducting Traffic and Transportation and Engineering surveys, data processing and
analysis,, conducting of safety audits, junction design & improvements, feasibility studies for road corridors
expressways & bypasses, preparation of detailed project reports, traffic management plans and traffic
forecasting for road, parking and truck terminal projects.
Mr.Rama Krishna
Has about 12 years of experience (includes 5 years Middle east & UK) in carrying out the concept design,
feasibility and detailed designs for Urban and Rural Expressways, Arterial / Collector Streets and Local
Streets, Sea land developments and town ships Has involved design reviews for major road projects in
India,UK and the Gulf region (in the State of Qatar, Libya & Bahrain) starting from Preliminary stage to
Tender and Construction stages.
Mr.E.Surya Prakash Reddy
He has 8 years of experience in the field of Transportation/Highway Engineering Consultancy and
Constructions. He has experience in conducting various Traffic and Transportation Surveys, data coding,
data analysis, traffic forecasting, and mathematical modeling. Conducting of safety audits, feasibility
studies for road corridors expressways & bypasses, preparation of detailed project reports and Financial
Analysis.
Mr.G.V.Ramana Rao
He has more than 16 years of experience in the construction supervision of building construction and
road construction. He has also experience in Quality Control and Quality Assurance.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
6
Our Capability
1 Traffic and Transportation
With traffic on our roads forecast to grow multi-fold, there is an ever increasing need for
transport solutions that make the most of existing assets, including road space, whilst meeting
the needs of those who walk, cycle or take the bus.
Backed by our experts in various fields, we can ensure innovative solutions for our clients in
areas such as Traffic Forecast, Traffic Management including Parking Strategies & Traffic Signal
Design, Non-Motorized Transport (Walking & Cycling), Traffic Impact Studies, Traffic Engineering
Studies, etc.
 Traffic Data Collection and Analysis
 Classified Traffic Volume
Counts
 O– D Surveys
 Willingness to Pay/ Stated
Preference Surveys
 Turning Movement Count
Surveys at intersections
 Speed and Delay surveys
using Moving Car Method
 Socio-Economic Surveys
 Traffic Impact Studies
Development proposals that are subject to Planning Control Norms require a traffic
impact analysis to determine transportation concurrency and to estimate traffic impacts
and required improvement/ mitigation measures. We provide Development Proposals
for:
 Special Economic Zone Projects
 Mixed Development Projects
 IT/ Office Complex
 Residential projects of ten units or more;
 Non-residential projects
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
7
 Parking Studies
Parking studies are carried out to determine location, use and adequacy of existing
parking facilities as well as future parking requirements including future demand.
The following is the range of issues that are generally addressed in a parking study:
 Survey of existing parking utilization
 Estimation of future parking demand
 Calculation of shared parking opportunities
 Design of on-street parking or parking lots
 Design and review of parking lot access and circulation
 Review of valet parking operations
 Parking management (time limits, enforcement, parking fees)
 Cost and financing of Parking lots or structures
 Intersection Planning and Design
Intersection geometry, accident history, traffic conflicts, traffic volumes, signal timings
and human factors will be studied.
 Traffic signal warrant study
 Signal design
 Intersection Geometric Improvement Study
 Warrants for Grade Separation
 Traffic/Cost validation studies
We undertake pre and post bid stage traffic and cost validation studies for State
Highways and National Highways developed on BOT/Annuity basis.
 Traffic Engineering Studies
 Techno-Economic Feasibility Studies
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
8
2. Road Way Design
We undertake geometric design of Highways using software like MX-Road together with
AutoCAD. The graphic files containing survey data will be transferred to design package and the
detailed design and quantity calculations will be executed through the following steps:
 Generating Digital Terrain Model (DTM) followed by triangulation and contour plan of
the existing ground surface
 Designing horizontal alignment of the Proposed center line along the existing alignment
and providing geometric improvement wherever necessary
 Generating existing ground profile along the Proposed center line; designing vertical
Alignment for the proposed center line, so as to match with the formation level of the
existing alignment wherever possible and providing geometric improvement wherever
necessary.
 Creating cross-section templates and roadway libraries showing street-wise
applicability of different template.
 Running ‘roadway modeller’ to generate proposed road surface showing carriageway
and shoulder edges, toe lines of proposed embankment etc.
 Generating reports on proposed cross sections and setting out data as well as reports on
Horizontal and vertical alignment, clearance of structures and
 Utilities, utility relocation etc. using ‘Reports’ module. Calculating earthwork and sub
Grade quantities
All the relevant drawings will be prepared in the format as stated in IRC: SP-19.
 Collection of various Engineering Surveys Data
 Road Inventory and Condition Survey
 Pavement Condition survey
 Inventory for Culverts, Bridges and Structures
 Topographical Surveys and Soil Investigations
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
9
 Pavement Design
We have a dedicated team who can provide expert advice on the assessment of road
pavements and supporting infrastructure and their deterioration over time.
We can provide effective designs, with pavement testing for both during the
construction and the concession period.
 Economic and Financial Analysis
3. Public Health Engineering
 Water Supply, Sewerage and Storm Water Drainage System:
 Feasibility study of the proposed system with respect to the demand,
environment, supply and other factors Assessment of Water resources & water
supply, preparation of preliminary estimate.
 Water quality analysis, preparation of engineering study report involving
population projection, economic analysis of rising main & distribution system.
 Purification and recovery of waste water for irrigation and recharging of ground
water aquifers.
 Development and management of water Resources
 Design of Drinking water supply and distribution network
 Design of sewerage and storm water network
 Design of the Sewage treatment plant.
 Design of Drinking water supply and distribution Network
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
10
 Design of sewerage and storm water network
 Design of the Sewage treatment plant.
 Sewerage development and treatment of sewage
 Aesthetic water bodies development for recreation designed sewer networks,
trunk sewers, pumping stations, oxidation ponds and outfall
 Preparation of technical specifications as per the required codal provisions
 Preparation of detailed working drawings for the network, appurtenances and
structure
4. Quality Assurance and Quality Control
 Independent Review and Quality Monitoring the progress of projects
 Periodical visits to the site in all stages of project execution
 Preparation of standard check lists covering various activities and submit the
Performance report (fortnightly / monthly) to the client
 Review test reports on materials that are tested by the Contractor as stated in the
Individual Contract Documents.
 Select additional materials on random basis for independent testing.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
11
 Incorporate results in periodic testing reports and contract monitoring report.
 Quality of workmanship.
 To make unscheduled visits to site to ensure random surprise checks from time to time
to the various works under construction.
5. Urban Planning
 Master Planning
The Master Plan produces a concise written report summarizing the development
policies and phasing over time. It is accompanied by a plan defining the finer grain of the
urban frame work at the scale of the urban plot.
 Assessment of the environmental, physical, economical, social and planning
Context
 Translation of vision into a detailed development frame work with the creation
of a public realm spatial structure, a selection of appropriate uses and
infrastructure.
 Implementation and phasing, outlining a development schedule
 Site Potential Analysis
Site potential analysis is a process designed for the prospective developer. It provides an
ideal bargaining tool in the early negotiation phase with the planning authorities and the
public. Before land is acquired and before substantial financial means are committed to
the project the client is given at the outset an idea of economic implications.
Site potential analysis assesses development potential so as to determine the likelihood
of obtaining planning permission. It involves the following stages
 Visual appraisal of site context and site conditions
 Design brief development
 Establishment of preliminary Master Plan
 Production of final presentation in 2 dimensional and 3 – dimensional formats.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
12
Manpower
S.No. Name of the Staff
Member
Qualification Specialisation Number of
years
experience
1 P.S.P.Reddy B.E., Master of
Planning
Transport Planning
21
2. Ramakrishna R B.Tech., Master of
Urban Engineering
Urban Transportation 12
3 E.Surya Prakash Reddy M.Tech. Transportation Engineering 8
4 Ramana Rao D.C.E Civil Engineering 16
5 A.Kamal Kumar M.Tech. Structural Engineering 11
6 T.Gnaneswar M.Tech. Transportation Engineering 2
7 Shruthi Srinivasan M.Tech. Transportation Engineering 6
8 J.Sandeep M.Tech. Transportation Engineering 1
9 Phaneendra STP B.Tech. Civil Engineering 1
10 K.B.Krishna Murthy M.Engg. Public Health Engineering Retd. C.E.
11 S.K.Moinuzzama B.Arch. Urban Planning Retd.P.O.
12 Lovin D.C.E AutoCAD draftsman 6
13 B.Veerendar Intermediate Surveys supervisor 1
14 Srinivas Graduate Surveys supervisor 2
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
13
Office address
Regd. Office : 504, Maheswari Chambers, Somajiguda, Hyderabad- 500 082
Phone : 040-65742613, 9949473774
Email : gepipl@yahoo.in, reddypsp@yahoo.com
Web Site : www.gepinfra.com
Our Divisions
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
14
Our Clients
 Ramky Infrastructure Limited
 AMR Constructions Private Limited
 GVR Infra Projects
 GKC Constructions
 Sowbhagya Projects Private Limited
 Jindal Cements Limited
 GMR Maharashtra Energy Limited
 Roads & Buildings, Govt. of A.P.
 IVRCL Ltd.
Association with other Indian Firms
 Systra MVA Consulting(India) Private Limited
 Tandon Urban Solutions Private Limited
 CRAPHTS Consultants (India) Private Limited
 Artefact Projects Limited
 Consulting Engineering Services(India) Private Limited
 Varna Engineering Consulatnts Pvt Ltd.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
15
Summary of Project Experience of the Firm
S.N
o.
Name of the Project
Name and Address of
the Client
Date of
Brief Scope of Work
Starting Ending
1
Assessment of Traffic on Jetpur
to Somanath section of NH-8D in
Gujrath State
M/s Value Engineering,
Bangalore
08.06.2010 30.06.2010
Conducting Traffic surveys, Estimation of Traffic, Estimation
of traffic leakage, identification of alternate competing routes,
Estimation of Toll Revenue, Toll Plaza Locations,
2
Preparation of Detailed Project
Report, Execution designs for
BRTS in Vizag
GVR Infra Ltd., Chennai 04.07.2010 08.09.2010
Conducting total station survey, soil investigations,
preparation of geometric design, pavement design, Bill of
quantities(BOQ), Cost Estimation, tender document
preparation and evaluation
3
Preparation of Detailed Project
Report, Execution designs for
Kadapa-Pulivendula (Annutiy
Project)
Ms Soubaghya
Constructions
01.06.2010 09.09.2010
Conducting total station survey, soil investigations,
preparation of geometric design, pavement design, Bill of
quantities(BOQ), Cost Estimation, tender document
preparation and evaluation
4
Preparation of Intersection
Design and Signal Design for the
junction along the BRTS corridor
in Visakhapatnam
M/s GKC Constructions,
Hyderabad
03.06.2010 10.08.2010
Conducting intersection traffic volume count surveys, total
station survey, intersection design and signal design
5
Estimation of Parking Demand
around Charminar area in
Hyderabad
M/s MVA Systra (India)
Private Limited, Mumbai
05.10.2010 10.11.2010 Conducting parking survey, demand estimation
6
Preparation of Detailed Project
Report(DPR) for the construction
of Hill Road connecting Ultratech
Cement near Tadpatri, Anathapur
District, Andhra Pradesh
M/s G.Soma Sekhara
Reddy,
Anathapur
11.02.2010 15.03.2010
Conducting total station survey, soil investigations,
preparation of geometric design, pavement design, Bill of
quantities(BOQ), Cost Estimation
7
Preparation of Detailed Project
Report(DPR) for the connecting
road to Jindal Cement Factory,
near Nandyal, Kurnool district,
Andhra Pradesh
M/s Jindal Steel Works,
Hyderabad
23.12.2010 22.01.2011
Conducting total station survey, soil investigations,
preparation of geometric design, pavement design, Bill of
quantities(BOQ), Cost Estimation, tender document
preparation and evaluation
8
Preparation of Detailed
Feasibility Report(DFR) for
Roads and Buildings
Division,
18.02.2011 15.04.2011
Conducting total station survey, soil investigations,
preparation of geometric design, pavement design, Bill of
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
16
widening from single lane to two
lane of Kodangal to Gulbaraga
Road in Mahboobnagar district
Mahaboobnagar,
Andhara Pradesh
quantities(BOQ), Cost Estimation,tender document
preparation and evaluation
9
Preparation of Pre-Feasibility and
Feasibility Study Reportfor
Signal Free Corridor from
Cubban Road to Outer Ring
Road via Kamraj Road in
Benguluru.
Tandon Urban Solutions
Private Limited,Mumbai.
19.03.2011 On going
Conceptual design of elevated corridor and Technical and
Economical Feasibility Study for Signal Free Corridor from
Cubban Road from Outer Ring Road via Kamraj Road.
10
Preparation of Pilani Urban
Infrastructure Project, Pilani,
Rajasthan.
Birla Charitable Trust 30.04.2011 06.06.2011
Preparation of Pre-Feasibility study for theimprovement of
infrastructure facilities like Roads, Sewerage, StormWater
Drainage, SolidWaste Management, StreetLighting, Rain
Water Harvesting etc.
11
Preparation of Detailed Design of
Hata-Silapuri-Darguwan Road on
BOT(Toll plus Annuity) in
Madhya Pradesh.
Soubhagya Projects
Private Limited,
Hyderabad.
15.06.2011 On going
Conducting total station survey, soil investigations,
preparation of geometric design, pavement design, Bill of
quantities(BOQ), Cost Estimation,
12
Engagement of Consultant for
carrying out detailed engineering
services for the approach road
from the Umbarghar jetty to the
proposed site, for the proposed
1200 MW Gas based combined
cycle power plantof GMR
Maharastra Energy Lmited
(GMEL) at Dapoli Taluka,
Ratnagiri District, Maharastra.
GMR Energy Ltd 23.07.2011 On going
Surveys, Investigations, Detailed designs for proposed road,
including preparation of Bill of quantities, cost estimates and
preparation of Tender documents.
13
GVMC – Projects – JNNURM-
Balance stretch of 2 km –
Investigation, survey, Design and
execution of Bus Rapid Transit
System (BRTS) Corridor from ch.
14 to ch 16 with 2 years defect
liability under EPC system.
GVR Infra Projects Ltd., 25.07.2011 On going
Surveys, Investigations, Detailed designs for proposed road,
including preparation of Bill of quantities, and cost estimates.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
17
14
Pre-tendering Engineering
services for Rehabilitation and up
gradation tofour laning of Angul
– Sambalpur section of NH-42
(km 112 – km 265) in the state of
Orissa under NHDP-IV on
Design, Build, Finance Operate
and Transfer on BOT(TOLL)
basis.
Ramky Infrastructure Ltd 27.07.2011 22.08.2011
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
15
Pre-tendering Engineering
services for Rehabilitation and up
gradation tofour laning of Sanga
Reddy to MH_KNTborder
section of NH-9(km 348.000 – km
493.000) under NHDP-IV on
Design, Build, Finance, Operate
and Transfer on BOT(TOLL)
basis.
Ramky Infrastructure Ltd 06.09.2011 20.09.2011
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
16
Pre-tendering Engineering
services for Rehabilitation and up
gradation tofour laning of Cuttak
- Angul section of NH-9(km 0.000
– km 112.000) in the state of
Orissa under NHDP-IV on
Design, Build, Finance, Operate
and Transfer on BOT(TOLL)
basis.
AMR Constructions
Hyderabad
06.09.2011 20.09.2011
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
17
Pre-tendering Engineering
services for Rehabilitation and up
gradation tofour laning of
Zirakpur to Patiala section of NH-
64(km 0.000 – km 50.700) in the
Ramky Infrastructure Ltd 22.10.2011 04.11.2011
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
18
state of Punjab on Design, Build,
Finance, Operate and Transfer
on BOT(TOLL) basis.
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
18
Pre-tendering Engineering
services for Rehabilitation and up
gradation tofour laning of
Birmitrapur to Barakote section of
NH-23(km 211.200–km 335.800)
in the state of Orissa on Design,
Build, Finance, Operate and
Transfer on BOT(TOLL) basis.
Ramky Infrastructure Ltd 18.11.2011 01.12.2011
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
19
Preparation Road Safety Audit
for National Highway No. 5, 215
and 203 in the state of Orissa.
CRAPHTS Consultants
(India) Private Limited,
New Delhi.
01.12.2011 On going
Collection and analysis of Accidents data fromthe police
stations along the project corridorsfor the last two years.
Preparation of safety audit reportduring development stage
and construction stage.
20
Pre-tendering Engineering
services for Four Laning of
Obedullaganj Betul section of
NH-69 from km 2.800 to 8.300
and from km20.700 tokm
137.000 (approx. length 121.36
km) (excluding wild life sanctuary
from km 8.300 to km
20.700)(Except Bypass 28.000 to
km 61.500 as Two Lane with
paved shoulder) in the state of
MP to be executed as BOT(Toll)
project on DBFOT
pattern under NHDP Phase III
Ramky Infrastructure Ltd 17.12.2011 07.01.2012
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
19
21
Pre-tendering Engineering
services for Four laning of
CHANDIKHOLE-DUBARI-
TALCHER section of NH-200
from km 301.890 tokm 428.030
including km8.500 to km15.750
of NH-23 in the state of Orissa to
be executed as BOT(Toll)
project on DBFOTPattern under
NHDP Phase III
Ramky Infrastructure Ltd 07.02.2012 20.02.2012
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
22
Pre-tendering Engineering
services for Four Laning of
Solapur-Bijapur section ofNH– 13
fromkm. 0.00 to km. 110.542 to be
executed asBOT(Toll) basis on
DBFOTPattern under NHDP Phase
III
Ramky Infrastructure Ltd 03.03.2012 16.03.2012
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
23
Pre-tendering Engineering
services for Four laning of
Coimbatore-Mettupalayam
section of NH-67 from Km
377.780 in the state of Tamilnadu
to be executed as BOTon
DBFOT(Toll) Basis
AMR Constructions
Hyderabad
03.03.2012 26.03.2012
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis.
24
Pre-tendering Engineering
services for Rehabilitation and
upgradation to Six laning of
IVRCL Limted
Vishakapatnam
03.03.2012 28.03.2012
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
20
Anakapalli- Anandapuram
section of NH-5 fromKm
682+980 to Km 741+202 in the
state of Andhra Pradesh to be
executed as BOT(toll) on
DBFOTPattern UNDER NHDP
PHASE- V
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis
25
Pre-tendering Engineering
services for Rehabilitation and
upgradation to Six laning of
Gundugolanu to Rajahmundry
section of NH-5 from Km 80+000
to Km 200+000 in the state of
Andhra Pradesh to be executed
as BOT(toll) on DBFOTPattern
UNDER NHDP PHASE- V
IVRCL Limted
Vishakapatnam
03.03.2012 28.03.2012
Traffic surveys and analysis
Estimate toll revenue for the concession period
Identificationof project risks
Road and Bridge Inventory
Earthwork calculations
Preparation of GAD for structures
Preliminary Pavement design
Filed Investigations likeborrow areas, stone quarry and lead
charts
Preparation of Detailed BOQ with analysis
26
Detailed Design and Engineering
Services for two laning of Bahri-
Hanumana BOT(Toll+Annuty) in
the state of Madhya Pradesh
GVR Infra Projects Ltd., 22.03.2012 On Going
27
Preparation of plan and profile
Design for 2 MDR of Length 135
Km in the stateof Madhya
Pradesh
Varna Engineering
Consultants Pvt Ltd.
26.03.2012 On going
Pavement Design
Plan and Profile Design
Junction Design
Sign and Markings
Preparation of Detailed BOQ with analysis
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
21
28 Preparation of Detailed Project
Report for Comprehensive Water
Supply Scheme in Adoni
Municipality.
Adoni
Municipality,ADONI.
06.03.2012 On going  Reviewing the existing situation and undertaking
necessary assessments.
 Feasibility analysis and detailed planning.
 Keeping the view the broader thrust, as stated
above, the specific scope of study is again broken up
as given below:
 Reviewing population projections for horizon years
2013, 2028, 2043.
 Review of maps and drawings availablewith
concerned authorities.
 Water demand assessments.
 Analysis, scoping and screening of key social,
environmental aspects
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
22
Name of Staff : Mr. P.S. Potchi Reddy
Date of Birth : 2nd
November, 1964
Nationality : Indian
Educational Qualifications:
 B.E. in Civil Engineering from Marathwada University, Aurangabad, in 1990.
 Master of Planning with Specialization in Transportation Planning, School of Planning and
Architecture, New Delhi, 1998.
Membership of Professional Societies :
 Member, Institute of Urban Transport, India
 Member, Indian Roads Congress
Trainings :
 Attended two weeks training programme on “Traffic and Transportation Planning” conducted by
Central Road Research Institute (CRRI), New Delhi.
 Attended one week training programme on “Metropolitan Transport Management” conducted
by Yaswantrao Chavan Academy of Development Administration (YASHADA), Pune.
Publication :
 Paper on “Accident Analysis on National Highways” case study Pimpalgoan-Gonde section of
NH-3, 2001.
 Paper on “Preparation of Master Plan with innovative techniques” case study Master Plan for
Visakhapatnam Metropolitan Region, 2004.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
23
Employment Record:
 From March,2011 M/sGEP Infrastructure Private Limited, Hyderabad
Managing Director
1. Consultancy Services for Preparation of Detailed Project Report(DPR) for the
connecting road to Jindal Cement Factory, near Nandyal, Kurnool district, Andhra Pradesh
Project Length : 22. Km, 2 lane Rigid pavement
Funding : Jindal Steel Limited
Client : Jindal Steel Limited
Position : Team Leader and Traffic Engineer
Location : Nandyal
2. Preparation of Detailed Feasibility Report(DFR) for widening from single lane to two lane
of Kodangal to Gulbaraga Road in Mahboobnagar district
Project Length : 5.0 Km, 2 lane
Funding : Roads & Buildings Department
Client : Roads & Buildings Department
Position : Team Leader and Traffic Engineer
Location : Kodangal
3. Preparation of Pre-Feasibility and Feasibility Study Report for Signal Free Corridor from
Cubban Road to Outer Ring Road via Kamraj Road in Benguluru.
Project Length : 18.5 Km
Funding : Bangalore Development Authority(BDA)
Client : Tandon Urban Solutions Private Limited, Mumbai
Position : Team Leader and Traffic Engineer
Location : Bangalore
4. Preparation of Detailed Design of Hata-Silapuri-Darguwan Road on BOT(Toll plus Annuity)
in Madhya Pradesh.
Project Length : 64.0 Km
Funding : Madhya Pradesh Road Development Corporation(MPRDCL)
Client : Soubhagya Projects Private Limited
Position : Team Leader and Traffic Engineer
Location : Madhya Pradesh
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
24
5. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of
Angul – Sambalpur section of NH-42 (km 112 – km 265) in the state of Orissa under NHDP-
IV on design,build,finanace operate and transfer on BOT (TOLL) basis.
Project Length : 153.0 Km
Funding : Ramky Infrastructure Limited
Client : Ramky Infrastructure Limited
Position : Team Leader and Traffic Engineer
Location : Orissa
6. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of
MH_KN- Border to Sanga Reddy section of NH-9 from km 348.00 to Km 493.00 under
NHDP-IV on design,build,finanace operate and transfer on BOT (TOLL) basis.
Project Length : 145.0 Km
Funding : Ramky Infrastructure Limited
Client : Ramky Infrastructure Limited
Position : Team Leader and Traffic Engineer
Location : Andhra Pradesh
7. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of
Cuttack - Angul section of NH-42 (km 0.000 - km 112) in the state of Orissa under NHDP-IV
on design,build,finanace operate and transfer on BOT (TOLL) basis.
Project Length : 112.0 Km
Funding : AMR Constructions Limited
Client : AMR Constructions Limited
Position : Team Leader and Traffic Engineer
Location : Orissa
 From Sep 2010 to March,2011 M/s Arvee Associates Architects Engineers
& Consultants Pvt. Ltd.
Vice President
1. Consultancy Services for labeling, conducting traffic surveys, road inventory survey and
prioritization of 3 lane and above major roads for strengthening in Greater Hyderabad
Municipal Corporation jurisdiction.
Project Length : 800 Km, 3 lane and above
Funding : Greater Hyderabad Municipal Corporation (GHMC)
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
25
Client : Greater Hyderabad Municipal Corporation (GHMC)
Position : Team Leader and Traffic Engineer
Location : Hyderabad
2. Consultancy Services for preparation of revision of Master Plan for Rajahmundry
Municipal Corporation area.
Project area : 80 Sq.Km
Funding : Rajahmundry Municipal Corporation
Client : Rajahmundry Municipal Corporation
Position : Traffic and Transportation Expert
Location : Rajahmundry
3. Consultancy Services for assessment of traffic impact due to the development of
Knowledge City at Hitech City in Hyderabad.
Project area : 31.5 acres(6.0 million sq.ft. area development)
Funding : DLF Limited
Client : DLF Limited
Position : Team Leader cum Traffic and Transportation Expert
Location : Hyderabad
 Mar 2002 to Aug 2010 Consulting Engineering Services (I) Ltd., New Delhi
Senior Engineer/Deputy Project Manager/Project
Manager/Deputy General Manager/General Manager
4. Consultancy for Preparation of Pre-feasibility report for the Construction of Ring
Road/Bypass for Lucknow and Varansi cities of length 250 kms of 4 lanes in the state of
Uttar Pradesh.
Project Length : 250 Km, 4 lane
Project Cost : INR 3250 Crores
Funding : National Highways Authority of India
Client : National Highways Authority of India
Position : Traffic Engineer cum Safety Expert
Location : Uttar Pradesh
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
26
5. Consultancy Services for Preparation of Feasibility-cum-Preliminary Design for Standalone
Bypasses/Ring Road of length 445 kms of 6 lane for Viskhapatnam City in the State of
Andhra Pradesh under NHDP Phase VII.
Project Length : 45 Km, 6 lane
Project Cost : INR 450 Crores
Funding : National Highways Authority of India
Client : National Highways Authority of India
Position : Traffic Engineer cum Safety Expert
Location : Andhra Pradesh
Job scope, responsibilities includes:
As Traffic Engineer-cum-Safety Expert he was responsible for developing Quality Assurance
Plan and implementation procedure; evolve, finalize; formats and requirement of traffic
surveys including location of traffic surveys; supervise all traffic surveys and analyze traffic
data; identify bypass locations and location of traffic control; carryout preliminary design of
intersection and interchanges; identify and design road furniture, traffic safety facilities
including traffic safety measures. He was also involved in preparation of Traffic
Management Plans, assist Team Leader in conducting Road Safety Audit; suggesting the
complete layout and design of access regulation measures, traffic safety facilities and
provide such solutions which enhance safety during construction and operation phase.
6. Consultancy Services for preparation of Detailed Project Report for infrastructure facilities
in Aviation Special Economic Zone (SEZ), Shamshabad, Hyderabad.
Project Length : 50 Km, 4 lane
Project Cost : INR 450 Crores
Funding : GMR
Client : GMR
Position : Project Co-ordinator / Traffic & Transportation Expert
Location : Andhra Pradesh
Job scope, responsibilities includes:
As Project Coordinator/Traffic & Transportation Expert he was responsible for preparation
of traffic management plans, conducting traffic surveys, data collection, analysis, liaison,
bills processing and realization of payments.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
27
7. Preparation of Detailed Feasibility Report for Upgradation of Single lane and Intermediate
lane roads into 2/4 lane roads from Kalwakurthy to Nandyal of length 174 kms in the state
of Andhra Pradesh
Project Length : 174 Km, 2/4 lane
Project Cost : INR 430 Crores
Funding : Andhra Pradesh Road Development Corporation
Client : Andhra Pradesh Road Development Corporation
Position : Traffic Engineer
Location : Andhra Pradesh
8. Preparation of Detailed Project Report for Bus Rapid Transit System in Vijayawada in the
state of Andhra Pradesh
Project Length : 50 Km, 4 lane
Project Cost : INR 90 Crores
Funding : JNNURM
Client : Vijayawada Municipal Corporation (VMC)
Position : Traffic Engineer
Location : Andhra Pradesh
9. Preparation of Detailed Feasibility Report for the construction of Bridge across River
Tungabhadra near Alampur in Mahaboob Nagar district in the state of Andhra Pradesh.
Project Length : Road : 2.2 kms (Bridge : 1.2 kms) of 2 lanes
Project Cost : INR 33.09 Crores
Funding : Andhra Pradesh Road Development Corporation (APRDC)
Client : Andhra Pradesh Road Development Corporation (APRDC)
Position : Traffic Engineer
Location : Andhra Pradesh
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
28
10. Preparation of Detailed Feasibility Report for the Construction of Bridge across River
Krishna to connecting Kollapur in Mahaboob Nagar district and Siddeswaram in Kurnool
district.
Project Length : Roads : 11.6 kms (Bridge : 2 kms) of 2 lanes
Project Cost : INR 131.08 Crores
Funding : Andhra Pradesh Road Development Corporation (APRDC)
Client : Andhra Pradesh Road Development Corporation (APRDC)
Position : Traffic Engineer
Location : Andhra Pradesh
Job scope, responsibilities includes:
As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data
analysis, estimation of growth rates, safety studies, preparation of traffic management
plans, pavement condition survey of existing roads through visual assessment, BBD surveys,
various soil tests, identification of borrow areas and quarry sites, analyzing the data
obtained from testing of soil and aggregate samples traffic forecasting, identification of
major accidents points and preparation of traffic management / safety manuals and
strategies, conducting safety audits for enhancing traffic safety along the project highway
etc.
He was involved in review of data analysis and implementation of safety manuals as per
the data incorporated in safety audits. Intermittent inputs interms of – Review of growth
rate estimation and re-identification of accident spots during Project Management
Consultancy Phase. He was also involved in preparation of safe alignment of approach
roads to the bridge, Geometric and pavement design of the approach roads and preparation
of Detailed Feasibility Report including Transaction services.
11. Preparation of Comprehensive Traffic and Transportation Plan for Vijayawada Municipal
Corporation area.
Project Area : 61.88 Sq.kms
Project Cost : INR 5500 Crores
Funding : Vijayawada Municipal Corporation, Vijayawada
Client : Vijayawada Municipal Corporation, Vijayawada
Position : Transportation Planner
Location : Andhra Pradesh
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
29
Job scope, responsibilities includes:
Comprehensive study of traffic problems and to evolve feasible solutions to the problems,
Vijayawada Municipal Corporation has initiated a study on Comprehensive Traffic and
Transportation.
As Transportation Planner he was responsible for collecting traffic data, planning of road
networks, junction improvement studies, safety aspects, planning / conducting field and
traffic surveys including household survey, data analysis and preparation of base year
network.
12. Preparation of Perspective Transportation Plan for Navi Mumbai Special Economic Zone,
Navi Mumbai. (comprising of roads of length 125 kms of 6/8 lanes)
Project Length : 125 kms, 6/8 lanes
Project Cost : INR 1000 Crores
Funding : Navi Mumbai Special Economic Zone Company Limited
Client : Navi Mumbai Special Economic Zone Company Limited
Position : Traffic Engineer
Location : Andhra Pradesh
Job scope, responsibilities includes:
The Government has appointed NMSEZ Company Limited owned by Reliance India Limited
to develop Special Economic Zone in Navi Mumbai. The Navi Mumbai Special Economic
Zone consists of Dronagiri, Kalamboli and Ulwe nodes in Navi Mumbai. The NMSEZ
Company Limited has assigned the study to prepare Feasible Transportation Plan.
As Traffic Engineer he has conducted all types of Traffic and Transportation Surveys,
preparation of traffic management plans, analysis of the Survey Data and estimated the
impact of SEZ on the surrounding road network. He has also estimated traffic generated by
different activities proposed in NMSEZ area, distribution of trips between various activities
and preparation of external connectivity to SEZ area.
13. Preparation of Detailed Project Report for Bus Rapid Transit System in Hyderabad with
roads of length 16.5 kms of 4 lanes.
Project Length : 16.5 kms, 4 lanes
Project Cost : INR 424.32 Crores
Funding : Greater Hyderabad Municipal Corporation (GHMC)
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
30
Client : Greater Hyderabad Municipal Corporation (GHMC)
Position : Traffic Engineer
Location : Andhra Pradesh
Job scope, responsibilities includes:
As Traffic Engineer he was responsible for organizing topographic surveys, traffic surveys,
pavement condition survey of existing roads through visual assessment, BBD surveys,
various soil tests, identification of borrow areas and quarry sites, testing of soil and
aggregate samples etc and data analysis.
14. Preparation of Feasibility and Detailed Project Report for the Construction of Tunnel across
Simhachalam Hill in Visakhapatnam City
Project Length : 3.5 kms, 6 lanes
Project Cost : INR 138 Crores
Funding : GVMC & JNNURM
Client : Greater Visakhapatnam Municipal Corporation (GVMC),
Visakhapatnam
Position : Resident Project Manager / Traffic Engineer
Location : Andhra Pradesh
Job scope, responsibilities includes:
The Greater Visakhapatnam Municipal Corporation (GVMC) has proposed to construct a
tunnel across Simhachalam Hill to provide access to the commuters of near by habitations.
As Resident Project Manager/Traffic Engineer he was responsible for planning and
organizing Engineering surveys, geo-technical investigations and total station survey, traffic
surveys including opinion survey, data analysis, estimation of growth rates, traffic
projection, lane requirement and estimation of traffic diverted to Tunnel. He was also
involved in the Geometric Design and Pavement design of the approach roads to the
Tunnel.
15. Preparation of Techno-Economic Feasibility and Detailed Project Report for the
construction of Road Over Bridge and Road Under bridge in lieu of Level crossings in
Chennai.
Project Length : 2.5 kms, 2 lanes
Project Cost : INR 25 Crores
Funding : World Bank
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
31
Client : Chennai Metropolitan Development Authority
Position : Traffic Engineer
Location : Chennai
Job scope, responsibilities includes:
As Traffic Engineer he was responsible for planning, organizing and monitoring traffic
surveys, topographic surveys, data analysis, estimation of growth rates, traffic forecasting,
identification of major accident points and preparation of traffic management / safety
manuals, and preparation of feasibility report on the basis of EIRR developing strategies for
enhancing traffic safety along the project highway. He was also involved in Expressway
traffic estimation based on traffic surveys and network assignment.
16. Preparation of Feasibility and Detailed Project Report for the Construction of
Flyovers/Underpasses in Visakhapatnam City.
Project Length : 6 kms, 4 lanes
Project Cost : INR 60 Crores
Funding : Greater Visakhapatnam Municipal Corporation (GVMC),
Visakhapatnam
Client : Greater Visakhapatnam Municipal Corporation (GVMC),
Visakhapatnam
Position : Traffic Engineer
Location : Noida
Job scope, responsibilities includes:
GVMC has proposed, under this project, to construct flyovers at selected locations to ease
traffic congestion in Visakhapatnam City.
As Traffic Engineer he was responsible for planning and organizing Engineering and traffic
surveys, analysis and preparation of feasibility report on the basis of EIRR.
17. Revision of Master plan for Visakhapatnam Metropolitan Region and Zonal Development
Plan for five town’s viz. Anakapalli, Gajuwaka, Visakhapatnam, Bheemunipatnam and
Vizianagaram.
Project Area : 1750 sq kms; (Road Length: 500 kms of 2/4 lanes)
Project Cost : INR 12000 Crores
Funding : VUDA & State Government
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
32
Client : Visakhapatnam Urban Development Authority (VUDA),
Visakhapatnam
Position : Transportation Planner
Location : Noida
Job scope, responsibilities includes:
VUDA has taken up to revise the Master plan for Visakhapatnam Metropolitan Region(VMR)
and Zonal Development Plan for Visakhapatnam, Gajuwaka, Anakapalli, Bheemunipatnam
and Viziangaram which was prepared in 1989.
As Overall In-Charge of Project Site at Visakhapatnam in general, he was responsible for
Traffic and Transportation aspects in particular.
As Transportation Planner he was responsible for collecting data, planning and organizing
traffic surveys including Household survey and Land use survey, data analysis and
preparation of Traffic Management Schemes and preparation of pre-feasibility report for
introduction of Integrated Mass rapid Transit System in Visakhapatnam City.
18. Traffic Studies for 4 laning of Tindivanam-Trichy section of NH-45 and Trichy - Madurai
section of NH-45B of total length 45 kms in the state of Tamil Nadu.
Project Area : 45 kms (4 lanes)
Project Cost : INR 500 Crores
Funding : Council for Industrial Development Corporation
Client : Council for Industrial Development Corporation
Position : Traffic Engineer
Location : Tamilnadu
Job scope, responsibilities includes:
As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data
analysis, estimation of growth rates, traffic forecasting, identification of major accidents
points and preparation of safety manual / strategy for enhancing traffic safety along the
project highway.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
33
 Aug 2001 to Feb 2002 Sheladia Associates & Consultants Pvt. Ltd.
Senior Engineer / Traffic Engineer
19. Detailed Project Report for Proposed Widening from existing 2 lane to 4 lane of Mumbai-
Agra section of NH-3 road from Pimplegaon to Gonde of length 60 kms on BOT basis.
Project Area : 60 kms (4 lanes)
Project Cost : INR 330 Crores
Funding : BOT basis (PPP Project)
Client : Ministry of Road Transport and Highways, New Delhi
Position : Traffic Engineer
Location : Maharashtra
Job scope, responsibilities includes:
Ministry of Road Transport and Highway(MORTH) has taken up the improvement of major
National Highways operating under NHDP. Mumbai – Agra Road (NH-3) is one such
improvement corridor.
As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data
analysis, estimation of growth rates, traffic forecasting, identification of major accident
black points, preparation of strategy for enhancing traffic safety.
20. Station Area Traffic Improvement Schemes for Borivali Railway Station project comprising
of roads of total length 75 kms of 2/4 lanes.
Project Area : 75 kms (2/4 lanes)
Project Cost : INR 30 Crores
Funding : World Bank
Client : Mumbai Metropolitan Region Development Authority, Mumbai
Position : Traffic Engineer
Location : Maharashtra
Job scope, responsibilities includes:
To improve the traffic condition in and around sub urban railway stations in Mumbai,
MMRDA proposed Station Area Traffic Improvement Scheme (SATIS) at selected sub urban
railway stations including Borivali under Mumbai Urban Transport Project (MUTP).
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
34
As Traffic Engineer, responsible for review of earlier studies conducted by various
organizations, planning and organizing of Traffic surveys including Rail and Bus commuter
survey, preparation of alternative Traffic Improvement Schemes and recommending a
Traffic Management Scheme for implementation.
 Sep 1992 to Jul 2001 Mumbai Metropolitan Region Development
Authority
 Jun 1997 to Dec 1998 Pursued 'Master of Planning'
(Employer Sponsored)
On behalf of MMRDA he has worked on World Bank assisted Mumbai Urban Transport
Project (MUTP-II) preparatory studies, involved in the preparation of Terms of Reference
(TOR), evaluation and selection of consultants and monitoring and scrutiny of consultant’s
performance. MUTP is a multi-model project prepared by Government of Maharashtra to
seek financial assistance from World Bank.
His other assignments include:
21. As Traffic Engineer, Prepared Road Network Improvement schemes in and around Bandra
Kurla Complex, Bandra, Road Length: 12.0 kms of 4 lanes.
22. As Traffic Engineer, Conducted Traffic surveys, analysed and prepared Feasibility Report for
the construction of Road Over Bridge (ROB) in lieu of Level Crossing near Virar on Western
Railway, Road Length: 2.5 kms of 4 lanes.
23. As Traffic Engineer, Conducted Traffic Volume count surveys, pedestrian count surveys, and
pedestrian opinion surveys and prepared Feasibility Report for the construction of
Pedestrian Subways in Greater Mumbai, Road length: 15.0 kms of 4 lanes.
24. As Traffic Engineer, Prepared Traffic Management Schemes by conducting traffic surveys for
Road Over Bridges (ROBs) in Greater Mumbai, Road length: 10.0 kms of 4 lanes.
25. As Traffic Engineer, Conducted various traffic surveys, commuter surveys at railways
stations, analysed and prepared Station Area Traffic Improvement Schemes (SATIS) for 3
railway stations in Greater Mumbai, Road length: 45.0 kms of 2/4 lanes; Project Cost: Rs
60.00 crores
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
35
26. As Traffic Engineer, Carried out traffic volume count and pedestrian count surveys for the
Preparation of Feasibility Report for the construction of Catwalk between C.S.T.Railway
Station and Churchgate Railway Station, Road length: 2.0 kms of 4 lanes.
27. As Traffic Engineer, Prepared Traffic Management Scheme around Mantralaya in Greater
Mumbai, Road length: 15.0 kms of 4 lanes.
28. As Traffic Engineer, Conducted traffic volume count surveys, parking surveys and prepared
road improvement proposal for Sion Dharavi Link Road in Mumbai, Road length: 5.0 kms of
4 lanes.
29. As Junior Transportation Planner, Supervised and Monitored the traffic surveys and the
progress of the Comprehensive Traffic and Transportation Study for Mumbai Metropolitan
Region (MMR), Road length : 5000.00 kms of 2/4/6 lanes.
 Feb 1991 to Sep 1992 CRAPHTS, New Delhi
Traffic Engineer / Asst. Traffic Engineer
30. Conducted Traffic Surveys, Parking surveys, analyzed and prepared Parking and Traffic
Circulation System for 9 NDMC Markets in New Delhi, Client: NDMC, New Delhi; Project
length: 10.0 kms of 4 lanes.
31. Parking and Traffic Circulation System for Ring Railway Stations in New Delhi, RITES.
32. Parking and Traffic Circulation System for Metro Railway Stations in New Delhi, RITES.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
36
Name R.Ramakrishna
PROFESSION Highway Engineer
SPECIALISATION Highway Design / Traffic & Transportation planning
NATIONALITY Indian
QUALIFICATION Master of Engineering, in Urban Engineering, Division of Urban Transport
Systems Development, (ANNA UNIVERSITY, INDIA
Bachelor of Technology, in Civil Engineering (NGARJUNA UNIVERSITY, INDIA)
KEY EXPERIENCE
Has about 10 years of experience (includes 5 years Middle east & UK) in carrying out the concept design,
feasibility and detailed designs for Urban and Rural Expressways, Arterial / Collector Streets and Local
Streets, Sea land developments and town ships Has involved design reviews for major road projects in
India,UK and the Gulf region (in the State of Qatar, Libya & Bahrain) starting from Preliminary stage to
Tender and Construction stages. Well versed with
QATAR/BAHRAIN/ABUDHABI/AASHTO/DMRB/AUSTROADS and IRC design standards and conversant
with the geometric design of expressways, roundabouts, major/minor junctions, Parking Areas and
Pavement design including flexible and Rigid, preparation of cost estimates, project design reports, and Bill
of Quantities. Has good experience in conceptual planning of townships and carrying out the feasibility
and detailed designs of township roads and infrastructure components.
Well experienced in Geometric designs for Motorways/NH/Hill Roads and Town Ships includes Multi
Level Inter changes, At Grade Major Junctions, Roundabout and Priority Junctions.
Well experienced in Pavement designs for different Geographic standards for flexible, Rigid and Paver
Blocks designs for Highways and local streets.
Has involved in Traffic Impact and Transportation planning studies in The State of QATAR, Kingdom of
Bahrain, Libya, Kuwait and India. Well experienced in TRIP generation estimates as per DUBAI Traffic
manual for various developments, Junction capacity analysis, Traffic signal designs using aaSIDRA
Well experienced in Bilingual Sign face designs, sign post and sign foundation design, road signs &
markings for different regions in Middle East & India Has good exposure to KEY SIGNS software for sign
face designs in UK region.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
37
Experience in Independent Quality Audit and Quality control tests for Major road construction projects in
India funded by World Bank and Asian Development Bank. Has involved in construction supervision for
major highway works in India.
Work experience in conducting Road Safety Audits during concept, preliminary, detailed design stage and
also pre and post construction stage for different roads and developments.
Work experience Major surface and multi level car parking studies in India and Middle East region. Has
involved in review internal circulation plans, access and egress arrangement and pedestrian facilities in
parking areas.
Well experience in design coordination with various design teams and CAD teams for timely deliverables
and proven record of client satisfaction
Good exposure in using MX software, aaSIDRA, arcady, Picady and well versed with all engineering surveys
required for major highway projects (Road Inventory and Pavement Condition survey, BBD survey,
Bridge/Culvert Condition survey, Traffic Surveys) and analysis of data obtained from the surveys.
EMPLOYMENT RECORD
May,2011-Till date Director, GEP Infrastructure Private Limited
March 2010 –
April.2011
DY. General Manager (Highway Design) – CEG
Apr 2005 – March 2010 Highway cum Transportation Engineer, ATKINS - UK,ME & India
May 2001 – Apr 2005 Highway Engineer, Wilbur Smith Associates, INDIA
MAJOR LAND MARK - PROJECTS INVOLVED
Designation Project Client
Highway Design Engineer DBFO – LONDON RING ROAD – M25
MOTORWAY WIDENING
Highway Agency UK
Highway Design Engineer New Doha International Airport –
Roads and Infrastructure
Ashgal (Ministry of Public Works),
Qatar (PMC – Bechtel)
Highway Design Engineer Bahrain Bay – New Township – Roads
and Infrastructure (on reclaimed fill)
in Bahrain
Bahrain Bay Development
Company, Bahrain
Highway Design Engineer Education City – New Township –
Roads and Infrastructure
Qatar Foundation (QF)
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
38
Highway Design Engineer Upgradation of existing 2-lane Dukhan
road (Qatar Primary route) to 8-lane
expressway
Ministry of Public Works
Traffic & Transportation
Planner
Education city – Transport model
development
Qatar Foundation
Transportation planner &
Project Coordinator
Education city – Pedestrian model
development
Qatar Foundation
Transportation planner Libya CBD –city gate Traffic Impact
study
MAF Libya
PROFESSIONAL EXPERIENCE
March 2010 – till date
Dy General Manager – Highway Design: Handed and Delivered the following projects highways design
team in CEG Hyderabad and coordinating with Design Team in Head office Jaipur.
Improvement of existing TWO lane road to 4lanning configuration of NH 3 from Gwalior to Dewas km
123 to km 526 – BOT (406 km) – Madhya Pradesh
Improvement of existing TWO lane road to 4lanning configuration of NH 50 from Khed to Sinnar km 42
to km 177 – BOT (135 km) - Maharashtra
Improvement of existing road to 2 lane paved shoulder of NH 222 from km 342 to km 442 – BOT (100
km) - Maharashtra
Improvement of existing road to 2 lane paved shoulder of NH 106 from km 0 to km 136 (136 km) –
WORLD BANK AIDED.- Bihar
Improvement of existing road to 2 lane paved shoulder of NH 30A from km 0 to km 67 (67 km) – WORLD
BANK AIDED.- Bihar
WS ATKINS – UINITED KINGDOM
M25 DBFO– Design Engineer Responsible design of 8/10 lane motorway 25 (M25). M25 is the Major
connecting corridor in UK and busiest Network in entire Europe. Also know as LONDON Ring Road. As a
Highway Design Engineer I was involved in Geometric Designs for main road, Slip road designs,
Intersection Improvements, Pavement Designs, Signs design, earthworks and safety barrier design.
Coordination with highway Agency and UK safe roads team.
WS ATKINS, Bangalore, INDIA
A14 Ellington to Fen Ditton – Review of MX design for section 2, 3, Trinity Foot junction, Dry Drayton
junction and M11 junction 14 (Girton interchange).
WS ATKINS, DOHA, QATAR
Consultant for Primary Infrastructure Design Services - Education City, Doha, Qatar
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
39
The scope of work includes “Planning and Detailed Design” of the new township to cater exclusively for
education needs for the State of Qatar with the state of the art facilities. The township is spread over an
area of 12 sq. kms.
The following responsibilities are carried out as a Highway engineer
 Preparation of Road layouts
 Geometric Cross Sections
 Horizontal & Vertical alignment of project roads using MX
 Design of Roundabouts
 Junction Designs using MX
 Capacity analysis of junction using aaSIDRA
 Pavement Designs
The following responsibilities are carried out as a Transport planner for 3 major car parks namely
 Northeast car park
 South east car park
 And West car park located in South campus of Education city
 Reviewing the car park layout plans & internal circulation arrangements
 Suggesting to improve internal circulation
 Reviewing the internal access arrangement and its improvement proposal
 Internal junction proposal and capacity analysis using aaSIDRA
 Internal access proposals.
 External entry and Exit arrangement improvement proposals.
 Capacity Analysis of Qatar Academy Intersection, Ghrarraffa Intersection and South Gharraffa
Intersection.
 Signal Designs Using aaSIDRA
 Sign face designs
DUKHAN EXPRESS WAY – 8 Lane Access Control Highway - DOHA QATAR
Client: ASHGAL PWD, Doha, Qatar
The following responsibilities are carried out as a Highway engineer
 Geometric Cross Sections
 Horizontal & Vertical alignment of project roads using MX
 Design of Roundabouts
 Multi Level Junction Designs using MX
 Capacity analysis of junction using aaSIDRA
 Pavement Designs
 Signal Designs using aaSIDRA
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
40
New Doha International Airport - AIRSIDE LANDSIDE ROADWAYS &PARKING
Client: NDIA (New Doha International Airport)
The project is under D&B (Design and Build) Contract. The new airport is partially built on reclaimed fill
and is estimated to handle 2.0 million passengers per day. Scope of work consists of planning, design
and development of access interchanges to the passenger terminal, cargo terminal and commercial
terminal, runway and the providing service roads within the airport area to cater to the cargo vehicles,
improvement of existing dual two lane carriageway into 8-lane expressway and providing interchanges
(trumpet & cloverleaf) to provide access to the terminal buildings.
The following responsibilities are carried out
 Preparation of Road layouts
 Geometric Cross Sections
 Horizontal & Vertical alignment of project road using MX
 Reviewing Pavement Designs
 Design of Traffic Signs
 Intersection Designs
Bahrain bay Infrastructure Design, Manama, Bahrain
Client: BBD (Bahrain bay Development, Manama, Bahrain)
The Bahrain Business Bay is the flagship component in the future growth of Bahrain and its capital city of
Manama. It is part of a larger response to economic development in the Persian Gulf and will be the
catalyst and model for growth and development in the greater North Manama master plan. Its close
proximity to the Airport, Bahrain Financial Harbor, world Trade Centre, and the Diplomatic Area make it
a prestigious site bursting with Potential.
The following responsibilities area carried out
 Complete Roadway design Using MX
 Detail Design for all Road Components
 Design of Traffic Signs and Markings
 Pavement Designs
 Signal designs using aaSIDRA
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
41
Detailed Engineering Study for Supreme Education council Headquarters, DOHA
Client: Supreme Educational Council, Ministry of Education Qatar
 Design of approach roads and Junctions using MX
 Trip Generation Estimates
 Junction Improvement Measures using aaSIDRA/ Arcady
 Signal designs for external junctions
 Preparation of Junction Improvement Plans
 Parking arrangements and circulation plans
Pedestrian Studies for Education City, Doha, Qatar
Client: Qatar Foundation, Doha, Qatar
 Design Coordination with UK Teams
 Model development/ Network review with UK teams
 Finalisation of footpaths locations and pedestrian crossing points
 People mover system (Light Rail system) platform/staircase size fixing.
Durrat Al Bahrain Traffic Impact Study
 Trip Generation Estimates
 Reviewing of VISSIM Outputs
 Junction Improvement Measures using aaSIDRA
 Signal designs for external junctions
Libya CBD Traffic Impact Study
Client: MAF Libya
 Trip Generation Estimates
 Junction Improvement Measures using aaSIDRA/ Arcady
 Signal designs for external junctions
 Preparation of Junction Improvement Plans
M/s WILBUR SMITH ASSOCIATES, INDIA
Integrated Infrastructure Development of Thiru VI KA Industrial Estate, Guindy, Chennai, India
Client: TNRDC (Tamil Nadu Road Development Company, INDIA)
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
42
The following responsibilities are carried out
 Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis
of primary and secondary data,
 Finalization of design standards and geometric design of the project road
 Design of flexible pavement for estate roads
 Geometric design for the road & Junction designs
 Design of lighting systems design of all road furniture’s
 Preparation of Rate analysis and
 Preparation of Detailed Estimates, Bill of Quantities.
Engineering Study for Roads in CMA (TNUDP- III), Chennai, India.
Client: Highways Department, Tamil Nadu.
The following responsibilities are carried out
 Co ordination for Pavement, Road, CD and Bridges
 Analysis of Pavement and Road Data
 Finalization of Geometric cross sections for the Project road
 Horizontal and vertical alignment for the project road
 Design of Flexible pavement for the Project Road
 Junction Designs, Design of all Road furniture’s and Truck lay byes
 Preparation of Standard drawings
 Rate analysis for Road and Bridge Items
 Preparations of Detailed Estimates and Bill of Quantities
Study for Second Road Bridge over river Kharkai in Adityapur , INDIA
Client: ILFS (Infrastructure Lease and Financial Services)
The study involves preparation of Detailed Project Report for new road bridge project & Improvements
existing Truck terminal Road in Adityapur and Jamshedpur.
The following responsibilities are carried out
 Co – ordination for All traffic Surveys
 Fixing the New alignment for Road and bridge using GPS
 Co- ordination for Topographical and soil Investigation surveys
 Analysis of primary and secondary data
 Finalisation of Geometric cross section for the project roads
 Horizontal and Vertical design for the project road
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
43
 Design of Flexible pavement for new alignment & Paver block design for truck terminal Road &
for Truck lay byes.
 Design of all Road furniture’s including lighting
 Preparation of Standard drawings
 Preparation of Rate Analysis
 Preparation of detailed Estimates and Bill of Quantities.
Consultancy services: Feasibility study & DPR for 4/6 lanning of NH-52A and NH-52 from Itanagar to
Halem in the states of Arunachalpradesh & Assam (NHAI)
The study involves prepartion of Detailed Feasibility and Detailed project report for 4 lanning of NH 52 &
52A
Client: NHAI (National Highways Authority of India)
The following responsibilities are carried out
 Assisting the Team leader in planning the surveys and preparation of reports.
 Analysis of Primary and Secondary data Such as Road Inventory, Pavement Condition survey,
BBD, Roughness, Axle load data, Culvert and Bridge data.
 Design of Flexible & Rigid pavements (IRC: 37 & IRC 58)
 Preparation of monthly progress reports
 Finalisation of Geometric cross sections for project road
 Junctions and cross roads designs
 Design of all road furniture’s
 Design of bus bays
 Design of Parking lots and Truck lay byes
 Preparation of standard drawings
 Preparation of Rate Analysis
 Preparation of Detailed Estimates and Bill of Quantities.
Consultancy Services for Feasibility and DPR of Kovalam Redevelopment Project ,Kerala, INDIA
Client: IIDC (Trivandrum)
The following responsibilities are carried out
 Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis
of primary and secondary data,
 Finalization of design standards and geometric design of the project road Design of flexible
pavement for the project road
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
44
Independent Technical Review for First year Road Maintenance work Tamil Nadu, INDIA
Client: TNRSP (Tamilnadu Road Sector Project, State Highways Department)
The scope of the work involved in review of Pavement design, Project costing and Bill of Quantities. And
independent review of Execution of work before and after construction, preparation of progress reports.
The following responsibilities are carried out
 Involved In Pavement design review for the various project roads
 Review of the detailed estimates and bill of quantities
 Redesigning the pavements for various project roads
 Preparation of detailed estimates and bill of quantities for various project roads
 Conducting the Various Field tests and verifying the test results for Pavement materials, CD &
Drain works.
Preparation of Detailed Project Report for Four Laning of TPP Road, Chennai, Tamil Nadu, INDIA
Client: TNRDC (Tamil Nadu Road Development Company)
The following responsibilities are carried out
 Co ordination for Pavement, Road surveys, CD and Bridges
 Analysis of Pavement and Road Data
 Finalization of Geometric cross sections for the Project road
 Horizontal and vertical alignment for the project road
 Design of Flexible pavement for the Project Road
 Junction Designs, Design of all Road furniture’s and Truck lay byes
 Preparation of Standard drawings
 Rate analysis for Road and Bridge Items
 Preparations of Detailed Estimates and Bill of Quantities
Strengthening and widening of Manali Oil Refinery and Inner Ring Road, Chennai, Tamil Nadu, INDIA
Client: TNRDC (Tamil Nadu Road Development Company)
The study involves preparation of detailed project report for four laning & strengthening of the 15km
long project road. Scope of the work involved in four laning and strengthening of MOR and IRR road to
National Highways standards.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
45
The following responsibilities are carried out
 Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis
of primary and secondary data,
 Finalization of design standards and geometric design of the project road
 Design of flexible pavement for the project road,
 Design of Horizontal and vertical alignment for the project road
 Junction Designs
 Design of lighting systems design of all road furniture’s, design of truck laybyes,
 Rate analysis and
 Preparation of Detailed Estimates and Bill of Quantities.
Third Party Quality Assurance Study, Andhra Pradesh, INDIA
Client: (Govt. of AP – PHMED)
Scope of the work involved in third party quality checking for different municipal road and drainage
 Conducting Material Testing for all road items.
 Conducting Material Testing for CD & Drain Items.
Detailed Engineering Study for OMR (IT Corridor) (km 0/0 to 30/4), Chennai, Tamil Nadu, INDIA
Client: TNRDC (Tamil Nadu Road Development Company)
The study involves preparation of detailed project report widening and strengthening of Old
mahabalipuram Road (IT Corridor) to six lanes
The following responsibilities are carried out
 Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis
of primary and secondary data,
 Finalization of design standards and geometric design of the project road
 Design of flexible & Rigid pavement for the Project road
 Geometric design for the road & Junction designs
 Design of lighting systems design of all road furniture’s
 Preparation of Rate analysis and
 Cost comparison of Flexible and rigid Pavement
 Preparation of Detailed Estimates, Bill of Quantities. And Bid documents
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
46
Consultancy for Preparation of Detailed Project Report for Construction of Bridges in Chennai
Corporation, Chennai, Tamil Nadu, INDIA
Client: TNUIFSL
The following responsibilities are carried out
 Co ordination for Traffic surveys
 Analysis of traffic Data
 Preparation of Detailed Estimates, Bill of Quantities.
Feasibility Study/Detailed Engineering studies for Improving Old Mahabalipuram Road from Siruseri Jn
of ECR (OMR) (Km 30/2 to 54/6), Chennai,
Client: TNRDC (Tamil Nadu Road Development Company)
Scope of the work involved in Strengthening of OMR four lane road/ feasibility for widening to six lane
configuration. The work involved in conducting
The following responsibilities are carried out
 Road Inventory Survey, Pavement co ordination for Topo surveys,
 Co ordination for Road and pavement condition surveys.
 Analysis of primary and secondary data,
 Finalization of design standards and geometric design of the project road
 Design of flexible for the Project road
 Geometric design for the road & Junction designs
 Design of lighting systems design of all road furniture’s
 Preparation of Rate analysis and
 Preparation of Detailed Estimates and Bill of Quantities
Detailed Engineering Study for TPP Road (Two Lane – Strengthening and Widening), Chennai, Tamil
Nadu, INDIA
Client: TNRDC (Tamil Nadu Road Development Company)
The study involves preparation of detailed project report for Two laning & strengthening of the 10km
long project road.
The following responsibilities are carried out
 Finalization of design standards and geometric design of the project road
 Design of flexible pavement for the project road, design of Horizontal and vertical alignment,
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
47
 Junction Designs
 design of lighting systems design of all road furniture’s, design of truck lay byes,
 Rate analysis and
 Preparation of Detailed Estimates and Bill of Quantities.
Construction Supervision of the proposed roads and Storm water drains in Tiruvannamalai
Municipality, Tiruvannamalai, Tamil Nadu, INDIA
Client: TNUIFSL
The following responsibilities are carried out
 Evaluation of Tender Documents,
 construction and supervision of Road works and Storm water drains,
 Preparation of billing documents.
Preparation of DPR for the Improvement of Road Connecting TPP Road and Ennore Port and NCTPP,
Chennai, Tamil Nadu, INDIA
Client: TNRDC (Tamil Nadu Road Development Company)
The following responsibilities are carried out
 Conducting Road Inventory Survey, Pavement Condition Survey,
 BBD survey, Soil Test Pit Survey,
 Analysis of Survey Data,
 Pavement Design, Geometric Designs
 Junction Designs
 Design of road furniture,
 Preparation of Rate Analysis,
 Preparation of detailed Costing and preparation of BOQ.
DPR for Provision of Bus terminal in Krishnagiri Municipality, Krishnagiri, Tamil Nadu, INDIA
Client: TNUIFSL
The following responsibilities are carried out
 Co ordination for soil investigations, Topo survey, co ordination for traffic surveys,
 Design of Rigid Pavement and flexible Pavements for Bus Terminal Area,
 Preparation of Rate Analysis for Building and Road items
 Preparation of Detailed costing and preparation of BOQ for Building and Road Items

G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
48
DPR for Improvement of Traffic facilities in Coimbatore Corporation, Coimbatore, Tamil Nadu, INDIA
Client: TNUIFSL
The following responsibilities are carried out
 Co-ordination for Topographic Survey,
 Traffic surveys, and Collection Secondary data such as under ground utility lines,
 Design of flexible and rigid pavements and
 Preparation of Rate Analysis for pavement Items
 Cost estimate for pavement items.
Estimation and Marking of Required Right of Way on Ennore Expressway for EMRIP, Chennai, Tamil
Nadu, INDIA
Client: TNRDC (Tamil Nadu Road Development Company)
The scope of the project includes design of flexible and Rigid pavements for the project road and cost
estimates for the same.
The following responsibilities are carried out
 Finalisation of Geometric cross sections and Junction designs
 Geometric design of the Project road
 Preparation of Rate Analysis
 Preparations of Detailed Estimate & Bill of Quantities
Quality Audit for Road Works in Chennai Corporation, Chennai, Tamil Nadu, INDIA
Client: TNUIFSL
The work involved in quality audit consultancy for the Chennai Corporation roads monitoring Quality of
the work while execution in three Zones of Chennai Corporation. About 15 kms. of Road length of Semi
Dense Bituminous Concrete road.
DPR Integrated Infrastructure Development of Guindy Industrial Area, Chennai, Tamil Nadu.
Client: TNRDC (Tamil Nadu Road Development Company)
The following responsibilities are carried out
 The scope of the project includes work out the deficiency analysis for the estate roads and
design the roads
 work involved in co ordination of benkleman beam survey
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
49
 study pavement condition and road inventory surveys
 Analysis and design of Estate roads
 Design of Road furniture’s,
 Preparation of Rate Analysis
 Preparation of detailed estimate and BOQ for the same.
Traffic Revalidation Study for IT expressway, Chennai, Tamil Nadu.
Client: TNRDC (Tamil Nadu Road Development Company)
The study involves preparation of detailed project report for six lanning of the IT corridor popularly
known as Old Mahabalipuram road (OMR) near Chennai.
 Co ordination for Traffic surveys and analysis of Traffic data
 Preparation of Reports
Construction of Cement Concrete Roads, Chennai, Tamil Nadu.
Client: TNUIFSL
The scope of the project include preparation DPR and Bid documents for the construction of Cement
concrete road for 13 Km of corporation roads
The following responsibilities are carried out
 work involved in co ordination for pavement test pits and
 design of Rigid pavements,
 Preparation of Rate Analysis
 Preparation of detailed estimate and BOQ and
 Preparation of Tender document.
Preparation of Engineering & Landscape Report from Kathipara Junction to Meenambakkam Airport
on NH45 , Chennai, Tamil Nadu.
Client: TNRDC (Tamil Nadu Road Development Company)
The following responsibilities are carried out
 The study is to improve the urban stretch between Tambaram and Kathipara Junction on the
NH45 to international standards, with pavement strengthening, appropriate landscaping,
beautification, modern pedestrian facility and proper road marking and furniture work involved
 Co ordination for surveys. analysis of primary and secondary data,
 finalization of design standards and geometric design of the project road
 Design of flexible & Rigid pavement for the Project road
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
50
 Geometric design for the road & Junction designs
 design of lighting systems design of all road furniture’s
 Preparation of Rate analysis and
 Cost comparison of Flexible and rigid Pavement
 Preparation of Detailed Estimates, Bill of Quantities. And Bid documents
As a Post Graduation Student I was involved in Many Traffic and Transportation studies such as Volume
survey, Parking surveys, OD surveys, Speed delay surveys, Parking Surveys. I was Involved in Many
Government sponsored projects such as Traffic Operational and Management Plans for various cities,
Area traffic Management plans, Parking plans, Junction Improvements plans and Signal designs
COMPUTER KNOWLEDGE
Packages: MX, aaSIDRA. Arcady, Picady, KEY SIGNS, VISSIM (learning)
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
51
Name of Staff : A.KAMALAKUMAR
Date of Birth : 20/06/1975
Nationality : Indian
Educational Qualifications :
a) B.Tech (Civil) : Bapatla Engineering College
1998-2001
b) M. Tech (Structural Engineering) :
MS University, Baroda 2001-2002
Membership of Professional Societies : Nil
Employment Record : From March 2003 to till date
Position Held : Bridge Engineer/Structural Engineer
 Preparation of Detailed Project report for Rehabilitation and Upgrading to 2-Lane with paved
shoulder configuration of Ahmedabad – Dani Section from Kim river to Dandi of length
109Kms of National Highways No: 228 in the state of Gujarat.
Major bridges
Bridge over KIM River at Km 277.00 (2x40.0 of length 85m)
Bridge over Mindola River at Km 346.100 (2x40.0 of length 85m)
 Preparation of feasibility study and detailed project report for four laning of Sambalput-
Bargarh-orissa/chittisgarh border section of NH-6 in the state of Orissa under NHDP phase-III
(Total length 88 kms)
Major bridges (6-laning)
1. Bridge over Mahanathi at Km 7.200 (25x30.48+2x10.0 of length 842.50m)
2. Bridge over jainjore at Km27.324(7x12.4 of length 92.8m)
3. Bridge over Danta River at Km 39.755(11x16.0 of length 186m)
4. Bridge over jeera river on bargarh by-pass (7x33.50+2x10.50)
5. Bridge over nala on sohila by-pass (3x21m of length 64.800m)
Minor bridges(6-laning)
13 minor bridges and 2 Robs including under passes, RE walls and flyovers.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
52
 Design Review for Rehabilitation & Up-gradation of km 229.250 to km 381.000 of NH-76 to 4-
lane configuration in the State of Rajasthan - Consultancy Services for construction supervision
Package-I ADB Funded.
 Preparation of Detailed Project Report for construction of approach roads to the proposed
Bogibeel Rail-cum-Road Bridge across river Brahmaputra along NH-52B near Dibrugarh in Assam
Major bridges (3-lane)
Bridge at Km 22.560 over tangani river of length 208m (10 x 18.30)
Bridge at Km 22.010 of length 68 m(1 x 7.157 + 1x13.4 + 1 x13.45 + 1x13.45 + 1x 13.4 + 1x7.157)
Two minor bridges and one Rob
Major Bridges(6-lane)
1) Bridge over Kuni River at km 149.678 (length 130.0 m)
2) Bridge of span 3 x 21 m at 141.321 (length 63.0 m)
Flyovers(6-lane)
1) Flyover crossing of MSH-6 at km 132.850 i.e. Wani road junction
2) Flyover crossing of MSH-6 at km 139.900 i.e. Yavatmal, Mumbai road Junction
 Preparation of feasibility study and detailed project report for four laning of Nalbari
to Guwahati section of NH-31 from km 1065.00 to km 1124.00 (Pkg. C-III/24) under
East-West Corridor Project in the State of Assam. - Designing of 3 ROBs (one of 20 m
and 2 of 313 m) + 4 major bridges of 3 x 41 m span (123 m) PSC Girder and 2 x 41 m
span (82 m) PSC Girder & 23 other bridges) for NHAI. (Project Cost = Rs. 400 Crores)
3 Nos. of PSC Girder Bridge (3 x 41 m span of length 123 m)
2 Nos. of PSC Girder Bridge (2 x 41 m span of length 82 m)
4 Nos. of PSC Girder Bridge (1 x 41 m span of length 41 m)
3 RoBs including approaches (length of 330m,330m & 20m each)
 Consultancy Services for Preparation of Detailed Project Report for for Pilot Project for
Construction of Cement Concrete Roads in 4 districts of Andhra Pradesh & 4 districts of
Karnataka (Total Length = 27 km) under PMGSY for NCCBM, New Delhi. (Project Cost = Rs. 9
crores)
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
53
 Consultancy Services for preparation of DPR for widening to 2-lane from Km 220.00 to Km 352.00
of NH-155 in the state of Nagaland.
 Survey, Investigation and preparation of Detailed project report for improvement of Road
HAYULIANG-CHANGWANTI-HAWAI (65 Kms) to NH Double lane specifications in the state of
Arunachalpradesh.
 Survey, Investigation and preparation of Detailed project report for improvement of Road HUNLI -
ANINI (138 Kms) to NH Double lane specifications in the state of Arunachalpradesh.
 Proof Consultancy Services for 2 Flyovers to a length of 1.8 Km at Basheerbagh & Telugu Talli &
Ambedkar Statue Junctions, that includes checking of designs, field Supervision, checking of
alignment, location and Geometric design, Bridge Designs.
Summary of the CV
A) Education:
i) Field of Graduation and year : B.Tech (Civil) - 2001
ii) Field of Post Graduation and year : M. Tech. (Structures)- 2003
B) Experience:
i) Total experience in Highways : 8 1/2 years
ii) Responsibilities held : i) Bridge Engineer/Structural Engineer / MC
Consulting Engineers (P) Ltd. – 8 1/2 years
iii) Relevant Experience : 8 1/2 years
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
54
Name of Staff : Shruthi Srinivas
Profession : Traffic and Transportation Engineer
Date of Birth : 15th
June, 1983
Nationality : Indian
Education
 Master’s Degree in Transportation Engineering and Management from BMS College
Engineering, Bangalore, Visveswaraiah Technological University-2008
 Bachelor of Transportation Engineering from BMS College of Engineering, Bangalore
Visveswaraiah Technological University-2005
Employment Record
 September,2011 to
date
 October 2010-
August2011
: Project Engineer, GEP Infrastructure Private Limited
: Manager (Technical), Transport Training Institute and
Consultancy
 May 2007- September
2010
: Transportation Planner, Traffic and Transportation Division,
Wilbur Smith Associates Inc, Bangalore
 Aug 2005 – Apr 2007 : Engineer, Traffic and Transportation Division, Wilbur Smith
Associates Private Limited, Bangalore.
Key Qualifications
Six Years of Experience in Transportation Planning and Traffic Engineering Studies. Has professional
experience in Traffic Engineering, Transportation Planning, Transport Modeling, Highway Traffic
Forecasting and Parking Studies. Involved in preparation of survey formats, supervising all the traffic and
transportation surveys, assisting and analyzing all the traffic and transportation surveys, Development of
4 stage Travel Demand Model using the state-of-the art GIS travel demand modeling software such as
TransCAD and CUBE.
Professional Experience:
2010-2011
 Transport System Management Measures for Benniganahalli Ward
The main objective of the study is to conduct a detailed traffic study at a local level and propose
all the solutions needed to alleviate traffic and transportation problems of the area.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
55
As a Transportation Planner, involved in conducting and organizing Traffic Surveys, evaluating
existing situation and arriving at alternate solutions, Signal Design and preparation of Block Cost
Estimates.
2009-2010
 Transportation Planner, Comprehensive Traffic and Transportation Study for Bellary (Client:
The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for
Bellary Local Planning Area to understand the travel characteristics of the city and the LPA and
formulate short, medium and long-term solutions to alleviate traffic and transport problems.
As a Transportation Planner, involved in testing of different transport strategies for the horizon
years using CUBE, the state-of-the art GIS travel demand modeling software, involved in
formulating short, medium and long-term measures and also involved in data analysis and block
cost estimates.
 Transportation Planner, Comprehensive Traffic and Transportation Study for Gulbarga
The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for
Gulbarga Local Planning Area to understand the travel characteristics of the city and the LPA and
formulate short, medium and long-term solutions to alleviate traffic and transport problems.
As a Transportation Planner, involved in testing of different transport strategies for the horizon
years using CUBE, the state-of-the art GIS travel demand modeling software, involved in
formulating short, medium and long-term measures and also involved in data analysis and block
cost estimates.
 Consultancy Services for Preparation of DPR for Upgrading to 2 lane with Paved Shoulders of
Mangalore – Belur Section of NH-234 in the State of Karnataka (Package no. SP/B/2)
The main objective of the consultancy service is to establish the technical, environmental, social,
economical, and financial viability of the project and prepare detailed project reports for
rehabilitation and upgrading of the existing road to 2-lane/2-lane with paved shoulders
configuration and/or its strengthening.
As a Transport Planner involved in the Data Collection, Detailed Traffic Analysis, Traffic
Forecasting and in the preparation of Feasibility Report.
G.E.P. Infrastructure Private Limited (GEPIPL)
Flat No.504, 5th
Floor, Maheswari Chambers,Hyderabad – 500082.
Tel No: 040-65742613, +91-9949473774,www.gepinfra.com
E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com
56
 Consultancy Services for Preparation of DPR for Rehabilitation and upgrading to 2 lane with
Paved Shoulders of Madhugiri – AP Border Section of NH-234 in the State of Karnataka
(Package no. SP/A/2)
The main objective of the consultancy service is to establish the technical, environmental, social,
economical, and financial viability of the project and prepare detailed project reports for
rehabilitation and upgrading of the existing road to 2-lane/2-lane with paved shoulders
configuration and/or its strengthening.
As a Transport Planner involved in the Data Collection, Detailed Traffic Analysis, Traffic
Forecasting and in the preparation of Feasibility Report.
 Due Diligence Study for Varanasi-Aurangabad Section of NH-2
Primary objective of the present study is to revalidate the earlier reports, determine deviations,
if any in terms of AADT, growth rates, travel pattern and risks involved.
As a Transport Planner involved in the preparation of survey formats, zone delineation, Detailed
Traffic Analysis, Traffic Forecasting and in the preparation of report.
 Due Diligence Study for Kishanngarh-Beawar Section of NH-8
Primary objective of the present study is to revalidate the earlier reports, determine deviations,
if any in terms of AADT, growth rates, travel pattern and risks involved.
As a Transport Planner involved in the preparation of survey formats, zone delineation, Detailed
Traffic Analysis, Traffic Forecasting and in the preparation of report.
 Transportation Planner, Comprehensive Mobility Plan for Jodhpur City
The main objective of the study is to explore the feasibility of Mass Transit systems and study
aspects like the city’s population, expanse, human density, traffic conditions, number of
vehicles, private and public transport, sewerage and drainage network, power and water
distribution etc. As a Transportation Planner involved in the traffic and transportation survey
analysis such as Mid-Block, Turning Volume count, Household Interview Survey, Roadside
Interview Survey, Pedestrian Survey and Parking Survey and also involved in the demographic
analysis and Projections.
 Transportation Planner, Comprehensive Traffic and Transportation Study for Bangalore
Metropolitan Region
The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for
Bangalore Metropolitan Region to ensure adequate accessibility and smooth mobility for all
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web
GEPIPL Profile 9.5.12-web

More Related Content

What's hot

Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad
 
nbccindia.com NBCC Recruitment 2014
nbccindia.com NBCC Recruitment 2014 nbccindia.com NBCC Recruitment 2014
nbccindia.com NBCC Recruitment 2014
Ramanareddy Anathapur
 
CV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFCV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFShajeer A.S
 
Cv
CvCv
Resume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year expResume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year exp
saurabh33776
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPsureshrenu1996
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
Mohan Kaliamurthy
 
Pradeep_Ramrao_Shinde_CAE_ENGINEER
Pradeep_Ramrao_Shinde_CAE_ENGINEERPradeep_Ramrao_Shinde_CAE_ENGINEER
Pradeep_Ramrao_Shinde_CAE_ENGINEERpradeep shinde
 
CV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerCV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerAkbar Sadiq
 

What's hot (14)

Resume_Amteshwar
Resume_AmteshwarResume_Amteshwar
Resume_Amteshwar
 
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity Surveyor
 
nbccindia.com NBCC Recruitment 2014
nbccindia.com NBCC Recruitment 2014 nbccindia.com NBCC Recruitment 2014
nbccindia.com NBCC Recruitment 2014
 
CV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDFCV-SHAJEER(23-02-2015).PDF
CV-SHAJEER(23-02-2015).PDF
 
Cv
CvCv
Cv
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
 
Resume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year expResume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year exp
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
QS - CV
QS - CVQS - CV
QS - CV
 
Quantity Surveyor CV
Quantity Surveyor CVQuantity Surveyor CV
Quantity Surveyor CV
 
Pradeep_Ramrao_Shinde_CAE_ENGINEER
Pradeep_Ramrao_Shinde_CAE_ENGINEERPradeep_Ramrao_Shinde_CAE_ENGINEER
Pradeep_Ramrao_Shinde_CAE_ENGINEER
 
CV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerCV - Electrical Estimation Engineer
CV - Electrical Estimation Engineer
 
Mr. Noor02.03.2016
Mr. Noor02.03.2016Mr. Noor02.03.2016
Mr. Noor02.03.2016
 

Similar to GEPIPL Profile 9.5.12-web

Sincrono solutions Traffic and Transportation
Sincrono solutions Traffic and TransportationSincrono solutions Traffic and Transportation
Sincrono solutions Traffic and Transportation
jitendra mane
 
Amar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmar Rajendra Rahate Resume
Amar Rajendra Rahate Resume
AmarRahatePatil
 
Fawad cv a
Fawad cv aFawad cv a
Fawad cv a
Fawad Mazhar
 
Junaid Uddin Mohammed - Resume
Junaid Uddin Mohammed - ResumeJunaid Uddin Mohammed - Resume
Junaid Uddin Mohammed - Resume
Junaid Uddin Mohammed
 
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee
 
Company Profile IKRAM PREMIER CONSULTING
Company Profile IKRAM PREMIER CONSULTINGCompany Profile IKRAM PREMIER CONSULTING
Company Profile IKRAM PREMIER CONSULTING
Imran37Afiq
 
COMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYCOMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYSanjay Jha
 
Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014
Ibrahim Al-Hudhaif
 

Similar to GEPIPL Profile 9.5.12-web (20)

Sincrono solutions Traffic and Transportation
Sincrono solutions Traffic and TransportationSincrono solutions Traffic and Transportation
Sincrono solutions Traffic and Transportation
 
MY PROFILE
MY PROFILEMY PROFILE
MY PROFILE
 
Ravi_Shenker2014
Ravi_Shenker2014Ravi_Shenker2014
Ravi_Shenker2014
 
MOHAMMED BADER_CV
MOHAMMED BADER_CV MOHAMMED BADER_CV
MOHAMMED BADER_CV
 
Amar Rajendra Rahate Resume
Amar Rajendra Rahate ResumeAmar Rajendra Rahate Resume
Amar Rajendra Rahate Resume
 
Fawad cv a
Fawad cv aFawad cv a
Fawad cv a
 
Brajnandan Kumar Profile
Brajnandan Kumar ProfileBrajnandan Kumar Profile
Brajnandan Kumar Profile
 
resume_ved_
resume_ved_resume_ved_
resume_ved_
 
Junaid Uddin Mohammed - Resume
Junaid Uddin Mohammed - ResumeJunaid Uddin Mohammed - Resume
Junaid Uddin Mohammed - Resume
 
Resume Md Firoz Mahmood Ovi
Resume Md Firoz Mahmood OviResume Md Firoz Mahmood Ovi
Resume Md Firoz Mahmood Ovi
 
ManojKumar_2016
ManojKumar_2016ManojKumar_2016
ManojKumar_2016
 
NEW CV (2014- DEC)
NEW CV (2014- DEC)NEW CV (2014- DEC)
NEW CV (2014- DEC)
 
_Mohamad Bendary_Jan-2015
_Mohamad Bendary_Jan-2015_Mohamad Bendary_Jan-2015
_Mohamad Bendary_Jan-2015
 
CV_Shabeer
CV_ShabeerCV_Shabeer
CV_Shabeer
 
CV_09.09.2016
CV_09.09.2016CV_09.09.2016
CV_09.09.2016
 
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2
 
Company Profile IKRAM PREMIER CONSULTING
Company Profile IKRAM PREMIER CONSULTINGCompany Profile IKRAM PREMIER CONSULTING
Company Profile IKRAM PREMIER CONSULTING
 
COMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYCOMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEY
 
Resume
ResumeResume
Resume
 
Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014Flour Presentation MEED MENA 2014
Flour Presentation MEED MENA 2014
 

GEPIPL Profile 9.5.12-web

  • 1. #504, Maheswari Chambers, Somajiguda, Hyderabad- 500082. Ph:+91-40-65742613 www.gepinfra.com E-Mail:gepipl@yahoo.in GEP Infra 2012 Profile and Capability of GEP Infra Consultants
  • 2. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 2 Vision “To be recognized as the best consultancy organisation in the field of Infrastructure Development for its people performance, creativity, technical excellence and dedication”. Mission Our mission is acquisition and application of knowledge and thereby succeeds in service delivery from winning the confidence of client through proven performance. Company Background GEP Infrastructure Private Limited (GEPIPL) is a professional multidisciplinary consultancy organization committed to provide quality services in various disciplines of infrastructure and other developments. GEPIPL is managed by engineers, planners and ably supported by experts in various disciplines of highest caliber. The major fields of specialization of GEPIPL relates to Traffic and Transportation systems of various types which include highways, expressways, rural roads, urban roads, bridges, flyovers, grade-separated interchanges amongst others and Water Supply and Sewerage Systems Planning and Design. GEPIPL provides consultancy services in the following disciplines;  Traffic and Transportation  Traffic Surveys, Data Analysis, Demand Forecast and Traffic Assignment  Traffic/Cost Validation Studies  Pre-Bid Traffic Studies  Review of traffic forecast for Bankers/ Financial Institutes  Traffic Engineering and Management Studies  Traffic Dispersal Scheme  Design of Junction and Terminal Points  Freight and Public Transport Studies  Transportation Planning and System Analysis
  • 3. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 3  Road Way Design  Route Location Studies  Inventory and Visual Condition Assessment  Topographic and Hydrographical Survey  Geotechnical Investigation and Materials Testing  Road Roughness Measurement  Benkelman Beam Deflection Test  Pavement Evaluation and Design  Geometric Design  Design of Bridges, Flyovers, Interchanges and other related Structures  Detail Design of Road, Bridges & Cross Drains  Public Health Engineering  Feasibility study of the proposed system with respect to the demand, environment, supply and other factors Assessment of Water resources & water supply, preparation of preliminary estimate.  Design of Drinking water supply and distribution Network  Design of sewerage and storm water network  Design of the Sewage treatment plant.  Pre Tendering Services  Urban Planning  Quality Control and Assurance SCOPE OF SERVICES GEPIPL renders comprehensive consultancy services starting from initial fact finding and appraisal studies, project preparation, formulation and concept planning, feasibility study, detailed engineering and pre contract services. The services include:  Preliminary Investigations  Project Identification  Techno-Economic Feasibility Study
  • 4. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 4  Field Surveys/Investigations (Bathymetric, Construction Materials, Geotechnical, Socio- economic, Topographical, Traffic, etc.) and Analysis.  Economic and Financial Analysis  Conceptual Design  Detailed Design and Engineering of Roads and Highways and Pavement, Infrastructural development for Township , large commercial complexes, Special Economic Zones(SEZ)  Preparation of project reports, technical specifications, cost estimates, analysis of rates, tender documents.  Detailed Design of Bridges, Culverts and Other Structures  Quality Control/Assurance
  • 5. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 5 Board of Directors P.S.Potchi Reddy P.S. Potchi Reddy is a graduate in Civil Engineering with Specialization in Transportation Planning with 20 years of experience in the field of traffic engineering and transport planning. He has experience in organizing and conducting Traffic and Transportation and Engineering surveys, data processing and analysis,, conducting of safety audits, junction design & improvements, feasibility studies for road corridors expressways & bypasses, preparation of detailed project reports, traffic management plans and traffic forecasting for road, parking and truck terminal projects. Mr.Rama Krishna Has about 12 years of experience (includes 5 years Middle east & UK) in carrying out the concept design, feasibility and detailed designs for Urban and Rural Expressways, Arterial / Collector Streets and Local Streets, Sea land developments and town ships Has involved design reviews for major road projects in India,UK and the Gulf region (in the State of Qatar, Libya & Bahrain) starting from Preliminary stage to Tender and Construction stages. Mr.E.Surya Prakash Reddy He has 8 years of experience in the field of Transportation/Highway Engineering Consultancy and Constructions. He has experience in conducting various Traffic and Transportation Surveys, data coding, data analysis, traffic forecasting, and mathematical modeling. Conducting of safety audits, feasibility studies for road corridors expressways & bypasses, preparation of detailed project reports and Financial Analysis. Mr.G.V.Ramana Rao He has more than 16 years of experience in the construction supervision of building construction and road construction. He has also experience in Quality Control and Quality Assurance.
  • 6. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 6 Our Capability 1 Traffic and Transportation With traffic on our roads forecast to grow multi-fold, there is an ever increasing need for transport solutions that make the most of existing assets, including road space, whilst meeting the needs of those who walk, cycle or take the bus. Backed by our experts in various fields, we can ensure innovative solutions for our clients in areas such as Traffic Forecast, Traffic Management including Parking Strategies & Traffic Signal Design, Non-Motorized Transport (Walking & Cycling), Traffic Impact Studies, Traffic Engineering Studies, etc.  Traffic Data Collection and Analysis  Classified Traffic Volume Counts  O– D Surveys  Willingness to Pay/ Stated Preference Surveys  Turning Movement Count Surveys at intersections  Speed and Delay surveys using Moving Car Method  Socio-Economic Surveys  Traffic Impact Studies Development proposals that are subject to Planning Control Norms require a traffic impact analysis to determine transportation concurrency and to estimate traffic impacts and required improvement/ mitigation measures. We provide Development Proposals for:  Special Economic Zone Projects  Mixed Development Projects  IT/ Office Complex  Residential projects of ten units or more;  Non-residential projects
  • 7. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 7  Parking Studies Parking studies are carried out to determine location, use and adequacy of existing parking facilities as well as future parking requirements including future demand. The following is the range of issues that are generally addressed in a parking study:  Survey of existing parking utilization  Estimation of future parking demand  Calculation of shared parking opportunities  Design of on-street parking or parking lots  Design and review of parking lot access and circulation  Review of valet parking operations  Parking management (time limits, enforcement, parking fees)  Cost and financing of Parking lots or structures  Intersection Planning and Design Intersection geometry, accident history, traffic conflicts, traffic volumes, signal timings and human factors will be studied.  Traffic signal warrant study  Signal design  Intersection Geometric Improvement Study  Warrants for Grade Separation  Traffic/Cost validation studies We undertake pre and post bid stage traffic and cost validation studies for State Highways and National Highways developed on BOT/Annuity basis.  Traffic Engineering Studies  Techno-Economic Feasibility Studies
  • 8. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 8 2. Road Way Design We undertake geometric design of Highways using software like MX-Road together with AutoCAD. The graphic files containing survey data will be transferred to design package and the detailed design and quantity calculations will be executed through the following steps:  Generating Digital Terrain Model (DTM) followed by triangulation and contour plan of the existing ground surface  Designing horizontal alignment of the Proposed center line along the existing alignment and providing geometric improvement wherever necessary  Generating existing ground profile along the Proposed center line; designing vertical Alignment for the proposed center line, so as to match with the formation level of the existing alignment wherever possible and providing geometric improvement wherever necessary.  Creating cross-section templates and roadway libraries showing street-wise applicability of different template.  Running ‘roadway modeller’ to generate proposed road surface showing carriageway and shoulder edges, toe lines of proposed embankment etc.  Generating reports on proposed cross sections and setting out data as well as reports on Horizontal and vertical alignment, clearance of structures and  Utilities, utility relocation etc. using ‘Reports’ module. Calculating earthwork and sub Grade quantities All the relevant drawings will be prepared in the format as stated in IRC: SP-19.  Collection of various Engineering Surveys Data  Road Inventory and Condition Survey  Pavement Condition survey  Inventory for Culverts, Bridges and Structures  Topographical Surveys and Soil Investigations
  • 9. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 9  Pavement Design We have a dedicated team who can provide expert advice on the assessment of road pavements and supporting infrastructure and their deterioration over time. We can provide effective designs, with pavement testing for both during the construction and the concession period.  Economic and Financial Analysis 3. Public Health Engineering  Water Supply, Sewerage and Storm Water Drainage System:  Feasibility study of the proposed system with respect to the demand, environment, supply and other factors Assessment of Water resources & water supply, preparation of preliminary estimate.  Water quality analysis, preparation of engineering study report involving population projection, economic analysis of rising main & distribution system.  Purification and recovery of waste water for irrigation and recharging of ground water aquifers.  Development and management of water Resources  Design of Drinking water supply and distribution network  Design of sewerage and storm water network  Design of the Sewage treatment plant.  Design of Drinking water supply and distribution Network
  • 10. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 10  Design of sewerage and storm water network  Design of the Sewage treatment plant.  Sewerage development and treatment of sewage  Aesthetic water bodies development for recreation designed sewer networks, trunk sewers, pumping stations, oxidation ponds and outfall  Preparation of technical specifications as per the required codal provisions  Preparation of detailed working drawings for the network, appurtenances and structure 4. Quality Assurance and Quality Control  Independent Review and Quality Monitoring the progress of projects  Periodical visits to the site in all stages of project execution  Preparation of standard check lists covering various activities and submit the Performance report (fortnightly / monthly) to the client  Review test reports on materials that are tested by the Contractor as stated in the Individual Contract Documents.  Select additional materials on random basis for independent testing.
  • 11. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 11  Incorporate results in periodic testing reports and contract monitoring report.  Quality of workmanship.  To make unscheduled visits to site to ensure random surprise checks from time to time to the various works under construction. 5. Urban Planning  Master Planning The Master Plan produces a concise written report summarizing the development policies and phasing over time. It is accompanied by a plan defining the finer grain of the urban frame work at the scale of the urban plot.  Assessment of the environmental, physical, economical, social and planning Context  Translation of vision into a detailed development frame work with the creation of a public realm spatial structure, a selection of appropriate uses and infrastructure.  Implementation and phasing, outlining a development schedule  Site Potential Analysis Site potential analysis is a process designed for the prospective developer. It provides an ideal bargaining tool in the early negotiation phase with the planning authorities and the public. Before land is acquired and before substantial financial means are committed to the project the client is given at the outset an idea of economic implications. Site potential analysis assesses development potential so as to determine the likelihood of obtaining planning permission. It involves the following stages  Visual appraisal of site context and site conditions  Design brief development  Establishment of preliminary Master Plan  Production of final presentation in 2 dimensional and 3 – dimensional formats.
  • 12. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 12 Manpower S.No. Name of the Staff Member Qualification Specialisation Number of years experience 1 P.S.P.Reddy B.E., Master of Planning Transport Planning 21 2. Ramakrishna R B.Tech., Master of Urban Engineering Urban Transportation 12 3 E.Surya Prakash Reddy M.Tech. Transportation Engineering 8 4 Ramana Rao D.C.E Civil Engineering 16 5 A.Kamal Kumar M.Tech. Structural Engineering 11 6 T.Gnaneswar M.Tech. Transportation Engineering 2 7 Shruthi Srinivasan M.Tech. Transportation Engineering 6 8 J.Sandeep M.Tech. Transportation Engineering 1 9 Phaneendra STP B.Tech. Civil Engineering 1 10 K.B.Krishna Murthy M.Engg. Public Health Engineering Retd. C.E. 11 S.K.Moinuzzama B.Arch. Urban Planning Retd.P.O. 12 Lovin D.C.E AutoCAD draftsman 6 13 B.Veerendar Intermediate Surveys supervisor 1 14 Srinivas Graduate Surveys supervisor 2
  • 13. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 13 Office address Regd. Office : 504, Maheswari Chambers, Somajiguda, Hyderabad- 500 082 Phone : 040-65742613, 9949473774 Email : gepipl@yahoo.in, reddypsp@yahoo.com Web Site : www.gepinfra.com Our Divisions
  • 14. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 14 Our Clients  Ramky Infrastructure Limited  AMR Constructions Private Limited  GVR Infra Projects  GKC Constructions  Sowbhagya Projects Private Limited  Jindal Cements Limited  GMR Maharashtra Energy Limited  Roads & Buildings, Govt. of A.P.  IVRCL Ltd. Association with other Indian Firms  Systra MVA Consulting(India) Private Limited  Tandon Urban Solutions Private Limited  CRAPHTS Consultants (India) Private Limited  Artefact Projects Limited  Consulting Engineering Services(India) Private Limited  Varna Engineering Consulatnts Pvt Ltd.
  • 15. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 15 Summary of Project Experience of the Firm S.N o. Name of the Project Name and Address of the Client Date of Brief Scope of Work Starting Ending 1 Assessment of Traffic on Jetpur to Somanath section of NH-8D in Gujrath State M/s Value Engineering, Bangalore 08.06.2010 30.06.2010 Conducting Traffic surveys, Estimation of Traffic, Estimation of traffic leakage, identification of alternate competing routes, Estimation of Toll Revenue, Toll Plaza Locations, 2 Preparation of Detailed Project Report, Execution designs for BRTS in Vizag GVR Infra Ltd., Chennai 04.07.2010 08.09.2010 Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation, tender document preparation and evaluation 3 Preparation of Detailed Project Report, Execution designs for Kadapa-Pulivendula (Annutiy Project) Ms Soubaghya Constructions 01.06.2010 09.09.2010 Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation, tender document preparation and evaluation 4 Preparation of Intersection Design and Signal Design for the junction along the BRTS corridor in Visakhapatnam M/s GKC Constructions, Hyderabad 03.06.2010 10.08.2010 Conducting intersection traffic volume count surveys, total station survey, intersection design and signal design 5 Estimation of Parking Demand around Charminar area in Hyderabad M/s MVA Systra (India) Private Limited, Mumbai 05.10.2010 10.11.2010 Conducting parking survey, demand estimation 6 Preparation of Detailed Project Report(DPR) for the construction of Hill Road connecting Ultratech Cement near Tadpatri, Anathapur District, Andhra Pradesh M/s G.Soma Sekhara Reddy, Anathapur 11.02.2010 15.03.2010 Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation 7 Preparation of Detailed Project Report(DPR) for the connecting road to Jindal Cement Factory, near Nandyal, Kurnool district, Andhra Pradesh M/s Jindal Steel Works, Hyderabad 23.12.2010 22.01.2011 Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation, tender document preparation and evaluation 8 Preparation of Detailed Feasibility Report(DFR) for Roads and Buildings Division, 18.02.2011 15.04.2011 Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of
  • 16. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 16 widening from single lane to two lane of Kodangal to Gulbaraga Road in Mahboobnagar district Mahaboobnagar, Andhara Pradesh quantities(BOQ), Cost Estimation,tender document preparation and evaluation 9 Preparation of Pre-Feasibility and Feasibility Study Reportfor Signal Free Corridor from Cubban Road to Outer Ring Road via Kamraj Road in Benguluru. Tandon Urban Solutions Private Limited,Mumbai. 19.03.2011 On going Conceptual design of elevated corridor and Technical and Economical Feasibility Study for Signal Free Corridor from Cubban Road from Outer Ring Road via Kamraj Road. 10 Preparation of Pilani Urban Infrastructure Project, Pilani, Rajasthan. Birla Charitable Trust 30.04.2011 06.06.2011 Preparation of Pre-Feasibility study for theimprovement of infrastructure facilities like Roads, Sewerage, StormWater Drainage, SolidWaste Management, StreetLighting, Rain Water Harvesting etc. 11 Preparation of Detailed Design of Hata-Silapuri-Darguwan Road on BOT(Toll plus Annuity) in Madhya Pradesh. Soubhagya Projects Private Limited, Hyderabad. 15.06.2011 On going Conducting total station survey, soil investigations, preparation of geometric design, pavement design, Bill of quantities(BOQ), Cost Estimation, 12 Engagement of Consultant for carrying out detailed engineering services for the approach road from the Umbarghar jetty to the proposed site, for the proposed 1200 MW Gas based combined cycle power plantof GMR Maharastra Energy Lmited (GMEL) at Dapoli Taluka, Ratnagiri District, Maharastra. GMR Energy Ltd 23.07.2011 On going Surveys, Investigations, Detailed designs for proposed road, including preparation of Bill of quantities, cost estimates and preparation of Tender documents. 13 GVMC – Projects – JNNURM- Balance stretch of 2 km – Investigation, survey, Design and execution of Bus Rapid Transit System (BRTS) Corridor from ch. 14 to ch 16 with 2 years defect liability under EPC system. GVR Infra Projects Ltd., 25.07.2011 On going Surveys, Investigations, Detailed designs for proposed road, including preparation of Bill of quantities, and cost estimates.
  • 17. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 17 14 Pre-tendering Engineering services for Rehabilitation and up gradation tofour laning of Angul – Sambalpur section of NH-42 (km 112 – km 265) in the state of Orissa under NHDP-IV on Design, Build, Finance Operate and Transfer on BOT(TOLL) basis. Ramky Infrastructure Ltd 27.07.2011 22.08.2011 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 15 Pre-tendering Engineering services for Rehabilitation and up gradation tofour laning of Sanga Reddy to MH_KNTborder section of NH-9(km 348.000 – km 493.000) under NHDP-IV on Design, Build, Finance, Operate and Transfer on BOT(TOLL) basis. Ramky Infrastructure Ltd 06.09.2011 20.09.2011 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 16 Pre-tendering Engineering services for Rehabilitation and up gradation tofour laning of Cuttak - Angul section of NH-9(km 0.000 – km 112.000) in the state of Orissa under NHDP-IV on Design, Build, Finance, Operate and Transfer on BOT(TOLL) basis. AMR Constructions Hyderabad 06.09.2011 20.09.2011 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 17 Pre-tendering Engineering services for Rehabilitation and up gradation tofour laning of Zirakpur to Patiala section of NH- 64(km 0.000 – km 50.700) in the Ramky Infrastructure Ltd 22.10.2011 04.11.2011 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations
  • 18. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 18 state of Punjab on Design, Build, Finance, Operate and Transfer on BOT(TOLL) basis. Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 18 Pre-tendering Engineering services for Rehabilitation and up gradation tofour laning of Birmitrapur to Barakote section of NH-23(km 211.200–km 335.800) in the state of Orissa on Design, Build, Finance, Operate and Transfer on BOT(TOLL) basis. Ramky Infrastructure Ltd 18.11.2011 01.12.2011 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 19 Preparation Road Safety Audit for National Highway No. 5, 215 and 203 in the state of Orissa. CRAPHTS Consultants (India) Private Limited, New Delhi. 01.12.2011 On going Collection and analysis of Accidents data fromthe police stations along the project corridorsfor the last two years. Preparation of safety audit reportduring development stage and construction stage. 20 Pre-tendering Engineering services for Four Laning of Obedullaganj Betul section of NH-69 from km 2.800 to 8.300 and from km20.700 tokm 137.000 (approx. length 121.36 km) (excluding wild life sanctuary from km 8.300 to km 20.700)(Except Bypass 28.000 to km 61.500 as Two Lane with paved shoulder) in the state of MP to be executed as BOT(Toll) project on DBFOT pattern under NHDP Phase III Ramky Infrastructure Ltd 17.12.2011 07.01.2012 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis.
  • 19. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 19 21 Pre-tendering Engineering services for Four laning of CHANDIKHOLE-DUBARI- TALCHER section of NH-200 from km 301.890 tokm 428.030 including km8.500 to km15.750 of NH-23 in the state of Orissa to be executed as BOT(Toll) project on DBFOTPattern under NHDP Phase III Ramky Infrastructure Ltd 07.02.2012 20.02.2012 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 22 Pre-tendering Engineering services for Four Laning of Solapur-Bijapur section ofNH– 13 fromkm. 0.00 to km. 110.542 to be executed asBOT(Toll) basis on DBFOTPattern under NHDP Phase III Ramky Infrastructure Ltd 03.03.2012 16.03.2012 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 23 Pre-tendering Engineering services for Four laning of Coimbatore-Mettupalayam section of NH-67 from Km 377.780 in the state of Tamilnadu to be executed as BOTon DBFOT(Toll) Basis AMR Constructions Hyderabad 03.03.2012 26.03.2012 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis. 24 Pre-tendering Engineering services for Rehabilitation and upgradation to Six laning of IVRCL Limted Vishakapatnam 03.03.2012 28.03.2012 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks
  • 20. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 20 Anakapalli- Anandapuram section of NH-5 fromKm 682+980 to Km 741+202 in the state of Andhra Pradesh to be executed as BOT(toll) on DBFOTPattern UNDER NHDP PHASE- V Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis 25 Pre-tendering Engineering services for Rehabilitation and upgradation to Six laning of Gundugolanu to Rajahmundry section of NH-5 from Km 80+000 to Km 200+000 in the state of Andhra Pradesh to be executed as BOT(toll) on DBFOTPattern UNDER NHDP PHASE- V IVRCL Limted Vishakapatnam 03.03.2012 28.03.2012 Traffic surveys and analysis Estimate toll revenue for the concession period Identificationof project risks Road and Bridge Inventory Earthwork calculations Preparation of GAD for structures Preliminary Pavement design Filed Investigations likeborrow areas, stone quarry and lead charts Preparation of Detailed BOQ with analysis 26 Detailed Design and Engineering Services for two laning of Bahri- Hanumana BOT(Toll+Annuty) in the state of Madhya Pradesh GVR Infra Projects Ltd., 22.03.2012 On Going 27 Preparation of plan and profile Design for 2 MDR of Length 135 Km in the stateof Madhya Pradesh Varna Engineering Consultants Pvt Ltd. 26.03.2012 On going Pavement Design Plan and Profile Design Junction Design Sign and Markings Preparation of Detailed BOQ with analysis
  • 21. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 21 28 Preparation of Detailed Project Report for Comprehensive Water Supply Scheme in Adoni Municipality. Adoni Municipality,ADONI. 06.03.2012 On going  Reviewing the existing situation and undertaking necessary assessments.  Feasibility analysis and detailed planning.  Keeping the view the broader thrust, as stated above, the specific scope of study is again broken up as given below:  Reviewing population projections for horizon years 2013, 2028, 2043.  Review of maps and drawings availablewith concerned authorities.  Water demand assessments.  Analysis, scoping and screening of key social, environmental aspects
  • 22. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 22 Name of Staff : Mr. P.S. Potchi Reddy Date of Birth : 2nd November, 1964 Nationality : Indian Educational Qualifications:  B.E. in Civil Engineering from Marathwada University, Aurangabad, in 1990.  Master of Planning with Specialization in Transportation Planning, School of Planning and Architecture, New Delhi, 1998. Membership of Professional Societies :  Member, Institute of Urban Transport, India  Member, Indian Roads Congress Trainings :  Attended two weeks training programme on “Traffic and Transportation Planning” conducted by Central Road Research Institute (CRRI), New Delhi.  Attended one week training programme on “Metropolitan Transport Management” conducted by Yaswantrao Chavan Academy of Development Administration (YASHADA), Pune. Publication :  Paper on “Accident Analysis on National Highways” case study Pimpalgoan-Gonde section of NH-3, 2001.  Paper on “Preparation of Master Plan with innovative techniques” case study Master Plan for Visakhapatnam Metropolitan Region, 2004.
  • 23. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 23 Employment Record:  From March,2011 M/sGEP Infrastructure Private Limited, Hyderabad Managing Director 1. Consultancy Services for Preparation of Detailed Project Report(DPR) for the connecting road to Jindal Cement Factory, near Nandyal, Kurnool district, Andhra Pradesh Project Length : 22. Km, 2 lane Rigid pavement Funding : Jindal Steel Limited Client : Jindal Steel Limited Position : Team Leader and Traffic Engineer Location : Nandyal 2. Preparation of Detailed Feasibility Report(DFR) for widening from single lane to two lane of Kodangal to Gulbaraga Road in Mahboobnagar district Project Length : 5.0 Km, 2 lane Funding : Roads & Buildings Department Client : Roads & Buildings Department Position : Team Leader and Traffic Engineer Location : Kodangal 3. Preparation of Pre-Feasibility and Feasibility Study Report for Signal Free Corridor from Cubban Road to Outer Ring Road via Kamraj Road in Benguluru. Project Length : 18.5 Km Funding : Bangalore Development Authority(BDA) Client : Tandon Urban Solutions Private Limited, Mumbai Position : Team Leader and Traffic Engineer Location : Bangalore 4. Preparation of Detailed Design of Hata-Silapuri-Darguwan Road on BOT(Toll plus Annuity) in Madhya Pradesh. Project Length : 64.0 Km Funding : Madhya Pradesh Road Development Corporation(MPRDCL) Client : Soubhagya Projects Private Limited Position : Team Leader and Traffic Engineer Location : Madhya Pradesh
  • 24. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 24 5. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Angul – Sambalpur section of NH-42 (km 112 – km 265) in the state of Orissa under NHDP- IV on design,build,finanace operate and transfer on BOT (TOLL) basis. Project Length : 153.0 Km Funding : Ramky Infrastructure Limited Client : Ramky Infrastructure Limited Position : Team Leader and Traffic Engineer Location : Orissa 6. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of MH_KN- Border to Sanga Reddy section of NH-9 from km 348.00 to Km 493.00 under NHDP-IV on design,build,finanace operate and transfer on BOT (TOLL) basis. Project Length : 145.0 Km Funding : Ramky Infrastructure Limited Client : Ramky Infrastructure Limited Position : Team Leader and Traffic Engineer Location : Andhra Pradesh 7. Pre-tendering Engineering services for Rehabilitation and up gradation to four laning of Cuttack - Angul section of NH-42 (km 0.000 - km 112) in the state of Orissa under NHDP-IV on design,build,finanace operate and transfer on BOT (TOLL) basis. Project Length : 112.0 Km Funding : AMR Constructions Limited Client : AMR Constructions Limited Position : Team Leader and Traffic Engineer Location : Orissa  From Sep 2010 to March,2011 M/s Arvee Associates Architects Engineers & Consultants Pvt. Ltd. Vice President 1. Consultancy Services for labeling, conducting traffic surveys, road inventory survey and prioritization of 3 lane and above major roads for strengthening in Greater Hyderabad Municipal Corporation jurisdiction. Project Length : 800 Km, 3 lane and above Funding : Greater Hyderabad Municipal Corporation (GHMC)
  • 25. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 25 Client : Greater Hyderabad Municipal Corporation (GHMC) Position : Team Leader and Traffic Engineer Location : Hyderabad 2. Consultancy Services for preparation of revision of Master Plan for Rajahmundry Municipal Corporation area. Project area : 80 Sq.Km Funding : Rajahmundry Municipal Corporation Client : Rajahmundry Municipal Corporation Position : Traffic and Transportation Expert Location : Rajahmundry 3. Consultancy Services for assessment of traffic impact due to the development of Knowledge City at Hitech City in Hyderabad. Project area : 31.5 acres(6.0 million sq.ft. area development) Funding : DLF Limited Client : DLF Limited Position : Team Leader cum Traffic and Transportation Expert Location : Hyderabad  Mar 2002 to Aug 2010 Consulting Engineering Services (I) Ltd., New Delhi Senior Engineer/Deputy Project Manager/Project Manager/Deputy General Manager/General Manager 4. Consultancy for Preparation of Pre-feasibility report for the Construction of Ring Road/Bypass for Lucknow and Varansi cities of length 250 kms of 4 lanes in the state of Uttar Pradesh. Project Length : 250 Km, 4 lane Project Cost : INR 3250 Crores Funding : National Highways Authority of India Client : National Highways Authority of India Position : Traffic Engineer cum Safety Expert Location : Uttar Pradesh
  • 26. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 26 5. Consultancy Services for Preparation of Feasibility-cum-Preliminary Design for Standalone Bypasses/Ring Road of length 445 kms of 6 lane for Viskhapatnam City in the State of Andhra Pradesh under NHDP Phase VII. Project Length : 45 Km, 6 lane Project Cost : INR 450 Crores Funding : National Highways Authority of India Client : National Highways Authority of India Position : Traffic Engineer cum Safety Expert Location : Andhra Pradesh Job scope, responsibilities includes: As Traffic Engineer-cum-Safety Expert he was responsible for developing Quality Assurance Plan and implementation procedure; evolve, finalize; formats and requirement of traffic surveys including location of traffic surveys; supervise all traffic surveys and analyze traffic data; identify bypass locations and location of traffic control; carryout preliminary design of intersection and interchanges; identify and design road furniture, traffic safety facilities including traffic safety measures. He was also involved in preparation of Traffic Management Plans, assist Team Leader in conducting Road Safety Audit; suggesting the complete layout and design of access regulation measures, traffic safety facilities and provide such solutions which enhance safety during construction and operation phase. 6. Consultancy Services for preparation of Detailed Project Report for infrastructure facilities in Aviation Special Economic Zone (SEZ), Shamshabad, Hyderabad. Project Length : 50 Km, 4 lane Project Cost : INR 450 Crores Funding : GMR Client : GMR Position : Project Co-ordinator / Traffic & Transportation Expert Location : Andhra Pradesh Job scope, responsibilities includes: As Project Coordinator/Traffic & Transportation Expert he was responsible for preparation of traffic management plans, conducting traffic surveys, data collection, analysis, liaison, bills processing and realization of payments.
  • 27. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 27 7. Preparation of Detailed Feasibility Report for Upgradation of Single lane and Intermediate lane roads into 2/4 lane roads from Kalwakurthy to Nandyal of length 174 kms in the state of Andhra Pradesh Project Length : 174 Km, 2/4 lane Project Cost : INR 430 Crores Funding : Andhra Pradesh Road Development Corporation Client : Andhra Pradesh Road Development Corporation Position : Traffic Engineer Location : Andhra Pradesh 8. Preparation of Detailed Project Report for Bus Rapid Transit System in Vijayawada in the state of Andhra Pradesh Project Length : 50 Km, 4 lane Project Cost : INR 90 Crores Funding : JNNURM Client : Vijayawada Municipal Corporation (VMC) Position : Traffic Engineer Location : Andhra Pradesh 9. Preparation of Detailed Feasibility Report for the construction of Bridge across River Tungabhadra near Alampur in Mahaboob Nagar district in the state of Andhra Pradesh. Project Length : Road : 2.2 kms (Bridge : 1.2 kms) of 2 lanes Project Cost : INR 33.09 Crores Funding : Andhra Pradesh Road Development Corporation (APRDC) Client : Andhra Pradesh Road Development Corporation (APRDC) Position : Traffic Engineer Location : Andhra Pradesh
  • 28. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 28 10. Preparation of Detailed Feasibility Report for the Construction of Bridge across River Krishna to connecting Kollapur in Mahaboob Nagar district and Siddeswaram in Kurnool district. Project Length : Roads : 11.6 kms (Bridge : 2 kms) of 2 lanes Project Cost : INR 131.08 Crores Funding : Andhra Pradesh Road Development Corporation (APRDC) Client : Andhra Pradesh Road Development Corporation (APRDC) Position : Traffic Engineer Location : Andhra Pradesh Job scope, responsibilities includes: As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data analysis, estimation of growth rates, safety studies, preparation of traffic management plans, pavement condition survey of existing roads through visual assessment, BBD surveys, various soil tests, identification of borrow areas and quarry sites, analyzing the data obtained from testing of soil and aggregate samples traffic forecasting, identification of major accidents points and preparation of traffic management / safety manuals and strategies, conducting safety audits for enhancing traffic safety along the project highway etc. He was involved in review of data analysis and implementation of safety manuals as per the data incorporated in safety audits. Intermittent inputs interms of – Review of growth rate estimation and re-identification of accident spots during Project Management Consultancy Phase. He was also involved in preparation of safe alignment of approach roads to the bridge, Geometric and pavement design of the approach roads and preparation of Detailed Feasibility Report including Transaction services. 11. Preparation of Comprehensive Traffic and Transportation Plan for Vijayawada Municipal Corporation area. Project Area : 61.88 Sq.kms Project Cost : INR 5500 Crores Funding : Vijayawada Municipal Corporation, Vijayawada Client : Vijayawada Municipal Corporation, Vijayawada Position : Transportation Planner Location : Andhra Pradesh
  • 29. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 29 Job scope, responsibilities includes: Comprehensive study of traffic problems and to evolve feasible solutions to the problems, Vijayawada Municipal Corporation has initiated a study on Comprehensive Traffic and Transportation. As Transportation Planner he was responsible for collecting traffic data, planning of road networks, junction improvement studies, safety aspects, planning / conducting field and traffic surveys including household survey, data analysis and preparation of base year network. 12. Preparation of Perspective Transportation Plan for Navi Mumbai Special Economic Zone, Navi Mumbai. (comprising of roads of length 125 kms of 6/8 lanes) Project Length : 125 kms, 6/8 lanes Project Cost : INR 1000 Crores Funding : Navi Mumbai Special Economic Zone Company Limited Client : Navi Mumbai Special Economic Zone Company Limited Position : Traffic Engineer Location : Andhra Pradesh Job scope, responsibilities includes: The Government has appointed NMSEZ Company Limited owned by Reliance India Limited to develop Special Economic Zone in Navi Mumbai. The Navi Mumbai Special Economic Zone consists of Dronagiri, Kalamboli and Ulwe nodes in Navi Mumbai. The NMSEZ Company Limited has assigned the study to prepare Feasible Transportation Plan. As Traffic Engineer he has conducted all types of Traffic and Transportation Surveys, preparation of traffic management plans, analysis of the Survey Data and estimated the impact of SEZ on the surrounding road network. He has also estimated traffic generated by different activities proposed in NMSEZ area, distribution of trips between various activities and preparation of external connectivity to SEZ area. 13. Preparation of Detailed Project Report for Bus Rapid Transit System in Hyderabad with roads of length 16.5 kms of 4 lanes. Project Length : 16.5 kms, 4 lanes Project Cost : INR 424.32 Crores Funding : Greater Hyderabad Municipal Corporation (GHMC)
  • 30. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 30 Client : Greater Hyderabad Municipal Corporation (GHMC) Position : Traffic Engineer Location : Andhra Pradesh Job scope, responsibilities includes: As Traffic Engineer he was responsible for organizing topographic surveys, traffic surveys, pavement condition survey of existing roads through visual assessment, BBD surveys, various soil tests, identification of borrow areas and quarry sites, testing of soil and aggregate samples etc and data analysis. 14. Preparation of Feasibility and Detailed Project Report for the Construction of Tunnel across Simhachalam Hill in Visakhapatnam City Project Length : 3.5 kms, 6 lanes Project Cost : INR 138 Crores Funding : GVMC & JNNURM Client : Greater Visakhapatnam Municipal Corporation (GVMC), Visakhapatnam Position : Resident Project Manager / Traffic Engineer Location : Andhra Pradesh Job scope, responsibilities includes: The Greater Visakhapatnam Municipal Corporation (GVMC) has proposed to construct a tunnel across Simhachalam Hill to provide access to the commuters of near by habitations. As Resident Project Manager/Traffic Engineer he was responsible for planning and organizing Engineering surveys, geo-technical investigations and total station survey, traffic surveys including opinion survey, data analysis, estimation of growth rates, traffic projection, lane requirement and estimation of traffic diverted to Tunnel. He was also involved in the Geometric Design and Pavement design of the approach roads to the Tunnel. 15. Preparation of Techno-Economic Feasibility and Detailed Project Report for the construction of Road Over Bridge and Road Under bridge in lieu of Level crossings in Chennai. Project Length : 2.5 kms, 2 lanes Project Cost : INR 25 Crores Funding : World Bank
  • 31. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 31 Client : Chennai Metropolitan Development Authority Position : Traffic Engineer Location : Chennai Job scope, responsibilities includes: As Traffic Engineer he was responsible for planning, organizing and monitoring traffic surveys, topographic surveys, data analysis, estimation of growth rates, traffic forecasting, identification of major accident points and preparation of traffic management / safety manuals, and preparation of feasibility report on the basis of EIRR developing strategies for enhancing traffic safety along the project highway. He was also involved in Expressway traffic estimation based on traffic surveys and network assignment. 16. Preparation of Feasibility and Detailed Project Report for the Construction of Flyovers/Underpasses in Visakhapatnam City. Project Length : 6 kms, 4 lanes Project Cost : INR 60 Crores Funding : Greater Visakhapatnam Municipal Corporation (GVMC), Visakhapatnam Client : Greater Visakhapatnam Municipal Corporation (GVMC), Visakhapatnam Position : Traffic Engineer Location : Noida Job scope, responsibilities includes: GVMC has proposed, under this project, to construct flyovers at selected locations to ease traffic congestion in Visakhapatnam City. As Traffic Engineer he was responsible for planning and organizing Engineering and traffic surveys, analysis and preparation of feasibility report on the basis of EIRR. 17. Revision of Master plan for Visakhapatnam Metropolitan Region and Zonal Development Plan for five town’s viz. Anakapalli, Gajuwaka, Visakhapatnam, Bheemunipatnam and Vizianagaram. Project Area : 1750 sq kms; (Road Length: 500 kms of 2/4 lanes) Project Cost : INR 12000 Crores Funding : VUDA & State Government
  • 32. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 32 Client : Visakhapatnam Urban Development Authority (VUDA), Visakhapatnam Position : Transportation Planner Location : Noida Job scope, responsibilities includes: VUDA has taken up to revise the Master plan for Visakhapatnam Metropolitan Region(VMR) and Zonal Development Plan for Visakhapatnam, Gajuwaka, Anakapalli, Bheemunipatnam and Viziangaram which was prepared in 1989. As Overall In-Charge of Project Site at Visakhapatnam in general, he was responsible for Traffic and Transportation aspects in particular. As Transportation Planner he was responsible for collecting data, planning and organizing traffic surveys including Household survey and Land use survey, data analysis and preparation of Traffic Management Schemes and preparation of pre-feasibility report for introduction of Integrated Mass rapid Transit System in Visakhapatnam City. 18. Traffic Studies for 4 laning of Tindivanam-Trichy section of NH-45 and Trichy - Madurai section of NH-45B of total length 45 kms in the state of Tamil Nadu. Project Area : 45 kms (4 lanes) Project Cost : INR 500 Crores Funding : Council for Industrial Development Corporation Client : Council for Industrial Development Corporation Position : Traffic Engineer Location : Tamilnadu Job scope, responsibilities includes: As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data analysis, estimation of growth rates, traffic forecasting, identification of major accidents points and preparation of safety manual / strategy for enhancing traffic safety along the project highway.
  • 33. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 33  Aug 2001 to Feb 2002 Sheladia Associates & Consultants Pvt. Ltd. Senior Engineer / Traffic Engineer 19. Detailed Project Report for Proposed Widening from existing 2 lane to 4 lane of Mumbai- Agra section of NH-3 road from Pimplegaon to Gonde of length 60 kms on BOT basis. Project Area : 60 kms (4 lanes) Project Cost : INR 330 Crores Funding : BOT basis (PPP Project) Client : Ministry of Road Transport and Highways, New Delhi Position : Traffic Engineer Location : Maharashtra Job scope, responsibilities includes: Ministry of Road Transport and Highway(MORTH) has taken up the improvement of major National Highways operating under NHDP. Mumbai – Agra Road (NH-3) is one such improvement corridor. As Traffic Engineer he was responsible for organizing and monitoring traffic surveys, data analysis, estimation of growth rates, traffic forecasting, identification of major accident black points, preparation of strategy for enhancing traffic safety. 20. Station Area Traffic Improvement Schemes for Borivali Railway Station project comprising of roads of total length 75 kms of 2/4 lanes. Project Area : 75 kms (2/4 lanes) Project Cost : INR 30 Crores Funding : World Bank Client : Mumbai Metropolitan Region Development Authority, Mumbai Position : Traffic Engineer Location : Maharashtra Job scope, responsibilities includes: To improve the traffic condition in and around sub urban railway stations in Mumbai, MMRDA proposed Station Area Traffic Improvement Scheme (SATIS) at selected sub urban railway stations including Borivali under Mumbai Urban Transport Project (MUTP).
  • 34. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 34 As Traffic Engineer, responsible for review of earlier studies conducted by various organizations, planning and organizing of Traffic surveys including Rail and Bus commuter survey, preparation of alternative Traffic Improvement Schemes and recommending a Traffic Management Scheme for implementation.  Sep 1992 to Jul 2001 Mumbai Metropolitan Region Development Authority  Jun 1997 to Dec 1998 Pursued 'Master of Planning' (Employer Sponsored) On behalf of MMRDA he has worked on World Bank assisted Mumbai Urban Transport Project (MUTP-II) preparatory studies, involved in the preparation of Terms of Reference (TOR), evaluation and selection of consultants and monitoring and scrutiny of consultant’s performance. MUTP is a multi-model project prepared by Government of Maharashtra to seek financial assistance from World Bank. His other assignments include: 21. As Traffic Engineer, Prepared Road Network Improvement schemes in and around Bandra Kurla Complex, Bandra, Road Length: 12.0 kms of 4 lanes. 22. As Traffic Engineer, Conducted Traffic surveys, analysed and prepared Feasibility Report for the construction of Road Over Bridge (ROB) in lieu of Level Crossing near Virar on Western Railway, Road Length: 2.5 kms of 4 lanes. 23. As Traffic Engineer, Conducted Traffic Volume count surveys, pedestrian count surveys, and pedestrian opinion surveys and prepared Feasibility Report for the construction of Pedestrian Subways in Greater Mumbai, Road length: 15.0 kms of 4 lanes. 24. As Traffic Engineer, Prepared Traffic Management Schemes by conducting traffic surveys for Road Over Bridges (ROBs) in Greater Mumbai, Road length: 10.0 kms of 4 lanes. 25. As Traffic Engineer, Conducted various traffic surveys, commuter surveys at railways stations, analysed and prepared Station Area Traffic Improvement Schemes (SATIS) for 3 railway stations in Greater Mumbai, Road length: 45.0 kms of 2/4 lanes; Project Cost: Rs 60.00 crores
  • 35. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 35 26. As Traffic Engineer, Carried out traffic volume count and pedestrian count surveys for the Preparation of Feasibility Report for the construction of Catwalk between C.S.T.Railway Station and Churchgate Railway Station, Road length: 2.0 kms of 4 lanes. 27. As Traffic Engineer, Prepared Traffic Management Scheme around Mantralaya in Greater Mumbai, Road length: 15.0 kms of 4 lanes. 28. As Traffic Engineer, Conducted traffic volume count surveys, parking surveys and prepared road improvement proposal for Sion Dharavi Link Road in Mumbai, Road length: 5.0 kms of 4 lanes. 29. As Junior Transportation Planner, Supervised and Monitored the traffic surveys and the progress of the Comprehensive Traffic and Transportation Study for Mumbai Metropolitan Region (MMR), Road length : 5000.00 kms of 2/4/6 lanes.  Feb 1991 to Sep 1992 CRAPHTS, New Delhi Traffic Engineer / Asst. Traffic Engineer 30. Conducted Traffic Surveys, Parking surveys, analyzed and prepared Parking and Traffic Circulation System for 9 NDMC Markets in New Delhi, Client: NDMC, New Delhi; Project length: 10.0 kms of 4 lanes. 31. Parking and Traffic Circulation System for Ring Railway Stations in New Delhi, RITES. 32. Parking and Traffic Circulation System for Metro Railway Stations in New Delhi, RITES.
  • 36. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 36 Name R.Ramakrishna PROFESSION Highway Engineer SPECIALISATION Highway Design / Traffic & Transportation planning NATIONALITY Indian QUALIFICATION Master of Engineering, in Urban Engineering, Division of Urban Transport Systems Development, (ANNA UNIVERSITY, INDIA Bachelor of Technology, in Civil Engineering (NGARJUNA UNIVERSITY, INDIA) KEY EXPERIENCE Has about 10 years of experience (includes 5 years Middle east & UK) in carrying out the concept design, feasibility and detailed designs for Urban and Rural Expressways, Arterial / Collector Streets and Local Streets, Sea land developments and town ships Has involved design reviews for major road projects in India,UK and the Gulf region (in the State of Qatar, Libya & Bahrain) starting from Preliminary stage to Tender and Construction stages. Well versed with QATAR/BAHRAIN/ABUDHABI/AASHTO/DMRB/AUSTROADS and IRC design standards and conversant with the geometric design of expressways, roundabouts, major/minor junctions, Parking Areas and Pavement design including flexible and Rigid, preparation of cost estimates, project design reports, and Bill of Quantities. Has good experience in conceptual planning of townships and carrying out the feasibility and detailed designs of township roads and infrastructure components. Well experienced in Geometric designs for Motorways/NH/Hill Roads and Town Ships includes Multi Level Inter changes, At Grade Major Junctions, Roundabout and Priority Junctions. Well experienced in Pavement designs for different Geographic standards for flexible, Rigid and Paver Blocks designs for Highways and local streets. Has involved in Traffic Impact and Transportation planning studies in The State of QATAR, Kingdom of Bahrain, Libya, Kuwait and India. Well experienced in TRIP generation estimates as per DUBAI Traffic manual for various developments, Junction capacity analysis, Traffic signal designs using aaSIDRA Well experienced in Bilingual Sign face designs, sign post and sign foundation design, road signs & markings for different regions in Middle East & India Has good exposure to KEY SIGNS software for sign face designs in UK region.
  • 37. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 37 Experience in Independent Quality Audit and Quality control tests for Major road construction projects in India funded by World Bank and Asian Development Bank. Has involved in construction supervision for major highway works in India. Work experience in conducting Road Safety Audits during concept, preliminary, detailed design stage and also pre and post construction stage for different roads and developments. Work experience Major surface and multi level car parking studies in India and Middle East region. Has involved in review internal circulation plans, access and egress arrangement and pedestrian facilities in parking areas. Well experience in design coordination with various design teams and CAD teams for timely deliverables and proven record of client satisfaction Good exposure in using MX software, aaSIDRA, arcady, Picady and well versed with all engineering surveys required for major highway projects (Road Inventory and Pavement Condition survey, BBD survey, Bridge/Culvert Condition survey, Traffic Surveys) and analysis of data obtained from the surveys. EMPLOYMENT RECORD May,2011-Till date Director, GEP Infrastructure Private Limited March 2010 – April.2011 DY. General Manager (Highway Design) – CEG Apr 2005 – March 2010 Highway cum Transportation Engineer, ATKINS - UK,ME & India May 2001 – Apr 2005 Highway Engineer, Wilbur Smith Associates, INDIA MAJOR LAND MARK - PROJECTS INVOLVED Designation Project Client Highway Design Engineer DBFO – LONDON RING ROAD – M25 MOTORWAY WIDENING Highway Agency UK Highway Design Engineer New Doha International Airport – Roads and Infrastructure Ashgal (Ministry of Public Works), Qatar (PMC – Bechtel) Highway Design Engineer Bahrain Bay – New Township – Roads and Infrastructure (on reclaimed fill) in Bahrain Bahrain Bay Development Company, Bahrain Highway Design Engineer Education City – New Township – Roads and Infrastructure Qatar Foundation (QF)
  • 38. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 38 Highway Design Engineer Upgradation of existing 2-lane Dukhan road (Qatar Primary route) to 8-lane expressway Ministry of Public Works Traffic & Transportation Planner Education city – Transport model development Qatar Foundation Transportation planner & Project Coordinator Education city – Pedestrian model development Qatar Foundation Transportation planner Libya CBD –city gate Traffic Impact study MAF Libya PROFESSIONAL EXPERIENCE March 2010 – till date Dy General Manager – Highway Design: Handed and Delivered the following projects highways design team in CEG Hyderabad and coordinating with Design Team in Head office Jaipur. Improvement of existing TWO lane road to 4lanning configuration of NH 3 from Gwalior to Dewas km 123 to km 526 – BOT (406 km) – Madhya Pradesh Improvement of existing TWO lane road to 4lanning configuration of NH 50 from Khed to Sinnar km 42 to km 177 – BOT (135 km) - Maharashtra Improvement of existing road to 2 lane paved shoulder of NH 222 from km 342 to km 442 – BOT (100 km) - Maharashtra Improvement of existing road to 2 lane paved shoulder of NH 106 from km 0 to km 136 (136 km) – WORLD BANK AIDED.- Bihar Improvement of existing road to 2 lane paved shoulder of NH 30A from km 0 to km 67 (67 km) – WORLD BANK AIDED.- Bihar WS ATKINS – UINITED KINGDOM M25 DBFO– Design Engineer Responsible design of 8/10 lane motorway 25 (M25). M25 is the Major connecting corridor in UK and busiest Network in entire Europe. Also know as LONDON Ring Road. As a Highway Design Engineer I was involved in Geometric Designs for main road, Slip road designs, Intersection Improvements, Pavement Designs, Signs design, earthworks and safety barrier design. Coordination with highway Agency and UK safe roads team. WS ATKINS, Bangalore, INDIA A14 Ellington to Fen Ditton – Review of MX design for section 2, 3, Trinity Foot junction, Dry Drayton junction and M11 junction 14 (Girton interchange). WS ATKINS, DOHA, QATAR Consultant for Primary Infrastructure Design Services - Education City, Doha, Qatar
  • 39. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 39 The scope of work includes “Planning and Detailed Design” of the new township to cater exclusively for education needs for the State of Qatar with the state of the art facilities. The township is spread over an area of 12 sq. kms. The following responsibilities are carried out as a Highway engineer  Preparation of Road layouts  Geometric Cross Sections  Horizontal & Vertical alignment of project roads using MX  Design of Roundabouts  Junction Designs using MX  Capacity analysis of junction using aaSIDRA  Pavement Designs The following responsibilities are carried out as a Transport planner for 3 major car parks namely  Northeast car park  South east car park  And West car park located in South campus of Education city  Reviewing the car park layout plans & internal circulation arrangements  Suggesting to improve internal circulation  Reviewing the internal access arrangement and its improvement proposal  Internal junction proposal and capacity analysis using aaSIDRA  Internal access proposals.  External entry and Exit arrangement improvement proposals.  Capacity Analysis of Qatar Academy Intersection, Ghrarraffa Intersection and South Gharraffa Intersection.  Signal Designs Using aaSIDRA  Sign face designs DUKHAN EXPRESS WAY – 8 Lane Access Control Highway - DOHA QATAR Client: ASHGAL PWD, Doha, Qatar The following responsibilities are carried out as a Highway engineer  Geometric Cross Sections  Horizontal & Vertical alignment of project roads using MX  Design of Roundabouts  Multi Level Junction Designs using MX  Capacity analysis of junction using aaSIDRA  Pavement Designs  Signal Designs using aaSIDRA
  • 40. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 40 New Doha International Airport - AIRSIDE LANDSIDE ROADWAYS &PARKING Client: NDIA (New Doha International Airport) The project is under D&B (Design and Build) Contract. The new airport is partially built on reclaimed fill and is estimated to handle 2.0 million passengers per day. Scope of work consists of planning, design and development of access interchanges to the passenger terminal, cargo terminal and commercial terminal, runway and the providing service roads within the airport area to cater to the cargo vehicles, improvement of existing dual two lane carriageway into 8-lane expressway and providing interchanges (trumpet & cloverleaf) to provide access to the terminal buildings. The following responsibilities are carried out  Preparation of Road layouts  Geometric Cross Sections  Horizontal & Vertical alignment of project road using MX  Reviewing Pavement Designs  Design of Traffic Signs  Intersection Designs Bahrain bay Infrastructure Design, Manama, Bahrain Client: BBD (Bahrain bay Development, Manama, Bahrain) The Bahrain Business Bay is the flagship component in the future growth of Bahrain and its capital city of Manama. It is part of a larger response to economic development in the Persian Gulf and will be the catalyst and model for growth and development in the greater North Manama master plan. Its close proximity to the Airport, Bahrain Financial Harbor, world Trade Centre, and the Diplomatic Area make it a prestigious site bursting with Potential. The following responsibilities area carried out  Complete Roadway design Using MX  Detail Design for all Road Components  Design of Traffic Signs and Markings  Pavement Designs  Signal designs using aaSIDRA
  • 41. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 41 Detailed Engineering Study for Supreme Education council Headquarters, DOHA Client: Supreme Educational Council, Ministry of Education Qatar  Design of approach roads and Junctions using MX  Trip Generation Estimates  Junction Improvement Measures using aaSIDRA/ Arcady  Signal designs for external junctions  Preparation of Junction Improvement Plans  Parking arrangements and circulation plans Pedestrian Studies for Education City, Doha, Qatar Client: Qatar Foundation, Doha, Qatar  Design Coordination with UK Teams  Model development/ Network review with UK teams  Finalisation of footpaths locations and pedestrian crossing points  People mover system (Light Rail system) platform/staircase size fixing. Durrat Al Bahrain Traffic Impact Study  Trip Generation Estimates  Reviewing of VISSIM Outputs  Junction Improvement Measures using aaSIDRA  Signal designs for external junctions Libya CBD Traffic Impact Study Client: MAF Libya  Trip Generation Estimates  Junction Improvement Measures using aaSIDRA/ Arcady  Signal designs for external junctions  Preparation of Junction Improvement Plans M/s WILBUR SMITH ASSOCIATES, INDIA Integrated Infrastructure Development of Thiru VI KA Industrial Estate, Guindy, Chennai, India Client: TNRDC (Tamil Nadu Road Development Company, INDIA)
  • 42. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 42 The following responsibilities are carried out  Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis of primary and secondary data,  Finalization of design standards and geometric design of the project road  Design of flexible pavement for estate roads  Geometric design for the road & Junction designs  Design of lighting systems design of all road furniture’s  Preparation of Rate analysis and  Preparation of Detailed Estimates, Bill of Quantities. Engineering Study for Roads in CMA (TNUDP- III), Chennai, India. Client: Highways Department, Tamil Nadu. The following responsibilities are carried out  Co ordination for Pavement, Road, CD and Bridges  Analysis of Pavement and Road Data  Finalization of Geometric cross sections for the Project road  Horizontal and vertical alignment for the project road  Design of Flexible pavement for the Project Road  Junction Designs, Design of all Road furniture’s and Truck lay byes  Preparation of Standard drawings  Rate analysis for Road and Bridge Items  Preparations of Detailed Estimates and Bill of Quantities Study for Second Road Bridge over river Kharkai in Adityapur , INDIA Client: ILFS (Infrastructure Lease and Financial Services) The study involves preparation of Detailed Project Report for new road bridge project & Improvements existing Truck terminal Road in Adityapur and Jamshedpur. The following responsibilities are carried out  Co – ordination for All traffic Surveys  Fixing the New alignment for Road and bridge using GPS  Co- ordination for Topographical and soil Investigation surveys  Analysis of primary and secondary data  Finalisation of Geometric cross section for the project roads  Horizontal and Vertical design for the project road
  • 43. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 43  Design of Flexible pavement for new alignment & Paver block design for truck terminal Road & for Truck lay byes.  Design of all Road furniture’s including lighting  Preparation of Standard drawings  Preparation of Rate Analysis  Preparation of detailed Estimates and Bill of Quantities. Consultancy services: Feasibility study & DPR for 4/6 lanning of NH-52A and NH-52 from Itanagar to Halem in the states of Arunachalpradesh & Assam (NHAI) The study involves prepartion of Detailed Feasibility and Detailed project report for 4 lanning of NH 52 & 52A Client: NHAI (National Highways Authority of India) The following responsibilities are carried out  Assisting the Team leader in planning the surveys and preparation of reports.  Analysis of Primary and Secondary data Such as Road Inventory, Pavement Condition survey, BBD, Roughness, Axle load data, Culvert and Bridge data.  Design of Flexible & Rigid pavements (IRC: 37 & IRC 58)  Preparation of monthly progress reports  Finalisation of Geometric cross sections for project road  Junctions and cross roads designs  Design of all road furniture’s  Design of bus bays  Design of Parking lots and Truck lay byes  Preparation of standard drawings  Preparation of Rate Analysis  Preparation of Detailed Estimates and Bill of Quantities. Consultancy Services for Feasibility and DPR of Kovalam Redevelopment Project ,Kerala, INDIA Client: IIDC (Trivandrum) The following responsibilities are carried out  Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis of primary and secondary data,  Finalization of design standards and geometric design of the project road Design of flexible pavement for the project road
  • 44. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 44 Independent Technical Review for First year Road Maintenance work Tamil Nadu, INDIA Client: TNRSP (Tamilnadu Road Sector Project, State Highways Department) The scope of the work involved in review of Pavement design, Project costing and Bill of Quantities. And independent review of Execution of work before and after construction, preparation of progress reports. The following responsibilities are carried out  Involved In Pavement design review for the various project roads  Review of the detailed estimates and bill of quantities  Redesigning the pavements for various project roads  Preparation of detailed estimates and bill of quantities for various project roads  Conducting the Various Field tests and verifying the test results for Pavement materials, CD & Drain works. Preparation of Detailed Project Report for Four Laning of TPP Road, Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The following responsibilities are carried out  Co ordination for Pavement, Road surveys, CD and Bridges  Analysis of Pavement and Road Data  Finalization of Geometric cross sections for the Project road  Horizontal and vertical alignment for the project road  Design of Flexible pavement for the Project Road  Junction Designs, Design of all Road furniture’s and Truck lay byes  Preparation of Standard drawings  Rate analysis for Road and Bridge Items  Preparations of Detailed Estimates and Bill of Quantities Strengthening and widening of Manali Oil Refinery and Inner Ring Road, Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The study involves preparation of detailed project report for four laning & strengthening of the 15km long project road. Scope of the work involved in four laning and strengthening of MOR and IRR road to National Highways standards.
  • 45. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 45 The following responsibilities are carried out  Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis of primary and secondary data,  Finalization of design standards and geometric design of the project road  Design of flexible pavement for the project road,  Design of Horizontal and vertical alignment for the project road  Junction Designs  Design of lighting systems design of all road furniture’s, design of truck laybyes,  Rate analysis and  Preparation of Detailed Estimates and Bill of Quantities. Third Party Quality Assurance Study, Andhra Pradesh, INDIA Client: (Govt. of AP – PHMED) Scope of the work involved in third party quality checking for different municipal road and drainage  Conducting Material Testing for all road items.  Conducting Material Testing for CD & Drain Items. Detailed Engineering Study for OMR (IT Corridor) (km 0/0 to 30/4), Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The study involves preparation of detailed project report widening and strengthening of Old mahabalipuram Road (IT Corridor) to six lanes The following responsibilities are carried out  Co ordination for Topo surveys, co ordination for Road and pavement condition surveys. analysis of primary and secondary data,  Finalization of design standards and geometric design of the project road  Design of flexible & Rigid pavement for the Project road  Geometric design for the road & Junction designs  Design of lighting systems design of all road furniture’s  Preparation of Rate analysis and  Cost comparison of Flexible and rigid Pavement  Preparation of Detailed Estimates, Bill of Quantities. And Bid documents
  • 46. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 46 Consultancy for Preparation of Detailed Project Report for Construction of Bridges in Chennai Corporation, Chennai, Tamil Nadu, INDIA Client: TNUIFSL The following responsibilities are carried out  Co ordination for Traffic surveys  Analysis of traffic Data  Preparation of Detailed Estimates, Bill of Quantities. Feasibility Study/Detailed Engineering studies for Improving Old Mahabalipuram Road from Siruseri Jn of ECR (OMR) (Km 30/2 to 54/6), Chennai, Client: TNRDC (Tamil Nadu Road Development Company) Scope of the work involved in Strengthening of OMR four lane road/ feasibility for widening to six lane configuration. The work involved in conducting The following responsibilities are carried out  Road Inventory Survey, Pavement co ordination for Topo surveys,  Co ordination for Road and pavement condition surveys.  Analysis of primary and secondary data,  Finalization of design standards and geometric design of the project road  Design of flexible for the Project road  Geometric design for the road & Junction designs  Design of lighting systems design of all road furniture’s  Preparation of Rate analysis and  Preparation of Detailed Estimates and Bill of Quantities Detailed Engineering Study for TPP Road (Two Lane – Strengthening and Widening), Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The study involves preparation of detailed project report for Two laning & strengthening of the 10km long project road. The following responsibilities are carried out  Finalization of design standards and geometric design of the project road  Design of flexible pavement for the project road, design of Horizontal and vertical alignment,
  • 47. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 47  Junction Designs  design of lighting systems design of all road furniture’s, design of truck lay byes,  Rate analysis and  Preparation of Detailed Estimates and Bill of Quantities. Construction Supervision of the proposed roads and Storm water drains in Tiruvannamalai Municipality, Tiruvannamalai, Tamil Nadu, INDIA Client: TNUIFSL The following responsibilities are carried out  Evaluation of Tender Documents,  construction and supervision of Road works and Storm water drains,  Preparation of billing documents. Preparation of DPR for the Improvement of Road Connecting TPP Road and Ennore Port and NCTPP, Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The following responsibilities are carried out  Conducting Road Inventory Survey, Pavement Condition Survey,  BBD survey, Soil Test Pit Survey,  Analysis of Survey Data,  Pavement Design, Geometric Designs  Junction Designs  Design of road furniture,  Preparation of Rate Analysis,  Preparation of detailed Costing and preparation of BOQ. DPR for Provision of Bus terminal in Krishnagiri Municipality, Krishnagiri, Tamil Nadu, INDIA Client: TNUIFSL The following responsibilities are carried out  Co ordination for soil investigations, Topo survey, co ordination for traffic surveys,  Design of Rigid Pavement and flexible Pavements for Bus Terminal Area,  Preparation of Rate Analysis for Building and Road items  Preparation of Detailed costing and preparation of BOQ for Building and Road Items 
  • 48. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 48 DPR for Improvement of Traffic facilities in Coimbatore Corporation, Coimbatore, Tamil Nadu, INDIA Client: TNUIFSL The following responsibilities are carried out  Co-ordination for Topographic Survey,  Traffic surveys, and Collection Secondary data such as under ground utility lines,  Design of flexible and rigid pavements and  Preparation of Rate Analysis for pavement Items  Cost estimate for pavement items. Estimation and Marking of Required Right of Way on Ennore Expressway for EMRIP, Chennai, Tamil Nadu, INDIA Client: TNRDC (Tamil Nadu Road Development Company) The scope of the project includes design of flexible and Rigid pavements for the project road and cost estimates for the same. The following responsibilities are carried out  Finalisation of Geometric cross sections and Junction designs  Geometric design of the Project road  Preparation of Rate Analysis  Preparations of Detailed Estimate & Bill of Quantities Quality Audit for Road Works in Chennai Corporation, Chennai, Tamil Nadu, INDIA Client: TNUIFSL The work involved in quality audit consultancy for the Chennai Corporation roads monitoring Quality of the work while execution in three Zones of Chennai Corporation. About 15 kms. of Road length of Semi Dense Bituminous Concrete road. DPR Integrated Infrastructure Development of Guindy Industrial Area, Chennai, Tamil Nadu. Client: TNRDC (Tamil Nadu Road Development Company) The following responsibilities are carried out  The scope of the project includes work out the deficiency analysis for the estate roads and design the roads  work involved in co ordination of benkleman beam survey
  • 49. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 49  study pavement condition and road inventory surveys  Analysis and design of Estate roads  Design of Road furniture’s,  Preparation of Rate Analysis  Preparation of detailed estimate and BOQ for the same. Traffic Revalidation Study for IT expressway, Chennai, Tamil Nadu. Client: TNRDC (Tamil Nadu Road Development Company) The study involves preparation of detailed project report for six lanning of the IT corridor popularly known as Old Mahabalipuram road (OMR) near Chennai.  Co ordination for Traffic surveys and analysis of Traffic data  Preparation of Reports Construction of Cement Concrete Roads, Chennai, Tamil Nadu. Client: TNUIFSL The scope of the project include preparation DPR and Bid documents for the construction of Cement concrete road for 13 Km of corporation roads The following responsibilities are carried out  work involved in co ordination for pavement test pits and  design of Rigid pavements,  Preparation of Rate Analysis  Preparation of detailed estimate and BOQ and  Preparation of Tender document. Preparation of Engineering & Landscape Report from Kathipara Junction to Meenambakkam Airport on NH45 , Chennai, Tamil Nadu. Client: TNRDC (Tamil Nadu Road Development Company) The following responsibilities are carried out  The study is to improve the urban stretch between Tambaram and Kathipara Junction on the NH45 to international standards, with pavement strengthening, appropriate landscaping, beautification, modern pedestrian facility and proper road marking and furniture work involved  Co ordination for surveys. analysis of primary and secondary data,  finalization of design standards and geometric design of the project road  Design of flexible & Rigid pavement for the Project road
  • 50. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 50  Geometric design for the road & Junction designs  design of lighting systems design of all road furniture’s  Preparation of Rate analysis and  Cost comparison of Flexible and rigid Pavement  Preparation of Detailed Estimates, Bill of Quantities. And Bid documents As a Post Graduation Student I was involved in Many Traffic and Transportation studies such as Volume survey, Parking surveys, OD surveys, Speed delay surveys, Parking Surveys. I was Involved in Many Government sponsored projects such as Traffic Operational and Management Plans for various cities, Area traffic Management plans, Parking plans, Junction Improvements plans and Signal designs COMPUTER KNOWLEDGE Packages: MX, aaSIDRA. Arcady, Picady, KEY SIGNS, VISSIM (learning)
  • 51. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 51 Name of Staff : A.KAMALAKUMAR Date of Birth : 20/06/1975 Nationality : Indian Educational Qualifications : a) B.Tech (Civil) : Bapatla Engineering College 1998-2001 b) M. Tech (Structural Engineering) : MS University, Baroda 2001-2002 Membership of Professional Societies : Nil Employment Record : From March 2003 to till date Position Held : Bridge Engineer/Structural Engineer  Preparation of Detailed Project report for Rehabilitation and Upgrading to 2-Lane with paved shoulder configuration of Ahmedabad – Dani Section from Kim river to Dandi of length 109Kms of National Highways No: 228 in the state of Gujarat. Major bridges Bridge over KIM River at Km 277.00 (2x40.0 of length 85m) Bridge over Mindola River at Km 346.100 (2x40.0 of length 85m)  Preparation of feasibility study and detailed project report for four laning of Sambalput- Bargarh-orissa/chittisgarh border section of NH-6 in the state of Orissa under NHDP phase-III (Total length 88 kms) Major bridges (6-laning) 1. Bridge over Mahanathi at Km 7.200 (25x30.48+2x10.0 of length 842.50m) 2. Bridge over jainjore at Km27.324(7x12.4 of length 92.8m) 3. Bridge over Danta River at Km 39.755(11x16.0 of length 186m) 4. Bridge over jeera river on bargarh by-pass (7x33.50+2x10.50) 5. Bridge over nala on sohila by-pass (3x21m of length 64.800m) Minor bridges(6-laning) 13 minor bridges and 2 Robs including under passes, RE walls and flyovers.
  • 52. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 52  Design Review for Rehabilitation & Up-gradation of km 229.250 to km 381.000 of NH-76 to 4- lane configuration in the State of Rajasthan - Consultancy Services for construction supervision Package-I ADB Funded.  Preparation of Detailed Project Report for construction of approach roads to the proposed Bogibeel Rail-cum-Road Bridge across river Brahmaputra along NH-52B near Dibrugarh in Assam Major bridges (3-lane) Bridge at Km 22.560 over tangani river of length 208m (10 x 18.30) Bridge at Km 22.010 of length 68 m(1 x 7.157 + 1x13.4 + 1 x13.45 + 1x13.45 + 1x 13.4 + 1x7.157) Two minor bridges and one Rob Major Bridges(6-lane) 1) Bridge over Kuni River at km 149.678 (length 130.0 m) 2) Bridge of span 3 x 21 m at 141.321 (length 63.0 m) Flyovers(6-lane) 1) Flyover crossing of MSH-6 at km 132.850 i.e. Wani road junction 2) Flyover crossing of MSH-6 at km 139.900 i.e. Yavatmal, Mumbai road Junction  Preparation of feasibility study and detailed project report for four laning of Nalbari to Guwahati section of NH-31 from km 1065.00 to km 1124.00 (Pkg. C-III/24) under East-West Corridor Project in the State of Assam. - Designing of 3 ROBs (one of 20 m and 2 of 313 m) + 4 major bridges of 3 x 41 m span (123 m) PSC Girder and 2 x 41 m span (82 m) PSC Girder & 23 other bridges) for NHAI. (Project Cost = Rs. 400 Crores) 3 Nos. of PSC Girder Bridge (3 x 41 m span of length 123 m) 2 Nos. of PSC Girder Bridge (2 x 41 m span of length 82 m) 4 Nos. of PSC Girder Bridge (1 x 41 m span of length 41 m) 3 RoBs including approaches (length of 330m,330m & 20m each)  Consultancy Services for Preparation of Detailed Project Report for for Pilot Project for Construction of Cement Concrete Roads in 4 districts of Andhra Pradesh & 4 districts of Karnataka (Total Length = 27 km) under PMGSY for NCCBM, New Delhi. (Project Cost = Rs. 9 crores)
  • 53. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 53  Consultancy Services for preparation of DPR for widening to 2-lane from Km 220.00 to Km 352.00 of NH-155 in the state of Nagaland.  Survey, Investigation and preparation of Detailed project report for improvement of Road HAYULIANG-CHANGWANTI-HAWAI (65 Kms) to NH Double lane specifications in the state of Arunachalpradesh.  Survey, Investigation and preparation of Detailed project report for improvement of Road HUNLI - ANINI (138 Kms) to NH Double lane specifications in the state of Arunachalpradesh.  Proof Consultancy Services for 2 Flyovers to a length of 1.8 Km at Basheerbagh & Telugu Talli & Ambedkar Statue Junctions, that includes checking of designs, field Supervision, checking of alignment, location and Geometric design, Bridge Designs. Summary of the CV A) Education: i) Field of Graduation and year : B.Tech (Civil) - 2001 ii) Field of Post Graduation and year : M. Tech. (Structures)- 2003 B) Experience: i) Total experience in Highways : 8 1/2 years ii) Responsibilities held : i) Bridge Engineer/Structural Engineer / MC Consulting Engineers (P) Ltd. – 8 1/2 years iii) Relevant Experience : 8 1/2 years
  • 54. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 54 Name of Staff : Shruthi Srinivas Profession : Traffic and Transportation Engineer Date of Birth : 15th June, 1983 Nationality : Indian Education  Master’s Degree in Transportation Engineering and Management from BMS College Engineering, Bangalore, Visveswaraiah Technological University-2008  Bachelor of Transportation Engineering from BMS College of Engineering, Bangalore Visveswaraiah Technological University-2005 Employment Record  September,2011 to date  October 2010- August2011 : Project Engineer, GEP Infrastructure Private Limited : Manager (Technical), Transport Training Institute and Consultancy  May 2007- September 2010 : Transportation Planner, Traffic and Transportation Division, Wilbur Smith Associates Inc, Bangalore  Aug 2005 – Apr 2007 : Engineer, Traffic and Transportation Division, Wilbur Smith Associates Private Limited, Bangalore. Key Qualifications Six Years of Experience in Transportation Planning and Traffic Engineering Studies. Has professional experience in Traffic Engineering, Transportation Planning, Transport Modeling, Highway Traffic Forecasting and Parking Studies. Involved in preparation of survey formats, supervising all the traffic and transportation surveys, assisting and analyzing all the traffic and transportation surveys, Development of 4 stage Travel Demand Model using the state-of-the art GIS travel demand modeling software such as TransCAD and CUBE. Professional Experience: 2010-2011  Transport System Management Measures for Benniganahalli Ward The main objective of the study is to conduct a detailed traffic study at a local level and propose all the solutions needed to alleviate traffic and transportation problems of the area.
  • 55. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 55 As a Transportation Planner, involved in conducting and organizing Traffic Surveys, evaluating existing situation and arriving at alternate solutions, Signal Design and preparation of Block Cost Estimates. 2009-2010  Transportation Planner, Comprehensive Traffic and Transportation Study for Bellary (Client: The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for Bellary Local Planning Area to understand the travel characteristics of the city and the LPA and formulate short, medium and long-term solutions to alleviate traffic and transport problems. As a Transportation Planner, involved in testing of different transport strategies for the horizon years using CUBE, the state-of-the art GIS travel demand modeling software, involved in formulating short, medium and long-term measures and also involved in data analysis and block cost estimates.  Transportation Planner, Comprehensive Traffic and Transportation Study for Gulbarga The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for Gulbarga Local Planning Area to understand the travel characteristics of the city and the LPA and formulate short, medium and long-term solutions to alleviate traffic and transport problems. As a Transportation Planner, involved in testing of different transport strategies for the horizon years using CUBE, the state-of-the art GIS travel demand modeling software, involved in formulating short, medium and long-term measures and also involved in data analysis and block cost estimates.  Consultancy Services for Preparation of DPR for Upgrading to 2 lane with Paved Shoulders of Mangalore – Belur Section of NH-234 in the State of Karnataka (Package no. SP/B/2) The main objective of the consultancy service is to establish the technical, environmental, social, economical, and financial viability of the project and prepare detailed project reports for rehabilitation and upgrading of the existing road to 2-lane/2-lane with paved shoulders configuration and/or its strengthening. As a Transport Planner involved in the Data Collection, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of Feasibility Report.
  • 56. G.E.P. Infrastructure Private Limited (GEPIPL) Flat No.504, 5th Floor, Maheswari Chambers,Hyderabad – 500082. Tel No: 040-65742613, +91-9949473774,www.gepinfra.com E-Mail:gepipl@yahoo.in,reddypsp@yahoo.com 56  Consultancy Services for Preparation of DPR for Rehabilitation and upgrading to 2 lane with Paved Shoulders of Madhugiri – AP Border Section of NH-234 in the State of Karnataka (Package no. SP/A/2) The main objective of the consultancy service is to establish the technical, environmental, social, economical, and financial viability of the project and prepare detailed project reports for rehabilitation and upgrading of the existing road to 2-lane/2-lane with paved shoulders configuration and/or its strengthening. As a Transport Planner involved in the Data Collection, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of Feasibility Report.  Due Diligence Study for Varanasi-Aurangabad Section of NH-2 Primary objective of the present study is to revalidate the earlier reports, determine deviations, if any in terms of AADT, growth rates, travel pattern and risks involved. As a Transport Planner involved in the preparation of survey formats, zone delineation, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of report.  Due Diligence Study for Kishanngarh-Beawar Section of NH-8 Primary objective of the present study is to revalidate the earlier reports, determine deviations, if any in terms of AADT, growth rates, travel pattern and risks involved. As a Transport Planner involved in the preparation of survey formats, zone delineation, Detailed Traffic Analysis, Traffic Forecasting and in the preparation of report.  Transportation Planner, Comprehensive Mobility Plan for Jodhpur City The main objective of the study is to explore the feasibility of Mass Transit systems and study aspects like the city’s population, expanse, human density, traffic conditions, number of vehicles, private and public transport, sewerage and drainage network, power and water distribution etc. As a Transportation Planner involved in the traffic and transportation survey analysis such as Mid-Block, Turning Volume count, Household Interview Survey, Roadside Interview Survey, Pedestrian Survey and Parking Survey and also involved in the demographic analysis and Projections.  Transportation Planner, Comprehensive Traffic and Transportation Study for Bangalore Metropolitan Region The major goal of the study is to prepare a Comprehensive Traffic and Transportation Plan for Bangalore Metropolitan Region to ensure adequate accessibility and smooth mobility for all