Filming	
  and	
  Editing	
  Schedule	
  

Date	
  
30th	
  October	
  	
  

Schedule	
  
Filming	
  	
  
-­‐ Northolt	
  Hills	
  
-­‐ 2	
  outfits:	
  sari	
  &	
  black	
  dress	
  
-­‐ 1pm	
  -­‐6pm	
  
-­‐ Filming	
  the	
  whole	
  song	
  with	
  both	
  outfits	
  –	
  singing	
  the	
  lyrics	
  
-­‐ High	
  angle	
  shots	
  
-­‐ Close	
  up	
  shots	
  
-­‐ Establishing	
  shots	
  
nd
2 	
  November	
  
Filming	
  	
  
-­‐ Hyde	
  Park	
  
-­‐ 2	
  outfits:	
  flowery	
  dress	
  &	
  black	
  dress	
  
-­‐ 11am	
  –	
  5pm	
  
-­‐ Filming	
  the	
  model	
  moving	
  and	
  walking	
  about	
  –	
  film	
  model	
  
singing	
  the	
  lyrics	
  if	
  needed	
  
-­‐ Extreme	
  close	
  ups	
  
-­‐ Mid-­‐shots	
  
-­‐ Establishing	
  shots	
  
16-­‐17th	
  November	
   Editing	
  
-­‐ Upload	
  footage	
  on	
  hard	
  drive	
  
-­‐ Watch	
  all	
  footage	
  
-­‐ Pick	
  out	
  useful	
  clips	
  
th
18 	
  November	
  
Editing	
  	
  
-­‐ Place	
  all	
  useful	
  clips	
  on	
  timeline	
  in	
  premier	
  pro	
  
nd
22 	
  November	
  	
  
Editing	
  
-­‐ Start	
  sorting	
  out	
  clips	
  in	
  order	
  and	
  in	
  sync	
  with	
  the	
  song	
  
th
25 	
  November	
  	
  
Editing	
  
-­‐ Continue	
  cutting	
  the	
  scenes	
  up	
  so	
  they	
  match	
  the	
  soundtrack	
  
29th	
  November	
  	
  
Editing	
  
-­‐ Continue	
  (if	
  needed)	
  to	
  cut	
  scenes	
  and	
  match	
  the	
  soundtrack	
  	
  
-­‐ Start	
  filling	
  gaps	
  where	
  there	
  is	
  no	
  singing	
  with	
  the	
  
walking/dancing	
  clips	
  
nd
2 	
  December	
  	
  
Editing	
  	
  
-­‐ Continue	
  filling	
  gaps	
  	
  
th
6 	
  December	
  	
  
Editing	
  
-­‐ Continue	
  (if	
  needed)	
  to	
  fill	
  gaps	
  	
  
-­‐ Tidy	
  up	
  other	
  scenes	
  	
  
-­‐ Add	
  effects/transitions	
  
9th	
  December	
  	
  
Editing	
  	
  
-­‐ Finish	
  final	
  bits	
  
-­‐ Export	
  video	
  
-­‐ Upload	
  onto	
  Vimeo	
  
th
13 	
  December	
  	
  
Editing	
  
-­‐ Get	
  feedback	
  via	
  focus	
  groups	
  and	
  surveys	
  
ALLOW	
  TWO	
  WEEKS	
  TO	
  GET	
  CONSTRUCTIVE	
  FEEDBACK	
  
27th	
  December	
  	
  
Editing	
  	
  
-­‐ Improve	
  music	
  video	
  using	
  feedback	
  given	
  
rd
3 	
  January	
  
Editing	
  	
  
-­‐ Continue	
  improving	
  
rd
6 	
  January	
  	
  
Editing	
  
-­‐ Finish	
  improving	
  	
  
Filming	
  and	
  Editing	
  Schedule	
  

10th	
  January	
  	
  
13th	
  January	
  	
  
17th	
  January	
  	
  

	
  

-­‐ Export	
  video	
  
-­‐ Upload	
  on	
  Vimeo	
  
Editing	
  
-­‐ Get	
  further	
  feedback	
  from	
  media	
  students,	
  teachers	
  
Editing	
  
-­‐ Do	
  improvements	
  
Editing	
  
-­‐ Finish	
  music	
  video	
  to	
  its	
  very	
  best	
  	
  
-­‐ Export	
  music	
  video	
  
-­‐ Upload	
  onto	
  Vimeo,	
  Blogger	
  

Filming and Editing Schedule

  • 1.
    Filming  and  Editing  Schedule   Date   30th  October     Schedule   Filming     -­‐ Northolt  Hills   -­‐ 2  outfits:  sari  &  black  dress   -­‐ 1pm  -­‐6pm   -­‐ Filming  the  whole  song  with  both  outfits  –  singing  the  lyrics   -­‐ High  angle  shots   -­‐ Close  up  shots   -­‐ Establishing  shots   nd 2  November   Filming     -­‐ Hyde  Park   -­‐ 2  outfits:  flowery  dress  &  black  dress   -­‐ 11am  –  5pm   -­‐ Filming  the  model  moving  and  walking  about  –  film  model   singing  the  lyrics  if  needed   -­‐ Extreme  close  ups   -­‐ Mid-­‐shots   -­‐ Establishing  shots   16-­‐17th  November   Editing   -­‐ Upload  footage  on  hard  drive   -­‐ Watch  all  footage   -­‐ Pick  out  useful  clips   th 18  November   Editing     -­‐ Place  all  useful  clips  on  timeline  in  premier  pro   nd 22  November     Editing   -­‐ Start  sorting  out  clips  in  order  and  in  sync  with  the  song   th 25  November     Editing   -­‐ Continue  cutting  the  scenes  up  so  they  match  the  soundtrack   29th  November     Editing   -­‐ Continue  (if  needed)  to  cut  scenes  and  match  the  soundtrack     -­‐ Start  filling  gaps  where  there  is  no  singing  with  the   walking/dancing  clips   nd 2  December     Editing     -­‐ Continue  filling  gaps     th 6  December     Editing   -­‐ Continue  (if  needed)  to  fill  gaps     -­‐ Tidy  up  other  scenes     -­‐ Add  effects/transitions   9th  December     Editing     -­‐ Finish  final  bits   -­‐ Export  video   -­‐ Upload  onto  Vimeo   th 13  December     Editing   -­‐ Get  feedback  via  focus  groups  and  surveys   ALLOW  TWO  WEEKS  TO  GET  CONSTRUCTIVE  FEEDBACK   27th  December     Editing     -­‐ Improve  music  video  using  feedback  given   rd 3  January   Editing     -­‐ Continue  improving   rd 6  January     Editing   -­‐ Finish  improving    
  • 2.
    Filming  and  Editing  Schedule   10th  January     13th  January     17th  January       -­‐ Export  video   -­‐ Upload  on  Vimeo   Editing   -­‐ Get  further  feedback  from  media  students,  teachers   Editing   -­‐ Do  improvements   Editing   -­‐ Finish  music  video  to  its  very  best     -­‐ Export  music  video   -­‐ Upload  onto  Vimeo,  Blogger