Human-Capital Strategies in a Slow Recovery: Focus on Manufacturing is published by CFO Publishing LLC, 51 Sleeper
Street, Boston, MA 02210. Please direct inquiries to Matt Surka at (617) 790 3211 or mattsurka@cfo.com.

CFO Research and Paychex developed hypotheses for this research jointly. Paychex funded the research and publica-
tion of our findings.

At CFO Research, Celina Rogers and Matt Surka directed the research, and Matt Surka wrote the report.

August 2012

Copyright © 2012 CFO Publishing LLC, which is solely responsible for its content. All rights reserved.
No part of this report may be reproduced, stored in a retrieval system, or transmitted in any form, by any means,
without written permission.
Human-Capital Strategies
in a Slow Recovery




                           Contents

                           About this report	                                     1

                           Rising stakes for workforce management	               2

                           After cost control, building a better workforce	       5

                           The need for a better-equipped HR department	         9

                           A commitment to making better use of HR technology	   10
Human-Capital Strategies
            in a Slow Recovery




About this report
In July 2012, CFO Research conducted a survey
among senior finance executives at midsize
U.S. companies to examine their views on the
challenges of maximizing workforce produc-
tivity—both now and in the future. We sought
to gauge how companies are planning to
improve their ability to manage their work-
force, as well as find out more about how their
human-capital strategies will take shape over
the next two years.

From the full set of 164 respondents, we
received 45 qualified responses from execu-
tives working at manufacturing companies, as
follows:

Annual revenue
Less than $100 million	                 58%
$100 million–$500 million	              33%
$500 million–$1 billion 	                7%
$1 billion–$2 billion	                   2%

Number of employees
50–250 employees	                       51%
250–500 employees	                     29%
500–1,000 employees	                   20%

Titles
Chief financial officer	 51%
Controller	27%
Director of finance	      9%
VP of finance	            7%
EVP or SVP of finance	    4%
Other	2%

Note: Percentages may not total 100%, due to
rounding.




  © C FO P U B LISHING 2012	                      1
Human-Capital Strategies
           in a Slow Recovery




The problem of                 Rising stakes                                       workforce management, working to fine-tune

finding skilled                for workforce                                       the increasingly critical balance between help-
                                                                                   ing employees do more and carefully managing
employees                      management                                          a small, precious pool of resources.
is making it
increasingly                   after an economic near-collapse, a tepid            For manufacturing companies, striking this
                               recovery, and persistent uncertainty through-       balance may be made especially difficult by
important—and
                               out the world, no one could blame a CFO for         challenges in recruiting and retaining skilled
increasingly                   feeling like nothing ever gets less difficult but   employees. Research conducted by the Society
difficult—to                   more important. For companies in this economic      for Human Resource Management in August
manage the size of             environment, the most important tasks seem          2012 indicates, for example, that manufactur-
compensation and               only to become more difficult. This is certainly    ers are being pressured to increase the size of
                               true for workforce management—the processes,        compensation packages to recruit qualified
benefits packages
                               practices, and technologies that companies use      workers. New-hire compensation rose 1.9%
effectively, train             to build their teams of employees into power-       between July 2011 and July 2012, in contrast with
new hires, and                 houses of productivity. Our survey of 164 senior    a 6.1% drop in new-hire compensation in service
retain employees.              finance executives at midsize U.S. companies        industries over the same time period. Manufac-
                               suggests that the stakes for developing and         turing companies are struggling to find quali-
                               executing effective human-capital strategy are      fied machinists, engineers, and other technical
                               rising—and quickly. The finance executives          workers—and the effects of that struggle can
                               responding to our survey point out that com-        send tremors through many other aspects of
                               panies will need to continue to do more with        managing a workforce. In our survey, finance
                               less over the next two years. As the difficulty     executives working in the manufacturing sector
                               of maximizing employee productivity rises           tend to describe recruiting challenges as the epi-
                               along with its importance, finance teams may        center of a number of labor challenges. Respon-
                               be called upon to become especially involved in     dents suggest that the problem of finding skilled
                                                                                   employees is making it increasingly important—
                                                                                   and increasingly difficult—to manage the size of
                                                                                   compensation and benefits packages effectively,
Figure 1. Companies’ Labor Plans Over the Next Two Years
                                                                                   train new hires, and retain employees. These
Survey results suggest that most manufacturers plan to increase the pace           issues are compounded by broad trends within
of hiring without increasing the share of resources allocated to labor.            the manufacturing sector—most notably the
                                                                                   push for faster, larger-scale hiring.
Decrease                  Stay the Same                           Increase
                                                                                   Manufacturing companies’ workforces are
                                                                                   growing, and the need to extract greater value
                                                                                   from that investment in human capital is
                                                                                   growing with them. Most manufacturers are
                Hiring   13%     24%                   62%                         planning to increase the pace of hiring over
                                                                                   the next two years—even as the average labor
                                                                                   budget (measured as a percentage of operating
Labor Budget    20%              51%                 29%                           budget) remains somewhat steady, according to
                                                                                   our research. A solid majority of senior finance




  2	                                                                                                       © C FO P U BL I S H I N G 2 0 1 2
Human-Capital Strategies
             in a Slow Recovery




executives at manufacturing companies (62%)         ing the right people is a challenge, say finance     A solid majority
say that their companies are planning to ramp       executives. In open-response questions, several
                                                                                                         of finance
up hiring over the next two years. (See Figure      finance executives at midsize manufacturing
1.) Only a quarter of manufacturers (24%) will      companies point to a “dearth of engineering
                                                                                                         executives at
keep the pace of hiring steady, and very few        talent and skilled field service personnel,” a       manufacturing
(13%) plan to decrease hiring. At the same time,    “demand for qualified employees [that] over-         companies (62%)
more than two-thirds of manufacturing finance       whelms talent availability,” and similar prob-       say that their
executives (71%) say that their companies will      lems. One manufacturing CFO says, simply, that
be working with either the same (51%) or lower      the “skillset we need is hard to find in the midst
                                                                                                         companies are
(20%) levels of resource allocation to labor over   of so many unqualified applicants.”                  planning to ramp
the next two years, compared with today. (See                                                            up hiring over the
Figure 1 on page 2.)                                Hiring challenges seem to be tied especially         next two years.
                                                    closely with company location among manu-
From these results, it’s clear that manufacturers   facturers, as respondents observe in open-
will face a substantial internal labor challenge    response questions. Salary expectations vary
over the next two years, as they strive to posi-    by region, for example. One VP of finance at a
tion their employees in a way that maximizes        midsize manufacturer, for example, says that
their contribution to the business. But the         the company is “located in a small town with
mounting labor-strategy challenge doesn’t end       a lower cost of living,” which allows it to stay
at a company’s four walls, survey results indi-     competitive while keeping compensation pack-
cate: manufacturers will have to work harder        ages smaller. Many other respondents—both
not only to manage their existing workforce,        those in higher-salary regions and those in
but also to wrestle with their competitors for      lower-salary regions—confirm this point. The
qualified employees. Sometimes, manufactur-         advantages of being based in a lower-salary
ing companies will take on the two challenges       region are not without drawbacks, however, as
together, optimizing their hiring and training      companies in these areas often struggle to find
practices with their compensation packages to       high-skill employees. “For skilled and admin-
account for both internal needs and the realities   istrative positions, our facilities are located in
of the labor market. In less ideal cases, aggres-   less populated areas that are a detriment to
sive recruiting practices may serve as a means      recruiting,” says the CFO of a midsize manu-
of compensating for weaknesses in other areas       facturer. Other respondents working in the
of workforce management. “We always need            manufacturing sector describe similar regional
to hire experienced people [but] do not do a        issues with recruiting, like one VP of finance
good job of bringing up new talent through the      who notes, “Shop labor is not a problem; skilled
organization,” says a controller at a midsize       labor is difficult due to [our] small-town loca-
manufacturing company.                              tion.” Companies based in or near cities tend
                                                    to face the opposite trade-off: greater access
Currently, most finance executives at manufac-      to highly qualified employees at the cost of
turing companies (55%) say that they are facing     greater competition for labor and higher salary
moderate competition for qualified employees,       expectations. Although the specific barriers to
and an additional 18% say that competition for      effective hiring and employee retention vary by
qualified employees is intense. (See Figure 2.)     region, no region is without its challenges.
Despite persistently high unemployment, find-




   © C FO P U B LISHING 2012	                                                                                            3
Human-Capital Strategies
       in a Slow Recovery




                   Figure 2. Competition for Qualified Employees Over the Next Two Years

                   Competition in the labor market will become more intense over the next two years, say
                   finance executives at manufacturing companies.


                                       Less Intense           No Change          More Intense




                                                          9%     16%                      75%




Seventy-five            For most manufacturers, attracting the right       two years; only 26% will hire primarily low-
                        people is already tough—and it will only           skill workers. Two major trends underpin these
percent of
                        become tougher in the years ahead, say senior      results: first, persistent interest in automating or
senior finance          finance executives. Survey results suggest         outsourcing low-skill, manual tasks, and second,
executives say          that the battle in the labor market is poised to   the need to direct labor resources to the techni-
that competition        become increasingly fierce over the next two       cal workers, knowledge workers, and managers
                        years: 75% of senior finance executives say that   who they deem likely to produce the greatest
for qualified
                        competition for qualified employees is likely      gains in overall workforce productivity.
employees is            to become more intense, and only 9% see it
likely to become        becoming at all easier. (See Figure 2.) In open-   Survey respondents also observe that finding
more intense            response questions, manufacturing respondents      employees to fill specialized roles often proves
over the next           reference the two dimensions of this rising com-   to be more of a challenge than filling roles that
                        petition for labor—greater demand and shrink-      require fewer qualifications. “To date, we have
two years.
                        ing supply—and offer explanations for both.        not had an issue hiring the production staff,”
                                                                           says one controller at a midsize manufacturing
                        Greater demand for labor. One CFO at a             company. “Our issues arise when it comes to
                        midsize manufacturer predicts that competi-        hiring a more skilled worker/manager.” Such
                        tion for employees will become more intense        observations may become more common over
                        over the next two years, because “the economy      the next few years. One controller at a midsize
                        is improving and there will be more hiring.”       manufacturer notes, “Finding qualified manu-
                        Other respondents express similar views, and in    facturing engineers is becoming increasingly
                        many cases they indicate that greater demand       difficult.”
                        for highly skilled workers, in particular, will
                        pose the greatest challenge. According to survey   Shrinking pool of qualified applicants. Some
                        data, a plurality of manufacturers (47%) will      respondents express concerns that the number
                        primarily hire high-skill workers over the next    of qualified potential employees in their subset


 4	                                                                                                 © C FO P U BL I S H I N G 2 0 1 2
Human-Capital Strategies
             in a Slow Recovery




of the labor market may be on the decline. Opin-
ions on the causes of the shrinking labor supply     After cost control,                               Most
                                                                                                       manufacturers
vary, with respondents offering explanations         building a better                                 (53%) will
related to their specific niche in the manufactur-
ing sector, the region in which their company is
                                                     workforce                                         primarily focus
based, and the aging workforce. Although some
                                                     how will manufacturing companies
                                                                                                       on maximizing
causes of the skilled-labor shortage in manu-
                                                     approach the labor challenges that lie ahead?     the output of
facturing may be more immediate and more
localized than others (one CFO at a manufactur-
                                                     Although our research confirms that manu-         their workforce:
                                                     facturers plan to catch these challenges in a     improving their
ing company, for example, points to an ongoing
                                                     classic pincer—working to reduce labor costs
“workforce exodus” from the state in which the
                                                     on one side and maximize workforce output
                                                                                                       ability to recruit,
company is based), finance executives have their                                                       retain, train,
                                                     on the other—deeper analysis of the data sug-
eye on longer-term trends as well. “Retiring
                                                     gests a more nuanced story. Finance executives    and develop
workers put pressure on need for new hires,”
                                                     suggest that workforce management starts          employees.
notes a CFO at another midsize manufacturer.
                                                     with developing robust systems and processes
                                                     for managing labor costs. The next step—the
In order to stay competitive, manufacturing
                                                     step that most manufacturing companies will
companies may need to push back against both
                                                     focus on over the next few years, according
short- and long-term trends. Doing more to
                                                     to finance executives—involves working to
find and develop the right people isn’t a task
                                                     improve employee performance, training, and
that manufacturers can afford to bow out of. A
                                                     development.
solid majority of manufacturing respondents
(78%) agree that “Over the next two years, our
                                                     In our survey, we presented senior finance
ability to attract, develop, and retain quali-
                                                     executives with two broad strategies for
fied employees will be an important source of
                                                     maximizing workforce productivity: maxi-
competitive advantage for my company.” More
                                                     mizing output and minimizing input. These
than one-third (36%) agree strongly that their
                                                     two strategies are, of course, anything but
companies will seek to derive a great deal of
                                                     mutually exclusive; they represent two sides
competitive advantage from their human-cap-
                                                     of a single mission, and neither one could be
ital strategy, and an additional 42% agree to at
                                                     effective without the other. With this in mind,
least some extent.
                                                     however, we set out to determine which of the
                                                     two strategies companies are most likely to
                                                     focus on over the next two years. According to
 ➽ the bottom line Finding the right                 our research, most manufacturing companies
 people—and keeping them—will become                 (53%) will focus primarily on maximizing the
 substantially more difficult over the next          output of their workforce: improving their
 two years, survey results suggest. At the           ability to recruit, retain, train, and develop
 same time, the share of resources that              employees. (See Figure 3 on page 6.) A smaller
 manufacturing companies allocate to labor           proportion (31%) will focus primarily on
 is likely to remain steady. This adds up to an      minimizing the cost of their workforce, which
 all-too-familiar imperative: continue to do         includes improving their ability to manage
 more with less.                                     employee time and attendance, benefits costs,
                                                     expenses, and labor-related taxes.



   © C FO P U B LISHING 2012	                                                                                            5
Human-Capital Strategies
         in a Slow Recovery




Controlling costs           Although manufacturing companies are, of              important—but finance executives working in
                            course, interested in both increasing labor           manufacturing also recognize its limits.
is step one;
                            output and decreasing labor input, our data
everything else             suggests that improvement efforts will center         The rationale behind this arrangement of labor
is step two.                on the output side of the equation. Asked about       priorities varies by company and industry,
                            their companies’ plans for each component of          but the explanations offered by senior finance
                            these strategies for workforce management,            executives in open-response questions tend to
                            finance executives working in the manufactur-         support the idea that building robust processes
                            ing sector confirm that their companies will          for managing employee time and attendance
                            take on the task of maximizing workforce pro-         forms the foundation to support other aspects
                            ductivity from multiple directions. In particular,    of workforce management. Simply put, con-
                            manufacturing respondents say their companies         trolling costs is step one; everything else is
                            will seek to boost output by improving both           step two. Many manufacturing respondents
                            their ability to manage employee performance          indicate that their companies have already
                            and to train and develop employees (87% of            implemented new systems and practices for
                            manufacturing respondents, respectively). At          managing employee time and attendance—in
                            the same time, more than half of manufactur-          some cases very recently. “We have just imple-
                            ing respondents (56%) say their companies             mented a paperless time-off reporting system,”
                            will move to control labor costs by improv-           says the CFO of a midsize manufacturer. Other
                            ing their time and attendance management.             respondents offer similar responses, saying
                            (See Figure 4 on page 7.) Taken together, these       that they “have already taken steps to do this”
                            results confirm that labor cost-control remains       and “already use new software to manage




                            Figure 3. Which strategy for maximizing workforce productivity will your company
                            focus on over the next two years?

                                   Minimizing Workforce Cost…                    …Or Maximizing Workforce Output?
                                   Improving ability to manage employee time     Improving ability to recruit, retain, train,
                                   and attendance, benefits costs, expenses,     and/or develop employees
                                   and/or labor-related taxes


                                                    2%                                                2%
                                            13%                                             13%




                                      31%                         53%                31%                              53%
 Note: 13% of manu-
 facturing respondents
 chose, “Neither of these
 statements describes
 our approach,” and 2%
 answered, “Not sure.”



 6	                                                                                                            © C FO P U BL I S H I N G 2 0 1 2
Human-Capital Strategies
             in a Slow Recovery




Figure 4. Over the next two years, will your company work to improve its ability to _________________?
Although manufacturers will work to improve multiple aspects of workforce management, survey results suggest that
they will prioritize maximizing employee output by managing performance and promoting training and development.

                     Manage Employee                    Train and Develop                    Manage Employee
                       Performance                          Employees                       Time and Attendance
                                          YES




                                      87%                                87%                                56%




employee time and attendance.” Among the             pared with other industries represented in our      “It is vital that
companies that are not planning to further           research. One EVP of finance at a manufacturing
                                                                                                         our employees
improve their ability to manage time and             company notes, “Our industry is extremely price
attendance, many may have spent the last             sensitive and cost savings are expected from our    contribute to
several years focusing intently on the cost          customers.”                                         their maximum
dimension of workforce productivity. “We cur-                                                            capability. This is
rently have systems and procedures in place          Once a sufficiently cost-minded foundation
                                                                                                         a primary focus
for managing this area,” says one controller at      is in place, manufacturers may find that they
a midsize manufacturer. “Small tweaks may            have more resources to spare on maximiz-
                                                                                                         for management.”
be made to address issues but [this is] not a        ing the output of their workforce. In open-           —CONTROLLER, MIDSIZE
                                                                                                                MANUFACTURER
primary area of focus.”                              response questions, finance executives work-
                                                     ing in the manufacturing sector confirm the
Nonetheless, some companies are still catch-         increasing importance of managing employee
ing up on time-and-attendance management.            performance. Some respondents explain that
“We feel we have the staffing numbers not the        striving to improve employee performance
staffing productivity,” says a director of finance   represents a valuable means of staving off
at a midsize manufacturing company. One CFO          external pressures. “It is vital that our employ-
at a midsize manufacturer describes similar          ees contribute to their maximum capability,”
challenges and ties them to cultural changes         says a controller at a midsize manufacturing
within the labor supply: “Younger workers have       company, adding that managing employee
a need/desire for more flexible work hours and       performance “is a primary focus for manage-
our industry needs more time and attendance          ment.” Another midsize manufacturer relies
[oversight].” Manufacturing respondents seem         on boosting employee performance in order
especially conscious of the importance of            to compensate for necessary increases in
managing employee time and attendance, com-          compensation. “Manufacturing efficiency is a


   © C FO P U B LISHING 2012	                                                                                              7
Human-Capital Strategies
       in a Slow Recovery




Most senior           major component of our costs,” says the com-         to the company’s CFO. “For relatively minimal
                      pany’s CFO. “We have to manage efficiency            investment, our staff learns new skills, keeps
finance
                      to at least offset wage and benefit increases,       up on changing regulations, and is exposed to
executives (64%)      as we do not have the ability to pass on price       different ways of thinking about old problems.”
anticipate that       increases to the customer.”                          Both companies and employees stand to ben-
their companies’                                                           efit from a greater focus on employee develop-
                      Respondents to our survey also emphasize             ment. The task falls to finance executives and
HR function will
                      the need to improve practices for employee           their peers in other functions and business
play a greater role   training and development, taking a variety of        units to ensure that employees’ desire to learn
in maximizing         approaches to the issue. “New employees are          and grow is matched with an opportunity to
workforce             a high risk to quality, safety, and productivity,”   do so.
                      says one controller at a midsize manufactur-
productivity over
                      ing company. “As such, they are a focus of our        ➽the bottom line Manufacturing CFOs are
the next two          efforts.” One CFO takes a different (but com-         looking forward to maintaining labor cost sav-
years.                patible) perspective, focusing on the benefits        ings real-ized in the course of the downturn. But
                      of well-designed training programs: “Employ-          they recognize that, after several years of intense
                      ees who can do more work faster with better           focus on cost management, their companies will
                      quality—and don’t cost more in salary. The            need to invest in training and development and
                      company gains, and the employee [gains] too           employee-performance management in order to
                      with new and current skills.” Another manu-           continue to boost productivity.
                      facturing CFO suggests that the rising impor-
                      tance of focusing on employee development
                      may have roots in the mind-set of employees—
                      those both current and prospective. “Employ-
                      ees nowadays attain much job satisfaction
                      from career development, so it is critical that
                      they see themselves given the opportunity to
                      grow on the job,” this CFO argues. The CFO
                      adds, however, that redoubling efforts to train
                      and develop employees, far from being merely
                      a means of satisfying employee expectations,
                      has long-term advantages for a company: “It
                      is beneficial to have a group of well-trained
                      ‘veterans’ to effectively guide the ‘rookies’ and
                      newcomers so as to achieve seamless assimila-
                      tion/transition.”

                      If the desire for learning and growing is truly
                      on the rise among employees, the interests
                      of employees and employers may be aligning
                      more than ever before. At a midsize manu-
                      facturer, “Training existing staff adds to our
                      culture of employee empowerment,” according




  8	                                                                                                © C FO P U BL I S H I N G 2 0 1 2
Human-Capital Strategies
             in a Slow Recovery




The need for a                                     companies’ HR function as “very effective” at
                                                   supporting their efforts to maximize overall
                                                                                                      Fifty-eight
                                                                                                      percent of
better-equipped                                    workforce productivity; a much greater pro-
                                                                                                      manufacturers
HR department                                      portion (36%) describe it as “not very effec-
                                                   tive.” The remaining respondents (48%) fall        are likely to make
                                                   in the middle, describing their companies’ HR      better use of HR
                                                   function as only “somewhat effective.”
As improving workforce management                                                                     technology over
becomes increasingly critical, finance execu-
                                                   The problem, according to many finance
                                                                                                      the next
tives working in the manufacturing sector
                                                   executives, is that manufacturers have thus        two years,
recognize that their companies will need to
improve the effectiveness of HR if they want
                                                   far struggled to position their HR function to     say finance
                                                   be able to contribute to high-value activities.    executives.
to make much headway. Manufacturers will
                                                   For example, finance executives acknowledge
ask more of their HR functions in the years
                                                   that HR is often underresourced, which in
ahead, survey results indicate. Most manufac-
                                                   turn detracts from HR’s ability to develop and
turing respondents (58%) anticipate that their
                                                   execute human-capital strategy. “HR focuses
companies’ HR function will play a greater
                                                   more on policing the workforce and compli-
role in maximizing workforce productivity
                                                   ance with regulations rather than develop-
over the next two years.
                                                   ing the workforce,” notes one manufacturing
                                                   CFO. “Training is concentrated on compliance
At some manufacturing companies, say
                                                   rather than developing skill level or develop-
respondents in open-response questions, HR
                                                   ing management talent.” The controller at
is well positioned to support the workforce-
                                                   another manufacturing company expresses
management objectives of the entire company.
                                                   similar concerns about HR’s ability to develop
For example, HR at one midsize manufacturer
                                                   employees, linking this issue to the demands
excels at “employee relations and engagement,
                                                   of the industry: “They struggle to keep up with
benefits and compensation, [and developing]
                                                   our 24/7 manufacturing facilities. Training/
reasonable and fair policies,” according to the
                                                   meetings must be scheduled for each shift
company’s EVP of finance. This EVP adds that
                                                   or they are not effective.” Organizational
the company has “received awards for our
                                                   problems may compound this issue, hinder-
company/employee practices.” A handful of
                                                   ing HR’s access to strategic discussion. One
respondents express similar levels of satisfac-
                                                   manufacturing CFO notes that HR struggles to
tion with HR at their companies.
                                                   “coordinate with department heads to identify
                                                   employee-specific skill upgrades.”
But although a segment of manufacturing
companies have already pushed their HR func-
                                                   Interestingly, despite many finance execu-
tion up to where it needs to be, the majority
                                                   tives’ suggestion in open-ended responses
of manufacturers still have a long way to go.
                                                   that HR lacks the staff and resources to truly
Most senior finance executives in our survey
                                                   contribute value to the business, survey
indicate that their companies’ HR function
                                                   results indicate that HR efficiency is a concern
currently lacks the levels of effectiveness that
                                                   for a substantial number of senior finance
may prove increasingly necessary over the
                                                   executives. Only 11% of senior finance execu-
next two years. Few senior finance executives
                                                   tives at manufacturing companies describe
working in manufacturing (14%) describe their



   © C FO P U B LISHING 2012	                                                                                         9
Human-Capital Strategies
       in a Slow Recovery




A majority of        the efficiency and cost-effectiveness of HR
                     administration at their company as “excellent”;
                                                                       A commitment to
manufacturing
respondents
                     a much larger proportion—42%—say that the         making better use
(58%) say that
                     efficiency of HR at their companies is in need
                     of improvement. Compared with respondents
                                                                       of HR technology
their companies      working in the other industries represented in
                                                                       throughout our survey, finance
are likely to make   our research, manufacturing respondents are
                                                                       executives working in the manufacturing
                     far more likely to take the view that the cost-
better use of        effectiveness of HR at their companies will
                                                                       sector consistently indicate that the primary
                                                                       barrier to a more-effective HR function—
technology for       need to get better over the next two years.
                                                                       and the issue their companies are most
HR over the next                                                       likely to address over the next two years—is
two years.           But our survey also suggests that finance exec-
                                                                       ineffective IT systems for HR. Manufacturing
                     utives at manufacturing companies are much
                                                                       respondents indicate that their HR functions
                     less concerned with the absolute amount of
                                                                       depend too heavily on manual processes,
                     resources consumed by the HR function, and
                                                                       with two-thirds of finance executives (67%)
                     much more concerned that those resources are
                                                                       agreeing that their companies’ HR function
                     deployed to higher-value work. Manufacturers
                                                                       is currently burdened with too many manual
                     seeking to improve the overall effectiveness of
                                                                       tasks. A majority (52%) also agree that
                     their HR function, then, are planning to take
                                                                       supervisors at their companies are burdened
                     a close look at resource allocation within HR:
                                                                       with too many manual HR processes.
                     how are HR executives and managers spend-
                     ing their time and attention? More important,
                                                                       Survey results suggest that manufacturers
                     how can HR make better use of its existing
                                                                       will focus on improving their HR functions
                     resources? The answer to this question, for
                                                                       through better use of technology. Presented
                     most finance executives, lies in helping HR
                                                                       with a list of steps that companies might take
                     make better use of technology.
                                                                       in order to better position their HR function
                                                                       to contribute to maximizing overall workforce
                                                                       productivity, a majority of manufacturing
                      ➽ the bottom line Manufacturing                  respondents (58%) say that their companies
                      companies will depend on HR to help
                                                                       are most likely to make better use of tech-
                      increase productivity by developing their
                                                                       nology for HR (e.g., web-based self-service,
                      workforces—but many CFOs say their HR
                                                                       automated HR reporting) over the next two
                      teams are currently underresourced. CFOs
                                                                       years. (See Figure 5 on page 11.) Improving HR
                      see a growing need to better equip their HR
                                                                       processes follows somewhat distantly (38% of
                      departments to meet these requirements.
                                                                       respondents). “The complexity of our payroll
                                                                       requirements has created too many manual
                                                                       processes,” says the CFO of a midsize manu-
                                                                       facturing company. “This is an area we need to
                                                                       spend time automating.”

                                                                       A controller at one midsize manufacturing
                                                                       company suggests that making better use of
                                                                       HR technology represents an effective way



 10	                                                                                         © C FO PU BL I S H I N G 2 0 1 2
Human-Capital Strategies
            in a Slow Recovery




Figure 5. What steps is your company most likely to take to better position HR to
contribute to maximizing workforce productivity over the next two years?

Survey results indicate that most manufacturers will strive to
make better use of HR technology over the next two years.

(Respondents were asked to
select up to three responses)




               11%                16%                 29%                31%               38%                 58%

              Make better       Reorganize the   Enable supervisors     Enhance HR          Improve/         Making better
                 use of          HR function      to better perform       staffing       Streamline HR     use of technology
              outsourcing                        HR-related activites                      processes             for HR
                for HR


to meet the rising imperative to do more            based HR software. Our research suggests that        “HR will upgrade
with less. “HR will upgrade its systems and         senior finance executives recognize the value
                                                                                                         its systems and
processes to better meet our needs without          in adopting this kind of software. Among
adding staff,” says the controller. This            senior finance executives at manufacturing           processes to
point likely resonates with finance and HR          companies that have not yet adopted third-           better meet our
executives alike, as our research indicates         party, web-based software applications for           needs without
that most manufacturers (64%) will allocate         a variety of HR processes, most agree that
                                                                                                         adding staff.”
the same amount of resources to their HR            using such applications would improve overall
                                                                                                          —CONTROLLER, MIDSIZE
departments as they have over the past five         workforce productivity at their company. (See
                                                                                                               MANUFACTURER
years. (A handful [11%] will go so far as to        Table on page 12.) Manufacturing respondents
reduce the share of resources allocated to          identify time and attendance management,
HR.) Finance executives believe that making         training and employee development, and
better use of HR systems will help their            access to forms and policies as activities that
companies respond to mounting pressures             are particularly conducive to automation
even as HR and labor budgets hold steady.           through web-based applications.

In the course of striving to make better use        A plurality of manufacturing respondents
of technology for HR, many manufacturing            (49%) favor the use of web-based HR self-
companies are turning to third-party, web-          service for supervisors and/or employees at



  © C FO P U B LISHING 2012	                                                                                                   11
Human-Capital Strategies
          in a Slow Recovery




Implementing                 their companies, compared with only 22%          at a midsize manufacturer remarks, “After
                             of respondents who are resistant to the idea.    dealing with the ‘change’ issue; [self-service
self-service
                             Although these findings lend further support     technology] works well.”
technology                   to the idea that manufacturers will meet
constitutes a                current and future labor challenges primarily    Taken together, finance executives’ plans
careful balancing            through the use of new technologies, they also   for and concerns with web-based HR self-
                             suggest that manufacturing respondents are       service suggest that implementing such
act.
                             approaching new HR systems with a close eye      technology constitutes a careful balancing
                             on change management. As with any systems-       act. Manufacturers can err in either
                             improvement project, implementation of new       direction, over-automating a fundamentally
                             technology is only one part of the change;       interpersonal department or resisting the
                             companies also need to train and encourage       use of web-based HR self-service in areas
                             employees to use the systems effectively.        where it may be the best option. The decision
                             Our research suggests that transitioning         often comes down to company culture. At
                             employees to new systems may be of               one midsize manufacturing company, for
                             particular concern within the manufacturing      example, HR self-service might conflict with
                             sector, with many manufacturing respondents      employee expectations, says the company’s
                             expressing reservations to the effect of, “our   CFO: “Our company is still small enough for
                             supervisors need more training [before we        us to provide these HR services in person and
                             can implement new systems].” One CFO             provide the personal touch that matches the
                                                                              culture created by the owners/founders of
                                                                              this company.” By contrast, the controller at
                                                                              another midsize manufacturing company says
Table. Would using third-party web-based software applications
for HR processes improve your company’s ability to maximize                   that employees may no longer be looking for
workforce productivity?                                                       face-to-face discussions with HR as often as
                                                                              they once did. “These days almost everyone
Finance executives at manufacturing companies see value in using
                                                                              has access to the Internet,” explains this
third-party, web-based software for a wide range of HR processes.
                                                                              controller. “It is much more convenient to
                                                                              log something on a website than schedule a
HR Process	                                             	
                                                      YES           NO        meeting with an HR person.”

Time and attendance management	                       74%	         26%

Training/Employee development	                        71%	         29%         ➽ the bottom line Manufacturing
                                                                               CFOs sense that their HR departments
Access to forms and policies	                         68%	         32%
                                                                               are too heavily burdened with manual
Benefits, open enrollment, and administration	        65%	         35%         processes—and they aim to resolve that
Applicant recruiting/tracking	                        65%	         35%         problem by helping HR to make better use
                                                                               of technology over the next two years.
Performance tracking/review	                          62%	         38%

Labor compliance	                                     59%	         41%

Paperless payroll	                                    55%	         45%

Ad-hoc, HR-related employee queries	                  53%	         47%



  12	                                                                                                 © C FO PU BL I S H I N G 2 0 1 2
Human-Capital Strategies
             in a Slow Recovery




the task of building strong teams
of employees—and giving them what they
need to help them do more for the business—
isn’t getting any easier, our research suggests.
But finance and HR executives alike may
find that, at many manufacturing companies,
the internal mandate to improve workforce
management is rising along with the difficulty
and importance of doing the job as well as
possible. Finance executives are keeping a
sharp watch on labor challenges both current
and looming, and they recognize the press-
ing need to better support their companies’
efforts to maximize workforce productivity.
The workforce-management goals of finance,
HR, and the business units may be converg-
ing on one idea: the practices of the past will
not be enough to take on the challenges of the
imminent future. Finding the seed of oppor-
tunity in this notion may be the first step for
manufacturers committed to making the most
of one of their most important investments—
the investment in their people.




   © C FO P U B LISHING 2012	                      13
Linking Numbers and Narratives:
       Human-Capital Strategies
 Correlating Quantitative Reports
       in a Slow Recovery
 with Qualitative Analysis




        Sponsor’s perspective
Chapter hed
                                when we first discussed this study with               Many senior finance executives report either
                                CFO Research, we had some idea of the                 having plans to implement these solutions in the
                                future conditions that senior finance execu-          near future, or that they have already done so.
                                tives might be expecting. These conditions
                                included a slower than expected economic              User adoption of web-based HR software was
                                recovery, increased competition, and rising           identified as a concern among respondents. At
                                inflationary pressures.                               Paychex, we became aware of this issue early
                                                                                      in the game, when mid-market clients first
                                Where the research surprised us was in the            approached us about offering web services.
                                number of points on which senior finance              As a result, we’ve made our comprehensive
                                executives are largely in agreement:                  service packages as easy and intuitive to use
                                                                                      as possible. In fact, our latest web services are
                                n   Labor performance as a key                        designed to be easily configured to meet future
                                    competitive strategy                              needs that we either haven’t been asked for
                                n   Plans to steadily ramp up hiring                  yet, or haven’t thought of ourselves.
                                n   Emphasis on skills, recruiting, training,
                                    development, and retention                        About Paychex, Inc.
                                n   Leveraging workplace technology                   Paychex, Inc. is a leading provider of payroll,
                                    (pages 9–11 in this report)                       human resource, and benefits outsourcing
                                                                                      solutions for small– to medium-sized busi-
                                Leveraging skilled labor appears to be the stra-      nesses. Paychex One-Source Solutions offers
                                tegic imperative in a slow economy. Yet, the          midsize organizations a complete range of
                                majority of respondents are not planning to           scalable employer solutions that cover the
                                increase compensation or internal HR budgets          entire employee lifecycle. Industry-leading,
                                over the next two years.                              web-based solutions include recruiting, hiring,
                                                                                      benefits, training and performance, time and
                                Clearly, managers of human resources will             labor, payroll and tax administration, expense
                                need to find creative ways to do more with            reporting, and employee/manager self-service.
                                less, and web technologies may be the silver          Service delivery includes specialized onsite
                                bullet. The Paychex-CFO survey indicates the          support, HR administrative outsourcing, con-
                                following approval rankings for web-based             sulting, and employee leasing.
                                solutions that could help them achieve this:

                                Time and attendance management 	            71%
                                Paperless payroll	                          68%
                                                                                       To learn more about Paychex One-Source
                                Access to forms and policies	               68%        Solutions for midsize companies, visit us at
                                Training/Employee development	              68%
                                Performance tracking/review	                65%        www.paychex.com

                                Benefits, open enrollment,
                                and administration	                             65%
                                Recruiting and applicant tracking	              61%
                                Labor compliance	                               61%
                                Ad-hoc, HR-related employee queries	            57%




© CFO P U B LISHING 2 0 1 2 	
14	                                                                                                           © C FO PU BL I S H I N G 2 0 1 2
                                                                                                                                             4

Focus On Manufacturing

  • 1.
    Focus on Manufacturing Human-Capital Strategies in a Slow Recovery THE FINANCE PERSPECTIVE ON WORKFORCE MANAGEMENT A report prepared by CFO Research in collaboration with Paychex
  • 3.
    Human-Capital Strategies in aSlow Recovery THE FINANCE PERSPECTIVE ON WORKFORCE MANAGEMENT Focus on Manufacturing A report prepared by CFO Research in collaboration with Paychex
  • 4.
    Human-Capital Strategies ina Slow Recovery: Focus on Manufacturing is published by CFO Publishing LLC, 51 Sleeper Street, Boston, MA 02210. Please direct inquiries to Matt Surka at (617) 790 3211 or mattsurka@cfo.com. CFO Research and Paychex developed hypotheses for this research jointly. Paychex funded the research and publica- tion of our findings. At CFO Research, Celina Rogers and Matt Surka directed the research, and Matt Surka wrote the report. August 2012 Copyright © 2012 CFO Publishing LLC, which is solely responsible for its content. All rights reserved. No part of this report may be reproduced, stored in a retrieval system, or transmitted in any form, by any means, without written permission.
  • 5.
    Human-Capital Strategies in aSlow Recovery Contents About this report 1 Rising stakes for workforce management 2 After cost control, building a better workforce 5 The need for a better-equipped HR department 9 A commitment to making better use of HR technology 10
  • 7.
    Human-Capital Strategies in a Slow Recovery About this report In July 2012, CFO Research conducted a survey among senior finance executives at midsize U.S. companies to examine their views on the challenges of maximizing workforce produc- tivity—both now and in the future. We sought to gauge how companies are planning to improve their ability to manage their work- force, as well as find out more about how their human-capital strategies will take shape over the next two years. From the full set of 164 respondents, we received 45 qualified responses from execu- tives working at manufacturing companies, as follows: Annual revenue Less than $100 million 58% $100 million–$500 million 33% $500 million–$1 billion 7% $1 billion–$2 billion 2% Number of employees 50–250 employees 51% 250–500 employees 29% 500–1,000 employees 20% Titles Chief financial officer 51% Controller 27% Director of finance 9% VP of finance 7% EVP or SVP of finance 4% Other 2% Note: Percentages may not total 100%, due to rounding. © C FO P U B LISHING 2012 1
  • 8.
    Human-Capital Strategies in a Slow Recovery The problem of Rising stakes workforce management, working to fine-tune finding skilled for workforce the increasingly critical balance between help- ing employees do more and carefully managing employees management a small, precious pool of resources. is making it increasingly after an economic near-collapse, a tepid For manufacturing companies, striking this recovery, and persistent uncertainty through- balance may be made especially difficult by important—and out the world, no one could blame a CFO for challenges in recruiting and retaining skilled increasingly feeling like nothing ever gets less difficult but employees. Research conducted by the Society difficult—to more important. For companies in this economic for Human Resource Management in August manage the size of environment, the most important tasks seem 2012 indicates, for example, that manufactur- compensation and only to become more difficult. This is certainly ers are being pressured to increase the size of true for workforce management—the processes, compensation packages to recruit qualified benefits packages practices, and technologies that companies use workers. New-hire compensation rose 1.9% effectively, train to build their teams of employees into power- between July 2011 and July 2012, in contrast with new hires, and houses of productivity. Our survey of 164 senior a 6.1% drop in new-hire compensation in service retain employees. finance executives at midsize U.S. companies industries over the same time period. Manufac- suggests that the stakes for developing and turing companies are struggling to find quali- executing effective human-capital strategy are fied machinists, engineers, and other technical rising—and quickly. The finance executives workers—and the effects of that struggle can responding to our survey point out that com- send tremors through many other aspects of panies will need to continue to do more with managing a workforce. In our survey, finance less over the next two years. As the difficulty executives working in the manufacturing sector of maximizing employee productivity rises tend to describe recruiting challenges as the epi- along with its importance, finance teams may center of a number of labor challenges. Respon- be called upon to become especially involved in dents suggest that the problem of finding skilled employees is making it increasingly important— and increasingly difficult—to manage the size of compensation and benefits packages effectively, Figure 1. Companies’ Labor Plans Over the Next Two Years train new hires, and retain employees. These Survey results suggest that most manufacturers plan to increase the pace issues are compounded by broad trends within of hiring without increasing the share of resources allocated to labor. the manufacturing sector—most notably the push for faster, larger-scale hiring. Decrease Stay the Same Increase Manufacturing companies’ workforces are growing, and the need to extract greater value from that investment in human capital is growing with them. Most manufacturers are Hiring 13% 24% 62% planning to increase the pace of hiring over the next two years—even as the average labor budget (measured as a percentage of operating Labor Budget 20% 51% 29% budget) remains somewhat steady, according to our research. A solid majority of senior finance 2 © C FO P U BL I S H I N G 2 0 1 2
  • 9.
    Human-Capital Strategies in a Slow Recovery executives at manufacturing companies (62%) ing the right people is a challenge, say finance A solid majority say that their companies are planning to ramp executives. In open-response questions, several of finance up hiring over the next two years. (See Figure finance executives at midsize manufacturing 1.) Only a quarter of manufacturers (24%) will companies point to a “dearth of engineering executives at keep the pace of hiring steady, and very few talent and skilled field service personnel,” a manufacturing (13%) plan to decrease hiring. At the same time, “demand for qualified employees [that] over- companies (62%) more than two-thirds of manufacturing finance whelms talent availability,” and similar prob- say that their executives (71%) say that their companies will lems. One manufacturing CFO says, simply, that be working with either the same (51%) or lower the “skillset we need is hard to find in the midst companies are (20%) levels of resource allocation to labor over of so many unqualified applicants.” planning to ramp the next two years, compared with today. (See up hiring over the Figure 1 on page 2.) Hiring challenges seem to be tied especially next two years. closely with company location among manu- From these results, it’s clear that manufacturers facturers, as respondents observe in open- will face a substantial internal labor challenge response questions. Salary expectations vary over the next two years, as they strive to posi- by region, for example. One VP of finance at a tion their employees in a way that maximizes midsize manufacturer, for example, says that their contribution to the business. But the the company is “located in a small town with mounting labor-strategy challenge doesn’t end a lower cost of living,” which allows it to stay at a company’s four walls, survey results indi- competitive while keeping compensation pack- cate: manufacturers will have to work harder ages smaller. Many other respondents—both not only to manage their existing workforce, those in higher-salary regions and those in but also to wrestle with their competitors for lower-salary regions—confirm this point. The qualified employees. Sometimes, manufactur- advantages of being based in a lower-salary ing companies will take on the two challenges region are not without drawbacks, however, as together, optimizing their hiring and training companies in these areas often struggle to find practices with their compensation packages to high-skill employees. “For skilled and admin- account for both internal needs and the realities istrative positions, our facilities are located in of the labor market. In less ideal cases, aggres- less populated areas that are a detriment to sive recruiting practices may serve as a means recruiting,” says the CFO of a midsize manu- of compensating for weaknesses in other areas facturer. Other respondents working in the of workforce management. “We always need manufacturing sector describe similar regional to hire experienced people [but] do not do a issues with recruiting, like one VP of finance good job of bringing up new talent through the who notes, “Shop labor is not a problem; skilled organization,” says a controller at a midsize labor is difficult due to [our] small-town loca- manufacturing company. tion.” Companies based in or near cities tend to face the opposite trade-off: greater access Currently, most finance executives at manufac- to highly qualified employees at the cost of turing companies (55%) say that they are facing greater competition for labor and higher salary moderate competition for qualified employees, expectations. Although the specific barriers to and an additional 18% say that competition for effective hiring and employee retention vary by qualified employees is intense. (See Figure 2.) region, no region is without its challenges. Despite persistently high unemployment, find- © C FO P U B LISHING 2012 3
  • 10.
    Human-Capital Strategies in a Slow Recovery Figure 2. Competition for Qualified Employees Over the Next Two Years Competition in the labor market will become more intense over the next two years, say finance executives at manufacturing companies. Less Intense No Change More Intense 9% 16% 75% Seventy-five For most manufacturers, attracting the right two years; only 26% will hire primarily low- people is already tough—and it will only skill workers. Two major trends underpin these percent of become tougher in the years ahead, say senior results: first, persistent interest in automating or senior finance finance executives. Survey results suggest outsourcing low-skill, manual tasks, and second, executives say that the battle in the labor market is poised to the need to direct labor resources to the techni- that competition become increasingly fierce over the next two cal workers, knowledge workers, and managers years: 75% of senior finance executives say that who they deem likely to produce the greatest for qualified competition for qualified employees is likely gains in overall workforce productivity. employees is to become more intense, and only 9% see it likely to become becoming at all easier. (See Figure 2.) In open- Survey respondents also observe that finding more intense response questions, manufacturing respondents employees to fill specialized roles often proves over the next reference the two dimensions of this rising com- to be more of a challenge than filling roles that petition for labor—greater demand and shrink- require fewer qualifications. “To date, we have two years. ing supply—and offer explanations for both. not had an issue hiring the production staff,” says one controller at a midsize manufacturing Greater demand for labor. One CFO at a company. “Our issues arise when it comes to midsize manufacturer predicts that competi- hiring a more skilled worker/manager.” Such tion for employees will become more intense observations may become more common over over the next two years, because “the economy the next few years. One controller at a midsize is improving and there will be more hiring.” manufacturer notes, “Finding qualified manu- Other respondents express similar views, and in facturing engineers is becoming increasingly many cases they indicate that greater demand difficult.” for highly skilled workers, in particular, will pose the greatest challenge. According to survey Shrinking pool of qualified applicants. Some data, a plurality of manufacturers (47%) will respondents express concerns that the number primarily hire high-skill workers over the next of qualified potential employees in their subset 4 © C FO P U BL I S H I N G 2 0 1 2
  • 11.
    Human-Capital Strategies in a Slow Recovery of the labor market may be on the decline. Opin- ions on the causes of the shrinking labor supply After cost control, Most manufacturers vary, with respondents offering explanations building a better (53%) will related to their specific niche in the manufactur- ing sector, the region in which their company is workforce primarily focus based, and the aging workforce. Although some how will manufacturing companies on maximizing causes of the skilled-labor shortage in manu- approach the labor challenges that lie ahead? the output of facturing may be more immediate and more localized than others (one CFO at a manufactur- Although our research confirms that manu- their workforce: facturers plan to catch these challenges in a improving their ing company, for example, points to an ongoing classic pincer—working to reduce labor costs “workforce exodus” from the state in which the on one side and maximize workforce output ability to recruit, company is based), finance executives have their retain, train, on the other—deeper analysis of the data sug- eye on longer-term trends as well. “Retiring gests a more nuanced story. Finance executives and develop workers put pressure on need for new hires,” suggest that workforce management starts employees. notes a CFO at another midsize manufacturer. with developing robust systems and processes for managing labor costs. The next step—the In order to stay competitive, manufacturing step that most manufacturing companies will companies may need to push back against both focus on over the next few years, according short- and long-term trends. Doing more to to finance executives—involves working to find and develop the right people isn’t a task improve employee performance, training, and that manufacturers can afford to bow out of. A development. solid majority of manufacturing respondents (78%) agree that “Over the next two years, our In our survey, we presented senior finance ability to attract, develop, and retain quali- executives with two broad strategies for fied employees will be an important source of maximizing workforce productivity: maxi- competitive advantage for my company.” More mizing output and minimizing input. These than one-third (36%) agree strongly that their two strategies are, of course, anything but companies will seek to derive a great deal of mutually exclusive; they represent two sides competitive advantage from their human-cap- of a single mission, and neither one could be ital strategy, and an additional 42% agree to at effective without the other. With this in mind, least some extent. however, we set out to determine which of the two strategies companies are most likely to focus on over the next two years. According to ➽ the bottom line Finding the right our research, most manufacturing companies people—and keeping them—will become (53%) will focus primarily on maximizing the substantially more difficult over the next output of their workforce: improving their two years, survey results suggest. At the ability to recruit, retain, train, and develop same time, the share of resources that employees. (See Figure 3 on page 6.) A smaller manufacturing companies allocate to labor proportion (31%) will focus primarily on is likely to remain steady. This adds up to an minimizing the cost of their workforce, which all-too-familiar imperative: continue to do includes improving their ability to manage more with less. employee time and attendance, benefits costs, expenses, and labor-related taxes. © C FO P U B LISHING 2012 5
  • 12.
    Human-Capital Strategies in a Slow Recovery Controlling costs Although manufacturing companies are, of important—but finance executives working in course, interested in both increasing labor manufacturing also recognize its limits. is step one; output and decreasing labor input, our data everything else suggests that improvement efforts will center The rationale behind this arrangement of labor is step two. on the output side of the equation. Asked about priorities varies by company and industry, their companies’ plans for each component of but the explanations offered by senior finance these strategies for workforce management, executives in open-response questions tend to finance executives working in the manufactur- support the idea that building robust processes ing sector confirm that their companies will for managing employee time and attendance take on the task of maximizing workforce pro- forms the foundation to support other aspects ductivity from multiple directions. In particular, of workforce management. Simply put, con- manufacturing respondents say their companies trolling costs is step one; everything else is will seek to boost output by improving both step two. Many manufacturing respondents their ability to manage employee performance indicate that their companies have already and to train and develop employees (87% of implemented new systems and practices for manufacturing respondents, respectively). At managing employee time and attendance—in the same time, more than half of manufactur- some cases very recently. “We have just imple- ing respondents (56%) say their companies mented a paperless time-off reporting system,” will move to control labor costs by improv- says the CFO of a midsize manufacturer. Other ing their time and attendance management. respondents offer similar responses, saying (See Figure 4 on page 7.) Taken together, these that they “have already taken steps to do this” results confirm that labor cost-control remains and “already use new software to manage Figure 3. Which strategy for maximizing workforce productivity will your company focus on over the next two years? Minimizing Workforce Cost… …Or Maximizing Workforce Output? Improving ability to manage employee time Improving ability to recruit, retain, train, and attendance, benefits costs, expenses, and/or develop employees and/or labor-related taxes 2% 2% 13% 13% 31% 53% 31% 53% Note: 13% of manu- facturing respondents chose, “Neither of these statements describes our approach,” and 2% answered, “Not sure.” 6 © C FO P U BL I S H I N G 2 0 1 2
  • 13.
    Human-Capital Strategies in a Slow Recovery Figure 4. Over the next two years, will your company work to improve its ability to _________________? Although manufacturers will work to improve multiple aspects of workforce management, survey results suggest that they will prioritize maximizing employee output by managing performance and promoting training and development. Manage Employee Train and Develop Manage Employee Performance Employees Time and Attendance YES 87% 87% 56% employee time and attendance.” Among the pared with other industries represented in our “It is vital that companies that are not planning to further research. One EVP of finance at a manufacturing our employees improve their ability to manage time and company notes, “Our industry is extremely price attendance, many may have spent the last sensitive and cost savings are expected from our contribute to several years focusing intently on the cost customers.” their maximum dimension of workforce productivity. “We cur- capability. This is rently have systems and procedures in place Once a sufficiently cost-minded foundation a primary focus for managing this area,” says one controller at is in place, manufacturers may find that they a midsize manufacturer. “Small tweaks may have more resources to spare on maximiz- for management.” be made to address issues but [this is] not a ing the output of their workforce. In open- —CONTROLLER, MIDSIZE MANUFACTURER primary area of focus.” response questions, finance executives work- ing in the manufacturing sector confirm the Nonetheless, some companies are still catch- increasing importance of managing employee ing up on time-and-attendance management. performance. Some respondents explain that “We feel we have the staffing numbers not the striving to improve employee performance staffing productivity,” says a director of finance represents a valuable means of staving off at a midsize manufacturing company. One CFO external pressures. “It is vital that our employ- at a midsize manufacturer describes similar ees contribute to their maximum capability,” challenges and ties them to cultural changes says a controller at a midsize manufacturing within the labor supply: “Younger workers have company, adding that managing employee a need/desire for more flexible work hours and performance “is a primary focus for manage- our industry needs more time and attendance ment.” Another midsize manufacturer relies [oversight].” Manufacturing respondents seem on boosting employee performance in order especially conscious of the importance of to compensate for necessary increases in managing employee time and attendance, com- compensation. “Manufacturing efficiency is a © C FO P U B LISHING 2012 7
  • 14.
    Human-Capital Strategies in a Slow Recovery Most senior major component of our costs,” says the com- to the company’s CFO. “For relatively minimal pany’s CFO. “We have to manage efficiency investment, our staff learns new skills, keeps finance to at least offset wage and benefit increases, up on changing regulations, and is exposed to executives (64%) as we do not have the ability to pass on price different ways of thinking about old problems.” anticipate that increases to the customer.” Both companies and employees stand to ben- their companies’ efit from a greater focus on employee develop- Respondents to our survey also emphasize ment. The task falls to finance executives and HR function will the need to improve practices for employee their peers in other functions and business play a greater role training and development, taking a variety of units to ensure that employees’ desire to learn in maximizing approaches to the issue. “New employees are and grow is matched with an opportunity to workforce a high risk to quality, safety, and productivity,” do so. says one controller at a midsize manufactur- productivity over ing company. “As such, they are a focus of our ➽the bottom line Manufacturing CFOs are the next two efforts.” One CFO takes a different (but com- looking forward to maintaining labor cost sav- years. patible) perspective, focusing on the benefits ings real-ized in the course of the downturn. But of well-designed training programs: “Employ- they recognize that, after several years of intense ees who can do more work faster with better focus on cost management, their companies will quality—and don’t cost more in salary. The need to invest in training and development and company gains, and the employee [gains] too employee-performance management in order to with new and current skills.” Another manu- continue to boost productivity. facturing CFO suggests that the rising impor- tance of focusing on employee development may have roots in the mind-set of employees— those both current and prospective. “Employ- ees nowadays attain much job satisfaction from career development, so it is critical that they see themselves given the opportunity to grow on the job,” this CFO argues. The CFO adds, however, that redoubling efforts to train and develop employees, far from being merely a means of satisfying employee expectations, has long-term advantages for a company: “It is beneficial to have a group of well-trained ‘veterans’ to effectively guide the ‘rookies’ and newcomers so as to achieve seamless assimila- tion/transition.” If the desire for learning and growing is truly on the rise among employees, the interests of employees and employers may be aligning more than ever before. At a midsize manu- facturer, “Training existing staff adds to our culture of employee empowerment,” according 8 © C FO P U BL I S H I N G 2 0 1 2
  • 15.
    Human-Capital Strategies in a Slow Recovery The need for a companies’ HR function as “very effective” at supporting their efforts to maximize overall Fifty-eight percent of better-equipped workforce productivity; a much greater pro- manufacturers HR department portion (36%) describe it as “not very effec- tive.” The remaining respondents (48%) fall are likely to make in the middle, describing their companies’ HR better use of HR function as only “somewhat effective.” As improving workforce management technology over becomes increasingly critical, finance execu- The problem, according to many finance the next tives working in the manufacturing sector executives, is that manufacturers have thus two years, recognize that their companies will need to improve the effectiveness of HR if they want far struggled to position their HR function to say finance be able to contribute to high-value activities. executives. to make much headway. Manufacturers will For example, finance executives acknowledge ask more of their HR functions in the years that HR is often underresourced, which in ahead, survey results indicate. Most manufac- turn detracts from HR’s ability to develop and turing respondents (58%) anticipate that their execute human-capital strategy. “HR focuses companies’ HR function will play a greater more on policing the workforce and compli- role in maximizing workforce productivity ance with regulations rather than develop- over the next two years. ing the workforce,” notes one manufacturing CFO. “Training is concentrated on compliance At some manufacturing companies, say rather than developing skill level or develop- respondents in open-response questions, HR ing management talent.” The controller at is well positioned to support the workforce- another manufacturing company expresses management objectives of the entire company. similar concerns about HR’s ability to develop For example, HR at one midsize manufacturer employees, linking this issue to the demands excels at “employee relations and engagement, of the industry: “They struggle to keep up with benefits and compensation, [and developing] our 24/7 manufacturing facilities. Training/ reasonable and fair policies,” according to the meetings must be scheduled for each shift company’s EVP of finance. This EVP adds that or they are not effective.” Organizational the company has “received awards for our problems may compound this issue, hinder- company/employee practices.” A handful of ing HR’s access to strategic discussion. One respondents express similar levels of satisfac- manufacturing CFO notes that HR struggles to tion with HR at their companies. “coordinate with department heads to identify employee-specific skill upgrades.” But although a segment of manufacturing companies have already pushed their HR func- Interestingly, despite many finance execu- tion up to where it needs to be, the majority tives’ suggestion in open-ended responses of manufacturers still have a long way to go. that HR lacks the staff and resources to truly Most senior finance executives in our survey contribute value to the business, survey indicate that their companies’ HR function results indicate that HR efficiency is a concern currently lacks the levels of effectiveness that for a substantial number of senior finance may prove increasingly necessary over the executives. Only 11% of senior finance execu- next two years. Few senior finance executives tives at manufacturing companies describe working in manufacturing (14%) describe their © C FO P U B LISHING 2012 9
  • 16.
    Human-Capital Strategies in a Slow Recovery A majority of the efficiency and cost-effectiveness of HR administration at their company as “excellent”; A commitment to manufacturing respondents a much larger proportion—42%—say that the making better use (58%) say that efficiency of HR at their companies is in need of improvement. Compared with respondents of HR technology their companies working in the other industries represented in throughout our survey, finance are likely to make our research, manufacturing respondents are executives working in the manufacturing far more likely to take the view that the cost- better use of effectiveness of HR at their companies will sector consistently indicate that the primary barrier to a more-effective HR function— technology for need to get better over the next two years. and the issue their companies are most HR over the next likely to address over the next two years—is two years. But our survey also suggests that finance exec- ineffective IT systems for HR. Manufacturing utives at manufacturing companies are much respondents indicate that their HR functions less concerned with the absolute amount of depend too heavily on manual processes, resources consumed by the HR function, and with two-thirds of finance executives (67%) much more concerned that those resources are agreeing that their companies’ HR function deployed to higher-value work. Manufacturers is currently burdened with too many manual seeking to improve the overall effectiveness of tasks. A majority (52%) also agree that their HR function, then, are planning to take supervisors at their companies are burdened a close look at resource allocation within HR: with too many manual HR processes. how are HR executives and managers spend- ing their time and attention? More important, Survey results suggest that manufacturers how can HR make better use of its existing will focus on improving their HR functions resources? The answer to this question, for through better use of technology. Presented most finance executives, lies in helping HR with a list of steps that companies might take make better use of technology. in order to better position their HR function to contribute to maximizing overall workforce productivity, a majority of manufacturing ➽ the bottom line Manufacturing respondents (58%) say that their companies companies will depend on HR to help are most likely to make better use of tech- increase productivity by developing their nology for HR (e.g., web-based self-service, workforces—but many CFOs say their HR automated HR reporting) over the next two teams are currently underresourced. CFOs years. (See Figure 5 on page 11.) Improving HR see a growing need to better equip their HR processes follows somewhat distantly (38% of departments to meet these requirements. respondents). “The complexity of our payroll requirements has created too many manual processes,” says the CFO of a midsize manu- facturing company. “This is an area we need to spend time automating.” A controller at one midsize manufacturing company suggests that making better use of HR technology represents an effective way 10 © C FO PU BL I S H I N G 2 0 1 2
  • 17.
    Human-Capital Strategies in a Slow Recovery Figure 5. What steps is your company most likely to take to better position HR to contribute to maximizing workforce productivity over the next two years? Survey results indicate that most manufacturers will strive to make better use of HR technology over the next two years. (Respondents were asked to select up to three responses) 11% 16% 29% 31% 38% 58% Make better Reorganize the Enable supervisors Enhance HR Improve/ Making better use of HR function to better perform staffing Streamline HR use of technology outsourcing HR-related activites processes for HR for HR to meet the rising imperative to do more based HR software. Our research suggests that “HR will upgrade with less. “HR will upgrade its systems and senior finance executives recognize the value its systems and processes to better meet our needs without in adopting this kind of software. Among adding staff,” says the controller. This senior finance executives at manufacturing processes to point likely resonates with finance and HR companies that have not yet adopted third- better meet our executives alike, as our research indicates party, web-based software applications for needs without that most manufacturers (64%) will allocate a variety of HR processes, most agree that adding staff.” the same amount of resources to their HR using such applications would improve overall —CONTROLLER, MIDSIZE departments as they have over the past five workforce productivity at their company. (See MANUFACTURER years. (A handful [11%] will go so far as to Table on page 12.) Manufacturing respondents reduce the share of resources allocated to identify time and attendance management, HR.) Finance executives believe that making training and employee development, and better use of HR systems will help their access to forms and policies as activities that companies respond to mounting pressures are particularly conducive to automation even as HR and labor budgets hold steady. through web-based applications. In the course of striving to make better use A plurality of manufacturing respondents of technology for HR, many manufacturing (49%) favor the use of web-based HR self- companies are turning to third-party, web- service for supervisors and/or employees at © C FO P U B LISHING 2012 11
  • 18.
    Human-Capital Strategies in a Slow Recovery Implementing their companies, compared with only 22% at a midsize manufacturer remarks, “After of respondents who are resistant to the idea. dealing with the ‘change’ issue; [self-service self-service Although these findings lend further support technology] works well.” technology to the idea that manufacturers will meet constitutes a current and future labor challenges primarily Taken together, finance executives’ plans careful balancing through the use of new technologies, they also for and concerns with web-based HR self- suggest that manufacturing respondents are service suggest that implementing such act. approaching new HR systems with a close eye technology constitutes a careful balancing on change management. As with any systems- act. Manufacturers can err in either improvement project, implementation of new direction, over-automating a fundamentally technology is only one part of the change; interpersonal department or resisting the companies also need to train and encourage use of web-based HR self-service in areas employees to use the systems effectively. where it may be the best option. The decision Our research suggests that transitioning often comes down to company culture. At employees to new systems may be of one midsize manufacturing company, for particular concern within the manufacturing example, HR self-service might conflict with sector, with many manufacturing respondents employee expectations, says the company’s expressing reservations to the effect of, “our CFO: “Our company is still small enough for supervisors need more training [before we us to provide these HR services in person and can implement new systems].” One CFO provide the personal touch that matches the culture created by the owners/founders of this company.” By contrast, the controller at another midsize manufacturing company says Table. Would using third-party web-based software applications for HR processes improve your company’s ability to maximize that employees may no longer be looking for workforce productivity? face-to-face discussions with HR as often as they once did. “These days almost everyone Finance executives at manufacturing companies see value in using has access to the Internet,” explains this third-party, web-based software for a wide range of HR processes. controller. “It is much more convenient to log something on a website than schedule a HR Process YES NO meeting with an HR person.” Time and attendance management 74% 26% Training/Employee development 71% 29% ➽ the bottom line Manufacturing CFOs sense that their HR departments Access to forms and policies 68% 32% are too heavily burdened with manual Benefits, open enrollment, and administration 65% 35% processes—and they aim to resolve that Applicant recruiting/tracking 65% 35% problem by helping HR to make better use of technology over the next two years. Performance tracking/review 62% 38% Labor compliance 59% 41% Paperless payroll 55% 45% Ad-hoc, HR-related employee queries 53% 47% 12 © C FO PU BL I S H I N G 2 0 1 2
  • 19.
    Human-Capital Strategies in a Slow Recovery the task of building strong teams of employees—and giving them what they need to help them do more for the business— isn’t getting any easier, our research suggests. But finance and HR executives alike may find that, at many manufacturing companies, the internal mandate to improve workforce management is rising along with the difficulty and importance of doing the job as well as possible. Finance executives are keeping a sharp watch on labor challenges both current and looming, and they recognize the press- ing need to better support their companies’ efforts to maximize workforce productivity. The workforce-management goals of finance, HR, and the business units may be converg- ing on one idea: the practices of the past will not be enough to take on the challenges of the imminent future. Finding the seed of oppor- tunity in this notion may be the first step for manufacturers committed to making the most of one of their most important investments— the investment in their people. © C FO P U B LISHING 2012 13
  • 20.
    Linking Numbers andNarratives: Human-Capital Strategies Correlating Quantitative Reports in a Slow Recovery with Qualitative Analysis Sponsor’s perspective Chapter hed when we first discussed this study with Many senior finance executives report either CFO Research, we had some idea of the having plans to implement these solutions in the future conditions that senior finance execu- near future, or that they have already done so. tives might be expecting. These conditions included a slower than expected economic User adoption of web-based HR software was recovery, increased competition, and rising identified as a concern among respondents. At inflationary pressures. Paychex, we became aware of this issue early in the game, when mid-market clients first Where the research surprised us was in the approached us about offering web services. number of points on which senior finance As a result, we’ve made our comprehensive executives are largely in agreement: service packages as easy and intuitive to use as possible. In fact, our latest web services are n Labor performance as a key designed to be easily configured to meet future competitive strategy needs that we either haven’t been asked for n Plans to steadily ramp up hiring yet, or haven’t thought of ourselves. n Emphasis on skills, recruiting, training, development, and retention About Paychex, Inc. n Leveraging workplace technology Paychex, Inc. is a leading provider of payroll, (pages 9–11 in this report) human resource, and benefits outsourcing solutions for small– to medium-sized busi- Leveraging skilled labor appears to be the stra- nesses. Paychex One-Source Solutions offers tegic imperative in a slow economy. Yet, the midsize organizations a complete range of majority of respondents are not planning to scalable employer solutions that cover the increase compensation or internal HR budgets entire employee lifecycle. Industry-leading, over the next two years. web-based solutions include recruiting, hiring, benefits, training and performance, time and Clearly, managers of human resources will labor, payroll and tax administration, expense need to find creative ways to do more with reporting, and employee/manager self-service. less, and web technologies may be the silver Service delivery includes specialized onsite bullet. The Paychex-CFO survey indicates the support, HR administrative outsourcing, con- following approval rankings for web-based sulting, and employee leasing. solutions that could help them achieve this: Time and attendance management 71% Paperless payroll 68% To learn more about Paychex One-Source Access to forms and policies 68% Solutions for midsize companies, visit us at Training/Employee development 68% Performance tracking/review 65% www.paychex.com Benefits, open enrollment, and administration 65% Recruiting and applicant tracking 61% Labor compliance 61% Ad-hoc, HR-related employee queries 57% © CFO P U B LISHING 2 0 1 2 14 © C FO PU BL I S H I N G 2 0 1 2 4