C.V
Personal Data
Name: Ahmed Mohamed Attia Mohamed.
Date of birth: 13
th
April,1988.
Address: 6 Elmadina Elmenwra, Ein-Shams, Cairo, Egypt.
Qualification: B.A of Applied Arts, Helwan University, Department of Interior Design
and Furniture .
Grade: Very Good with honor (the 2
nd
accumulative grade).
Date of graduation: 2010
Gender: Male.
Religion: Muslim.
Nationality: Egyptian.
Marital status: Married.
Military status: Exempted.
Telephone Number: 010 686 11 464 - 011 2070 3799
E-mail: ahmedattiagad@gmail.com
Current job: Project manager "East Delta Contracting", Egypt.
Driving license: Available.
Pratical Experience
- Working at “Decorama “for furniture, summer training in 2007.
- Working at “EUG “office in Quality Control Department, Third Line Metro Project,
summer training in 2007.
- Working at " High Art " for Decoration and Interior Design , Obour City , Aalia District , ,
summer training in 2008 .
- Working at " Archi Touch " during summer training , summer training in 2008 .
- Working at "Arab Consulting Engineer, MOHRAAM. BAKHOUM" as a consultant in
AUC project , Qatamia . in 2008, summer training in 2008 .
- Working at " Sigma " for Decoration and Interior Design , at UPS "Universal Payment
Services" , Nasr City , summer training in 2009 .
- Working at " Logina " for Decoration and Interior Design , 2010 .
- Working at " Mehrez " for Decoration and Interior Design , as Executive Engineer for the
furniture gallery in Katamia,2010.
- Working at " Ebtecar " for Decoration and Interior Design , as Site Engineer &
Designer for many projects , 2010 to 2012 .
- Working at " AVA CREATIVE SOLUTIONS" for Decoration , Interior Design and
Advertising, as Site Engineer & Designer for many projects , 2012 to 2014 .
- Working at “Hotel Concept” HOSPITALITY INTERIORS DESIGNED& SUPPLY" in Egypt & China
as a project manager.
Training Courses
Mini Master leadership development , IN 2014 :
Project Management Professional … (P.M.P)
Microsoft Office Project.
Training of Trainers ... (T.O.T)
Diploma in Leadership Development.
Diploma in psychological counseling.
Diploma in Human Development.
-" Hotel Concept "HOSPITALITY INTERIORS DESIGNED& SUPPLY":
Microsoft project, in 2014
-The Egyptian Center For Training & Continuous Education "MISR LEARN":
I C D L, in 2010
-Faculty of Engineering, Cairo University:
3D MAX, in 2008
-Faculty of Engineering, Cairo University:
AutoCAD, in 2007
-YAT Education Center:
Photoshop, in 2006
‫ـــــــــــــــــــــــــــ‬
- Summary of my Experience :-
- Manages the project from conception to implementation, in order to ensure that
projects are delivered on time, cost and quality standards.
- Manage all processes based on my experience and my studies in line with the
company's policies.
- Ensure that all processes of the project are performed within budget, time frame &
quality standards.
- Compile periodic reports on all processes, analysis of costs and implementations to
improve costs.
- Liaises and coordinates with contractors in order to ensure that schedules of shop
drawings (civil + MEP) are properly communicated.
- Oversees on-site construction works in order to ensure that operations are carried out in
the most efficient and safest manner, taking corrective action as appropriate in full
coordination with the Site Engineer.
- Acts as support for operatives on non-routine site problems, applying specialist skills
and knowledge to ensure problems are resolved quickly and effectively.
- Liaises and coordinates with other departments in order to exchange information,
resolves problems.
Skills
- Drawing paintings & Art works.
- Carpentry Skills. - Customer service skills.
- Ability to work in a team. - Flexibility and punctuality.
- Confident about communicating, coaching and managing/leading others.
- Ability to priorities and organize personal tasks and the work of others in order to make
the most efficient use of time available.
Languages :
Arabic: Mother tongue
English: Good
Computer
- Good at Image Ready.
- Good at Windows Movie Maker.
Hobbies
- Following up specialized Catalogues and Newspapers.
- Attending Human Resources lectures for Dr/ Ibrahim Alfiky.
- Reading, Photography, Drawing.
- Volunteering in Resale and Life Makers charities.
Miscellaneous
- The Ideal Student at the level of the Faculty of Applied Arts, in 2008.
- The Ideal Student at the level Helwan University, in 2008.
I got the second rank of my class (accumulative grade), in 2010.
Projects
Al-Galaa Hotel
- Salah Salem, Egypt.
- As a project manager, the project budget 23.6 Million EGP, Duration 180 Days, 2014.
- Cairo Festival City Mall, Katamya - new Cairo.
- As a project manager, 2015.
- Diplo 3, North Coast.
- As a project manager, the project budget 250000 EGP, Duration 30 Days, 2015.
- New Cairo, Egypt.
-As a consultant on the furniture companies (MOBICA - MOHM - NADIM) to inspect the quality of
furniture, and its suitability for use, 2008.
Nasr City, Cairo.
- As a site engineer to follow all operational works in the site, 2009.
- Downtown mall - Katamya - new Cairo.
- As a site engineer to follow all operational works in the site, 2010.
- CIB Bank, Helwan Branch.
As a project manager, the project budget 4 Million EGP, Duration 60 Days, 2016.
Fashion accessories
- City stars, Nasr city, 2012.
- Shehab st, Elmohandsen, 2012.
- Mall Of Arabia, 6th October, 2012.
- As a site engineer to follow all operational works in the site and the installation of display units.
- SUN CITY MALL. Sheraton Bldgs., Heliopolis.
- As a production engineer to follow manufacturing display units and signage, 2013.
- 15 Baghdad St., El Korba, Heliopolis, Cairo, Egypt.
- Cairo Festival City Mall, Katamya - new Cairo.
- As a production engineer to follow manufacturing display units, all works of claddings and
signage, 2013 - 2014.
-Private Villa, Dunes, October.
-As a project manager, the project budget 1.5 Million EGP, Duration 90 Days, 2016.
- Mall of Arabia, 6th October.
As a production engineer to follow all works of claddings, sky light and signage, 2013.
-Zayed, 6th October.
- As a production engineer in new extension, 2013.
- Smart village, 6th October.
- As a site engineer to follow all operational works in the site, 2013.
- Dandy mall, 6th October.
- As a production engineer to follow all works of claddings and the installation of display units, 2013.
- 7, Dr.Mohamed Sobhy st, Giza.
- As a project manager under the supervision of Eng. / Ramy Darrag, 2014.
-media production city, 6th October.
- As a designer under the supervision of Eng. / Ramy Darrag, 2014.
-Abbas El-Akkad st, Nasr City.
- As a project manager, 2015.
Paper Products Company
- City stars, Nasr city.
- As a site engineer to follow all operational works in the site, 2012.
‫للسفر‬ ‫الطيار‬ ‫مجموعة‬
- El Obour Bldgs., Salah Salem St., Nasr City, Cairo.
-As a designer, 2012.
- Cairo Festival City Mall, Katamya - new Cairo.
- As a production engineer to follow manufacturing display units, all works of claddings and signage,
2014.
.
Cairo Festival City Mall, Katamya - new Cairo.
- As a production engineer to follow manufacturing display units, 2014.
- Mercato Hyper Market.
- B.TECH, Ismailia.
- As a designer, 2012.
- El Tahir St, Dokki, Giza.
- As a project manager, 2014.
- Gallaria40, 6 October, Egypt.
-- As a project manager, 2014.
Hyper Plus
- Shoubra Elkhema, Cairo.
-As a project manager, 2011.
Dr: WAEL pharmacy
- Almokatam, Cairo.
-As a designer, 2011.
Dr: EHAB pharmacy
- Alwarraq, Cairo.
-As a designer, 2014.
AND OTHERS ... NAY, SAMA, AWLAD EL-MASRY, PISTAGE, VERDY, AL-MALEKA...
- All certificates are furbished upon request.

C.v (project manager)

  • 1.
    C.V Personal Data Name: AhmedMohamed Attia Mohamed. Date of birth: 13 th April,1988. Address: 6 Elmadina Elmenwra, Ein-Shams, Cairo, Egypt. Qualification: B.A of Applied Arts, Helwan University, Department of Interior Design and Furniture . Grade: Very Good with honor (the 2 nd accumulative grade). Date of graduation: 2010 Gender: Male. Religion: Muslim. Nationality: Egyptian. Marital status: Married. Military status: Exempted. Telephone Number: 010 686 11 464 - 011 2070 3799 E-mail: ahmedattiagad@gmail.com Current job: Project manager "East Delta Contracting", Egypt. Driving license: Available. Pratical Experience - Working at “Decorama “for furniture, summer training in 2007. - Working at “EUG “office in Quality Control Department, Third Line Metro Project, summer training in 2007.
  • 2.
    - Working at" High Art " for Decoration and Interior Design , Obour City , Aalia District , , summer training in 2008 . - Working at " Archi Touch " during summer training , summer training in 2008 . - Working at "Arab Consulting Engineer, MOHRAAM. BAKHOUM" as a consultant in AUC project , Qatamia . in 2008, summer training in 2008 . - Working at " Sigma " for Decoration and Interior Design , at UPS "Universal Payment Services" , Nasr City , summer training in 2009 . - Working at " Logina " for Decoration and Interior Design , 2010 . - Working at " Mehrez " for Decoration and Interior Design , as Executive Engineer for the furniture gallery in Katamia,2010. - Working at " Ebtecar " for Decoration and Interior Design , as Site Engineer & Designer for many projects , 2010 to 2012 . - Working at " AVA CREATIVE SOLUTIONS" for Decoration , Interior Design and Advertising, as Site Engineer & Designer for many projects , 2012 to 2014 . - Working at “Hotel Concept” HOSPITALITY INTERIORS DESIGNED& SUPPLY" in Egypt & China as a project manager. Training Courses Mini Master leadership development , IN 2014 : Project Management Professional … (P.M.P) Microsoft Office Project. Training of Trainers ... (T.O.T) Diploma in Leadership Development. Diploma in psychological counseling. Diploma in Human Development.
  • 3.
    -" Hotel Concept"HOSPITALITY INTERIORS DESIGNED& SUPPLY": Microsoft project, in 2014 -The Egyptian Center For Training & Continuous Education "MISR LEARN": I C D L, in 2010 -Faculty of Engineering, Cairo University: 3D MAX, in 2008 -Faculty of Engineering, Cairo University: AutoCAD, in 2007 -YAT Education Center: Photoshop, in 2006 ‫ـــــــــــــــــــــــــــ‬ - Summary of my Experience :- - Manages the project from conception to implementation, in order to ensure that projects are delivered on time, cost and quality standards. - Manage all processes based on my experience and my studies in line with the company's policies. - Ensure that all processes of the project are performed within budget, time frame & quality standards. - Compile periodic reports on all processes, analysis of costs and implementations to improve costs. - Liaises and coordinates with contractors in order to ensure that schedules of shop drawings (civil + MEP) are properly communicated. - Oversees on-site construction works in order to ensure that operations are carried out in the most efficient and safest manner, taking corrective action as appropriate in full coordination with the Site Engineer. - Acts as support for operatives on non-routine site problems, applying specialist skills and knowledge to ensure problems are resolved quickly and effectively. - Liaises and coordinates with other departments in order to exchange information, resolves problems.
  • 4.
    Skills - Drawing paintings& Art works. - Carpentry Skills. - Customer service skills. - Ability to work in a team. - Flexibility and punctuality. - Confident about communicating, coaching and managing/leading others. - Ability to priorities and organize personal tasks and the work of others in order to make the most efficient use of time available. Languages : Arabic: Mother tongue English: Good Computer - Good at Image Ready. - Good at Windows Movie Maker. Hobbies - Following up specialized Catalogues and Newspapers. - Attending Human Resources lectures for Dr/ Ibrahim Alfiky. - Reading, Photography, Drawing. - Volunteering in Resale and Life Makers charities. Miscellaneous - The Ideal Student at the level of the Faculty of Applied Arts, in 2008. - The Ideal Student at the level Helwan University, in 2008. I got the second rank of my class (accumulative grade), in 2010.
  • 5.
    Projects Al-Galaa Hotel - SalahSalem, Egypt. - As a project manager, the project budget 23.6 Million EGP, Duration 180 Days, 2014. - Cairo Festival City Mall, Katamya - new Cairo. - As a project manager, 2015. - Diplo 3, North Coast. - As a project manager, the project budget 250000 EGP, Duration 30 Days, 2015. - New Cairo, Egypt. -As a consultant on the furniture companies (MOBICA - MOHM - NADIM) to inspect the quality of furniture, and its suitability for use, 2008. Nasr City, Cairo. - As a site engineer to follow all operational works in the site, 2009. - Downtown mall - Katamya - new Cairo. - As a site engineer to follow all operational works in the site, 2010.
  • 6.
    - CIB Bank,Helwan Branch. As a project manager, the project budget 4 Million EGP, Duration 60 Days, 2016. Fashion accessories - City stars, Nasr city, 2012. - Shehab st, Elmohandsen, 2012. - Mall Of Arabia, 6th October, 2012. - As a site engineer to follow all operational works in the site and the installation of display units. - SUN CITY MALL. Sheraton Bldgs., Heliopolis. - As a production engineer to follow manufacturing display units and signage, 2013. - 15 Baghdad St., El Korba, Heliopolis, Cairo, Egypt. - Cairo Festival City Mall, Katamya - new Cairo. - As a production engineer to follow manufacturing display units, all works of claddings and signage, 2013 - 2014. -Private Villa, Dunes, October. -As a project manager, the project budget 1.5 Million EGP, Duration 90 Days, 2016.
  • 7.
    - Mall ofArabia, 6th October. As a production engineer to follow all works of claddings, sky light and signage, 2013. -Zayed, 6th October. - As a production engineer in new extension, 2013. - Smart village, 6th October. - As a site engineer to follow all operational works in the site, 2013. - Dandy mall, 6th October. - As a production engineer to follow all works of claddings and the installation of display units, 2013. - 7, Dr.Mohamed Sobhy st, Giza. - As a project manager under the supervision of Eng. / Ramy Darrag, 2014.
  • 8.
    -media production city,6th October. - As a designer under the supervision of Eng. / Ramy Darrag, 2014. -Abbas El-Akkad st, Nasr City. - As a project manager, 2015. Paper Products Company - City stars, Nasr city. - As a site engineer to follow all operational works in the site, 2012. ‫للسفر‬ ‫الطيار‬ ‫مجموعة‬ - El Obour Bldgs., Salah Salem St., Nasr City, Cairo. -As a designer, 2012. - Cairo Festival City Mall, Katamya - new Cairo. - As a production engineer to follow manufacturing display units, all works of claddings and signage, 2014.
  • 9.
    . Cairo Festival CityMall, Katamya - new Cairo. - As a production engineer to follow manufacturing display units, 2014. - Mercato Hyper Market. - B.TECH, Ismailia. - As a designer, 2012. - El Tahir St, Dokki, Giza. - As a project manager, 2014. - Gallaria40, 6 October, Egypt. -- As a project manager, 2014. Hyper Plus - Shoubra Elkhema, Cairo. -As a project manager, 2011.
  • 10.
    Dr: WAEL pharmacy -Almokatam, Cairo. -As a designer, 2011. Dr: EHAB pharmacy - Alwarraq, Cairo. -As a designer, 2014. AND OTHERS ... NAY, SAMA, AWLAD EL-MASRY, PISTAGE, VERDY, AL-MALEKA... - All certificates are furbished upon request.