FORMS AND MATERIALS FOR
SPEEDY CONSTRUCTION
Submitted by
Mohd kaif
Vijay kishor
Kamal kant
Jitendra saini
Mudassir khan
INTRODUCTION
 Formwork in construction is the use of support structures
and moulds to create structures out of concrete which is
poured into the moulds. Formwork can be made using
moulds out of steel, wood, aluminium and/or prefabricated
forms.

 Formwork systems are among the key factors determining
the success of a construction project in terms of speed,
quality, cost and safety of works.
 The operation of removing the formwork is known as
stripping. Stripped formwork can be reused. Reusable
forms are known as panel forms and non-usable are called
stationary forms.
Formwork
 Formwork is the temporary structure that enables
moulding of concrete into desired shape and size
 Holds it in the correct position until it has hardened
sufficiently and is able to support the loads imposed
on it.
 The structural system of temporary supports that
holds the formwork in position is termed as false
work.
 The operation of removing the formwork is known
as stripping. Stripped formwork can be reused.
 Reusable forms are known as panel forms and non-
usable ones are called stationary forms.
A GOOD QUALITY OF FORM WORK SATISFY
THE FOLLOWING REQUIREMENTS
• Strong enough to withstand all types of dead and live loads
•Rigidly constructed and efficiently propped and braced both
horizontally and vertically, so as to retain its shape
•The joints in the formwork should be tight against leakage
of cement grout
•Construction of formwork should permit removal of various
parts in desired sequences without damage to the concrete
•Material of the formwork should be cheap, easily available and
should be suitable for reuse
•Material of the formwork should not warp or get distorted
when exposed to the elements
Classification of Formwork
 Different types of construction require the use of different
types of formworks as
 STEEL FORMWORK IS MADE OF
 Steel Formwork
 Aluminum Formwork
 Wooden Form work
 Plastic Formwork
Steel Formwork
 Steel formwork
 Steel forms are stronger, durable and have longer
life than timber formwork and their reuses are more
in number
 Steel forms can be installed and dismantled with
greater ease and speed.
 The quality of exposed concrete surface by using
steel forms is good and such surfaces need no
further treatment.
 Steel formwork does not absorb moisture from
concrete.
 Steel formwork does not shrink or warp
ALUMINIUM FORMWORK
 Often used in pre-fabricated formwork, that
is put together on site.
 Aluminium is strong and light, and
consequently fewer supports and ties are
required.
 The lighter sections will deflect more, but
this can be avoided by simply following the
manufacturer’s recommendations.
Plywood formwork
- This is by far the most common material used for the facing
panel. It is easily cut to shape on site, and if handled and stored
carefully, it can be used many times.
- A standard plywood thickness on site is 18mm.This is usually
sufficient for most pours.
- However, if the formwork is curved, a thinner plywood is used to
facilitate bending.
- Thicker plywood may be used when the weight
of concrete causes a standard thickness plywood to bow out,
distorting the concrete face.
PLASTIC FORMWORK
 Glass reinforced plastics (GRP) and vacuum
formed plastics are used when complicated
concrete shapes are required (e.g. waffle floors).
 Although vacuum formed plastics will always
need support, GRP can be fabricated with
integral bearers making it self-supporting.
 Like steel, plastic formwork can be re-used
many times, as long as care is taken not to scour
the surface whilst vibrating the concrete.
FAILURE OF FORMWORK
 Generally some unexpected event causes one member to fail, then
others become overloaded or misaligned and the entire formwork
structure collapses
 Improper stripping and shore removal
 Unstable soil under mudsills, shoring not plumb
 Inadequate control of concrete placement
 Lack of attention to formwork details
 Inadequate cross bracing and horizontal bracing of shores
 Forms sometime collapse when their shores/ jack are displaced by
the vibration caused by:
 movement of workers & equipment on the formwork
READY MIX CONCRETE RMC)
READY MIX CONCRETE (RMC)
 Ready-mix concrete (RMC) is a type of concrete
which is manufactured in a cement factory, or
specifically known as the batching plant,
according to a given set of proportions, and then
delivered to a work site, by truck mounted with
mixers.This results in a precise mixture, allowing
specialty concrete mixtures to be developed and
implemented on construction sites.
READY MIX VS SITE MIX CONCRETE
 READY MIX
 1. ConsistentQuality- concrete is made in high tech batching plants
in a computerized environment.
 2. Construction in double quick time.
 3. Raw materials are chosen after strict quality checks
 4. Large quantities of concrete can be ordered.This allows you to
upgrade yourself and handle projects of any size.
 5. No wastage of raw materials at your site. Everything is pre-mixed
at our plants, based on your needs.
 6. No hassle of managing labor on site.We supply ready-to-use
concrete. well-equipped technical crew will handle the pouring and
patching of concrete at the site.
 7. Safe work practices – no disruption in your schedule
 8.You don’t have to stock materials and watch over them.There’s no
worry about pilferage as the concrete is directly supplied to your site
when you need it.
 SITE MIX
 Quality is inconsistent–because concrete is hand mixed.
 2. Manual mixing is time consuming. Projects take longer time to
finish.
 3. Quality of raw materials is manually checked. Or not checked at
all.
 4.Takes more time. Repeated mixing needs to be done for large
quantities as the mixer will be too small to handle the requirement
 5. High wastage of raw materials due to manual mixing.
 6. Involves the use of laborers for mixing the concrete on site.
Management of labor means more time, efforts and money.
 7. Highly unsafe. Unskilled and untrained laborers may work
carelessly resulting in dangerous working conditions
 8. Risk of pilferage of raw materials is high. Housekeeping could be
poor due to piles of stocks lying at the site
ADVANTAGE
• Better quality concrete is produced in lesser time.
• Elimination of storage space for basic materials at site.
• Elimination of Procurement / Hiring of plant and machinery
• Wastage of basic materials is avoided.
• Labor associated with production of concrete is eliminated.
• Time required is greatly reduced.
• Noise and dust pollution at site is reduced.
• Organization at site is more streamlined.
RMC PLANTS IN INDIA
COMPANY PLANTS ACROSS INDIA
UltraTech - Ready Mix
Concrete (RMC) Plants
103
LAFARGE 68
ACC LIMITED 92
RMC Ready-mix India 50
Relcon Infra Projects Ltd -
RDC -
Apollo Inffratech Private
Limited
-
The Ramco Cements Limited -
Wonder Ready-mixConcrete -
THANK YOU…..

More Related Content

What's hot

22006361-The-Council-of-Architecture.ppt
22006361-The-Council-of-Architecture.ppt22006361-The-Council-of-Architecture.ppt
22006361-The-Council-of-Architecture.pptvritisachdeva1
 
Architecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationArchitecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationAditi Garg
 
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMDeepak Verma
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYSheraniDaniel
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional BuildingKashish Duggal
 
ARCHITECTURE PROFESSIONAL PRACTICE
ARCHITECTURE PROFESSIONAL PRACTICE ARCHITECTURE PROFESSIONAL PRACTICE
ARCHITECTURE PROFESSIONAL PRACTICE Gai3 Segar
 
Literature review and case study of corporate architecture
Literature review and case study of corporate architectureLiterature review and case study of corporate architecture
Literature review and case study of corporate architectureKathmandu Engineering College
 
Exhibition case study
Exhibition case studyExhibition case study
Exhibition case studyshraddhanepal
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture IIAr. Mukunda K.S
 
NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN Ar Naveen Naveen
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practiceAditya Sanyal
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre finalJYOTSNA MISHRA
 
Bharat Bhavan, Bhopal
Bharat Bhavan, BhopalBharat Bhavan, Bhopal
Bharat Bhavan, BhopalDivya Suresh
 
convention center litrature
convention center litratureconvention center litrature
convention center litratureSrujanaReddy41
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyVishwas Sahni
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Deepak Verma
 

What's hot (20)

Architects act
Architects actArchitects act
Architects act
 
22006361-The-Council-of-Architecture.ppt
22006361-The-Council-of-Architecture.ppt22006361-The-Council-of-Architecture.ppt
22006361-The-Council-of-Architecture.ppt
 
Architecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationArchitecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliation
 
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEMADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEM
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDY
 
Building services & Standards For Institutional Building
Building services & Standards For Institutional BuildingBuilding services & Standards For Institutional Building
Building services & Standards For Institutional Building
 
ARCHITECTURE PROFESSIONAL PRACTICE
ARCHITECTURE PROFESSIONAL PRACTICE ARCHITECTURE PROFESSIONAL PRACTICE
ARCHITECTURE PROFESSIONAL PRACTICE
 
Literature review and case study of corporate architecture
Literature review and case study of corporate architectureLiterature review and case study of corporate architecture
Literature review and case study of corporate architecture
 
Manaav sadhna, Ahmedabad
Manaav sadhna, AhmedabadManaav sadhna, Ahmedabad
Manaav sadhna, Ahmedabad
 
BV doshi design
BV doshi designBV doshi design
BV doshi design
 
Exhibition case study
Exhibition case studyExhibition case study
Exhibition case study
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture II
 
NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN NATIONAL INSITUTE OF DESIGN
NATIONAL INSITUTE OF DESIGN
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
 
Bharat Bhavan, Bhopal
Bharat Bhavan, BhopalBharat Bhavan, Bhopal
Bharat Bhavan, Bhopal
 
convention center litrature
convention center litratureconvention center litrature
convention center litrature
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
 

Similar to Forms and materials for speedy construction

Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork adarshkaushik6
 
Concrete framework
Concrete frameworkConcrete framework
Concrete frameworkJustin Myint
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction purvi golecha
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2Gali Suresh
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringUjasPandya2
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptxMr Amol Ghogare
 
Forms & materials for speedy construction
Forms & materials for speedy construction Forms & materials for speedy construction
Forms & materials for speedy construction somitra bhardwaj
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdfFaizanSolanki
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measuressabnisajit
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptxssuserc0bf9b
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shutteringKishor Ade
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid shaikh khalid
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities Pradumn Suryakar
 

Similar to Forms and materials for speedy construction (20)

Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
Concrete framework
Concrete frameworkConcrete framework
Concrete framework
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Formwork.pdf
Formwork.pdfFormwork.pdf
Formwork.pdf
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Forms & materials for speedy construction
Forms & materials for speedy construction Forms & materials for speedy construction
Forms & materials for speedy construction
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
 
Formwork
FormworkFormwork
Formwork
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
 
Unit 16
Unit 16Unit 16
Unit 16
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

Forms and materials for speedy construction

  • 1. FORMS AND MATERIALS FOR SPEEDY CONSTRUCTION Submitted by Mohd kaif Vijay kishor Kamal kant Jitendra saini Mudassir khan
  • 2. INTRODUCTION  Formwork in construction is the use of support structures and moulds to create structures out of concrete which is poured into the moulds. Formwork can be made using moulds out of steel, wood, aluminium and/or prefabricated forms.   Formwork systems are among the key factors determining the success of a construction project in terms of speed, quality, cost and safety of works.  The operation of removing the formwork is known as stripping. Stripped formwork can be reused. Reusable forms are known as panel forms and non-usable are called stationary forms.
  • 3. Formwork  Formwork is the temporary structure that enables moulding of concrete into desired shape and size  Holds it in the correct position until it has hardened sufficiently and is able to support the loads imposed on it.  The structural system of temporary supports that holds the formwork in position is termed as false work.  The operation of removing the formwork is known as stripping. Stripped formwork can be reused.  Reusable forms are known as panel forms and non- usable ones are called stationary forms.
  • 4. A GOOD QUALITY OF FORM WORK SATISFY THE FOLLOWING REQUIREMENTS • Strong enough to withstand all types of dead and live loads •Rigidly constructed and efficiently propped and braced both horizontally and vertically, so as to retain its shape •The joints in the formwork should be tight against leakage of cement grout •Construction of formwork should permit removal of various parts in desired sequences without damage to the concrete •Material of the formwork should be cheap, easily available and should be suitable for reuse •Material of the formwork should not warp or get distorted when exposed to the elements
  • 5. Classification of Formwork  Different types of construction require the use of different types of formworks as  STEEL FORMWORK IS MADE OF  Steel Formwork  Aluminum Formwork  Wooden Form work  Plastic Formwork
  • 6. Steel Formwork  Steel formwork  Steel forms are stronger, durable and have longer life than timber formwork and their reuses are more in number  Steel forms can be installed and dismantled with greater ease and speed.  The quality of exposed concrete surface by using steel forms is good and such surfaces need no further treatment.  Steel formwork does not absorb moisture from concrete.  Steel formwork does not shrink or warp
  • 7.
  • 8. ALUMINIUM FORMWORK  Often used in pre-fabricated formwork, that is put together on site.  Aluminium is strong and light, and consequently fewer supports and ties are required.  The lighter sections will deflect more, but this can be avoided by simply following the manufacturer’s recommendations.
  • 9.
  • 10. Plywood formwork - This is by far the most common material used for the facing panel. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times. - A standard plywood thickness on site is 18mm.This is usually sufficient for most pours. - However, if the formwork is curved, a thinner plywood is used to facilitate bending. - Thicker plywood may be used when the weight of concrete causes a standard thickness plywood to bow out, distorting the concrete face.
  • 11.
  • 12. PLASTIC FORMWORK  Glass reinforced plastics (GRP) and vacuum formed plastics are used when complicated concrete shapes are required (e.g. waffle floors).  Although vacuum formed plastics will always need support, GRP can be fabricated with integral bearers making it self-supporting.  Like steel, plastic formwork can be re-used many times, as long as care is taken not to scour the surface whilst vibrating the concrete.
  • 13.
  • 15.  Generally some unexpected event causes one member to fail, then others become overloaded or misaligned and the entire formwork structure collapses  Improper stripping and shore removal  Unstable soil under mudsills, shoring not plumb  Inadequate control of concrete placement  Lack of attention to formwork details  Inadequate cross bracing and horizontal bracing of shores  Forms sometime collapse when their shores/ jack are displaced by the vibration caused by:  movement of workers & equipment on the formwork
  • 16.
  • 18. READY MIX CONCRETE (RMC)  Ready-mix concrete (RMC) is a type of concrete which is manufactured in a cement factory, or specifically known as the batching plant, according to a given set of proportions, and then delivered to a work site, by truck mounted with mixers.This results in a precise mixture, allowing specialty concrete mixtures to be developed and implemented on construction sites.
  • 19. READY MIX VS SITE MIX CONCRETE  READY MIX  1. ConsistentQuality- concrete is made in high tech batching plants in a computerized environment.  2. Construction in double quick time.  3. Raw materials are chosen after strict quality checks  4. Large quantities of concrete can be ordered.This allows you to upgrade yourself and handle projects of any size.  5. No wastage of raw materials at your site. Everything is pre-mixed at our plants, based on your needs.  6. No hassle of managing labor on site.We supply ready-to-use concrete. well-equipped technical crew will handle the pouring and patching of concrete at the site.  7. Safe work practices – no disruption in your schedule  8.You don’t have to stock materials and watch over them.There’s no worry about pilferage as the concrete is directly supplied to your site when you need it.
  • 20.  SITE MIX  Quality is inconsistent–because concrete is hand mixed.  2. Manual mixing is time consuming. Projects take longer time to finish.  3. Quality of raw materials is manually checked. Or not checked at all.  4.Takes more time. Repeated mixing needs to be done for large quantities as the mixer will be too small to handle the requirement  5. High wastage of raw materials due to manual mixing.  6. Involves the use of laborers for mixing the concrete on site. Management of labor means more time, efforts and money.  7. Highly unsafe. Unskilled and untrained laborers may work carelessly resulting in dangerous working conditions  8. Risk of pilferage of raw materials is high. Housekeeping could be poor due to piles of stocks lying at the site
  • 21. ADVANTAGE • Better quality concrete is produced in lesser time. • Elimination of storage space for basic materials at site. • Elimination of Procurement / Hiring of plant and machinery • Wastage of basic materials is avoided. • Labor associated with production of concrete is eliminated. • Time required is greatly reduced. • Noise and dust pollution at site is reduced. • Organization at site is more streamlined.
  • 22. RMC PLANTS IN INDIA COMPANY PLANTS ACROSS INDIA UltraTech - Ready Mix Concrete (RMC) Plants 103 LAFARGE 68 ACC LIMITED 92 RMC Ready-mix India 50 Relcon Infra Projects Ltd - RDC - Apollo Inffratech Private Limited - The Ramco Cements Limited - Wonder Ready-mixConcrete -