The Comprehensive Guide to Construction Project Management Process" is a detailed manual designed
to provide in-depth knowledge and practical guidance on managing construction projects. This guide
covers every aspect of the construction project management process, from the initial planning and
design stages to the final completion and handover of the project. It aims to equip professionals in the
construction industry with the tools, techniques, and best practices needed to successfully oversee and
execute construction projects.
What is Construction Process Management
Construction process management is the systematic approach to planning, coordinating, and overseeing
the various phases of a construction project from inception to completion. It involves a series of steps
and tasks aimed at ensuring the project is completed on time, within budget, and to the required quality
standards. Here are the key aspects of construction process management:
Process of Project Management:
The process of construction project management involves several key phases, each with specific
tasks and objectives to ensure the successful completion of a project. Here’s a breakdown of the
typical construction project management process:
1. Introduction to Construction Project Management
Construction project management is the discipline of planning, coordinating, and overseeing
construction projects from inception to completion. The primary goals are to ensure that projects
are completed on time, within budget, and to the required quality standards. Effective project
management involves a structured approach to managing all aspects of the project, from initial
concept through to final handover.
2. Initiation: Laying the Groundwork
Project Definition: The first step in any construction project is to define its objectives, scope,
and feasibility. This involves understanding the project's goals, determining what is included and
excluded, and assessing the alignment with strategic goals.
Stakeholder Identification: Identifying all stakeholders is crucial. This includes clients,
contractors, regulatory bodies, and anyone else affected by the project. Understanding their
needs and expectations helps in aligning project goals with stakeholder interests.
Initial Feasibility Study: Conduct a feasibility study to evaluate the project's viability in terms
of costs, time, and resources. This early assessment helps in identifying potential challenges and
setting realistic expectations.
3. Planning: Crafting a Roadmap
Scope Management: Develop a detailed project scope statement that outlines all project
deliverables and boundaries. Clear scope management helps prevent scope creep and ensures that
all parties are on the same page.
Schedule Development: Create a comprehensive project schedule that includes timelines and
key milestones. Tools like Gantt charts can be used to visualize the schedule and track progress.
Budget Planning: Develop a detailed budget covering all costs associated with the project,
including materials, labor, and contingencies. Effective budget planning is essential for financial
control and avoiding unexpected expenses.
Resource Planning: Identify and allocate the resources required for the project, such as labor,
materials, and equipment. A resource management plan ensures that resources are available
when needed and used efficiently.
Risk Management Plan: Identify potential risks and develop strategies to mitigate them. A risk
register helps in documenting and tracking risks, while mitigation strategies prepare the team for
potential challenges.
Procurement Planning: Plan for the procurement of materials and subcontractors. Develop
contracts and specifications to ensure that all procurement activities align with project
requirements.
4. Design: Shaping the Vision
Conceptual Design: Collaborate with architects and engineers to create initial design concepts
that align with client requirements and project goals. This phase sets the foundation for detailed
design work.
Detailed Design: Develop detailed drawings, specifications, and plans. This stage involves
refining designs based on feedback and ensuring all aspects of the design are accurate and
complete.
Design Review: Conduct design reviews with stakeholders to ensure the design meets their
expectations and regulatory standards. Revisions may be necessary based on feedback.
Permits and Approvals: Obtain all necessary permits and regulatory approvals before
construction begins. Compliance with building codes and regulations is critical for project
success.
5. Execution: Turning Plans into Reality
Contracting: Finalize contracts with subcontractors and suppliers, ensuring that all terms and
conditions are clearly defined. Effective contracting sets the stage for smooth operations during
construction.
Construction: Oversee the construction activities to ensure adherence to design and
specifications. Managing day-to-day operations on-site involves coordinating various tasks and
addressing any issues that arise.
Quality Control: Implement quality control measures to ensure that all work meets the required
standards. Regular inspections and testing help maintain high quality throughout the construction
process.
Progress Monitoring: Track progress against the project schedule and budget. Address any
delays or issues promptly to keep the project on track.
Communication: Maintain effective communication among all project stakeholders. Regular
updates on project status help manage expectations and foster collaboration.
6. Monitoring and Controlling: Keeping on Track
Performance Monitoring: Continuously monitor project performance in terms of schedule,
budget, and quality. Use performance metrics and KPIs to assess progress and make data-driven
decisions.
Change Management: Manage changes to project scope, schedule, and budget. Document and
approve change orders to ensure that any modifications are properly controlled.
Risk Monitoring: Continuously assess and address risks as they arise. Update the risk register
and adjust mitigation strategies as needed.
Issue Resolution: Address and resolve any issues or conflicts that occur during construction.
Implement corrective actions to keep the project on course.
7. Completion: Wrapping Up
Final Inspection: Conduct a thorough final inspection of the completed work to ensure it meets
all required standards and specifications. This step is crucial for verifying that the project is
ready for handover.
Punch List: Identify and address any remaining issues or incomplete work. Ensure that all
punch list items are resolved before finalizing the project.
Project Handover: Prepare and hand over the completed project to the client. Provide all
necessary documentation, manuals, and warranties to facilitate a smooth transition.
Client Training: Provide training to the client on the operation and maintenance of the
completed project. Ensure that they are satisfied with the final outcome and understand how to
manage the new facility or structure.
8. Post-Construction: Reflecting and Improving
Post-Project Evaluation: Review the project's success and performance. Assess what went well
and identify areas for improvement to enhance future project management practices.
Lessons Learned: Document lessons learned from the project. Share insights and best practices
with the team to apply knowledge gained to future projects.
Warranty and Support: Provide ongoing support and address any warranty issues as they arise.
Ensure client satisfaction and address any post-construction concerns promptly.
Primary Function of Construction Process
Management:
The primary function of construction process management is to ensure that construction projects
are completed efficiently, effectively, and to the highest standards of quality. This involves
overseeing and coordinating various aspects of the project from start to finish. Here are the key
functions of construction process management:
1. Project Planning and Coordination
 Developing Detailed Plans: Create comprehensive plans that outline the project's scope,
objectives, timelines, and resource requirements.
 Scheduling: Develop and manage project schedules to ensure timely completion of tasks
and milestones.
2. Resource Management
 Allocating Resources: Ensure that the necessary resources, including labor, materials,
and equipment, are available and properly allocated.
 Managing Procurement: Oversee the procurement of materials and subcontractor
services to ensure quality and cost-effectiveness.
3. Quality Control
 Setting Standards: Establish quality standards and ensure that all construction work
meets these standards.
 Conducting Inspections: Regularly inspect work to ensure compliance with
specifications and regulations.
4. Cost Management
 Budgeting: Develop and manage the project budget to control costs and prevent
overspending.
 Financial Monitoring: Track expenditures and manage financial risks to keep the
project within budget.
5. Risk Management
 Identifying Risks: Identify potential risks that could impact the project.
 Mitigating Risks: Develop and implement strategies to mitigate these risks and handle
any issues that arise.
6. Compliance and Safety
 Regulatory Compliance: Ensure that the project complies with all relevant regulations,
codes, and standards.
 Safety Management: Implement safety protocols to protect workers and prevent
accidents on site.
7. Communication and Stakeholder Management
 Facilitating Communication: Maintain clear and effective communication among all
project stakeholders, including clients, contractors, and regulatory bodies.
 Managing Expectations: Address stakeholder concerns and manage their expectations
throughout the project.
8. Monitoring and Controlling
 Tracking Progress: Monitor project progress against the plan to ensure that milestones
and deadlines are met.
 Managing Changes: Handle changes to project scope, schedule, and budget, and update
plans accordingly.
9. Project Handover and Completion
 Final Inspections: Conduct final inspections to ensure that all work is completed to the
required standards.
 Handover: Prepare and hand over the completed project to the client, including all
necessary documentation and training.
10. Post-Construction Evaluation
 Assessing Performance: Review the project's success and performance to identify
lessons learned.
 Continuous Improvement: Use insights from the project to improve processes and
practices for future projects.
In summary, construction process management ensures that every aspect of a construction
project is carefully planned, executed, and monitored to achieve successful outcomes. It
integrates various functions to manage the complexities of construction projects and deliver
results that meet or exceed stakeholder expectations.
Legal Aspects of Construction Projects:
Legal aspects of construction projects are crucial for ensuring compliance, managing risks, and
protecting the interests of all parties involved. Understanding these aspects helps prevent legal
disputes and ensures that projects proceed smoothly within the bounds of the law. Here’s an
overview of the key legal aspects of construction projects:
1. Contract Law
Contract Formation:
 Types of Contracts: Understand the different types of construction contracts, such as
lump sum, cost-plus, and time and materials contracts.
 Terms and Conditions: Ensure that all terms, including scope of work, deadlines,
payment terms, and responsibilities, are clearly defined and agreed upon.
Contractual Obligations:
 Performance Standards: Ensure that all parties meet their contractual obligations,
including the quality and timeliness of work.
 Breach of Contract: Understand the remedies available for breaches of contract,
including damages, specific performance, or contract termination.
2. Permits and Licensing
Regulatory Compliance:
 Building Permits: Obtain all necessary building permits before starting construction.
This ensures that the project complies with local zoning laws and building codes.
 Licensing Requirements: Ensure that contractors and subcontractors hold the required
licenses and certifications for their work.
Inspection and Approval:
 Inspections: Schedule and pass inspections required by local authorities at various stages
of construction.
 Final Approval: Obtain final approval or occupancy permits before the project is
considered complete and ready for use.
3. Health and Safety Regulations
Workplace Safety:
 Compliance: Adhere to Occupational Health and Safety Administration (OSHA) or
equivalent regulations to ensure a safe working environment.
 Safety Plans: Develop and implement safety plans and procedures to manage risks and
prevent accidents on site.
Liability:
 Workers’ Compensation: Ensure that adequate workers’ compensation insurance is in
place to cover injuries sustained by workers on site.
 Site Safety: Address any safety concerns or hazards promptly to avoid legal liability.
4. Environmental Laws
Environmental Compliance:
 Environmental Impact Assessments: Conduct assessments to understand the
environmental impact of the construction project and comply with environmental
regulations.
 Waste Management: Implement proper waste management practices, including disposal
of hazardous materials.
Sustainability:
 Green Building Standards: Consider compliance with green building standards and
certifications, such as LEED, to promote sustainability.
5. Insurance and Bonds
Insurance Requirements:
 Types of Insurance: Ensure that appropriate insurance coverage is in place, including
general liability insurance, professional liability insurance, and builder’s risk insurance.
 Proof of Insurance: Obtain and verify proof of insurance from all contractors and
subcontractors.
Performance Bonds:
 Surety Bonds: Secure performance bonds to guarantee that the contractor will complete
the project as agreed. This protects the client against contractor default.
6. Dispute Resolution
Dispute Resolution Mechanisms:
 Mediation and Arbitration: Include clauses in contracts for mediation or arbitration as
alternative dispute resolution methods.
 Litigation: Understand the process and potential consequences of litigation if disputes
cannot be resolved through alternative means.
Claims Management:
 Documenting Claims: Properly document any claims or disputes that arise, including
communication and evidence related to the issue.
 Resolving Disputes: Work towards resolving disputes amicably and in accordance with
contract terms and legal requirements.
7. Intellectual Property Rights
Design and Plans:
 Ownership: Address intellectual property rights related to design plans, architectural
drawings, and other project documentation.
 Usage Rights: Define who owns the rights to the designs and how they can be used or
modified.
8. Contractor and Subcontractor Relations
Subcontractor Agreements:
 Subcontractor Contracts: Ensure that subcontractor agreements are in place and align
with the main contract’s terms and conditions.
 Liability and Payments: Address issues related to subcontractor liability, payments, and
performance within the main contract.
9. Public and Private Sector Requirements
Public Projects:
 Public Procurement Laws: Comply with public procurement laws and regulations for
government-funded projects, including bidding processes and transparency requirements.
Private Projects:
 Private Agreements: Address specific legal requirements related to private projects,
including contract negotiations and private land use regulations.
10. Project Closeout
Final Documentation:
 Completion Certificates: Obtain all necessary completion certificates and
documentation required for project closeout.
 Contractual Obligations: Ensure that all contractual obligations have been met before
finalizing the project.
Understanding these legal aspects helps manage construction projects effectively, mitigate risks,
and ensure compliance with legal and regulatory requirements. It’s often advisable to consult
with legal professionals who specialize in construction law to navigate complex legal issues and
protect your interests throughout the project.
Conclusion
Effective construction project management is crucial for delivering successful projects. By
following a structured process, managing risks, and maintaining clear communication, project
managers can ensure that projects are completed on time, within budget, and to the desired
quality standards. This comprehensive guide serves as a valuable resource for navigating the
complexities of construction project management and achieving successful project outcomes.

The Comprehensive Guide to Construction Project Management Process

  • 1.
    The Comprehensive Guideto Construction Project Management Process The Comprehensive Guide to Construction Project Management Process" is a detailed manual designed to provide in-depth knowledge and practical guidance on managing construction projects. This guide covers every aspect of the construction project management process, from the initial planning and design stages to the final completion and handover of the project. It aims to equip professionals in the construction industry with the tools, techniques, and best practices needed to successfully oversee and execute construction projects. What is Construction Process Management Construction process management is the systematic approach to planning, coordinating, and overseeing the various phases of a construction project from inception to completion. It involves a series of steps and tasks aimed at ensuring the project is completed on time, within budget, and to the required quality standards. Here are the key aspects of construction process management:
  • 2.
    Process of ProjectManagement: The process of construction project management involves several key phases, each with specific tasks and objectives to ensure the successful completion of a project. Here’s a breakdown of the typical construction project management process: 1. Introduction to Construction Project Management Construction project management is the discipline of planning, coordinating, and overseeing construction projects from inception to completion. The primary goals are to ensure that projects are completed on time, within budget, and to the required quality standards. Effective project management involves a structured approach to managing all aspects of the project, from initial concept through to final handover. 2. Initiation: Laying the Groundwork
  • 3.
    Project Definition: Thefirst step in any construction project is to define its objectives, scope, and feasibility. This involves understanding the project's goals, determining what is included and excluded, and assessing the alignment with strategic goals. Stakeholder Identification: Identifying all stakeholders is crucial. This includes clients, contractors, regulatory bodies, and anyone else affected by the project. Understanding their needs and expectations helps in aligning project goals with stakeholder interests. Initial Feasibility Study: Conduct a feasibility study to evaluate the project's viability in terms of costs, time, and resources. This early assessment helps in identifying potential challenges and setting realistic expectations. 3. Planning: Crafting a Roadmap Scope Management: Develop a detailed project scope statement that outlines all project deliverables and boundaries. Clear scope management helps prevent scope creep and ensures that all parties are on the same page. Schedule Development: Create a comprehensive project schedule that includes timelines and key milestones. Tools like Gantt charts can be used to visualize the schedule and track progress. Budget Planning: Develop a detailed budget covering all costs associated with the project, including materials, labor, and contingencies. Effective budget planning is essential for financial control and avoiding unexpected expenses. Resource Planning: Identify and allocate the resources required for the project, such as labor, materials, and equipment. A resource management plan ensures that resources are available when needed and used efficiently. Risk Management Plan: Identify potential risks and develop strategies to mitigate them. A risk register helps in documenting and tracking risks, while mitigation strategies prepare the team for potential challenges. Procurement Planning: Plan for the procurement of materials and subcontractors. Develop contracts and specifications to ensure that all procurement activities align with project requirements. 4. Design: Shaping the Vision Conceptual Design: Collaborate with architects and engineers to create initial design concepts that align with client requirements and project goals. This phase sets the foundation for detailed design work.
  • 4.
    Detailed Design: Developdetailed drawings, specifications, and plans. This stage involves refining designs based on feedback and ensuring all aspects of the design are accurate and complete. Design Review: Conduct design reviews with stakeholders to ensure the design meets their expectations and regulatory standards. Revisions may be necessary based on feedback. Permits and Approvals: Obtain all necessary permits and regulatory approvals before construction begins. Compliance with building codes and regulations is critical for project success. 5. Execution: Turning Plans into Reality Contracting: Finalize contracts with subcontractors and suppliers, ensuring that all terms and conditions are clearly defined. Effective contracting sets the stage for smooth operations during construction. Construction: Oversee the construction activities to ensure adherence to design and specifications. Managing day-to-day operations on-site involves coordinating various tasks and addressing any issues that arise. Quality Control: Implement quality control measures to ensure that all work meets the required standards. Regular inspections and testing help maintain high quality throughout the construction process. Progress Monitoring: Track progress against the project schedule and budget. Address any delays or issues promptly to keep the project on track. Communication: Maintain effective communication among all project stakeholders. Regular updates on project status help manage expectations and foster collaboration. 6. Monitoring and Controlling: Keeping on Track Performance Monitoring: Continuously monitor project performance in terms of schedule, budget, and quality. Use performance metrics and KPIs to assess progress and make data-driven decisions. Change Management: Manage changes to project scope, schedule, and budget. Document and approve change orders to ensure that any modifications are properly controlled. Risk Monitoring: Continuously assess and address risks as they arise. Update the risk register and adjust mitigation strategies as needed.
  • 5.
    Issue Resolution: Addressand resolve any issues or conflicts that occur during construction. Implement corrective actions to keep the project on course. 7. Completion: Wrapping Up Final Inspection: Conduct a thorough final inspection of the completed work to ensure it meets all required standards and specifications. This step is crucial for verifying that the project is ready for handover. Punch List: Identify and address any remaining issues or incomplete work. Ensure that all punch list items are resolved before finalizing the project. Project Handover: Prepare and hand over the completed project to the client. Provide all necessary documentation, manuals, and warranties to facilitate a smooth transition. Client Training: Provide training to the client on the operation and maintenance of the completed project. Ensure that they are satisfied with the final outcome and understand how to manage the new facility or structure. 8. Post-Construction: Reflecting and Improving Post-Project Evaluation: Review the project's success and performance. Assess what went well and identify areas for improvement to enhance future project management practices. Lessons Learned: Document lessons learned from the project. Share insights and best practices with the team to apply knowledge gained to future projects. Warranty and Support: Provide ongoing support and address any warranty issues as they arise. Ensure client satisfaction and address any post-construction concerns promptly.
  • 6.
    Primary Function ofConstruction Process Management: The primary function of construction process management is to ensure that construction projects are completed efficiently, effectively, and to the highest standards of quality. This involves overseeing and coordinating various aspects of the project from start to finish. Here are the key functions of construction process management: 1. Project Planning and Coordination  Developing Detailed Plans: Create comprehensive plans that outline the project's scope, objectives, timelines, and resource requirements.  Scheduling: Develop and manage project schedules to ensure timely completion of tasks and milestones.
  • 7.
    2. Resource Management Allocating Resources: Ensure that the necessary resources, including labor, materials, and equipment, are available and properly allocated.  Managing Procurement: Oversee the procurement of materials and subcontractor services to ensure quality and cost-effectiveness. 3. Quality Control  Setting Standards: Establish quality standards and ensure that all construction work meets these standards.  Conducting Inspections: Regularly inspect work to ensure compliance with specifications and regulations. 4. Cost Management  Budgeting: Develop and manage the project budget to control costs and prevent overspending.  Financial Monitoring: Track expenditures and manage financial risks to keep the project within budget. 5. Risk Management  Identifying Risks: Identify potential risks that could impact the project.  Mitigating Risks: Develop and implement strategies to mitigate these risks and handle any issues that arise. 6. Compliance and Safety  Regulatory Compliance: Ensure that the project complies with all relevant regulations, codes, and standards.  Safety Management: Implement safety protocols to protect workers and prevent accidents on site. 7. Communication and Stakeholder Management  Facilitating Communication: Maintain clear and effective communication among all project stakeholders, including clients, contractors, and regulatory bodies.  Managing Expectations: Address stakeholder concerns and manage their expectations throughout the project. 8. Monitoring and Controlling
  • 8.
     Tracking Progress:Monitor project progress against the plan to ensure that milestones and deadlines are met.  Managing Changes: Handle changes to project scope, schedule, and budget, and update plans accordingly. 9. Project Handover and Completion  Final Inspections: Conduct final inspections to ensure that all work is completed to the required standards.  Handover: Prepare and hand over the completed project to the client, including all necessary documentation and training. 10. Post-Construction Evaluation  Assessing Performance: Review the project's success and performance to identify lessons learned.  Continuous Improvement: Use insights from the project to improve processes and practices for future projects. In summary, construction process management ensures that every aspect of a construction project is carefully planned, executed, and monitored to achieve successful outcomes. It integrates various functions to manage the complexities of construction projects and deliver results that meet or exceed stakeholder expectations. Legal Aspects of Construction Projects: Legal aspects of construction projects are crucial for ensuring compliance, managing risks, and protecting the interests of all parties involved. Understanding these aspects helps prevent legal disputes and ensures that projects proceed smoothly within the bounds of the law. Here’s an overview of the key legal aspects of construction projects: 1. Contract Law Contract Formation:  Types of Contracts: Understand the different types of construction contracts, such as lump sum, cost-plus, and time and materials contracts.
  • 9.
     Terms andConditions: Ensure that all terms, including scope of work, deadlines, payment terms, and responsibilities, are clearly defined and agreed upon. Contractual Obligations:  Performance Standards: Ensure that all parties meet their contractual obligations, including the quality and timeliness of work.  Breach of Contract: Understand the remedies available for breaches of contract, including damages, specific performance, or contract termination. 2. Permits and Licensing Regulatory Compliance:  Building Permits: Obtain all necessary building permits before starting construction. This ensures that the project complies with local zoning laws and building codes.  Licensing Requirements: Ensure that contractors and subcontractors hold the required licenses and certifications for their work. Inspection and Approval:  Inspections: Schedule and pass inspections required by local authorities at various stages of construction.  Final Approval: Obtain final approval or occupancy permits before the project is considered complete and ready for use. 3. Health and Safety Regulations Workplace Safety:  Compliance: Adhere to Occupational Health and Safety Administration (OSHA) or equivalent regulations to ensure a safe working environment.  Safety Plans: Develop and implement safety plans and procedures to manage risks and prevent accidents on site. Liability:  Workers’ Compensation: Ensure that adequate workers’ compensation insurance is in place to cover injuries sustained by workers on site.  Site Safety: Address any safety concerns or hazards promptly to avoid legal liability. 4. Environmental Laws Environmental Compliance:
  • 10.
     Environmental ImpactAssessments: Conduct assessments to understand the environmental impact of the construction project and comply with environmental regulations.  Waste Management: Implement proper waste management practices, including disposal of hazardous materials. Sustainability:  Green Building Standards: Consider compliance with green building standards and certifications, such as LEED, to promote sustainability. 5. Insurance and Bonds Insurance Requirements:  Types of Insurance: Ensure that appropriate insurance coverage is in place, including general liability insurance, professional liability insurance, and builder’s risk insurance.  Proof of Insurance: Obtain and verify proof of insurance from all contractors and subcontractors. Performance Bonds:  Surety Bonds: Secure performance bonds to guarantee that the contractor will complete the project as agreed. This protects the client against contractor default. 6. Dispute Resolution Dispute Resolution Mechanisms:  Mediation and Arbitration: Include clauses in contracts for mediation or arbitration as alternative dispute resolution methods.  Litigation: Understand the process and potential consequences of litigation if disputes cannot be resolved through alternative means. Claims Management:  Documenting Claims: Properly document any claims or disputes that arise, including communication and evidence related to the issue.  Resolving Disputes: Work towards resolving disputes amicably and in accordance with contract terms and legal requirements. 7. Intellectual Property Rights Design and Plans:
  • 11.
     Ownership: Addressintellectual property rights related to design plans, architectural drawings, and other project documentation.  Usage Rights: Define who owns the rights to the designs and how they can be used or modified. 8. Contractor and Subcontractor Relations Subcontractor Agreements:  Subcontractor Contracts: Ensure that subcontractor agreements are in place and align with the main contract’s terms and conditions.  Liability and Payments: Address issues related to subcontractor liability, payments, and performance within the main contract. 9. Public and Private Sector Requirements Public Projects:  Public Procurement Laws: Comply with public procurement laws and regulations for government-funded projects, including bidding processes and transparency requirements. Private Projects:  Private Agreements: Address specific legal requirements related to private projects, including contract negotiations and private land use regulations. 10. Project Closeout Final Documentation:  Completion Certificates: Obtain all necessary completion certificates and documentation required for project closeout.  Contractual Obligations: Ensure that all contractual obligations have been met before finalizing the project. Understanding these legal aspects helps manage construction projects effectively, mitigate risks, and ensure compliance with legal and regulatory requirements. It’s often advisable to consult with legal professionals who specialize in construction law to navigate complex legal issues and protect your interests throughout the project.
  • 12.
    Conclusion Effective construction projectmanagement is crucial for delivering successful projects. By following a structured process, managing risks, and maintaining clear communication, project managers can ensure that projects are completed on time, within budget, and to the desired quality standards. This comprehensive guide serves as a valuable resource for navigating the complexities of construction project management and achieving successful project outcomes.