The deterioration of large generators or for
that matter any electrical equipment is
normal, and this process begins as soon as
generator is installed.


If deterioration is not checked, it can cause
electrical failures and malfunctions.




                               anilscoob@gmail.com
In addition a TEAM of stresses

- Thermal
- Electrical
- Ambient
- Mechanical

further    contributes    to             the
deterioration process.


                         anilscoob@gmail.com
Thermal            Electrical


           Stress


Mechanical          Ambient


                       anilscoob@gmail.com
The purpose of a good maintenance
program shall be
• to discover the potential reasons of
deterioration
• take remedial measures for correction
to avoid catastrophic failures.
                      failures.

The other important purpose of
maintenance program is to maximize
reliability and availability, improve
operational efficiency and productivity.
                           productivity.


                            anilscoob@gmail.com
GAP* is the answer


             anilscoob@gmail.com
GAP* is a proactive action and the solution to
ensure availability and reliability of generators as
   well as improve operational efficiency and
 productivity to ensure smooth and trouble free
               running of the plant.

GAP* is an inspection and maintenance process
during the lifetime of a generator and is planned
     for during either operation or outage.

 GAP* can be linked to the generator planned
outage time thereby ensuring minimum downtime
 of the plant and at the same time assessing the
           healthiness of the generator.
                                     anilscoob@gmail.com
anilscoob@gmail.com
1   GAP 2
GAP

    GAP*


GAP 4   GAP 3


           anilscoob@gmail.com
• During operation of the
          generator
        • Data collection and on-
          line measurement when
          the generator is in


GAP 1     operation
        • Recommended after
          8,000 hours of
          operation
        • Usually takes 1 day




                        anilscoob@gmail.com
GAP 1         deliverables

Thermal Life Assessment by Arrhenius Equation
Thermal Life Assessment by N-Y method
Schedule for GAP2, GAP3 and GAP4




                                 anilscoob@gmail.com
• During outage with
          power cables removed
          from the generator
        • Data collection and off-
          line electrical


GAP 2     measurements
        • Recommended after
          16,000 hours of
          operation
        • Usually takes 2 days




                        anilscoob@gmail.com
GAP 2         deliverables

Condition Assessment based on Diagnostic Tests
Residual Life Assessment by D-map Method
May include GAP1 deliverables
Schedule for GAP3, GAP4 and GAP1




                                 anilscoob@gmail.com
• During outage on
          partially disassembled
          generator (end-covers
          and inspection windows
          removed)


GAP 3   • Inspection and tests to
          the extent possible
        • Recommended after
          32,000 hours of
          operation
        • Usually takes 3-5 days




                        anilscoob@gmail.com
GAP 3          deliverables

Visual Examination and inspection
Residual Life based on Stress Analysis
May include GAP1 & GAP2 deliverables
Schedule for GAP4, GAP1 and GAP2




                                    anilscoob@gmail.com
• During outage on fully
          disassembled generator
          with rotor threaded-out
        • Inspection and
          appropriate testing


GAP 4   • Recommended after
          64,000 hours of
          operation
        • Usually takes 10-12
          days




                        anilscoob@gmail.com
GAP 4          deliverables

Residual Life based on Stress Analysis
Condition Assessment and Index
Risk Assessment and Index
may include GAP1, GAP2 & GAP3 deliverables
Schedule for GAP1, GAP2 and GAP3



                                  anilscoob@gmail.com
GAP Concept
Life Cycle Concept
   anilscoob@gmail.com
Life Cycle Concept
Value to Customer
through Maintenance
                          Optimized Maintenance Line



                                                                               }    Continuous
                                                                                    Upgrading/
                                                                                    Replacement
                                                                              Maintenance

                                                         Overhaul

                               Aging
                                                         Repair

                             Upgrade and                                                Time
     Warranty Period       Modernization Period        Replacement & Recycle Period

                                  Maintenance Period


           Customer Project Lifecycle



                                                                  anilscoob@gmail.com
GAP Concept
Confidence Level
 anilscoob@gmail.com
Strength
    Stress
                 Calculated
    calculated
                 from GAP1
    from GAP1

                           Strength
                           Calculated
Stress
                           from GAP2
calculated
from GAP2


                              Strength
                              Calculated
                              from GAP3
Stress
calculated
from GAP3



                              Strength
Stress                        Calculated
calculated                    from GAP4
from GAP4




                      anilscoob@gmail.com
uncertainty



                                        Strength
Strength/stress




                  Stress




                               Time
                           anilscoob@gmail.com
GAP Concept
Stator Winding Failures
        anilscoob@gmail.com
Failure statistics
            Detection during Normal Operation




               11%
       5%                                                Bearing
  3%                                  37%                Winding
6%
                                                         Rotor
                                                         Shaft/coupling
                                                         Brushes/slipring
5%
                                                         External devices
                                                         Not specified
                     33%




                                       anilscoob@gmail.com
Failure statistics
                    Detection during maintenance or test




                       10%
               4%
                                                               Bearing
     7%
                                                               Winding
                                                               Rotor
                                                               Shaft/coupling
8%                                                             Brushes/slipring
 2%                                                            External devices
          8%                                                   Not specified
                                                61%




                                                 anilscoob@gmail.com
Failure Statistics Conclusion
•   Bearings fail frequently

•   Windings also share a significant failure rate

•   Very few winding failures are detected
    in maintenance (8.3%) as against the
    total failure of 33% in normal operation

•   This indicates poor        insulation        problems
    detection technique
                                     anilscoob@gmail.com
anilscoob@gmail.com
anilscoob@gmail.com
THANK YOU



ध यवाद




               ‫ا‬
‫ﮨﮯ‬    ‫ﯾہ ادا‬



ந    றி

ಧನ ಾದಗಳ

More Related Content

Viewers also liked

презентация Sunday
презентация Sundayпрезентация Sunday
презентация Sunday
Nichald
 
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκραFightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκραYiota Ziaggou
 
Generator Assessment Process - Level 3
Generator Assessment Process - Level 3Generator Assessment Process - Level 3
Generator Assessment Process - Level 3Anil Panjani
 
Visualloft Profile 2011
Visualloft Profile 2011Visualloft Profile 2011
Visualloft Profile 2011
visualloft
 
презентация свадьбы Sunday
презентация свадьбы Sundayпрезентация свадьбы Sunday
презентация свадьбы Sunday
Nichald
 
Mobile templating με Joomla και K2
Mobile templating με Joomla και K2Mobile templating με Joomla και K2
Mobile templating με Joomla και K2Yiota Ziaggou
 
Ecorig Catalogue Low
Ecorig Catalogue LowEcorig Catalogue Low
Ecorig Catalogue Low
Chris Ecorig
 
Slimming ii презинтация
Slimming ii презинтацияSlimming ii презинтация
Slimming ii презинтацияNichald
 
Generator Assessment Process - Level 1
Generator Assessment Process - Level 1Generator Assessment Process - Level 1
Generator Assessment Process - Level 1Anil Panjani
 
Generator Assessment Process - Level 4
Generator Assessment Process - Level 4Generator Assessment Process - Level 4
Generator Assessment Process - Level 4Anil Panjani
 
visualloft architectural visualisation portfolio
visualloft architectural visualisation portfoliovisualloft architectural visualisation portfolio
visualloft architectural visualisation portfolio
visualloft
 
La Cantine Presentation, Paris, 10th June 2011
La Cantine Presentation, Paris, 10th June 2011La Cantine Presentation, Paris, 10th June 2011
La Cantine Presentation, Paris, 10th June 2011craigomatic
 
เขียนบทความทำเงิน ง่ายกว่าที่คิด
เขียนบทความทำเงิน ง่ายกว่าที่คิดเขียนบทความทำเงิน ง่ายกว่าที่คิด
เขียนบทความทำเงิน ง่ายกว่าที่คิดKittitat Wasati
 

Viewers also liked (13)

презентация Sunday
презентация Sundayпрезентация Sunday
презентация Sunday
 
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκραFightSaga.com - Φτάνοντας το Κ2 στα άκρα
FightSaga.com - Φτάνοντας το Κ2 στα άκρα
 
Generator Assessment Process - Level 3
Generator Assessment Process - Level 3Generator Assessment Process - Level 3
Generator Assessment Process - Level 3
 
Visualloft Profile 2011
Visualloft Profile 2011Visualloft Profile 2011
Visualloft Profile 2011
 
презентация свадьбы Sunday
презентация свадьбы Sundayпрезентация свадьбы Sunday
презентация свадьбы Sunday
 
Mobile templating με Joomla και K2
Mobile templating με Joomla και K2Mobile templating με Joomla και K2
Mobile templating με Joomla και K2
 
Ecorig Catalogue Low
Ecorig Catalogue LowEcorig Catalogue Low
Ecorig Catalogue Low
 
Slimming ii презинтация
Slimming ii презинтацияSlimming ii презинтация
Slimming ii презинтация
 
Generator Assessment Process - Level 1
Generator Assessment Process - Level 1Generator Assessment Process - Level 1
Generator Assessment Process - Level 1
 
Generator Assessment Process - Level 4
Generator Assessment Process - Level 4Generator Assessment Process - Level 4
Generator Assessment Process - Level 4
 
visualloft architectural visualisation portfolio
visualloft architectural visualisation portfoliovisualloft architectural visualisation portfolio
visualloft architectural visualisation portfolio
 
La Cantine Presentation, Paris, 10th June 2011
La Cantine Presentation, Paris, 10th June 2011La Cantine Presentation, Paris, 10th June 2011
La Cantine Presentation, Paris, 10th June 2011
 
เขียนบทความทำเงิน ง่ายกว่าที่คิด
เขียนบทความทำเงิน ง่ายกว่าที่คิดเขียนบทความทำเงิน ง่ายกว่าที่คิด
เขียนบทความทำเงิน ง่ายกว่าที่คิด
 

Similar to Generator Assessment Process - An Overview

ABB Life Expectancy Analysis Program Diagnostics
ABB Life Expectancy Analysis Program DiagnosticsABB Life Expectancy Analysis Program Diagnostics
ABB Life Expectancy Analysis Program Diagnostics
Jorge I. Villacis Gallo
 
INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
Bhaskara P Achar
 
AWP_Service_Manual.pdf
AWP_Service_Manual.pdfAWP_Service_Manual.pdf
AWP_Service_Manual.pdf
CristianJavierSierra
 
AWP_Service_Manual.pdf
AWP_Service_Manual.pdfAWP_Service_Manual.pdf
AWP_Service_Manual.pdf
CristianJavierSierra
 
TPM CYCLE B
TPM CYCLE BTPM CYCLE B
TPM CYCLE B
Max Lyons
 
Mill & Kiln Gear Asset Management
Mill & Kiln Gear Asset ManagementMill & Kiln Gear Asset Management
Mill & Kiln Gear Asset Management
Global Physical Asset Management
 
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdf
AbdulSalamSagir1
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
Filter Expert Co.,Ltd.
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
antonioharenas
 
time study in Arvind garment
time study in Arvind garment time study in Arvind garment
time study in Arvind garment
Chandra Shekhar Kumar
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
Matthew Clemens
 
Control charts in statistical quality control
Control charts in statistical quality controlControl charts in statistical quality control
Control charts in statistical quality control
rakheechhibber1971
 
Quality Improvement Using Gr&R : A Case Study
Quality Improvement Using Gr&R : A Case StudyQuality Improvement Using Gr&R : A Case Study
Quality Improvement Using Gr&R : A Case Study
IRJET Journal
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
Project Sales Corp
 
Gr&r studies
Gr&r studiesGr&r studies
Gr&r studies
shilpi020
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
ufjjdjjskekemm
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
fusjefjsekksemm
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
fjsekkdkmem
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
fjsjekkdmmemm
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
fujfjjjskekemm
 

Similar to Generator Assessment Process - An Overview (20)

ABB Life Expectancy Analysis Program Diagnostics
ABB Life Expectancy Analysis Program DiagnosticsABB Life Expectancy Analysis Program Diagnostics
ABB Life Expectancy Analysis Program Diagnostics
 
INTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.pptINTRODUCTION TO RCM.ppt
INTRODUCTION TO RCM.ppt
 
AWP_Service_Manual.pdf
AWP_Service_Manual.pdfAWP_Service_Manual.pdf
AWP_Service_Manual.pdf
 
AWP_Service_Manual.pdf
AWP_Service_Manual.pdfAWP_Service_Manual.pdf
AWP_Service_Manual.pdf
 
TPM CYCLE B
TPM CYCLE BTPM CYCLE B
TPM CYCLE B
 
Mill & Kiln Gear Asset Management
Mill & Kiln Gear Asset ManagementMill & Kiln Gear Asset Management
Mill & Kiln Gear Asset Management
 
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdf
 
90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter90915 03006 wp928-80 genuine toyota oil filter
90915 03006 wp928-80 genuine toyota oil filter
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
time study in Arvind garment
time study in Arvind garment time study in Arvind garment
time study in Arvind garment
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Control charts in statistical quality control
Control charts in statistical quality controlControl charts in statistical quality control
Control charts in statistical quality control
 
Quality Improvement Using Gr&R : A Case Study
Quality Improvement Using Gr&R : A Case StudyQuality Improvement Using Gr&R : A Case Study
Quality Improvement Using Gr&R : A Case Study
 
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrabGasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
GasGrab - Project Report on Cylinder Lifting and Benefits with GasGrab
 
Gr&r studies
Gr&r studiesGr&r studies
Gr&r studies
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
 
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manualKawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
Kawasaki tj27 d 2 stroke air-cooled gasoline engine service repair manual
 

Recently uploaded

Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
Alison B. Lowndes
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Product School
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Jeffrey Haguewood
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Generating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using SmithyGenerating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using Smithy
g2nightmarescribd
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 

Recently uploaded (20)

Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........Bits & Pixels using AI for Good.........
Bits & Pixels using AI for Good.........
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Generating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using SmithyGenerating a custom Ruby SDK for your web service or Rails API using Smithy
Generating a custom Ruby SDK for your web service or Rails API using Smithy
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 

Generator Assessment Process - An Overview

  • 1. GAP * generator assessment process a solution to life assessment of large generators anilscoob@gmail.com omsaiempl@gmail.com
  • 2. First Turbo Generator (1884) anilscoob@gmail.com
  • 3. The deterioration of large generators or for that matter any electrical equipment is normal, and this process begins as soon as generator is installed. If deterioration is not checked, it can cause electrical failures and malfunctions. anilscoob@gmail.com
  • 4. In addition a TEAM of stresses - Thermal - Electrical - Ambient - Mechanical further contributes to the deterioration process. anilscoob@gmail.com
  • 5. Thermal Electrical Stress Mechanical Ambient anilscoob@gmail.com
  • 6. The purpose of a good maintenance program shall be • to discover the potential reasons of deterioration • take remedial measures for correction to avoid catastrophic failures. failures. The other important purpose of maintenance program is to maximize reliability and availability, improve operational efficiency and productivity. productivity. anilscoob@gmail.com
  • 7. GAP* is the answer anilscoob@gmail.com
  • 8. GAP* is a proactive action and the solution to ensure availability and reliability of generators as well as improve operational efficiency and productivity to ensure smooth and trouble free running of the plant. GAP* is an inspection and maintenance process during the lifetime of a generator and is planned for during either operation or outage. GAP* can be linked to the generator planned outage time thereby ensuring minimum downtime of the plant and at the same time assessing the healthiness of the generator. anilscoob@gmail.com
  • 10. 1 GAP 2 GAP GAP* GAP 4 GAP 3 anilscoob@gmail.com
  • 11. • During operation of the generator • Data collection and on- line measurement when the generator is in GAP 1 operation • Recommended after 8,000 hours of operation • Usually takes 1 day anilscoob@gmail.com
  • 12. GAP 1 deliverables Thermal Life Assessment by Arrhenius Equation Thermal Life Assessment by N-Y method Schedule for GAP2, GAP3 and GAP4 anilscoob@gmail.com
  • 13. • During outage with power cables removed from the generator • Data collection and off- line electrical GAP 2 measurements • Recommended after 16,000 hours of operation • Usually takes 2 days anilscoob@gmail.com
  • 14. GAP 2 deliverables Condition Assessment based on Diagnostic Tests Residual Life Assessment by D-map Method May include GAP1 deliverables Schedule for GAP3, GAP4 and GAP1 anilscoob@gmail.com
  • 15. • During outage on partially disassembled generator (end-covers and inspection windows removed) GAP 3 • Inspection and tests to the extent possible • Recommended after 32,000 hours of operation • Usually takes 3-5 days anilscoob@gmail.com
  • 16. GAP 3 deliverables Visual Examination and inspection Residual Life based on Stress Analysis May include GAP1 & GAP2 deliverables Schedule for GAP4, GAP1 and GAP2 anilscoob@gmail.com
  • 17. • During outage on fully disassembled generator with rotor threaded-out • Inspection and appropriate testing GAP 4 • Recommended after 64,000 hours of operation • Usually takes 10-12 days anilscoob@gmail.com
  • 18. GAP 4 deliverables Residual Life based on Stress Analysis Condition Assessment and Index Risk Assessment and Index may include GAP1, GAP2 & GAP3 deliverables Schedule for GAP1, GAP2 and GAP3 anilscoob@gmail.com
  • 19. GAP Concept Life Cycle Concept anilscoob@gmail.com
  • 20. Life Cycle Concept Value to Customer through Maintenance Optimized Maintenance Line } Continuous Upgrading/ Replacement Maintenance Overhaul Aging Repair Upgrade and Time Warranty Period Modernization Period Replacement & Recycle Period Maintenance Period Customer Project Lifecycle anilscoob@gmail.com
  • 21. GAP Concept Confidence Level anilscoob@gmail.com
  • 22. Strength Stress Calculated calculated from GAP1 from GAP1 Strength Calculated Stress from GAP2 calculated from GAP2 Strength Calculated from GAP3 Stress calculated from GAP3 Strength Stress Calculated calculated from GAP4 from GAP4 anilscoob@gmail.com
  • 23. uncertainty Strength Strength/stress Stress Time anilscoob@gmail.com
  • 24. GAP Concept Stator Winding Failures anilscoob@gmail.com
  • 25. Failure statistics Detection during Normal Operation 11% 5% Bearing 3% 37% Winding 6% Rotor Shaft/coupling Brushes/slipring 5% External devices Not specified 33% anilscoob@gmail.com
  • 26. Failure statistics Detection during maintenance or test 10% 4% Bearing 7% Winding Rotor Shaft/coupling 8% Brushes/slipring 2% External devices 8% Not specified 61% anilscoob@gmail.com
  • 27. Failure Statistics Conclusion • Bearings fail frequently • Windings also share a significant failure rate • Very few winding failures are detected in maintenance (8.3%) as against the total failure of 33% in normal operation • This indicates poor insulation problems detection technique anilscoob@gmail.com