Filming Schedule
Date:7/2/14
Filming Time:12am Onwards
Crew:Christian Owens, Taylor Boardman, Dan Watt and Josh Robinson.
Equipment:Camera, Tripod, lighting
Location #1
Characters needed:
Interior or Exterior:
Day or Night:
Costume/Props Needed:

Drama Studio Stage
Pianist
INT.
Day
Pianist – Casual clothes, Jeans, T-shirt and
Jacket. Piano

Location #2
Characters needed:
Interior or Exterior:
Day or Night:
Costume/Props Needed:

Forest
Guitarist
EXT.
Day
Jeans and a T-shirt. Guitar.

Location #3
Characters needed:
Interior or Exterior:
Day or Night:
Costume/Props Needed:

Band Stand
Singer
EXT.
Day
Microphone. Jeans, T-shirt and a coat/Jacket.

Filming schedule ig4 final major project

  • 1.
    Filming Schedule Date:7/2/14 Filming Time:12amOnwards Crew:Christian Owens, Taylor Boardman, Dan Watt and Josh Robinson. Equipment:Camera, Tripod, lighting Location #1 Characters needed: Interior or Exterior: Day or Night: Costume/Props Needed: Drama Studio Stage Pianist INT. Day Pianist – Casual clothes, Jeans, T-shirt and Jacket. Piano Location #2 Characters needed: Interior or Exterior: Day or Night: Costume/Props Needed: Forest Guitarist EXT. Day Jeans and a T-shirt. Guitar. Location #3 Characters needed: Interior or Exterior: Day or Night: Costume/Props Needed: Band Stand Singer EXT. Day Microphone. Jeans, T-shirt and a coat/Jacket.