Schani Daniel Bharat 
Teoh Sze Ming 
Nge Jia Chen 
Tan Yincy 
Simpson Chin 
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN 
Foundation of Natural Build Environment (FNBE) 
Introduction to Business [BUS30104] 
Submission date – 28th November 2014
B. Objectives 
a) For this particular charity drive we have decided to donate our earning to the ‘World 
Vision’ organization. We have chosen this particular organization, because poverty has been 
one of the longest problems that the world has faced. We felt as though it would be the 
most appropriate cause to support as everyday we see how much food is wasted, by our 
selves and the ones around us. 
b) Our aim and target to donate towards the organization was RM 2500, which would mean 
almost 90% of target sales had to be met, before even thinking about achieving that target. 
c) http://youtu.be/yV2eBGqv0MM 
C. Target Market 
a) The Malaysian community consists of mainly 3 different races, Chinese, Indian & Malay. 
Amongst these races the cultural differences are in ample amounts, in terms of religion and 
way of lives. Furthermore majority of the students in Taylors are of Chinese origins 
(Buddhists and Christians), followed by Malays (Islam) and then Indians (Christians and 
Hindus). Assuming that even though various nationalities of students attend Taylors a 
generalized assumption can be made, that most of the student that study at Taylors 
University are of a middle or upper stage of the socio economic scale. Thus would be 
financially stable to afford the products that would be sold. Majority of Malaysians enjoy 
eating, the diversity and availability in the various types of food sources that solidify the 
consensus that eating is the number one infatuation that all Malaysians share. 
Due to the different cultural backgrounds and exposure, this would then mean, the type of 
products being sold would not only need to satisfy their common needs, but also connect to 
them in a particular sense as well. However, having students, as primary targets would 
imply that they would be more open and less reluctant to more westernize products. 
b) Cheap is the word that stands out when thinking about the masses in Malaysia, this is 
probably the most common stereotype that is evident amongst the peoples? Anything that 
is cheap is right, no two ways about it. The demand and supply that comes of the lesser 
option is generally most popular. Other than the obvious needs and wants that are of basic 
clarity. The demand for products that possess a great quality is also a massive subjectivity 
amongst the Malaysians. 
c) Spending power is specific to the area we are planning to sell at, in this instance the 
prescribed area would be Taylors University. Based on this evaluation and the observation 
of the functions of the commercial block, we noticed that students are willing to spend a 
minimum average of thirty-five ringgit, a day. Based on the pricing of the various restaurants
around the campus, we deducted that out of all the restaurants; the ‘Mamak’ would be the 
most cheapest, it’s a fall back restaurant when students or lecturers are tight or low on cash. 
Furthermore the lecturers at Taylors can be seen, as top of the spending chain, due to the 
status of possessing a job, hence would demean the greater and less stressful availability of 
spending power. 
D. Competition analysis 
Two main competitors would be the businesses that are actually selling products or 
distributing services that are totally different as compared to our products. The stall next to 
us were sponsored massively, as they possessed a Coco Cola machine as well an ice cream 
dispenser. This would already prove to be super useful resources in the long term. As the 
amount of profit they made and the customers they would attract would be of a wider base, 
due the humid/ hot climate that Malaysia possesses, it would mean, people would 
automatically seek, a cold beverage or a cold dessert to sooth their warm conditions. 
The other group, that proved to be a ‘threat’ would be the group that was offering other 
services that neither of the other groups possessed, the availability of ‘henna’ a form of non 
permanent tattooing that is greatly popular amongst teenagers. This would mean, that their 
target market would be more specific to girls, and shockingly a large number of boys now 
too, as they’re more willing to try new things. 
However I felt like due to the fact that both booth had more resources and different 
services compared to us, it also meant that, no other groups actually sold what we did, 
which were chicken floss tarts, longan pudding, unique muffins and chocolate chip cookies. 
Their weaknesses were probably how they weren’t really able to handle large number of 
customers due to inexperienced student working at their booths. 
E. Product & Packaging 
For the products of our charity drive, we decided to sell tarts, muffins and puddings. We 
initially thought of selling more items such as marshmallow dips and drinks but we cut them 
down to 3 items in the end that we think would be easier and could get more respond from 
the customers.
Products 
Item 01 | the muffins would be our main item sponsored by Bake & Brew café from Penang. 
A total of 129 muffins were sponsored, consisting different flavours such as red velvet, 
chocolate chips, green tea, blueberry, molten chocolate and poppy seed. We think that the 
muffin would get a huge respond as who doesn’t like something sweet and easy to grab on 
the go? And indeed it turned out to be a popular item at our stall. It received a pretty good 
respond from the customers, each praising the flavour and the sweetness that is perfect to 
the point. 
Packaging | As for the packaging of the muffins, they were individually packed. The 
packaging would attract customers as it was being placed in a transparent small packaging
bag, which shows those yummy looking muffins. The muffins fit the bags perfectly, which 
give an illusion that the sizes are quite huge. It also looks clean and decent from our stall. 
Item 02 | the chicken floss tarts is our second item. One of our group mates, Simpson Chin 
purchase stocks from his aunty with the original price. It is basically a tart with chicken floss 
fillings. We think that customers would like it because they are quite special; very few 
people had tried it before. It also has a unique look. It would definitely spark up passer-by’s 
interest. 
Packaging | There were also two kinds of packaging for the tarts. For those that are going to 
be sold separately, we packed 4 tarts in a bag. It was packed in a transparent packaging bag 
like how the muffins were packed. As for the second packaging, the tarts were packed in a 
bottle. The bottled packaging’s are for customers whom are interested to buy the tarts in a 
huge and cheaper amount. The packaging would attract customers because they were 
transparent and showcased the unique and appealing appearance of the tarts. Potential 
customers would be curious about it and have a look when they are passing by our stall.
Item 03 | the third item, homemade puddings sponsored by our fellow group mate, Jason 
Nge. The puddings are longan flavoured, with canned longan flesh in each one of them. We 
think that customers would like it, as it was chilled and lightly packed, absolutely suitable on 
warm weathered days. It received quite a lot of good feedbacks and were quite popular as it 
was served chilled which cooled down people’s thirst. 
Packaging | the puddings were packed in a really simple packaging with no ornaments to 
bring out that homemade character. The packaging was a transparent small container so 
that customers could see what it contains. Although it is not fancy looking but it promoted a 
more organic look. 
YOUTUBE VIDEO LINK: 
http://youtu.be/KR4hWBNGygY 
https://www.youtube.com/watch?v=mtTKj12rXUU
F. Pricing 
As for the pricing of our items, 
Pudding Muffin Chicken Floss Cookies Chocolate Chip Cookies 
S. Price RM3.50 RM4.00 RM6.00 RM6.00 
Units 142 180 295 55 
Rev RM497.00 RM720.00 RM1,770.00 RM330.00 
Pudding Muffin Chicken Floss Cookies 
Chocolate Chip 
Cookies 
C. Price RM0.25 RM2.90 RM4.75 RM1.80 
Units 142 180 295 55 
Rev RM35.50 RM522.00 RM1,401.25 RM99.00 
Our products are quite popular, as the muffins are delicious and worthy of its price; the tarts 
are unique and fresh to the customers as they rarely see anything like it before; and the 
puddings are chilly and yummy; which allowed us to set the pricing higher than the unit cost 
price. We set our pricing for all of the products fairly and in an acceptable range, so that 
customers would not feel being cheated on. 
We also came out with some strategies in advance in case we have difficulty selling our 
products. 
 Sell our products outside of campus to working adults whom have the spending 
ability to buy them 
 Walk around campus or offices and approach potential customers instead of sitting 
around the stall. 
G. Promotion 
a) Change for change. By sparing your change into the donation box, you can change 
somebody else’s life. 
b) Our 2 main tools for promoting our products are giving free samples of our products, and 
also face-to-face conversation. Firstly, we gave free samples of both our cookies by crushing 
them into smaller pieces and leave it there on the table for the customers to try. This 
approach showed us decent results as most of the customers who tried the samples bought 
our products. However, we do have some other customers who just tried free cookies and 
walked away.
Secondly, we did face to face conversations. This approach showed us great results as most 
of the customers do not know what products we were selling. By conversing with the 
lecturers, the students and some of our friends, they got to know what we were actually 
selling and adding on by letting them try our samples, they bought our products almost 
instantaneously. 
Other than these two, we did posters as well. However, it was not as effective as not really a 
lot of people were paying attention to the boards behind us. 
c) We have chosen the two main strategies because we thought that it would be easier if we 
just communicate with our customers instead of letting them discover us by themselves. We 
have to be bold and not be afraid of rejection in order for the two strategies to work. By 
approaching them and conversing with them, it made them feel that we are very sincere in 
selling our products. Then, by letting the customers try our products, it helped assuring the 
quality of our product, and hence customers are more willing to spend on our products. 
H. Sponsors 
a) For sponsorship wise, we approached our relatives first, and then we tried to find 
sponsorship from several big corporate like for example The Great Eastern and 
Permasteelisa. 
b) Our relatives were very enthusiastic in donating some amount of money. We targeted 
them because we know them personally and the chances of them donating are higher than 
other business groups. Then, we targeted the 2 big corporate because some of our relatives 
are working inside and so we tried our luck. 
c) Jason’s mother sponsored all the puddings; also his relatives sponsored a total of RM650. 
Yincy’s mother sponsored a total of RM100 for the decorations and another RM300 for the 
tarts. Then, Schani and his mother sponsored the chocolate chip cookies and also another 
RM300 for the tarts. Simpson’s uncle sponsored RM300 for the tarts. And lastly, Sze Ming’s 
father sponsored all the muffins that we sold, including the transportation fees. All 
monetary sponsorships were done in the form of cash. 
d) We have to send our official sponsorship letter with the Taylor’s letterhead to the two 
corporate. They agreed to sponsor quite a large sum of money for our group, however the 
whole process would take about 3 to 4 months time, and we do have the privilege of time. 
Unfortunately, we have to abort both sponsorships. Then, for our relatives wise, some of us 
talk to them through phone calls, and some of us asked for sponsorship in face-to-face 
conversation. 
K. Human Resource Planning
For our group, Jason was voted the project manager, Schani was the accountant, Yincy was 
in-charge of the advertising, Simpson and Sze Ming were given the roles of Sales and 
Marketing supervisors respectively. However, all of us helped in promoting and selling our 
products. Jason did a good job of organising us as a team, by teaching us what to do so that 
we can sell off our products quickly. Also, with the tips given by Mr.Jo, our sales increased in 
a faster rate. We distributed our jobs equally, so when for example Simpson and Schani 
were selling the products in the office, the other 3 will be looking after the booth and vice 
versa. 
I. Distribution 
a) We used a vehicle (car) that was possessed by one of the group mates to drive from the 
suppliers around Klang Valley and to transport it back to campus. This was highly efficient 
and productive. There was no lag time and we always opened out stall in advance. 
b) During instance of bulk selling, we encountered customers that dwell in KL, and then we 
had to transport the mass order of chicken floss there. We did this on time and in sync with 
our stall opening and closing timing. Furthermore we took turns doing different tasks at the 
booth this made do the diverse tasks easier. 
c) An average number of customers were actually approached and during peak hours, all 
members were at the booth to deal with the large number of people. However during less 
stressful hours, we were able to walk around to the staff rooms, lecture halls as well as the 
commercial block to sell ours products. 
d) A method used by our booth, was through promotion using close friends, as well the 
social media such as whatsapp, this was our means of communication with any of the 
customers that wished to order from us or inquire about when our booth would be open 
next, etc.
J. Green measures 
The products that we had chosen as following: 
A) Longan Pudding: We totally made it by our own so it considers as an environmentally 
product so it didn’t gives any effects to our environment. 
B) Chocolate chip cookies: The ingredients that we bought in making the cookies were 
Hershey chocolate chip that made by their own specific factories. So it considers as 
un-environmentally product so we reuse and recycle the empty bottles to reduce its 
hazardous effects. 
C) Muffin: Muffin was the main product that we sold for the charity drive that 
sponsored by the Bake and Brew Cafe. As it made by machines that release smokes 
to the environment so it considers as un-environmentally product. We had recycle 
the packaging box for the environmentally purpose. 
D) Chicken Floss Tart: Is homemade by Simpson’s aunt so it consider as an 
environmentally product 
B) Packaging: 
A) Longan Pudding: The packaging of the Longan Pudding was made by the plastic, 
which can be reused and recycled. 
B) Chocolate chip cookies: The packaging of the chocolate chip cookies was the plastic, 
which can be reused and recycled. 
C) Muffin: The packaging of the muffin was made by the plastic, which can be reused or 
recycled. 
D) Chicken Floss tart: The packaging of the tart is also made by plastic so is also consider 
reusable. 
C) Carbon footprint 
 Use ice box instead of refrigerator to save electricity 
 Reuse the plastic cups and spoons 
D) Product’s waste 
We had collected mostly of the products’ waste after finished by the customers in a 
big plastic bag. The products’ waste that we had collected included plastic cups, and 
plastic spoons. After that, we threw the entire product’s waste into the recycle bin in 
Taylor’s University to be recycled.
E) Reduce the consumption of resource 
Other than that, our group is pretty much environmentally friendly. We take this 
chance to reduce the consumption of resources like paper, water and electricity as 
we used recycle paper for the decorations and etc., and we kept the water in our 
icebox clean so we don’t have to change it many times. 
Income Statem ent of Group 8 (Jas on) Charity Drive Eve nt 
Revenue 
Sales 
RM3,317.00 
Less: Cost of Goods Sold 
RM2,057.75 
Gross Profit 
RM1,259.25 
Add: Donations & Sponsorship 
RM1,971.00 
Adjusted Gross Profit 
RM3,230.25 
Less: Operating Expenses 
Promotional Expenses RM68.25 
Stationary Expenses RM20.00 
Typhoid Vaccine Injection RM300.00 
Total Operatin g Expenses 
RM388.25 
Net Profit 
RM2,842.00 
Pudding Muffin Chicken Floss Cookies Chocolate Chip Cookies 
S. Price RM3.50 RM4.00 RM6.00 RM6.00 
Units 142 180 295 55 
Rev RM497.00 RM720.00 RM1,770.00 RM330.00 
Pudding Muffin Chicken Floss Cookies 
Chocolate Chip 
Cookies 
C. Price RM0.25 RM2.90 RM4.75 RM1.80 
Units 142 180 295 55 
Rev RM35.50 RM522.00 RM1,401.25 RM99.00
Sponsorship Letter
REFLECTION VIDEO : http://youtu.be/jZlBuByiHe4 
TEMPORARY RECEIPT FROM WORLD VISION

Final business rprt

  • 1.
    Schani Daniel Bharat Teoh Sze Ming Nge Jia Chen Tan Yincy Simpson Chin SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Foundation of Natural Build Environment (FNBE) Introduction to Business [BUS30104] Submission date – 28th November 2014
  • 2.
    B. Objectives a)For this particular charity drive we have decided to donate our earning to the ‘World Vision’ organization. We have chosen this particular organization, because poverty has been one of the longest problems that the world has faced. We felt as though it would be the most appropriate cause to support as everyday we see how much food is wasted, by our selves and the ones around us. b) Our aim and target to donate towards the organization was RM 2500, which would mean almost 90% of target sales had to be met, before even thinking about achieving that target. c) http://youtu.be/yV2eBGqv0MM C. Target Market a) The Malaysian community consists of mainly 3 different races, Chinese, Indian & Malay. Amongst these races the cultural differences are in ample amounts, in terms of religion and way of lives. Furthermore majority of the students in Taylors are of Chinese origins (Buddhists and Christians), followed by Malays (Islam) and then Indians (Christians and Hindus). Assuming that even though various nationalities of students attend Taylors a generalized assumption can be made, that most of the student that study at Taylors University are of a middle or upper stage of the socio economic scale. Thus would be financially stable to afford the products that would be sold. Majority of Malaysians enjoy eating, the diversity and availability in the various types of food sources that solidify the consensus that eating is the number one infatuation that all Malaysians share. Due to the different cultural backgrounds and exposure, this would then mean, the type of products being sold would not only need to satisfy their common needs, but also connect to them in a particular sense as well. However, having students, as primary targets would imply that they would be more open and less reluctant to more westernize products. b) Cheap is the word that stands out when thinking about the masses in Malaysia, this is probably the most common stereotype that is evident amongst the peoples? Anything that is cheap is right, no two ways about it. The demand and supply that comes of the lesser option is generally most popular. Other than the obvious needs and wants that are of basic clarity. The demand for products that possess a great quality is also a massive subjectivity amongst the Malaysians. c) Spending power is specific to the area we are planning to sell at, in this instance the prescribed area would be Taylors University. Based on this evaluation and the observation of the functions of the commercial block, we noticed that students are willing to spend a minimum average of thirty-five ringgit, a day. Based on the pricing of the various restaurants
  • 3.
    around the campus,we deducted that out of all the restaurants; the ‘Mamak’ would be the most cheapest, it’s a fall back restaurant when students or lecturers are tight or low on cash. Furthermore the lecturers at Taylors can be seen, as top of the spending chain, due to the status of possessing a job, hence would demean the greater and less stressful availability of spending power. D. Competition analysis Two main competitors would be the businesses that are actually selling products or distributing services that are totally different as compared to our products. The stall next to us were sponsored massively, as they possessed a Coco Cola machine as well an ice cream dispenser. This would already prove to be super useful resources in the long term. As the amount of profit they made and the customers they would attract would be of a wider base, due the humid/ hot climate that Malaysia possesses, it would mean, people would automatically seek, a cold beverage or a cold dessert to sooth their warm conditions. The other group, that proved to be a ‘threat’ would be the group that was offering other services that neither of the other groups possessed, the availability of ‘henna’ a form of non permanent tattooing that is greatly popular amongst teenagers. This would mean, that their target market would be more specific to girls, and shockingly a large number of boys now too, as they’re more willing to try new things. However I felt like due to the fact that both booth had more resources and different services compared to us, it also meant that, no other groups actually sold what we did, which were chicken floss tarts, longan pudding, unique muffins and chocolate chip cookies. Their weaknesses were probably how they weren’t really able to handle large number of customers due to inexperienced student working at their booths. E. Product & Packaging For the products of our charity drive, we decided to sell tarts, muffins and puddings. We initially thought of selling more items such as marshmallow dips and drinks but we cut them down to 3 items in the end that we think would be easier and could get more respond from the customers.
  • 4.
    Products Item 01| the muffins would be our main item sponsored by Bake & Brew café from Penang. A total of 129 muffins were sponsored, consisting different flavours such as red velvet, chocolate chips, green tea, blueberry, molten chocolate and poppy seed. We think that the muffin would get a huge respond as who doesn’t like something sweet and easy to grab on the go? And indeed it turned out to be a popular item at our stall. It received a pretty good respond from the customers, each praising the flavour and the sweetness that is perfect to the point. Packaging | As for the packaging of the muffins, they were individually packed. The packaging would attract customers as it was being placed in a transparent small packaging
  • 5.
    bag, which showsthose yummy looking muffins. The muffins fit the bags perfectly, which give an illusion that the sizes are quite huge. It also looks clean and decent from our stall. Item 02 | the chicken floss tarts is our second item. One of our group mates, Simpson Chin purchase stocks from his aunty with the original price. It is basically a tart with chicken floss fillings. We think that customers would like it because they are quite special; very few people had tried it before. It also has a unique look. It would definitely spark up passer-by’s interest. Packaging | There were also two kinds of packaging for the tarts. For those that are going to be sold separately, we packed 4 tarts in a bag. It was packed in a transparent packaging bag like how the muffins were packed. As for the second packaging, the tarts were packed in a bottle. The bottled packaging’s are for customers whom are interested to buy the tarts in a huge and cheaper amount. The packaging would attract customers because they were transparent and showcased the unique and appealing appearance of the tarts. Potential customers would be curious about it and have a look when they are passing by our stall.
  • 6.
    Item 03 |the third item, homemade puddings sponsored by our fellow group mate, Jason Nge. The puddings are longan flavoured, with canned longan flesh in each one of them. We think that customers would like it, as it was chilled and lightly packed, absolutely suitable on warm weathered days. It received quite a lot of good feedbacks and were quite popular as it was served chilled which cooled down people’s thirst. Packaging | the puddings were packed in a really simple packaging with no ornaments to bring out that homemade character. The packaging was a transparent small container so that customers could see what it contains. Although it is not fancy looking but it promoted a more organic look. YOUTUBE VIDEO LINK: http://youtu.be/KR4hWBNGygY https://www.youtube.com/watch?v=mtTKj12rXUU
  • 7.
    F. Pricing Asfor the pricing of our items, Pudding Muffin Chicken Floss Cookies Chocolate Chip Cookies S. Price RM3.50 RM4.00 RM6.00 RM6.00 Units 142 180 295 55 Rev RM497.00 RM720.00 RM1,770.00 RM330.00 Pudding Muffin Chicken Floss Cookies Chocolate Chip Cookies C. Price RM0.25 RM2.90 RM4.75 RM1.80 Units 142 180 295 55 Rev RM35.50 RM522.00 RM1,401.25 RM99.00 Our products are quite popular, as the muffins are delicious and worthy of its price; the tarts are unique and fresh to the customers as they rarely see anything like it before; and the puddings are chilly and yummy; which allowed us to set the pricing higher than the unit cost price. We set our pricing for all of the products fairly and in an acceptable range, so that customers would not feel being cheated on. We also came out with some strategies in advance in case we have difficulty selling our products.  Sell our products outside of campus to working adults whom have the spending ability to buy them  Walk around campus or offices and approach potential customers instead of sitting around the stall. G. Promotion a) Change for change. By sparing your change into the donation box, you can change somebody else’s life. b) Our 2 main tools for promoting our products are giving free samples of our products, and also face-to-face conversation. Firstly, we gave free samples of both our cookies by crushing them into smaller pieces and leave it there on the table for the customers to try. This approach showed us decent results as most of the customers who tried the samples bought our products. However, we do have some other customers who just tried free cookies and walked away.
  • 8.
    Secondly, we didface to face conversations. This approach showed us great results as most of the customers do not know what products we were selling. By conversing with the lecturers, the students and some of our friends, they got to know what we were actually selling and adding on by letting them try our samples, they bought our products almost instantaneously. Other than these two, we did posters as well. However, it was not as effective as not really a lot of people were paying attention to the boards behind us. c) We have chosen the two main strategies because we thought that it would be easier if we just communicate with our customers instead of letting them discover us by themselves. We have to be bold and not be afraid of rejection in order for the two strategies to work. By approaching them and conversing with them, it made them feel that we are very sincere in selling our products. Then, by letting the customers try our products, it helped assuring the quality of our product, and hence customers are more willing to spend on our products. H. Sponsors a) For sponsorship wise, we approached our relatives first, and then we tried to find sponsorship from several big corporate like for example The Great Eastern and Permasteelisa. b) Our relatives were very enthusiastic in donating some amount of money. We targeted them because we know them personally and the chances of them donating are higher than other business groups. Then, we targeted the 2 big corporate because some of our relatives are working inside and so we tried our luck. c) Jason’s mother sponsored all the puddings; also his relatives sponsored a total of RM650. Yincy’s mother sponsored a total of RM100 for the decorations and another RM300 for the tarts. Then, Schani and his mother sponsored the chocolate chip cookies and also another RM300 for the tarts. Simpson’s uncle sponsored RM300 for the tarts. And lastly, Sze Ming’s father sponsored all the muffins that we sold, including the transportation fees. All monetary sponsorships were done in the form of cash. d) We have to send our official sponsorship letter with the Taylor’s letterhead to the two corporate. They agreed to sponsor quite a large sum of money for our group, however the whole process would take about 3 to 4 months time, and we do have the privilege of time. Unfortunately, we have to abort both sponsorships. Then, for our relatives wise, some of us talk to them through phone calls, and some of us asked for sponsorship in face-to-face conversation. K. Human Resource Planning
  • 9.
    For our group,Jason was voted the project manager, Schani was the accountant, Yincy was in-charge of the advertising, Simpson and Sze Ming were given the roles of Sales and Marketing supervisors respectively. However, all of us helped in promoting and selling our products. Jason did a good job of organising us as a team, by teaching us what to do so that we can sell off our products quickly. Also, with the tips given by Mr.Jo, our sales increased in a faster rate. We distributed our jobs equally, so when for example Simpson and Schani were selling the products in the office, the other 3 will be looking after the booth and vice versa. I. Distribution a) We used a vehicle (car) that was possessed by one of the group mates to drive from the suppliers around Klang Valley and to transport it back to campus. This was highly efficient and productive. There was no lag time and we always opened out stall in advance. b) During instance of bulk selling, we encountered customers that dwell in KL, and then we had to transport the mass order of chicken floss there. We did this on time and in sync with our stall opening and closing timing. Furthermore we took turns doing different tasks at the booth this made do the diverse tasks easier. c) An average number of customers were actually approached and during peak hours, all members were at the booth to deal with the large number of people. However during less stressful hours, we were able to walk around to the staff rooms, lecture halls as well as the commercial block to sell ours products. d) A method used by our booth, was through promotion using close friends, as well the social media such as whatsapp, this was our means of communication with any of the customers that wished to order from us or inquire about when our booth would be open next, etc.
  • 10.
    J. Green measures The products that we had chosen as following: A) Longan Pudding: We totally made it by our own so it considers as an environmentally product so it didn’t gives any effects to our environment. B) Chocolate chip cookies: The ingredients that we bought in making the cookies were Hershey chocolate chip that made by their own specific factories. So it considers as un-environmentally product so we reuse and recycle the empty bottles to reduce its hazardous effects. C) Muffin: Muffin was the main product that we sold for the charity drive that sponsored by the Bake and Brew Cafe. As it made by machines that release smokes to the environment so it considers as un-environmentally product. We had recycle the packaging box for the environmentally purpose. D) Chicken Floss Tart: Is homemade by Simpson’s aunt so it consider as an environmentally product B) Packaging: A) Longan Pudding: The packaging of the Longan Pudding was made by the plastic, which can be reused and recycled. B) Chocolate chip cookies: The packaging of the chocolate chip cookies was the plastic, which can be reused and recycled. C) Muffin: The packaging of the muffin was made by the plastic, which can be reused or recycled. D) Chicken Floss tart: The packaging of the tart is also made by plastic so is also consider reusable. C) Carbon footprint  Use ice box instead of refrigerator to save electricity  Reuse the plastic cups and spoons D) Product’s waste We had collected mostly of the products’ waste after finished by the customers in a big plastic bag. The products’ waste that we had collected included plastic cups, and plastic spoons. After that, we threw the entire product’s waste into the recycle bin in Taylor’s University to be recycled.
  • 11.
    E) Reduce theconsumption of resource Other than that, our group is pretty much environmentally friendly. We take this chance to reduce the consumption of resources like paper, water and electricity as we used recycle paper for the decorations and etc., and we kept the water in our icebox clean so we don’t have to change it many times. Income Statem ent of Group 8 (Jas on) Charity Drive Eve nt Revenue Sales RM3,317.00 Less: Cost of Goods Sold RM2,057.75 Gross Profit RM1,259.25 Add: Donations & Sponsorship RM1,971.00 Adjusted Gross Profit RM3,230.25 Less: Operating Expenses Promotional Expenses RM68.25 Stationary Expenses RM20.00 Typhoid Vaccine Injection RM300.00 Total Operatin g Expenses RM388.25 Net Profit RM2,842.00 Pudding Muffin Chicken Floss Cookies Chocolate Chip Cookies S. Price RM3.50 RM4.00 RM6.00 RM6.00 Units 142 180 295 55 Rev RM497.00 RM720.00 RM1,770.00 RM330.00 Pudding Muffin Chicken Floss Cookies Chocolate Chip Cookies C. Price RM0.25 RM2.90 RM4.75 RM1.80 Units 142 180 295 55 Rev RM35.50 RM522.00 RM1,401.25 RM99.00
  • 12.
  • 13.
    REFLECTION VIDEO :http://youtu.be/jZlBuByiHe4 TEMPORARY RECEIPT FROM WORLD VISION