The document summarizes the National Building Code of Nigeria, which was established in 2007 to set minimum safety and health standards for building design, construction, use, and maintenance. It discusses the code's aims and organization into different sections addressing technical requirements, enforcement, and referenced standards. The code classifies buildings by use, construction type, and other factors in order to determine minimum design and safety provisions. It also establishes responsibilities for professionals and oversight committees. However, the document notes that full enforcement of the code remains a challenge, as many states and local governments have yet to fully adopt and enforce its provisions.