Methodology, Evaluation, & Feasibility Study
       of Total Phosphorus Removal Management
        Measures in Lake George & Nearby Lakes
Daniel L. Reisinger, Mary Brabham, Michael F. Schmidt, Patrick R. Victor, and Larry Schwartz



T
      he St. Johns River is the largest river in   process, the St. Johns River Water
      Florida, extending from southeast of         Management District (SJRWMD, district)
                                                                                                   Daniel L. Reisinger, E.I., is a water resources
      Orlando to Jacksonville and the              has implemented the St. Johns River Algal
                                                                                                   intern in the Denver, Colorado, office of the
Atlantic Ocean. The lower St. Johns River          Initiative, which will limit the growth and
                                                                                                   consulting, engineering, construction, and
Basin has exhibited issues associated with         nitrogen fixation from cyanobacteria (blue-
                                                                                                   operations firm CDM. Mary Brabham, P.E., is
eutrophication, which has led to the estab-        green algae) in the river.
                                                                                                   the Middle St. Johns River Basin Program man-
lishment of a Total Maximum Daily Load                  Algal initiative planning has determined
                                                                                                   ager for the St. Johns River Water
(TMDL) for Total Nitrogen (TN) and Total           that the TP load needs to be reduced by at
                                                                                                   Management District in Altamonte Springs.
Phosphorus (TP). Independent of the TMDL           least 84 metric tons per year (MT/Yr) (93
                                                                                                   Michael Schmidt, P.E., BCEE, is a vice presi-
                                                                                                   dent with CDM in the firm’s Jacksonville office.
                                                                                                   Larry Schwartz, Ph.D., P.W.S., is a CDM vice
                                                                                                   president in the firm’s Orlando office. Patrick
                                                                                                   R. Victor, P.E., is a CDM principal in the
                                                                                                   Jacksonville office. This article was presented
                                                                                                   as a technical paper at the 2008 Florida
                                                                                                   Water Resources Conference in May.




                                                                                                   tons per year) from current levels in the St.
                                                                                                   Johns River Basin (SJRWMD 2006) through
                                                                                                   multiple projects, including TP removal in
                                                                                                   Lake George, which is the largest lake in the
                                                                                                   river. To evaluate the feasibility of TP removal
                                                                                                   in Lake George, the district conducted a com-
                                                                                                   prehensive review of potentially viable and
                                                                                                   cost-effective Best Management Practices
                                                                                                   (BMPs), also referred to as management
                                                                                                   measures, for reducing TP concentrations in
                                                                                                   the lake.
                                                                                                        The comprehensive review was the first
                                                                                                   step in designing a potentially very large
                                                                                                   regional surface water quality facility treating
                                                                                                   50 to 75 million gallons per day (MGD), or
                                                                                                   78 to 116 cubic feet per second (cfs). This
                                                                                                   article focuses on the results of this review
                                                                                                   and the components that were key to its suc-
                                                                                                   cessful completion. Each section presents a
                                                                                                   key component in the review of TP removal
                                                                                                   in Lake George and nearby lakes.

                                                                                                                Project Area
                                                                                                             & TP Removal Goals
                                                                                                   Project Area
                                                                                                        Lake George is Florida’s second-largest
                                                                                                   lake, with an area of approximately 73 square
                                                                                                   miles. It is part of the main stem of the St.
                                                                                                   Johns River north of Astor, as shown in


42     • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
Table 1 – Water Quantity and Quality in the St. Johns River at Astor, Florida                     challenges for the removal of TP. Because of
                                                                                                     the large flow and lower concentration, rela-
                                                                                                     tively high treatment volumes will probably
                                                                                                     be required to remove adequate TP mass. The
                                                                                                     relatively low nutrient and solids concentra-
                                                                                                     tions are expected to be near or below the
                                                                                                     practical limit of many standard technologies
                                                                                                     (e.g. wet detention, wetlands treatment), and
                                                                                                     infiltration systems on the permeable soils on
                                                                                                     the west side of the lake may cause nitrate
                                                                                                     impacts in the springs..

                                                                                                     TP Removal Goal
Figure 1. Two large lakes, Lake Dexter and         the time of this study, 2007.                           Lake George has potential for very large
Lake Woodruff, are located on a secondary                Regular negative flows were recorded at     TP removal facilities. The removal goal of 84
channel of the river upstream of Lake George       the Astor gage. Since treatment will occur        MT/Yr was set for the overall St. Johns River
and were included in the evaluation of some        regardless of direction, negative flows were      Algal Initiative, but the removal goal of indi-
management measures.                               included in the possible treatment flow.          vidual projects will be decided based on a
     The area surrounding Lake George, Lake        Summary statistics for the gage as absolute       comparison of the potential projects in the
Dexter, and Lake Woodruff is largely in pub-       flows are shown in Table 1.                       initiative. The establishment of a nonbinding
lic ownership or divided into relatively small           The nutrient and solids concentrations      TP removal goal was considered important to
individual parcels. The district currently co-     are also measured at State Road 40 in Astor       be able to compare management measures
owns significant conservation lands on the         (SJRWMD Stations SJR40 and 20020012).             using specific itemized costs.
east shore of Lake George, referred to as the      The concentrations were found to be relative-           The effect of phosphorus removal on
Lake George Conservation Area and the Nine         ly low: less than 0.08 milligrams per liter       Lake George concentration was estimated by
Mile Point area, which are shown as shaded         (mg/L) of TP, less than 1.4 mg/L of TN, and       performing a mass balance at Astor.
areas in Figure 1. The land uses of the area are   less than 22 mg/L of Total Suspended Solids.      Removing the total St. Johns River Algal
predominately classified as wetlands, silvicul-    Average seasonal and annual TP and TN con-        Initiative goal of 84 MT/Yr, resulting in an
ture (forested uplands), and agriculture (SJR-     centrations at Astor are reported in Table 1.     average annual concentration of 0.053 mg/L
WMD 2000).                                         These low concentration levels and the vari-      in Lake George, would require at least 900
     Lake George is surrounded by sandy            ability by season have implications for the       MGD (1,395 cfs) to be treated, as shown in
hills between 20 and 80 feet NGVD                  types of management measures that can be          Figure 2. A lesser removal goal of 21 MT/Yr,
(National Geodetic Vertical Datum of 1929).        used cost-effectively and for potential effi-     resulting in an average annual concentration
Stages in Lake George normally range               ciencies of treatment.                            of 0.072 mg/L in Lake George, would require
between 0 and 0.5 feet NGVD, but will                    The variability of the water quantity and   treatment flow of at least 220 MGD (341 cfs).
increase to two feet NGVD in large flow            quality of Lake George provides significant                                 Continued on page 44
events. The lake bottom is relatively uniform
with a mean depth of eight feet and a maxi-
mum depth of 12 feet. The soils in the area
are generally hydrologic group B/D or D
(poor permeability), except on the western
shore where they are almost entirely A soils        Figure 2 – Lake George Total Phosphorus Concentration as a Function of TP Removal
(high permeable) (Lewis et al. 1987).
     Eleven springs are located in the Lake
George tributary area, with three large
springs, Silver Glen, Juniper, and Salt Springs,
discharging into Lake George on the western
shore (Stewart et al. 2006). Lake George is not
affected by marine salinity, but it is tidally
affected and local sources of salinity have
allowed the lake to support a large number of
marine species. Also shown in Figure 1, the
surrounding area has a large population of
Bald Eagles—a threatened species in Florida
that is currently proposed for delisting.

Summar y of Water Quantity & Quality
     Stewart et al. (2006) performed exten-
sive hydraulic modeling of the Lake George
area that provides excellent information for a
period of 1996 through 2004. Measured flow
data was available at the USGS flow gage
located at the State Road 40 Bridge at Astor
(USGS Gage 02236125) from 1994 through

                                                     FLORIDA WATER RESOURCES JOURNAL • SEPTEMBER 2008 •                                       43
Figure 3 – Mechanical Harvester Removing Aquatic
Plants (Texas Aquatic Harvesting Inc. 2007)

   Figure 4 – Bathymetry of Lake Dexter where Depths
           Less than Three Feet Can Not Be Harvested



Continued from page 43                             considered applicable to the configuration         1. Aquatic plant harvesting
     A goal of 5 MT/Yr was chosen by the dis-      and constraints of the project area were           2. Chemical addition
trict for the study, resulting in an average       evaluated:                                         3. Periphyton flowway treatment
annual concentration of 0.076 mg/L in Lake         1. Aquatic plant harvesting (e.g. hydrilla or
George, which would require between 50 and             water hyacinth)                                          Feasibility Study
75 MGD (78 cfs to 116 cfs) of treatment flow.      2. Chemical addition (e.g. ballasted floccula-           of Management Measures
This removal rate was chosen because it                tion)
would likely require several treatment units       3. Constructed wetland treatment                   Detailed Planning of Potentia l
to be built, and if a higher goal was later cho-   4. Constructed water hyacinth treatment            Management Measure Proces ses
sen, the results could be scaled upward as         5. Diversion of water for reuse                          Detailed information on the configura-
necessary.                                         6. Dredging                                        tion, sizing, nutrient removal, and byproduct
                                                   7. Fish harvesting                                 disposal were determined in the feasibility
        Evaluation of Potential                    8. Periphyton flowway treatment (e.g.              study. All analyses were performed at a plan-
                                                       HydroMentia Algal Turf Scrubber or             ning level of detail. The following paragraphs
        Management Measures                            Aquafiber)                                     summarize each management measure and
                                                   9. Retention/infiltration                          key components.
Management Mea sure Review
                                                         Each of the nine management measures               Aquatic Plant Harvesting—Aquatic
     A lake management approach was taken
                                                   was reviewed for its benefits, challenges, rela-   plant harvesting was considered, using
to determine possible management measures
                                                   tive costs, relative time to implement, and ref-   mechanical harvesters to remove TP and con-
for phosphorus removal in Lake George.
                                                   erences to publications used in order to veri-     trol the population of invasive aquatic plants.
Using this approach, short-term and long-
                                                   fy the applicability of the management meas-       Harvesters use a conveyor belt system to
term measures with offline and in-lake treat-
                                                   ure. Approaches that can be integrated for a       remove aquatic plants from the water, as
ment were considered.
                                                   synergistic benefit were also identified.          shown in Figure 3. The feasibility study of
     Possible management measures were
determined from lake management,                                                                      this management measure focused on water
                                                   Mana gement Measure Select ion
stormwater control, and water quality                                                                 hyacinth, which is the main aquatic plant
                                                         District and CDM representatives met to
improvement literature, relevant experts,                                                             controlled in the Lake George area.
                                                   discuss each evaluated management measure
and other implemented projects (both suc-                                                                   Harvesting was proposed to be the
                                                   and to select three measures for further
cessful and unsuccessful). The U.S.                                                                   main method of control, with herbicidal
                                                   detailed evaluation. A feasibility study was to
Environmental Protection Agency (EPA)                                                                 spraying, which is the current population
                                                   be conducted for each selected management
provides comprehensive review of lake and                                                             control method, as a secondary measure to
                                                   measure, which included the conceptual
reservoir restoration and management tech-                                                            assure very low water hyacinth populations
                                                   design, TP and TN removal capability, bene-
niques (EPA 1990), which was used as a                                                                are maintained. Windrow composting in a
                                                   fits, operation, and maintenance require-
starting point.                                                                                       contained site was found to be the most
                                                   ments.
     Because of the uncommon attributes of                                                            feasible method to dispose of harvested
                                                         The feasibility of each management
Lake George (e.g. large lake, variable flow                                                           water hyacinth. The resulting compost
                                                   measure was discussed until a consensus was
rates, low inflow concentrations, in-stream,                                                          could be given away or sold, depending on
                                                   reached on whether or not the measure was
unregulated, and relatively shallow), many                                                            demand.
                                                   appropriate for further study. The major
management measures were not considered,                                                                    This management measure is a depar-
                                                   decision criteria included its technical feasi-
as discussed with the district, since they                                                            ture from existing aquatic plant control in
                                                   bility, cost, and the ability to permit the sys-
appeared not applicable or infeasible. The                                                            the lakes; therefore, study efforts focused
                                                   tem. The three most promising management
following nine lake management measures                                                               on determining a feasible methods for har-
                                                   measures were determined to be:
                                                                                                                               Continued on page 46

44     • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
ACTIFLO testing and chemical analysis. At
                                                                                                     the time of the testing, the St. Johns River
                                                                                                     watershed was in drought condition and the
                                                                                                     river exhibited low flow. The results from the
                                                                                                     water sample indicated TP concentrations of
                                                                                                     0.064 mg/L, slightly below the seasonal aver-
                                                                                                     age, and undetectable quantities of ortho-
                                                                                                     phosphate.
                                                                                                           The bench scale testing conducted by
                                                                                                     Kruger Inc. evaluated TP removals associat-
                                                                                                     ed with various dosages of cationic and
                                                                                                     anionic polymers, ferric sulfate, and ferric
                                                                                                     chloride coagulants. The results, presented
                                                                                                     in Table 2, show that ACTIFLO ballasted
Figure 5 – ACTIFLO 35 MGD Modular Ballasted Flocculation System (Kruger 2007)                        flocculation was able to remove at least 85
                                                                                                     percent of particulate TP, defined as the dif-
                                                                                                     ference between TP and dissolved TP, to
                                                                                                     limit of detection for the measurement
Continued from page 44                            treatment process in controlled facilities.        method. There were undetectable quantities
vesting.                                          Because of the possibility of treating a large     of ortho-phosphate in the water, so one-
      Large harvesters are limited to operating   volume of flow, patented or proprietary sys-       third removal of ortho-phosphate was used
in water depths greater than three feet.          tems, which generally reduce the footprint of      for this study.
Bathymetric data for Lake George, Lake            the chemical addition system, were primarily             Periphyton Flowway Treatment—
Dexter, and Lake Woodruff indicate that large     considered.                                        Periphyton flowways are constructed, biolog-
areas of Lake Dexter and a significant portion         The ACTIFLO system that uses                  ically based treatment systems that pass a
of the near shore area of Lake George and         microsand ballast and settling plates to           shallow flow of water over a sloped mat of
Lake Woodruff are less than three feet in         increase overflow rates (the effective treat-      periphyton. Nutrients are removed from the
depth, as shown for Lake Dexter in Figure 4.      ment system flow) is shown in Figure 5.            water biologically by the periphyton, which
Based on the average standing crop of water       Implementation of the ACTIFLO process was          are harvested to remove the nutrients from
hyacinth, which was estimated from the            evaluated in this study; however, other pro-       the system and encourage further growth of
acreage receiving herbicidal treatment            prietary treatment systems may be equally          the periphyton.
(USACE 2007), no lake would have water            effective.                                               These systems are differentiated from
hyacinths at a harvestable depth in an average         The actual removal from chemical addi-        periphyton wetland systems by their flow
year.                                             tion systems can be estimated only by bench        characteristics. Flowways use shallow sheet-
      Several methods to remove water             and pilot scale tests; therefore, the collection   flow and higher velocity, although velocities
hyacinth from areas with less than two feet of    and testing of a sample to provide an indica-      would be considered low in most treatment
water depth were evaluated. The most prom-        tion of possible removal was the key compo-        applications. Periphyton flowways can be
ising method proposed is to chop the              nent of the chemical addition feasibility          conceptualized as hydroponics-style horti-
hyacinth using chopping boats to move the         analysis.                                          culture of algae.
chopped material in windrows to deeper                 A water sample was taken from the inlet             Two proprietary periphyton flowway
water for harvesting. Chopping boats are typ-     of the St. Johns River to Lake George in April     systems were evaluated: Aquafiber and
ically shallow-draft vessels with large pro-      2007 and sent to Kruger Inc. for bench scale                               Continued on page 48
pellers affixed to the bow to chop the plant
material. The working area will be contained
by turbidity-capturing geotextiles to reduce
effects of the chopping. The benefits of this                     Table 2 – Bench Scale ACTIFLO Results for Lake George
method were provided by Weedbusters Inc.
and include the following:
   Widely used with proven feasibility.
   Increases the efficiency of the harvesting
   process.
   May allow over five times more water
   hyacinth to be collected per harvester.
   Does not eliminate most submerged
   aquatic vegetation or suspend sediment.
      The use of chopping boats and har-
vesters was considered feasible and was used
to determine TP removal, TN removal, and
costs.
      Chemical Addition—Chemical addition
of coagulants to a flow stream and subse-
quent settling of formed floc can improve
water quality significantly. These processes
are used widely in the water and wastewater

46     • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
Continued from page 46                                      Table 3 – Summary of Management Measure Sizing and Costs
HydroMentia. HydroMentia’s Algal Turf
Scrubber® (ATS) pulses a shallow flow of
water over a bed of periphyton to remove
nutrients, which is shown in Figure 5.
Included in the process are patented phos-
phorus precipitation methods and biomass
management techniques.
      Aquafiber has developed patented and
trade secret technologies, including a peri-
phyton flowway system also using shallow
sheet flow. The Aquafiber periphyton
flowway system may include patented ozone
treatment to release nutrients bound in
organic matter, eliminate toxic compounds
found in cyanobacteria, and destroy micro-
invertebrates and their eggs.
      HydroMentia and Aquafiber were            ent removal.                                     The cost of land was not included, since the
engaged to provide information for this              The HydroMentia ATS information was         majority of land was in public ownership. All
study. A detailed review of the ATS technolo-   considered to be acceptable and was used to      costs were based on a 20-year design life and
gy at Lake George was provided for the feasi-   represent the periphyton flowway manage-         include 20 years of operation and mainte-
bility study by HydroMentia (Stewart E.A.       ment measure in the feasibility study.           nance.
2007). The report included the facility size,
anticipated removal rates, and an estimated                 Feasibility Study                    Discussion of Results
cost per pound of phosphorus removed.                       Results & Costs                           Each management measure was evaluat-
      Aquafiber provided a short memoran-                                                        ed in terms of feasibility and cost to make a
dum documenting the likely TP removal           Results & Cost per Pound of TP Removed           recommendation for further study and ulti-
from a hybrid system of the periphyton               The conceptual specifications and asso-     mately, design and implementation.
flowway system and the company’s patent-        ciated cost per pound of TP removed for each          Aquatic Plant Harvesting was estimated
pending, trade secret technology (Fagan         management measure is presented in Table 3.      to cost $240 per pound of TP removed. This
2007). Aquafiber did not provide a cost esti-   The sizing and TP removal for the feasibility    process has a relatively higher level of uncer-
mate for this feasibility study.                management measures were based on                tainty compared to the other alternatives
      The technical review of the document      detailed planning using the best available       because of a lack of data on the water
provided by HydroMentia found the facility      information. Each of the management meas-        hyacinth population and disposal site condi-
sizing, TP removal methodology, and costs       ures were evaluated based on approximately 5     tions; therefore, a study of the Lake Dexter
to be reasonable. HydroMentia used the best     MT/Yr per year of TP removed from Lake           and Woodruff water hyacinth populations
available data, results from the S-154 ATS      George and the St. Johns River; however, the     was suggested. Harvesting water hyacinth in
facility, to determine the periphyton growth    exact removal varied by process.                 Lake George was not suggested, based on the
rate and subsequent TP removal rate; how-            Costs in Table 3 are based itemized costs   long travel times and low density of water
ever, it was believed that this value may be    for each management measure, including           hyacinths in the lake.
different in Lake George because of much        conceptual probable capital and operational           Chemical Addition using ACTIFLO
lower TP levels and environmental condi-        cost estimates of site preparation, pumps,       could provide high levels of TP removal on a
tions, such as low bio-availability of nutri-   and piping. Contingencies, engineering, sur-     small footprint at an estimated cost of $350
ents, lower water temperatures, and solar       vey, permitting, mobilization, and discount      per pound of TP removed. It was recommend-
radiation. Pilot testing was suggested to       rates were also included. These costs supple-    ed that the ACTIFLO technology be consid-
determine a more accurate estimate of nutri-    mented the cost of the removal technology.       ered at sites other than Lake George, which
                                                                                                 would benefit from the ACTIFLO’s small foot-
                                                                                                 print. It was recommended that pilot testing of
                                                                                                 both the ACTIFLO system and potential
     Figure 6 –
                                                                                                 dewatering equipment be performed to better
  HydroMentia                                                                                    determine phosphorus removal and operation
     ATS S-154                                                                                   and maintenance costs at a site near existing
Basin Facility in                                                                                commercial or industrial land uses.
   Okeechobee                                                                                         Periphyton Flowway Treatment using
                                                                                                 HydroMentia’s ATS provides relatively high
     County, FL
                                                                                                 levels of phosphorus removal, and generates
 (Stewart, E.A.                                                                                  a marketable byproduct (compost) at an esti-
         2007)                                                                                   mated cost of $240 per pound of TP
                                                                                                 removed. It was recommended that the
                                                                                                 Aquafiber technologies also be considered for
                                                                                                 pilot testing

                                                                                                                         Continued on page 50


48     • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
Continued from page 48                                     FT Contour (Line). Palatka, FL. St. John’s        Herbicidal Spraying of Lake George, Lake
         Recommendations for                               River Water Management District.                  Dexter, and Lake Woodruff, FL. Electronic
       Further Planning & Design                           http://www.sjrwmd.com/programs/plan_              Communication March 2007.
                                                           monitor/gis/docs/metadata/elev_5ft.htm          • Camp Dresser & McKee (CDM). 1999.
      Three management measures listed in              •   Lewis et al. 1987. Soil Survey of                 “Renaissance Jar Testing.” Submitted to Mr.
Table 3 are recommended for further study                  Okeechobee County, FL. Electronic Report.         Jeff Hiscock of Mock Roos & Associates.
through pilot testing:                                     http://soildatamart.nrcs.usda.gov/Manuscr       • Stewart,    E.A.     2007.    “Preliminary
1. The harvest of water hyacinths should be                ipts/FL093/0/fl_okeechobee.pdf. Accessed          Engineering Assessment for the Application
   pilot tested in Lake Dexter.                            February 2007.                                    of an Algal Turf Scrubber (ATS) for
2. Periphyton flowway treatment should be              •   Stewart, Joseph B., Sucsey, Peter, and            Reduction of Nitrogen and Phosphorus
   pilot tested in the vicinity of Lake George.            Hendrickson, John. “Meteorological factors        Loads into Lake George, Florida.” Prepared
3. ACTIFLO should be pilot tested in a pre-                affecting estuarine conditions within Lake        by HydroMentia for SJRWMD: Ocala, FL.
   dominantly industrial or commercial area.               George in the St. Johns River, Florida”.        • Fagan, William B. 2007. Aquafiber
      Because of the water quality fluctuations in         Proceedings of the Seventh International          Application to Lake George. Letter to Mr.
Lake George, pilot studies should be performed             Conference on Hydroscience and                    Daniel Reisinger of CDM. June 15, 2007.
for a period of at least one year to evaluate a full       Engineering. Philadelphia, PA. September
range of water quality and flow conditions. The            2006. http://hdl.handle.net/1860/732
three management measures are modular and              •   Hendrickson, J.C. and J. Konwinski. 1998.
complementary; therefore, they can be used                 Seasonal Nutrient Import-Export Budgets
together if desired for additional removal.                for the Lower St. Johns River, Florida. Final
                                                           Report for Contract WM598, Florida
                  References                               Department of Environmental Protection.
                                                           109 pp.
• St. Johns River Water Management District            •   United States Environmental Protection
  (SJRWMD). 2006b. Lake George P                           Agency (EPA). 1990. “Lake and Reservoir
  Removal Project MSJRB St. Johns River                    Restoration Guidance Manual, Second
  Nutrient Discharge Reduction WBS                         Edition.” Publication # 440490006,
  2.3.30.00.08 (part of the SJR Algal                      Electronic, NTIS # PB93-207926.
  Initiative) Charter Document – 11/9/2006.            •   United States Army Corps of Engineer
• St. Johns River Water Management District                (USACE). 2007. Unclassified Acreage,
  (SJRWMD). 2000. Elevation: SJRWMD 5                      Herbicide Usage, and Man Hours for




50      • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL

More Related Content

Viewers also liked (7)

Murders in the rue morgue
Murders in the rue morgueMurders in the rue morgue
Murders in the rue morgue
 
Jomblo Pria Terbaik 2009
Jomblo Pria Terbaik 2009Jomblo Pria Terbaik 2009
Jomblo Pria Terbaik 2009
 
G-NETIC
G-NETICG-NETIC
G-NETIC
 
Hoepelman Kappers
Hoepelman KappersHoepelman Kappers
Hoepelman Kappers
 
Ats Algal Turf Scrubber
Ats Algal Turf ScrubberAts Algal Turf Scrubber
Ats Algal Turf Scrubber
 
Brandiranje i društveni mediji u Hrvatskoj
Brandiranje i društveni mediji u HrvatskojBrandiranje i društveni mediji u Hrvatskoj
Brandiranje i društveni mediji u Hrvatskoj
 
Proyecto A Gran Escala Hydromentia Presentation
Proyecto A Gran Escala Hydromentia PresentationProyecto A Gran Escala Hydromentia Presentation
Proyecto A Gran Escala Hydromentia Presentation
 

Similar to Evaluacion Filtrado Fosforo Lake George & Nearby Lakes

LID LEED and Policy -- April 2010
LID LEED and Policy --  April 2010LID LEED and Policy --  April 2010
LID LEED and Policy -- April 2010
Jon Barsanti
 
Shifting Regulatory Trends
Shifting Regulatory TrendsShifting Regulatory Trends
Shifting Regulatory Trends
Adam Frey
 
NOAA's GLRI Projects in TOXICS
NOAA's GLRI Projects in TOXICSNOAA's GLRI Projects in TOXICS
NOAA's GLRI Projects in TOXICS
Lynne Chaimowitz
 
15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals
Marcus Quigley
 
Progress of river health and e flow in china
Progress of river health and e flow in chinaProgress of river health and e flow in china
Progress of river health and e flow in china
International WaterCentre
 
2016_amalone_resume
2016_amalone_resume2016_amalone_resume
2016_amalone_resume
Andy Malone
 
FSAWWA Paper and Presentation Integrated master planning WPB 12012015
FSAWWA Paper and Presentation Integrated master planning WPB 12012015FSAWWA Paper and Presentation Integrated master planning WPB 12012015
FSAWWA Paper and Presentation Integrated master planning WPB 12012015
GJ Schers
 

Similar to Evaluacion Filtrado Fosforo Lake George & Nearby Lakes (20)

Cawasa newsletter 2nd quarter 2012
Cawasa newsletter   2nd quarter 2012Cawasa newsletter   2nd quarter 2012
Cawasa newsletter 2nd quarter 2012
 
WEF Stormwater Trends Webinar
WEF Stormwater Trends WebinarWEF Stormwater Trends Webinar
WEF Stormwater Trends Webinar
 
LID LEED and Policy l 2010
LID LEED and Policy l 2010LID LEED and Policy l 2010
LID LEED and Policy l 2010
 
LID LEED and Policy -- April 2010
LID LEED and Policy --  April 2010LID LEED and Policy --  April 2010
LID LEED and Policy -- April 2010
 
Stormwater Magazine
Stormwater MagazineStormwater Magazine
Stormwater Magazine
 
Shifting Regulatory Trends
Shifting Regulatory TrendsShifting Regulatory Trends
Shifting Regulatory Trends
 
SDP120116f
SDP120116fSDP120116f
SDP120116f
 
LID Barriers to Implementation April 2010 (final)
LID Barriers to Implementation  April 2010 (final)LID Barriers to Implementation  April 2010 (final)
LID Barriers to Implementation April 2010 (final)
 
NOAA's GLRI Projects in TOXICS
NOAA's GLRI Projects in TOXICSNOAA's GLRI Projects in TOXICS
NOAA's GLRI Projects in TOXICS
 
NewsCastle - January 2012
NewsCastle - January 2012NewsCastle - January 2012
NewsCastle - January 2012
 
Trans-boundary Issues
Trans-boundary IssuesTrans-boundary Issues
Trans-boundary Issues
 
Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)
 
GEF Hai Basin Integrated Water resources and Environment Management (IWEM) Pr...
GEF Hai Basin Integrated Water resources and Environment Management (IWEM) Pr...GEF Hai Basin Integrated Water resources and Environment Management (IWEM) Pr...
GEF Hai Basin Integrated Water resources and Environment Management (IWEM) Pr...
 
15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals
 
Progress of river health and e flow in china
Progress of river health and e flow in chinaProgress of river health and e flow in china
Progress of river health and e flow in china
 
T s3 gh3_yangbo sun
T s3 gh3_yangbo sunT s3 gh3_yangbo sun
T s3 gh3_yangbo sun
 
2016_amalone_resume
2016_amalone_resume2016_amalone_resume
2016_amalone_resume
 
FSAWWA Paper and Presentation Integrated master planning WPB 12012015
FSAWWA Paper and Presentation Integrated master planning WPB 12012015FSAWWA Paper and Presentation Integrated master planning WPB 12012015
FSAWWA Paper and Presentation Integrated master planning WPB 12012015
 
Greg claydon mdb plan overview nov 2010
Greg claydon mdb plan overview nov 2010Greg claydon mdb plan overview nov 2010
Greg claydon mdb plan overview nov 2010
 
Central Asia Energy-Water Development Program
Central Asia Energy-Water Development ProgramCentral Asia Energy-Water Development Program
Central Asia Energy-Water Development Program
 

More from H2RAmbiental

Proyecto Algas ATS
Proyecto Algas ATSProyecto Algas ATS
Proyecto Algas ATS
H2RAmbiental
 
Proyecto Algas ATS
Proyecto Algas ATSProyecto Algas ATS
Proyecto Algas ATS
H2RAmbiental
 
Proyecto Algas Ats 3
Proyecto Algas Ats 3Proyecto Algas Ats 3
Proyecto Algas Ats 3
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Proyecto Piloto 2005 Hmi S154 Pilot Two Stage Ats Whs Aquatic Plant
Proyecto Piloto 2005 Hmi  S154 Pilot Two Stage Ats Whs Aquatic PlantProyecto Piloto 2005 Hmi  S154 Pilot Two Stage Ats Whs Aquatic Plant
Proyecto Piloto 2005 Hmi S154 Pilot Two Stage Ats Whs Aquatic Plant
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
H2RAmbiental
 
Algal Turf Scrubber Tech 121206
Algal Turf Scrubber Tech 121206Algal Turf Scrubber Tech 121206
Algal Turf Scrubber Tech 121206
H2RAmbiental
 
Algal Turf Scrubber
Algal Turf ScrubberAlgal Turf Scrubber
Algal Turf Scrubber
H2RAmbiental
 
Proyecto Piloto Ats Final Report
Proyecto Piloto  Ats Final ReportProyecto Piloto  Ats Final Report
Proyecto Piloto Ats Final Report
H2RAmbiental
 
Filtracion Chesapeake Articulo Walter Adey
Filtracion Chesapeake Articulo Walter AdeyFiltracion Chesapeake Articulo Walter Adey
Filtracion Chesapeake Articulo Walter Adey
H2RAmbiental
 
Proyecto Ats Piloto Algas Y Biocombustible
Proyecto Ats Piloto  Algas Y BiocombustibleProyecto Ats Piloto  Algas Y Biocombustible
Proyecto Ats Piloto Algas Y Biocombustible
H2RAmbiental
 

More from H2RAmbiental (20)

Proyecto Algas ATS
Proyecto Algas ATSProyecto Algas ATS
Proyecto Algas ATS
 
Proyecto Algas ATS
Proyecto Algas ATSProyecto Algas ATS
Proyecto Algas ATS
 
Proyecto Algas Ats 3
Proyecto Algas Ats 3Proyecto Algas Ats 3
Proyecto Algas Ats 3
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Proyecto Piloto 2005 Hmi S154 Pilot Two Stage Ats Whs Aquatic Plant
Proyecto Piloto 2005 Hmi  S154 Pilot Two Stage Ats Whs Aquatic PlantProyecto Piloto 2005 Hmi  S154 Pilot Two Stage Ats Whs Aquatic Plant
Proyecto Piloto 2005 Hmi S154 Pilot Two Stage Ats Whs Aquatic Plant
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Presentación Algas
Presentación AlgasPresentación Algas
Presentación Algas
 
Algal Turf Scrubber Tech 121206
Algal Turf Scrubber Tech 121206Algal Turf Scrubber Tech 121206
Algal Turf Scrubber Tech 121206
 
Algal Turf Scrubber
Algal Turf ScrubberAlgal Turf Scrubber
Algal Turf Scrubber
 
Proyecto Piloto Ats Final Report
Proyecto Piloto  Ats Final ReportProyecto Piloto  Ats Final Report
Proyecto Piloto Ats Final Report
 
Filtracion Chesapeake Articulo Walter Adey
Filtracion Chesapeake Articulo Walter AdeyFiltracion Chesapeake Articulo Walter Adey
Filtracion Chesapeake Articulo Walter Adey
 
Plano 1
Plano 1Plano 1
Plano 1
 
ATS
ATSATS
ATS
 
ATS
ATSATS
ATS
 
Proyecto Ats Piloto Algas Y Biocombustible
Proyecto Ats Piloto  Algas Y BiocombustibleProyecto Ats Piloto  Algas Y Biocombustible
Proyecto Ats Piloto Algas Y Biocombustible
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Quantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingQuantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation Computing
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate Guide
 
The Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and InsightThe Zero-ETL Approach: Enhancing Data Agility and Insight
The Zero-ETL Approach: Enhancing Data Agility and Insight
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Choreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software EngineeringChoreo: Empowering the Future of Enterprise Software Engineering
Choreo: Empowering the Future of Enterprise Software Engineering
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 

Evaluacion Filtrado Fosforo Lake George & Nearby Lakes

  • 1. Methodology, Evaluation, & Feasibility Study of Total Phosphorus Removal Management Measures in Lake George & Nearby Lakes Daniel L. Reisinger, Mary Brabham, Michael F. Schmidt, Patrick R. Victor, and Larry Schwartz T he St. Johns River is the largest river in process, the St. Johns River Water Florida, extending from southeast of Management District (SJRWMD, district) Daniel L. Reisinger, E.I., is a water resources Orlando to Jacksonville and the has implemented the St. Johns River Algal intern in the Denver, Colorado, office of the Atlantic Ocean. The lower St. Johns River Initiative, which will limit the growth and consulting, engineering, construction, and Basin has exhibited issues associated with nitrogen fixation from cyanobacteria (blue- operations firm CDM. Mary Brabham, P.E., is eutrophication, which has led to the estab- green algae) in the river. the Middle St. Johns River Basin Program man- lishment of a Total Maximum Daily Load Algal initiative planning has determined ager for the St. Johns River Water (TMDL) for Total Nitrogen (TN) and Total that the TP load needs to be reduced by at Management District in Altamonte Springs. Phosphorus (TP). Independent of the TMDL least 84 metric tons per year (MT/Yr) (93 Michael Schmidt, P.E., BCEE, is a vice presi- dent with CDM in the firm’s Jacksonville office. Larry Schwartz, Ph.D., P.W.S., is a CDM vice president in the firm’s Orlando office. Patrick R. Victor, P.E., is a CDM principal in the Jacksonville office. This article was presented as a technical paper at the 2008 Florida Water Resources Conference in May. tons per year) from current levels in the St. Johns River Basin (SJRWMD 2006) through multiple projects, including TP removal in Lake George, which is the largest lake in the river. To evaluate the feasibility of TP removal in Lake George, the district conducted a com- prehensive review of potentially viable and cost-effective Best Management Practices (BMPs), also referred to as management measures, for reducing TP concentrations in the lake. The comprehensive review was the first step in designing a potentially very large regional surface water quality facility treating 50 to 75 million gallons per day (MGD), or 78 to 116 cubic feet per second (cfs). This article focuses on the results of this review and the components that were key to its suc- cessful completion. Each section presents a key component in the review of TP removal in Lake George and nearby lakes. Project Area & TP Removal Goals Project Area Lake George is Florida’s second-largest lake, with an area of approximately 73 square miles. It is part of the main stem of the St. Johns River north of Astor, as shown in 42 • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
  • 2. Table 1 – Water Quantity and Quality in the St. Johns River at Astor, Florida challenges for the removal of TP. Because of the large flow and lower concentration, rela- tively high treatment volumes will probably be required to remove adequate TP mass. The relatively low nutrient and solids concentra- tions are expected to be near or below the practical limit of many standard technologies (e.g. wet detention, wetlands treatment), and infiltration systems on the permeable soils on the west side of the lake may cause nitrate impacts in the springs.. TP Removal Goal Figure 1. Two large lakes, Lake Dexter and the time of this study, 2007. Lake George has potential for very large Lake Woodruff, are located on a secondary Regular negative flows were recorded at TP removal facilities. The removal goal of 84 channel of the river upstream of Lake George the Astor gage. Since treatment will occur MT/Yr was set for the overall St. Johns River and were included in the evaluation of some regardless of direction, negative flows were Algal Initiative, but the removal goal of indi- management measures. included in the possible treatment flow. vidual projects will be decided based on a The area surrounding Lake George, Lake Summary statistics for the gage as absolute comparison of the potential projects in the Dexter, and Lake Woodruff is largely in pub- flows are shown in Table 1. initiative. The establishment of a nonbinding lic ownership or divided into relatively small The nutrient and solids concentrations TP removal goal was considered important to individual parcels. The district currently co- are also measured at State Road 40 in Astor be able to compare management measures owns significant conservation lands on the (SJRWMD Stations SJR40 and 20020012). using specific itemized costs. east shore of Lake George, referred to as the The concentrations were found to be relative- The effect of phosphorus removal on Lake George Conservation Area and the Nine ly low: less than 0.08 milligrams per liter Lake George concentration was estimated by Mile Point area, which are shown as shaded (mg/L) of TP, less than 1.4 mg/L of TN, and performing a mass balance at Astor. areas in Figure 1. The land uses of the area are less than 22 mg/L of Total Suspended Solids. Removing the total St. Johns River Algal predominately classified as wetlands, silvicul- Average seasonal and annual TP and TN con- Initiative goal of 84 MT/Yr, resulting in an ture (forested uplands), and agriculture (SJR- centrations at Astor are reported in Table 1. average annual concentration of 0.053 mg/L WMD 2000). These low concentration levels and the vari- in Lake George, would require at least 900 Lake George is surrounded by sandy ability by season have implications for the MGD (1,395 cfs) to be treated, as shown in hills between 20 and 80 feet NGVD types of management measures that can be Figure 2. A lesser removal goal of 21 MT/Yr, (National Geodetic Vertical Datum of 1929). used cost-effectively and for potential effi- resulting in an average annual concentration Stages in Lake George normally range ciencies of treatment. of 0.072 mg/L in Lake George, would require between 0 and 0.5 feet NGVD, but will The variability of the water quantity and treatment flow of at least 220 MGD (341 cfs). increase to two feet NGVD in large flow quality of Lake George provides significant Continued on page 44 events. The lake bottom is relatively uniform with a mean depth of eight feet and a maxi- mum depth of 12 feet. The soils in the area are generally hydrologic group B/D or D (poor permeability), except on the western shore where they are almost entirely A soils Figure 2 – Lake George Total Phosphorus Concentration as a Function of TP Removal (high permeable) (Lewis et al. 1987). Eleven springs are located in the Lake George tributary area, with three large springs, Silver Glen, Juniper, and Salt Springs, discharging into Lake George on the western shore (Stewart et al. 2006). Lake George is not affected by marine salinity, but it is tidally affected and local sources of salinity have allowed the lake to support a large number of marine species. Also shown in Figure 1, the surrounding area has a large population of Bald Eagles—a threatened species in Florida that is currently proposed for delisting. Summar y of Water Quantity & Quality Stewart et al. (2006) performed exten- sive hydraulic modeling of the Lake George area that provides excellent information for a period of 1996 through 2004. Measured flow data was available at the USGS flow gage located at the State Road 40 Bridge at Astor (USGS Gage 02236125) from 1994 through FLORIDA WATER RESOURCES JOURNAL • SEPTEMBER 2008 • 43
  • 3. Figure 3 – Mechanical Harvester Removing Aquatic Plants (Texas Aquatic Harvesting Inc. 2007) Figure 4 – Bathymetry of Lake Dexter where Depths Less than Three Feet Can Not Be Harvested Continued from page 43 considered applicable to the configuration 1. Aquatic plant harvesting A goal of 5 MT/Yr was chosen by the dis- and constraints of the project area were 2. Chemical addition trict for the study, resulting in an average evaluated: 3. Periphyton flowway treatment annual concentration of 0.076 mg/L in Lake 1. Aquatic plant harvesting (e.g. hydrilla or George, which would require between 50 and water hyacinth) Feasibility Study 75 MGD (78 cfs to 116 cfs) of treatment flow. 2. Chemical addition (e.g. ballasted floccula- of Management Measures This removal rate was chosen because it tion) would likely require several treatment units 3. Constructed wetland treatment Detailed Planning of Potentia l to be built, and if a higher goal was later cho- 4. Constructed water hyacinth treatment Management Measure Proces ses sen, the results could be scaled upward as 5. Diversion of water for reuse Detailed information on the configura- necessary. 6. Dredging tion, sizing, nutrient removal, and byproduct 7. Fish harvesting disposal were determined in the feasibility Evaluation of Potential 8. Periphyton flowway treatment (e.g. study. All analyses were performed at a plan- HydroMentia Algal Turf Scrubber or ning level of detail. The following paragraphs Management Measures Aquafiber) summarize each management measure and 9. Retention/infiltration key components. Management Mea sure Review Each of the nine management measures Aquatic Plant Harvesting—Aquatic A lake management approach was taken was reviewed for its benefits, challenges, rela- plant harvesting was considered, using to determine possible management measures tive costs, relative time to implement, and ref- mechanical harvesters to remove TP and con- for phosphorus removal in Lake George. erences to publications used in order to veri- trol the population of invasive aquatic plants. Using this approach, short-term and long- fy the applicability of the management meas- Harvesters use a conveyor belt system to term measures with offline and in-lake treat- ure. Approaches that can be integrated for a remove aquatic plants from the water, as ment were considered. synergistic benefit were also identified. shown in Figure 3. The feasibility study of Possible management measures were determined from lake management, this management measure focused on water Mana gement Measure Select ion stormwater control, and water quality hyacinth, which is the main aquatic plant District and CDM representatives met to improvement literature, relevant experts, controlled in the Lake George area. discuss each evaluated management measure and other implemented projects (both suc- Harvesting was proposed to be the and to select three measures for further cessful and unsuccessful). The U.S. main method of control, with herbicidal detailed evaluation. A feasibility study was to Environmental Protection Agency (EPA) spraying, which is the current population be conducted for each selected management provides comprehensive review of lake and control method, as a secondary measure to measure, which included the conceptual reservoir restoration and management tech- assure very low water hyacinth populations design, TP and TN removal capability, bene- niques (EPA 1990), which was used as a are maintained. Windrow composting in a fits, operation, and maintenance require- starting point. contained site was found to be the most ments. Because of the uncommon attributes of feasible method to dispose of harvested The feasibility of each management Lake George (e.g. large lake, variable flow water hyacinth. The resulting compost measure was discussed until a consensus was rates, low inflow concentrations, in-stream, could be given away or sold, depending on reached on whether or not the measure was unregulated, and relatively shallow), many demand. appropriate for further study. The major management measures were not considered, This management measure is a depar- decision criteria included its technical feasi- as discussed with the district, since they ture from existing aquatic plant control in bility, cost, and the ability to permit the sys- appeared not applicable or infeasible. The the lakes; therefore, study efforts focused tem. The three most promising management following nine lake management measures on determining a feasible methods for har- measures were determined to be: Continued on page 46 44 • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
  • 4. ACTIFLO testing and chemical analysis. At the time of the testing, the St. Johns River watershed was in drought condition and the river exhibited low flow. The results from the water sample indicated TP concentrations of 0.064 mg/L, slightly below the seasonal aver- age, and undetectable quantities of ortho- phosphate. The bench scale testing conducted by Kruger Inc. evaluated TP removals associat- ed with various dosages of cationic and anionic polymers, ferric sulfate, and ferric chloride coagulants. The results, presented in Table 2, show that ACTIFLO ballasted Figure 5 – ACTIFLO 35 MGD Modular Ballasted Flocculation System (Kruger 2007) flocculation was able to remove at least 85 percent of particulate TP, defined as the dif- ference between TP and dissolved TP, to limit of detection for the measurement Continued from page 44 treatment process in controlled facilities. method. There were undetectable quantities vesting. Because of the possibility of treating a large of ortho-phosphate in the water, so one- Large harvesters are limited to operating volume of flow, patented or proprietary sys- third removal of ortho-phosphate was used in water depths greater than three feet. tems, which generally reduce the footprint of for this study. Bathymetric data for Lake George, Lake the chemical addition system, were primarily Periphyton Flowway Treatment— Dexter, and Lake Woodruff indicate that large considered. Periphyton flowways are constructed, biolog- areas of Lake Dexter and a significant portion The ACTIFLO system that uses ically based treatment systems that pass a of the near shore area of Lake George and microsand ballast and settling plates to shallow flow of water over a sloped mat of Lake Woodruff are less than three feet in increase overflow rates (the effective treat- periphyton. Nutrients are removed from the depth, as shown for Lake Dexter in Figure 4. ment system flow) is shown in Figure 5. water biologically by the periphyton, which Based on the average standing crop of water Implementation of the ACTIFLO process was are harvested to remove the nutrients from hyacinth, which was estimated from the evaluated in this study; however, other pro- the system and encourage further growth of acreage receiving herbicidal treatment prietary treatment systems may be equally the periphyton. (USACE 2007), no lake would have water effective. These systems are differentiated from hyacinths at a harvestable depth in an average The actual removal from chemical addi- periphyton wetland systems by their flow year. tion systems can be estimated only by bench characteristics. Flowways use shallow sheet- Several methods to remove water and pilot scale tests; therefore, the collection flow and higher velocity, although velocities hyacinth from areas with less than two feet of and testing of a sample to provide an indica- would be considered low in most treatment water depth were evaluated. The most prom- tion of possible removal was the key compo- applications. Periphyton flowways can be ising method proposed is to chop the nent of the chemical addition feasibility conceptualized as hydroponics-style horti- hyacinth using chopping boats to move the analysis. culture of algae. chopped material in windrows to deeper A water sample was taken from the inlet Two proprietary periphyton flowway water for harvesting. Chopping boats are typ- of the St. Johns River to Lake George in April systems were evaluated: Aquafiber and ically shallow-draft vessels with large pro- 2007 and sent to Kruger Inc. for bench scale Continued on page 48 pellers affixed to the bow to chop the plant material. The working area will be contained by turbidity-capturing geotextiles to reduce effects of the chopping. The benefits of this Table 2 – Bench Scale ACTIFLO Results for Lake George method were provided by Weedbusters Inc. and include the following: Widely used with proven feasibility. Increases the efficiency of the harvesting process. May allow over five times more water hyacinth to be collected per harvester. Does not eliminate most submerged aquatic vegetation or suspend sediment. The use of chopping boats and har- vesters was considered feasible and was used to determine TP removal, TN removal, and costs. Chemical Addition—Chemical addition of coagulants to a flow stream and subse- quent settling of formed floc can improve water quality significantly. These processes are used widely in the water and wastewater 46 • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
  • 5. Continued from page 46 Table 3 – Summary of Management Measure Sizing and Costs HydroMentia. HydroMentia’s Algal Turf Scrubber® (ATS) pulses a shallow flow of water over a bed of periphyton to remove nutrients, which is shown in Figure 5. Included in the process are patented phos- phorus precipitation methods and biomass management techniques. Aquafiber has developed patented and trade secret technologies, including a peri- phyton flowway system also using shallow sheet flow. The Aquafiber periphyton flowway system may include patented ozone treatment to release nutrients bound in organic matter, eliminate toxic compounds found in cyanobacteria, and destroy micro- invertebrates and their eggs. HydroMentia and Aquafiber were ent removal. The cost of land was not included, since the engaged to provide information for this The HydroMentia ATS information was majority of land was in public ownership. All study. A detailed review of the ATS technolo- considered to be acceptable and was used to costs were based on a 20-year design life and gy at Lake George was provided for the feasi- represent the periphyton flowway manage- include 20 years of operation and mainte- bility study by HydroMentia (Stewart E.A. ment measure in the feasibility study. nance. 2007). The report included the facility size, anticipated removal rates, and an estimated Feasibility Study Discussion of Results cost per pound of phosphorus removed. Results & Costs Each management measure was evaluat- Aquafiber provided a short memoran- ed in terms of feasibility and cost to make a dum documenting the likely TP removal Results & Cost per Pound of TP Removed recommendation for further study and ulti- from a hybrid system of the periphyton The conceptual specifications and asso- mately, design and implementation. flowway system and the company’s patent- ciated cost per pound of TP removed for each Aquatic Plant Harvesting was estimated pending, trade secret technology (Fagan management measure is presented in Table 3. to cost $240 per pound of TP removed. This 2007). Aquafiber did not provide a cost esti- The sizing and TP removal for the feasibility process has a relatively higher level of uncer- mate for this feasibility study. management measures were based on tainty compared to the other alternatives The technical review of the document detailed planning using the best available because of a lack of data on the water provided by HydroMentia found the facility information. Each of the management meas- hyacinth population and disposal site condi- sizing, TP removal methodology, and costs ures were evaluated based on approximately 5 tions; therefore, a study of the Lake Dexter to be reasonable. HydroMentia used the best MT/Yr per year of TP removed from Lake and Woodruff water hyacinth populations available data, results from the S-154 ATS George and the St. Johns River; however, the was suggested. Harvesting water hyacinth in facility, to determine the periphyton growth exact removal varied by process. Lake George was not suggested, based on the rate and subsequent TP removal rate; how- Costs in Table 3 are based itemized costs long travel times and low density of water ever, it was believed that this value may be for each management measure, including hyacinths in the lake. different in Lake George because of much conceptual probable capital and operational Chemical Addition using ACTIFLO lower TP levels and environmental condi- cost estimates of site preparation, pumps, could provide high levels of TP removal on a tions, such as low bio-availability of nutri- and piping. Contingencies, engineering, sur- small footprint at an estimated cost of $350 ents, lower water temperatures, and solar vey, permitting, mobilization, and discount per pound of TP removed. It was recommend- radiation. Pilot testing was suggested to rates were also included. These costs supple- ed that the ACTIFLO technology be consid- determine a more accurate estimate of nutri- mented the cost of the removal technology. ered at sites other than Lake George, which would benefit from the ACTIFLO’s small foot- print. It was recommended that pilot testing of both the ACTIFLO system and potential Figure 6 – dewatering equipment be performed to better HydroMentia determine phosphorus removal and operation ATS S-154 and maintenance costs at a site near existing Basin Facility in commercial or industrial land uses. Okeechobee Periphyton Flowway Treatment using HydroMentia’s ATS provides relatively high County, FL levels of phosphorus removal, and generates (Stewart, E.A. a marketable byproduct (compost) at an esti- 2007) mated cost of $240 per pound of TP removed. It was recommended that the Aquafiber technologies also be considered for pilot testing Continued on page 50 48 • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL
  • 6. Continued from page 48 FT Contour (Line). Palatka, FL. St. John’s Herbicidal Spraying of Lake George, Lake Recommendations for River Water Management District. Dexter, and Lake Woodruff, FL. Electronic Further Planning & Design http://www.sjrwmd.com/programs/plan_ Communication March 2007. monitor/gis/docs/metadata/elev_5ft.htm • Camp Dresser & McKee (CDM). 1999. Three management measures listed in • Lewis et al. 1987. Soil Survey of “Renaissance Jar Testing.” Submitted to Mr. Table 3 are recommended for further study Okeechobee County, FL. Electronic Report. Jeff Hiscock of Mock Roos & Associates. through pilot testing: http://soildatamart.nrcs.usda.gov/Manuscr • Stewart, E.A. 2007. “Preliminary 1. The harvest of water hyacinths should be ipts/FL093/0/fl_okeechobee.pdf. Accessed Engineering Assessment for the Application pilot tested in Lake Dexter. February 2007. of an Algal Turf Scrubber (ATS) for 2. Periphyton flowway treatment should be • Stewart, Joseph B., Sucsey, Peter, and Reduction of Nitrogen and Phosphorus pilot tested in the vicinity of Lake George. Hendrickson, John. “Meteorological factors Loads into Lake George, Florida.” Prepared 3. ACTIFLO should be pilot tested in a pre- affecting estuarine conditions within Lake by HydroMentia for SJRWMD: Ocala, FL. dominantly industrial or commercial area. George in the St. Johns River, Florida”. • Fagan, William B. 2007. Aquafiber Because of the water quality fluctuations in Proceedings of the Seventh International Application to Lake George. Letter to Mr. Lake George, pilot studies should be performed Conference on Hydroscience and Daniel Reisinger of CDM. June 15, 2007. for a period of at least one year to evaluate a full Engineering. Philadelphia, PA. September range of water quality and flow conditions. The 2006. http://hdl.handle.net/1860/732 three management measures are modular and • Hendrickson, J.C. and J. Konwinski. 1998. complementary; therefore, they can be used Seasonal Nutrient Import-Export Budgets together if desired for additional removal. for the Lower St. Johns River, Florida. Final Report for Contract WM598, Florida References Department of Environmental Protection. 109 pp. • St. Johns River Water Management District • United States Environmental Protection (SJRWMD). 2006b. Lake George P Agency (EPA). 1990. “Lake and Reservoir Removal Project MSJRB St. Johns River Restoration Guidance Manual, Second Nutrient Discharge Reduction WBS Edition.” Publication # 440490006, 2.3.30.00.08 (part of the SJR Algal Electronic, NTIS # PB93-207926. Initiative) Charter Document – 11/9/2006. • United States Army Corps of Engineer • St. Johns River Water Management District (USACE). 2007. Unclassified Acreage, (SJRWMD). 2000. Elevation: SJRWMD 5 Herbicide Usage, and Man Hours for 50 • SEPTEMBER 2008 • FLORIDA WATER RESOURCES JOURNAL