Introduction
 This System Design Document has been created to outline the
proposed system design for new geothermal power plant in Savusavu.
The new system is intended for the production of electricity from the
geothermal station for the consumers of Vanualevu hoping to get a
clean and renewable energy. The new system design indented to be
build is the binary power plant, it will replace the fossil fuel driven
generators 20 to 50 MW of power would be produced in a renewable
manner. The binary power station would require the brine or the
aquifer at 70-200 degrees Celsius. The binary cycle power plant has one
major advantage over flash steam and dry steam power plants: The
water-temperature can be as low as 57°C (135°F).
 The water coming from the geothermal reservoirs through the
production wells is never in direct contact with the working fluid. After
the some of its thermal energy is transferred to the working fluid with
a heat exchanger, the water is sent back to the reservoir through the
injection wells where it regains its thermal energy.
Introduction (cont.)
 These power plants have a thermal efficiency rate of only 10-13%. However,
geothermal binary cycle power plants enable us, through lowering temperature
requirements, to harness geothermal energy from reservoirs that with a dry- or
a flash steam power plant wouldn’t be possible.
 Looking at the number of people living and demand for power in Vanua Levu,
it is less when compared to the demand of power in Viti Levu. Nevertheless the
population size in Vanua Levu is small but there is need for the people in
Savusavu to access electricity with minimum cost and reliable energy source for
reducing the consumption of fossil fuels. Therefore, geothermal is a renewable
energy source which can reduce the emission of carbon dioxide into earth’s
surroundings and can minimize the cost to make people in Savusavu Area get
access to electricity.
 Furthermore, to represent an engineering design of a model, each and every
components of the system should be considered and gathered information
about each parts in order to know the function of each components in the
system. As stated above, we will design the model of Binary power plant for
Savusavu Area in Vanua Levu. Therefore, different parts of this system will do
different works starting from extraction, power conversion, power
transmission/transportation and delivering of power to customers.
Constrains
 The people of Vanualevu demands a stable electricity
supply that is cheap and clean to use.
 A renewable energy system that is safe and provides
electricity to the people of Savusavu
 The best energy system that can be used in Savusavu is
geothermal energy system.
Electricity demand
Fossil fuel power source
Replacing as geothermal
energy system
Power
station
Power
source
CAPACITY
(MW)
Savusavu Binary
geothermal
plant
80 *250KW
Three
phase
induction
type
genertors
TOTAL 20
Electricity supply
Classification of geothermal energy towards
clients
 Resources classification is a key element in the characterization,
assessment and development of geothermal energy.
 Stakeholders at all levels of government, with in the geothermal
industry, and among the general public need to be able to use and
understand consistent terminology regarding issues such as location,
quality, feasibility, of development, and potential impacts.
 Terminology must encompass both the geothermal nature of
geothermal resources and the practical technological and economic
aspects of resources exploitation while reaming understandable to the
broad community of non-specialists.
Environment measurable performance
indicators
 Its provides information that helps evaluation and decision making
within organizations that engage in environmental efforts.
 Provides a common foundation of information for organizations and
external interested parties ( such as consumers, business, partners,
residents in local communities, shareholders and financial
institutions) and their environmental efforts.
 It also provides a common foundation of information that helps the
integration of environmental policies of the national and local
governments, such as basic environment plans and environmental
activities of organization.
Geothermal power plant model
 One company that can
supply this type of power
plants is FUJI ELECTRIC
LTD
Working fluid, Cooling fluid,
Geothermal brine
 The two working fluid primary and secondary are brine and n-pentene.
 In the selection of working fluid, It was ensured that the thermal
characteristic satisfied the binary working conditions.
 There was less adhesive effect on the environment.
 The heating of the working fluid was easy
 The properties of the liquid are equal.
Evaporator
functions details
 Function is to heat the
working fluid after being heat
by the Preheater
item Major
features
evaporator type Horizontal
shell-and
tube type
capacity 1990KW
Temperatur
e
inlet/outlet
N-
pentene84/
105*C
Brine
130/130*C
Preheater
functions details
 it heats the working fluid.
 Purpose to heat the n-pentene.
Item Major
features
preheater Type Horizontal
shell-and
tube type
Capacity 720kw
Temperatur
e
inlet/outlet
N-penten
36/84*C
Brine
130/100*C
Turbine
 Turbine used in this binary cycle system is radial inflow with a
diameter of 448 mm of rotor, amount of rotor 110 pieces blades, nozzle
length 35 mm, diameter 20 x 6 mm nozzle, nozzle material is AISI 304,
the number of nozzle 6 pieces, with double mechanical seal of material
stainless steel, tungsten and carbon with gear box ratio is 4 : 1.
Condenser
 Condenser has the function to cool the working fluid that comes out of
the turbine so that it returns to the liquid phase.
Generator
 The turbine that is turn by the secondary liquid is connected to the
generator. There will be 80 generators with each capacity of 250kw
Other parts include
 The injection well-cooled brine is pumped into the
geothermal reservoir
 The production well-heated brine is pumped out from
the reservoir.
Transmission of electricity
 The 20MW power will be supplied to the consumers by
electric transmission cables by the help of
transformers electricity will supplied to every
household and industries.
Cost
 Direct use of geothermal energy is a absolutely cheaper than other
energy sources.
 Cost of electricity generation depends upon certain factors.
1. Temperature and depth of resources
2. Type of resources ( steam, liquid, mix)
3. Available volume of resources
4. Size and technology of plant
 The initial investment is high
 But after certain time period , the cost of electricity becomes
comparable to other resources of energy.
social requirements of geothermal energy
 Expectations of local communities, governments, development
organizations, nongovernmental organizations (NGOs), and other
stakeholders have risen significantly regarding how effectively
companies should mitigate environmental impacts of their activities.
 These expectations have been explicitly expanded to include social
issues and impacts, which are often not seriously discussed in
environmental impact assessment reports. In developing countries,
expectations have been made complex by the challenges associated
with sustainable development. To meet these challenges, governments
through their legal systems must develop regulation on creation of a
level field for industrial competition and investment without
jeopardizing the needs of the local communities and other affected
parties.
Economic requirements of geothermal
energy
 Marketing analysis – size of market, distribution, market segments
 Design costs – design team computing, information retrieval
 Development costs – design detailing, supplier costs, testing costs
 Manufacturing cost - tooling, labor, overhead, assembly, inspection
 Distribution costs - packing, transport, service centres, spare parts,
warranty
 Resources – time, budget, labor, capital, machines, material
Environmental requirements of
geothermal energy
 Compatibility with other land-uses. Geothermal power plants
require relatively little land. The installations don’t require damming of
rivers or harvesting of forests, and there are no mineshafts, tunnels,
open pits, waste heaps or oil spills. They can be sited in farmland and
forests and can share land with cattle and local wildlife.
 Renewability of the resource. Geothermal energy has been classified
under clean and renewable resource. The resource can be described as
renewable only if the rate of extraction is less than the recharge rate.
Sustainable use of the resource can be attained through reinjection and
reservoir flow monitoring.

Life cycle costing of the system
 The total amount of installing the system would be
close to 50 million dollars, which will take 2.5 million
per MW. The aim of achieving this 50 million would
take approximately 30 years, with 149000KWh of
electricity 55240000 dollars of electricity would be
sold. The maintenance and operation will cost
2762000 dollars. So at this at a breakeven rate of sale of
electricity at 0.12dollars/kWh would give back
15145000 dollars for the life cycle cost of this
geothermal power plant system.
Conclusion
 Geothermal heating system can be replace fossil fuel heating system in
a particular area.
 Annual costs for common heating purpose can be reduced by more
than 60%.
 Continued energy shortages have created added interest in geothermal
energy for power generation.
 Geothermal energy appears to be a partial solution to our energy needs.
Reference
 www.worldenergy.org
 www.NEED.org
 www.wikipedia.com
 Google maps
 Energy department of Fiji
 Fuji electric LTD
YOU

More Related Content

What's hot

Lecture 1 micro hydro basics and status in nepal
Lecture 1 micro hydro basics and status in nepalLecture 1 micro hydro basics and status in nepal
Lecture 1 micro hydro basics and status in nepal
shahabuddin khan
 
IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...
IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...
IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...
IRJET Journal
 
Hybrid power technologies
Hybrid power technologiesHybrid power technologies
Hybrid power technologies
ManojSharma502684
 
Cogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and BenefitsCogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and Benefits
Bobby Green
 
Cogeneration (chp)
Cogeneration (chp)Cogeneration (chp)
Cogeneration (chp)
Saeed Saleem
 
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15 SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15 Ram Kaul
 
Internship Report on Cogeneration
Internship Report on Cogeneration Internship Report on Cogeneration
Internship Report on Cogeneration Mohan Patil
 
Cogeneration
CogenerationCogeneration
Cogeneration
Sadanand Purohit
 
M Haroon REMENA -B20- PV-Diesel hybrid systems
M Haroon  REMENA -B20- PV-Diesel hybrid systemsM Haroon  REMENA -B20- PV-Diesel hybrid systems
M Haroon REMENA -B20- PV-Diesel hybrid systems
Muhammad Haroon
 
IRJET-Review on Solar Thermal and Photovoltaic Energy System
IRJET-Review on Solar Thermal and Photovoltaic Energy SystemIRJET-Review on Solar Thermal and Photovoltaic Energy System
IRJET-Review on Solar Thermal and Photovoltaic Energy System
IRJET Journal
 
Co-Generation Plant Reverse Engineering
Co-Generation Plant Reverse EngineeringCo-Generation Plant Reverse Engineering
Co-Generation Plant Reverse Engineering
Derek Dodge
 
Co-Generation
Co-GenerationCo-Generation
ENER-G Digester Gas Brochure Feb 2009
ENER-G Digester Gas Brochure Feb 2009ENER-G Digester Gas Brochure Feb 2009
ENER-G Digester Gas Brochure Feb 2009Scott Tamplin
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsFortum Heat Lietuva
 
Cogeneration
CogenerationCogeneration
Cogeneration
Puneet Jain
 
Case Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial CultureCase Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial CultureFermenta Biotech Ltd
 
The Power Behind Renewables - Trefor Evans (First Light Energy)
The Power Behind Renewables - Trefor Evans (First Light Energy)The Power Behind Renewables - Trefor Evans (First Light Energy)
The Power Behind Renewables - Trefor Evans (First Light Energy)ecoconnect
 

What's hot (20)

Lecture 1 micro hydro basics and status in nepal
Lecture 1 micro hydro basics and status in nepalLecture 1 micro hydro basics and status in nepal
Lecture 1 micro hydro basics and status in nepal
 
IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...
IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...
IRJET-Grid Connected Hybrid Renewable Energy System for Vehicles Charging Sta...
 
Hybrid power technologies
Hybrid power technologiesHybrid power technologies
Hybrid power technologies
 
Cogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and BenefitsCogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and Benefits
 
Cogeneration (chp)
Cogeneration (chp)Cogeneration (chp)
Cogeneration (chp)
 
Cultiveco_Greenhouse
Cultiveco_GreenhouseCultiveco_Greenhouse
Cultiveco_Greenhouse
 
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15 SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
 
Internship Report on Cogeneration
Internship Report on Cogeneration Internship Report on Cogeneration
Internship Report on Cogeneration
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
M Haroon REMENA -B20- PV-Diesel hybrid systems
M Haroon  REMENA -B20- PV-Diesel hybrid systemsM Haroon  REMENA -B20- PV-Diesel hybrid systems
M Haroon REMENA -B20- PV-Diesel hybrid systems
 
IRJET-Review on Solar Thermal and Photovoltaic Energy System
IRJET-Review on Solar Thermal and Photovoltaic Energy SystemIRJET-Review on Solar Thermal and Photovoltaic Energy System
IRJET-Review on Solar Thermal and Photovoltaic Energy System
 
Co-Generation Plant Reverse Engineering
Co-Generation Plant Reverse EngineeringCo-Generation Plant Reverse Engineering
Co-Generation Plant Reverse Engineering
 
Co-Generation
Co-GenerationCo-Generation
Co-Generation
 
ENER-G Digester Gas Brochure Feb 2009
ENER-G Digester Gas Brochure Feb 2009ENER-G Digester Gas Brochure Feb 2009
ENER-G Digester Gas Brochure Feb 2009
 
FAQ sheet_biomass
FAQ sheet_biomassFAQ sheet_biomass
FAQ sheet_biomass
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - Baltics
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Case Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial CultureCase Study - STP Power Saving - Bacterial Culture
Case Study - STP Power Saving - Bacterial Culture
 
MAGEEP 2016
MAGEEP 2016MAGEEP 2016
MAGEEP 2016
 
The Power Behind Renewables - Trefor Evans (First Light Energy)
The Power Behind Renewables - Trefor Evans (First Light Energy)The Power Behind Renewables - Trefor Evans (First Light Energy)
The Power Behind Renewables - Trefor Evans (First Light Energy)
 

Similar to Final presentation design project 1

MSc_Project_Thesis_Presentation.ppt
MSc_Project_Thesis_Presentation.pptMSc_Project_Thesis_Presentation.ppt
MSc_Project_Thesis_Presentation.ppt
mamudufrancis1
 
IRJET- Feasibility Study on Power Generation using Treated Waste Water
IRJET- Feasibility Study on Power Generation using Treated Waste WaterIRJET- Feasibility Study on Power Generation using Treated Waste Water
IRJET- Feasibility Study on Power Generation using Treated Waste Water
IRJET Journal
 
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
IRJET Journal
 
S01231117120
S01231117120S01231117120
S01231117120
IOSR Journals
 
electricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptxelectricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptx
AravindhKarthik1
 
Design and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water PumpDesign and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water Pump
IRJET Journal
 
GREEN ENERGY ELECTRICAL POWER CONVERTER GREEN ENERGY ELE...
GREEN ENERGY ELECTRICAL POWER CONVERTER                      GREEN ENERGY ELE...GREEN ENERGY ELECTRICAL POWER CONVERTER                      GREEN ENERGY ELE...
GREEN ENERGY ELECTRICAL POWER CONVERTER GREEN ENERGY ELE...
sanjay kumar pediredla
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET Journal
 
Solar power newsletter
Solar power newsletterSolar power newsletter
Solar power newsletter
H Janardan Prabhu
 
Renewable energy.pptx my presentation
Renewable energy.pptx my presentationRenewable energy.pptx my presentation
Renewable energy.pptx my presentation
shaik maheboob sab
 
2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf
2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf
2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf
MuammerAlakary
 
Yokogawa's approach to renewable energy and community energy systems | annual...
Yokogawa's approach to renewable energy and community energy systems | annual...Yokogawa's approach to renewable energy and community energy systems | annual...
Yokogawa's approach to renewable energy and community energy systems | annual...
Yokogawa
 
N01212101114
N01212101114N01212101114
N01212101114
IOSR Journals
 
Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...
Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...
Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...
IOSR Journals
 
spv wind and cell calculation analysis.pptx
spv wind and cell calculation analysis.pptxspv wind and cell calculation analysis.pptx
spv wind and cell calculation analysis.pptx
ssuser5120b3
 
L1-Generation and distribution of electric power-latest.pptx
L1-Generation and distribution of electric power-latest.pptxL1-Generation and distribution of electric power-latest.pptx
L1-Generation and distribution of electric power-latest.pptx
Assrul Reedza Zulkifli
 
Solar smart irrigation system
Solar smart irrigation systemSolar smart irrigation system
Solar smart irrigation system
Nihal Shiroya
 
IRJET- Ameliorate the Performance of PV Module by Inventing Heat Dissipat...
IRJET-  	  Ameliorate the Performance of PV Module by Inventing Heat Dissipat...IRJET-  	  Ameliorate the Performance of PV Module by Inventing Heat Dissipat...
IRJET- Ameliorate the Performance of PV Module by Inventing Heat Dissipat...
IRJET Journal
 
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET Journal
 
Iea bioenergy 2014
Iea bioenergy 2014Iea bioenergy 2014
Iea bioenergy 2014
Danielle Leão
 

Similar to Final presentation design project 1 (20)

MSc_Project_Thesis_Presentation.ppt
MSc_Project_Thesis_Presentation.pptMSc_Project_Thesis_Presentation.ppt
MSc_Project_Thesis_Presentation.ppt
 
IRJET- Feasibility Study on Power Generation using Treated Waste Water
IRJET- Feasibility Study on Power Generation using Treated Waste WaterIRJET- Feasibility Study on Power Generation using Treated Waste Water
IRJET- Feasibility Study on Power Generation using Treated Waste Water
 
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
Micro Hydro Electricity Generation in S.T.P, A Case Study of S.T.P, Salawas-J...
 
S01231117120
S01231117120S01231117120
S01231117120
 
electricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptxelectricity generation from food waste - based bioenergy with IOT.pptx
electricity generation from food waste - based bioenergy with IOT.pptx
 
Design and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water PumpDesign and Fabrication of Solar Water Pump
Design and Fabrication of Solar Water Pump
 
GREEN ENERGY ELECTRICAL POWER CONVERTER GREEN ENERGY ELE...
GREEN ENERGY ELECTRICAL POWER CONVERTER                      GREEN ENERGY ELE...GREEN ENERGY ELECTRICAL POWER CONVERTER                      GREEN ENERGY ELE...
GREEN ENERGY ELECTRICAL POWER CONVERTER GREEN ENERGY ELE...
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
 
Solar power newsletter
Solar power newsletterSolar power newsletter
Solar power newsletter
 
Renewable energy.pptx my presentation
Renewable energy.pptx my presentationRenewable energy.pptx my presentation
Renewable energy.pptx my presentation
 
2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf
2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf
2007-Iovetal.-Powerelectronicsandcontrolofrenewableenergysystems2.pdf
 
Yokogawa's approach to renewable energy and community energy systems | annual...
Yokogawa's approach to renewable energy and community energy systems | annual...Yokogawa's approach to renewable energy and community energy systems | annual...
Yokogawa's approach to renewable energy and community energy systems | annual...
 
N01212101114
N01212101114N01212101114
N01212101114
 
Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...
Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...
Performance Analysis Methodology for Parabolic Dish Solar Concentrators for P...
 
spv wind and cell calculation analysis.pptx
spv wind and cell calculation analysis.pptxspv wind and cell calculation analysis.pptx
spv wind and cell calculation analysis.pptx
 
L1-Generation and distribution of electric power-latest.pptx
L1-Generation and distribution of electric power-latest.pptxL1-Generation and distribution of electric power-latest.pptx
L1-Generation and distribution of electric power-latest.pptx
 
Solar smart irrigation system
Solar smart irrigation systemSolar smart irrigation system
Solar smart irrigation system
 
IRJET- Ameliorate the Performance of PV Module by Inventing Heat Dissipat...
IRJET-  	  Ameliorate the Performance of PV Module by Inventing Heat Dissipat...IRJET-  	  Ameliorate the Performance of PV Module by Inventing Heat Dissipat...
IRJET- Ameliorate the Performance of PV Module by Inventing Heat Dissipat...
 
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
 
Iea bioenergy 2014
Iea bioenergy 2014Iea bioenergy 2014
Iea bioenergy 2014
 

More from vishwaleenram

Peb802 capstone design project assesment 2
Peb802 capstone design project assesment 2Peb802 capstone design project assesment 2
Peb802 capstone design project assesment 2
vishwaleenram
 
2016133741 peb 802 capstone design project ii progress assessment 1
2016133741 peb 802 capstone design project ii progress assessment 12016133741 peb 802 capstone design project ii progress assessment 1
2016133741 peb 802 capstone design project ii progress assessment 1
vishwaleenram
 
2016133741 vishwaleen peb 801 capstone design project mid-year report
2016133741 vishwaleen peb 801 capstone design project mid-year report2016133741 vishwaleen peb 801 capstone design project mid-year report
2016133741 vishwaleen peb 801 capstone design project mid-year report
vishwaleenram
 
A poster peb capstone design project
A poster peb capstone design projectA poster peb capstone design project
A poster peb capstone design project
vishwaleenram
 
Soil stabilization using natural fibers and waste materials
Soil stabilization using natural fibers and waste materialsSoil stabilization using natural fibers and waste materials
Soil stabilization using natural fibers and waste materials
vishwaleenram
 
Basic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and qualityBasic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and quality
vishwaleenram
 
Synopsis 1capstone project
Synopsis 1capstone projectSynopsis 1capstone project
Synopsis 1capstone project
vishwaleenram
 
Ceb 706 design of reinforeced and presressed concrete updated!
Ceb 706 design of reinforeced and presressed concrete updated!Ceb 706 design of reinforeced and presressed concrete updated!
Ceb 706 design of reinforeced and presressed concrete updated!
vishwaleenram
 
geothermal power plant fiji
geothermal power plant fijigeothermal power plant fiji
geothermal power plant fiji
vishwaleenram
 
geothermal power plant fiji
geothermal power plant fijigeothermal power plant fiji
geothermal power plant fiji
vishwaleenram
 
Detail design of geothermal power plants
Detail design of geothermal power plantsDetail design of geothermal power plants
Detail design of geothermal power plants
vishwaleenram
 

More from vishwaleenram (11)

Peb802 capstone design project assesment 2
Peb802 capstone design project assesment 2Peb802 capstone design project assesment 2
Peb802 capstone design project assesment 2
 
2016133741 peb 802 capstone design project ii progress assessment 1
2016133741 peb 802 capstone design project ii progress assessment 12016133741 peb 802 capstone design project ii progress assessment 1
2016133741 peb 802 capstone design project ii progress assessment 1
 
2016133741 vishwaleen peb 801 capstone design project mid-year report
2016133741 vishwaleen peb 801 capstone design project mid-year report2016133741 vishwaleen peb 801 capstone design project mid-year report
2016133741 vishwaleen peb 801 capstone design project mid-year report
 
A poster peb capstone design project
A poster peb capstone design projectA poster peb capstone design project
A poster peb capstone design project
 
Soil stabilization using natural fibers and waste materials
Soil stabilization using natural fibers and waste materialsSoil stabilization using natural fibers and waste materials
Soil stabilization using natural fibers and waste materials
 
Basic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and qualityBasic appoarch to urban drainage runoff quantity and quality
Basic appoarch to urban drainage runoff quantity and quality
 
Synopsis 1capstone project
Synopsis 1capstone projectSynopsis 1capstone project
Synopsis 1capstone project
 
Ceb 706 design of reinforeced and presressed concrete updated!
Ceb 706 design of reinforeced and presressed concrete updated!Ceb 706 design of reinforeced and presressed concrete updated!
Ceb 706 design of reinforeced and presressed concrete updated!
 
geothermal power plant fiji
geothermal power plant fijigeothermal power plant fiji
geothermal power plant fiji
 
geothermal power plant fiji
geothermal power plant fijigeothermal power plant fiji
geothermal power plant fiji
 
Detail design of geothermal power plants
Detail design of geothermal power plantsDetail design of geothermal power plants
Detail design of geothermal power plants
 

Recently uploaded

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 

Recently uploaded (20)

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 

Final presentation design project 1

  • 1.
  • 2. Outline  Introduction  Constrains  Electricity demand/supply  Classification  Measurable performance indicators  Design model  Main parts of design model  Transmission of electricity  Costs  Social, economic and environment requirements  Life cycle system  Conclusion  Reference
  • 3. Introduction  This System Design Document has been created to outline the proposed system design for new geothermal power plant in Savusavu. The new system is intended for the production of electricity from the geothermal station for the consumers of Vanualevu hoping to get a clean and renewable energy. The new system design indented to be build is the binary power plant, it will replace the fossil fuel driven generators 20 to 50 MW of power would be produced in a renewable manner. The binary power station would require the brine or the aquifer at 70-200 degrees Celsius. The binary cycle power plant has one major advantage over flash steam and dry steam power plants: The water-temperature can be as low as 57°C (135°F).  The water coming from the geothermal reservoirs through the production wells is never in direct contact with the working fluid. After the some of its thermal energy is transferred to the working fluid with a heat exchanger, the water is sent back to the reservoir through the injection wells where it regains its thermal energy.
  • 4. Introduction (cont.)  These power plants have a thermal efficiency rate of only 10-13%. However, geothermal binary cycle power plants enable us, through lowering temperature requirements, to harness geothermal energy from reservoirs that with a dry- or a flash steam power plant wouldn’t be possible.  Looking at the number of people living and demand for power in Vanua Levu, it is less when compared to the demand of power in Viti Levu. Nevertheless the population size in Vanua Levu is small but there is need for the people in Savusavu to access electricity with minimum cost and reliable energy source for reducing the consumption of fossil fuels. Therefore, geothermal is a renewable energy source which can reduce the emission of carbon dioxide into earth’s surroundings and can minimize the cost to make people in Savusavu Area get access to electricity.  Furthermore, to represent an engineering design of a model, each and every components of the system should be considered and gathered information about each parts in order to know the function of each components in the system. As stated above, we will design the model of Binary power plant for Savusavu Area in Vanua Levu. Therefore, different parts of this system will do different works starting from extraction, power conversion, power transmission/transportation and delivering of power to customers.
  • 5. Constrains  The people of Vanualevu demands a stable electricity supply that is cheap and clean to use.  A renewable energy system that is safe and provides electricity to the people of Savusavu  The best energy system that can be used in Savusavu is geothermal energy system.
  • 6. Electricity demand Fossil fuel power source Replacing as geothermal energy system Power station Power source CAPACITY (MW) Savusavu Binary geothermal plant 80 *250KW Three phase induction type genertors TOTAL 20
  • 8. Classification of geothermal energy towards clients  Resources classification is a key element in the characterization, assessment and development of geothermal energy.  Stakeholders at all levels of government, with in the geothermal industry, and among the general public need to be able to use and understand consistent terminology regarding issues such as location, quality, feasibility, of development, and potential impacts.  Terminology must encompass both the geothermal nature of geothermal resources and the practical technological and economic aspects of resources exploitation while reaming understandable to the broad community of non-specialists.
  • 9. Environment measurable performance indicators  Its provides information that helps evaluation and decision making within organizations that engage in environmental efforts.  Provides a common foundation of information for organizations and external interested parties ( such as consumers, business, partners, residents in local communities, shareholders and financial institutions) and their environmental efforts.  It also provides a common foundation of information that helps the integration of environmental policies of the national and local governments, such as basic environment plans and environmental activities of organization.
  • 10. Geothermal power plant model  One company that can supply this type of power plants is FUJI ELECTRIC LTD
  • 11. Working fluid, Cooling fluid, Geothermal brine  The two working fluid primary and secondary are brine and n-pentene.  In the selection of working fluid, It was ensured that the thermal characteristic satisfied the binary working conditions.  There was less adhesive effect on the environment.  The heating of the working fluid was easy  The properties of the liquid are equal.
  • 12. Evaporator functions details  Function is to heat the working fluid after being heat by the Preheater item Major features evaporator type Horizontal shell-and tube type capacity 1990KW Temperatur e inlet/outlet N- pentene84/ 105*C Brine 130/130*C
  • 13. Preheater functions details  it heats the working fluid.  Purpose to heat the n-pentene. Item Major features preheater Type Horizontal shell-and tube type Capacity 720kw Temperatur e inlet/outlet N-penten 36/84*C Brine 130/100*C
  • 14. Turbine  Turbine used in this binary cycle system is radial inflow with a diameter of 448 mm of rotor, amount of rotor 110 pieces blades, nozzle length 35 mm, diameter 20 x 6 mm nozzle, nozzle material is AISI 304, the number of nozzle 6 pieces, with double mechanical seal of material stainless steel, tungsten and carbon with gear box ratio is 4 : 1.
  • 15. Condenser  Condenser has the function to cool the working fluid that comes out of the turbine so that it returns to the liquid phase.
  • 16. Generator  The turbine that is turn by the secondary liquid is connected to the generator. There will be 80 generators with each capacity of 250kw
  • 17. Other parts include  The injection well-cooled brine is pumped into the geothermal reservoir  The production well-heated brine is pumped out from the reservoir.
  • 18. Transmission of electricity  The 20MW power will be supplied to the consumers by electric transmission cables by the help of transformers electricity will supplied to every household and industries.
  • 19. Cost  Direct use of geothermal energy is a absolutely cheaper than other energy sources.  Cost of electricity generation depends upon certain factors. 1. Temperature and depth of resources 2. Type of resources ( steam, liquid, mix) 3. Available volume of resources 4. Size and technology of plant  The initial investment is high  But after certain time period , the cost of electricity becomes comparable to other resources of energy.
  • 20. social requirements of geothermal energy  Expectations of local communities, governments, development organizations, nongovernmental organizations (NGOs), and other stakeholders have risen significantly regarding how effectively companies should mitigate environmental impacts of their activities.  These expectations have been explicitly expanded to include social issues and impacts, which are often not seriously discussed in environmental impact assessment reports. In developing countries, expectations have been made complex by the challenges associated with sustainable development. To meet these challenges, governments through their legal systems must develop regulation on creation of a level field for industrial competition and investment without jeopardizing the needs of the local communities and other affected parties.
  • 21. Economic requirements of geothermal energy  Marketing analysis – size of market, distribution, market segments  Design costs – design team computing, information retrieval  Development costs – design detailing, supplier costs, testing costs  Manufacturing cost - tooling, labor, overhead, assembly, inspection  Distribution costs - packing, transport, service centres, spare parts, warranty  Resources – time, budget, labor, capital, machines, material
  • 22. Environmental requirements of geothermal energy  Compatibility with other land-uses. Geothermal power plants require relatively little land. The installations don’t require damming of rivers or harvesting of forests, and there are no mineshafts, tunnels, open pits, waste heaps or oil spills. They can be sited in farmland and forests and can share land with cattle and local wildlife.  Renewability of the resource. Geothermal energy has been classified under clean and renewable resource. The resource can be described as renewable only if the rate of extraction is less than the recharge rate. Sustainable use of the resource can be attained through reinjection and reservoir flow monitoring. 
  • 23. Life cycle costing of the system  The total amount of installing the system would be close to 50 million dollars, which will take 2.5 million per MW. The aim of achieving this 50 million would take approximately 30 years, with 149000KWh of electricity 55240000 dollars of electricity would be sold. The maintenance and operation will cost 2762000 dollars. So at this at a breakeven rate of sale of electricity at 0.12dollars/kWh would give back 15145000 dollars for the life cycle cost of this geothermal power plant system.
  • 24. Conclusion  Geothermal heating system can be replace fossil fuel heating system in a particular area.  Annual costs for common heating purpose can be reduced by more than 60%.  Continued energy shortages have created added interest in geothermal energy for power generation.  Geothermal energy appears to be a partial solution to our energy needs.