The document outlines a plan to redevelop a housing society in India with the following key points:
- It will redevelop the housing society to provide more efficient, modern amenities while eliminating brokers.
- The detailed project plan defines the tasks and timeline for the redevelopment which includes proposal writing, defining team members, feasibility analysis, developing requirements and scope, budgeting, scheduling, and planning for risks, quality, procurement and communication.
- The project schedule is presented in a Gantt chart showing the tasks, predecessors, start and end dates, and resources required to complete the pre-demolition, demolition, post-demolition, monitoring and final completion phases on schedule by December 2017.
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Presented to:
Kentucky Chemical Weapons Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board
Presented by:
Tom McKinney
Project Manager, Bechtel Parsons Blue Grass
Scheme for the construction of water channelsmirzaqadeer
we are giving only idea for making water channel for poor less un economical area for different counties where people need water for drinking we present presentation in univsty CIIT
Case study 1 effective and efficient communicationMustafa Ozgoren
This is a case study about effective and efficient communication submitted and presented during my RICS certification through professional route for Royal Institution of Chartered Surveyors (RICS).
Project Information:
BTC Pipeline Company (BTC) carries oil from the Azeri-Chirag-Deepwater Gunashli (ACG) field and condensate from Shah Deniz across Azerbaijan, Georgia and turkey. It links Sangachal terminal on the shores of the Caspian Sea to Ceyhan marine terminal on the Turkish Mediterranean coast. On November 2012 BTC awarded a contract to VERWATER EMEA BV-Turkey Branch for EPCC-Turnkey delivery of Oily Water Slop and Bilge Water Reception and Treatment Facility at Ceyhan Marine Terminal (CMT) – Adana, namely BTC MARPOL Facilities and Jetty Foam Line Replacement Project. The contract value was around US$40 million.
I have worked there as a project control engineer. I established and maintained cost control system and reported the progress of the project during detailed engineering and construction phases of the project. I prepared daily, weekly and monthly progress reports and issued them to the stakeholders.
Bps 5205 sustainability construction and maintainability velpandi & mariaMaria Archana
Singapore heavily relies on conventional precast construction involving extensive use of precast planks, canopy beams, column & facade. The recent prefabrication trend, which is being increasingly used in the building industry, alleviating some of the environmental burdens associated with conventional construction. Several case studies were conducted on residential buildings in Singapore. The findings revealed that environmental, economic and social benefits of using prefabrication were significant when compared to conventional construction methods. This implies that a wider use of prefabrication techniques could contribute to sustainable construction in a dense urban environment on the other hand using precast components have adverse effects on the structure. Today, as much as 82% of Singaporeans live in public housing delivered by the HDB.HDB plans and develops public housing towns that provide Singaporeans with quality homes and living environments.
In the construction industry, construction defects and failures can occur during the design and construction phases of a project, or after a structure is substantially complete. However, while a design professional is responsible to produce complete, accurate and well-coordinated design and construction documents that are substantially free of defects; and a contractor is required to adhere to the design and construction documents, nothing built is ever perfect nor does the law require a perfect design. Furthermore, all buildings have an expected lifespan and even the structures of the ancient world will erode into a mound of sand given enough time. The eventual failure of a structure is an expected result rather than a manifestation of a construction defect. The question becomes what is a construction defect; how do defects arise; and how can defects be identified and managed?
A Case Study has been conducted to analyse Construction Defects on site, Remedial Measures & Preventable Practices at HDB Water Way Banks at Punggol East.
1.2. Objectives:
The objective of this case study aims to mitigate the defects to the future HDB projects. This project may help to HDB engineers for awareness regarding defects prevention practice. HDB has objectives, which expanding from time to time, Recently, HDB is not only functioning as a provider of basic shelter but also creates housing that can comply with the needs, necessities and aspirations for modern living days and futures. HDB objective is to provide affordable quality homes and develop vibrant living environment.
This case study has the following objectives of:
To investigate and identify the defects that appeared in the precast slab planks.
To identify the defects during construction progress, remedial measures & preventable practices propose better & quality living standards to the public.
Scheme for the construction of water channelsmirzaqadeer
we are giving only idea for making water channel for poor less un economical area for different counties where people need water for drinking we present presentation in univsty CIIT
Case study 1 effective and efficient communicationMustafa Ozgoren
This is a case study about effective and efficient communication submitted and presented during my RICS certification through professional route for Royal Institution of Chartered Surveyors (RICS).
Project Information:
BTC Pipeline Company (BTC) carries oil from the Azeri-Chirag-Deepwater Gunashli (ACG) field and condensate from Shah Deniz across Azerbaijan, Georgia and turkey. It links Sangachal terminal on the shores of the Caspian Sea to Ceyhan marine terminal on the Turkish Mediterranean coast. On November 2012 BTC awarded a contract to VERWATER EMEA BV-Turkey Branch for EPCC-Turnkey delivery of Oily Water Slop and Bilge Water Reception and Treatment Facility at Ceyhan Marine Terminal (CMT) – Adana, namely BTC MARPOL Facilities and Jetty Foam Line Replacement Project. The contract value was around US$40 million.
I have worked there as a project control engineer. I established and maintained cost control system and reported the progress of the project during detailed engineering and construction phases of the project. I prepared daily, weekly and monthly progress reports and issued them to the stakeholders.
Bps 5205 sustainability construction and maintainability velpandi & mariaMaria Archana
Singapore heavily relies on conventional precast construction involving extensive use of precast planks, canopy beams, column & facade. The recent prefabrication trend, which is being increasingly used in the building industry, alleviating some of the environmental burdens associated with conventional construction. Several case studies were conducted on residential buildings in Singapore. The findings revealed that environmental, economic and social benefits of using prefabrication were significant when compared to conventional construction methods. This implies that a wider use of prefabrication techniques could contribute to sustainable construction in a dense urban environment on the other hand using precast components have adverse effects on the structure. Today, as much as 82% of Singaporeans live in public housing delivered by the HDB.HDB plans and develops public housing towns that provide Singaporeans with quality homes and living environments.
In the construction industry, construction defects and failures can occur during the design and construction phases of a project, or after a structure is substantially complete. However, while a design professional is responsible to produce complete, accurate and well-coordinated design and construction documents that are substantially free of defects; and a contractor is required to adhere to the design and construction documents, nothing built is ever perfect nor does the law require a perfect design. Furthermore, all buildings have an expected lifespan and even the structures of the ancient world will erode into a mound of sand given enough time. The eventual failure of a structure is an expected result rather than a manifestation of a construction defect. The question becomes what is a construction defect; how do defects arise; and how can defects be identified and managed?
A Case Study has been conducted to analyse Construction Defects on site, Remedial Measures & Preventable Practices at HDB Water Way Banks at Punggol East.
1.2. Objectives:
The objective of this case study aims to mitigate the defects to the future HDB projects. This project may help to HDB engineers for awareness regarding defects prevention practice. HDB has objectives, which expanding from time to time, Recently, HDB is not only functioning as a provider of basic shelter but also creates housing that can comply with the needs, necessities and aspirations for modern living days and futures. HDB objective is to provide affordable quality homes and develop vibrant living environment.
This case study has the following objectives of:
To investigate and identify the defects that appeared in the precast slab planks.
To identify the defects during construction progress, remedial measures & preventable practices propose better & quality living standards to the public.
IRJET- Critical Chain Project Management in Construction Projects
Final Project Presentation
1. Project Scope Statement
• REDEVELOPMENT OF HOUSING SOCIETY IN INDIA.
• EFFICIENT AND DELAY PROOF.
• IMPROVED AND LATEST HIGH-TECH AMENITIES.
• ELIMINATION OF BROKERS.
• A REDEVELOPED SOCIETY WITH ADVANCED AMENITIES AND
COST EFFECTIVE.
2. Detailed Project Plan
Proposal writing
Defining team members
and group leader.
Gathering required
information.
Performing feasibility
analysis.
Defining customer
requirements.
Develop project charter.
Identifying stakeholders.
Collecting requirements.
Project Costing.
Project Budgeting.
Scheduling.
Project scope management
planning.
Project scope statement
writing
Scope baseline.
Defining accepted work
deliverables.
Project risk management
planning.
Project communication
management planning.
Project quality
management planning.
Project procurement
management planning.
Whole construction
Activity resource
requirement plan
3. Detailed Project Plan
Types of Resources
3.Material and equipment
Cement, concrete, steel,sand etc woodcutter machine, motor, driller, etc
2.Transportation
Labour Material Transportation
1.Human Resources
Project team Labour
8. RISK PLAN
•ANALYZE THE IMPACT OF
RISK ON PROJECT.
•HIGH-LEVEL PLANS FOR
CONDUCTING THE RISK
MANAGEMENT ACTIVITIES
WILL BE DEFINED IN
MEETINGS.
•RISK MANAGEMENT COST
ELEMENTS AND SCHEDULE
ACTIVITIES WILL BE
DEVELOPED
9. Project Quality
Quality Role: Responsibilities
1. Project Cost Efficiency.
2. Procure good quality
material.
3. Manage quality of material
4. Project schedule.
5. Product overall working.
6. Allocation of resources at
time
1. Finance Department, Quality
Department, Project Manager,
Project Team.
2. Project manager
3. Project Team.
4. Project Manager, Quality
Department.
5. Project Manager, Project Team.
6. project manager
• Weekly cost performance reports
will be issued and help will be
sought from Finance department
to reduce costs on project.
• Weekly meeting will be called
between the project manager and
project team so that difficulties
which might be affect the project
will be removed.
• Control Charts and Scatter plot
will be made to analyse project,
team members and schedule
performance.
10. Project Procurement
This procurement plan sets the procurement frame work for this
project.
It will serve as the guideline for managing procurement
throughout the life of the project and will be updated when
required.