Integration front to back -
Mr. Custodian
tear down that wall
(software testing part)
Post Trade Software Testing Challenges
Exactpro Systems, 15 March 2018
1
Two Worlds: Clarity vs. Obscurity
2
Closed APIs hinder the ability to property test and monitor
interactions between components
FIX approach vs. API approach
Open Protocols Enable Passive Testing
3
• Test Coverage
• Compliance Reporting
• Environment Monitoring
• Functional Verification Under Load
• Onboarding and Certification
• Generating Test Cases from Production Data
Software Testing Challenges in Post Trade:
4
Post Trade Testing in Agile World:
5
To Tear Down These Walls, Use a Test Harness:
6
Iosif Itkin, co-CEO and co-founder
Exactpro Systems
http://exactpro.com
https://www.linkedin.com/in/iosifitkin/
Thank you

FIX EMEA Conference 2018 - Post Trade Software Testing Challenges

  • 1.
    Integration front toback - Mr. Custodian tear down that wall (software testing part) Post Trade Software Testing Challenges Exactpro Systems, 15 March 2018 1
  • 2.
    Two Worlds: Clarityvs. Obscurity 2 Closed APIs hinder the ability to property test and monitor interactions between components FIX approach vs. API approach
  • 3.
    Open Protocols EnablePassive Testing 3 • Test Coverage • Compliance Reporting • Environment Monitoring • Functional Verification Under Load • Onboarding and Certification • Generating Test Cases from Production Data
  • 4.
  • 5.
    Post Trade Testingin Agile World: 5
  • 6.
    To Tear DownThese Walls, Use a Test Harness: 6
  • 7.
    Iosif Itkin, co-CEOand co-founder Exactpro Systems http://exactpro.com https://www.linkedin.com/in/iosifitkin/ Thank you