Erasmus +
Knowledge Alliances 2020
Nicoleta Susanu
EUrOPA PROMpT @nicoletasusanu
OBJECTIVES AND ACTIONS
OF THE ERASMUS PROGRAMME
the objectives of the Europe 2020 strategy, including
the headline education target
the objectives of the strategic framework for
European cooperation in education and training (ET
2020), including the corresponding benchmarks
the sustainable development of Partner Countries in
the field of higher education
the overall objectives of the framework for European
cooperation in the youth field (2010–2018) as well
as the objectives of the renewed EU Youth Strategy
2019-2027
the objective of developing the European dimension
in sport, in particular grassroots sport, in line with
the third EU Work Plan for Sport 2017-2020
the promotion of European values in accordance
with Article 2 of the Treaty on European Union
01
02
03
04
05
06
The Erasmus+ Programme aims to contribute to the achievement of:
EUrOPA PROMpT @nicoletasusanu
Supporting educators, youth
workers, educational leaders
and support staff
Transparency and recognition
of skills and qualifications
Social inclusion
Innovative practices in a
digital era
Environmental and climate
goals
Supporting opportunities for all in
acquiring and developing key
competences, including basic skills
Sustainable investment,
quality and efficiency of
education, training and youth
systems
Social and educational value of
European cultural heritage, its
contribution to job creation,
economic growth and social
cohesion
HORIZONTAL PRIORITIES
EUrOPA PROMpT @nicoletasusanu
WHAT IS A KNOWLEDGE ALLIANCE?
• Knowledge Alliances are transnational, structured and result-driven projects, notably
between higher education and business.
• Knowledge Alliances are open to any discipline, sector and to cross-sectoral
cooperation.
• The partners share common goals and work together towards mutually beneficial
results and outcomes.
• The results and expected outcomes are clearly defined, realistic and address the issues
identified in the needs analysis.
• Knowledge Alliances are meant to have a short and long-term impact on the wide range
of stakeholders involved, at individual, organisational and systemic level.
• As a general rule, Knowledge Alliances target the cooperation between organisations
established in Programme Countries. However, organisations from Partner Countries
can be involved in a Knowledge Alliance, as partners (not as applicants), if their
participation brings an essential added value to the project.
EUrOPA PROMpT @nicoletasusanu
KNOWLEDGE ALLIANCE
PRIORITIES 2020
EUrOPA PROMpT @nicoletasusanu
Boosting innovation in higher education,
business and in the broader
socio-economic environment
Developing entrepreneurial
mind-set and skills
Stimulating the flow and exchange of knowledge
between higher education and enterprises
ACTIVITIES
SUPPORTED UNDER THIS ACTION
EUrOPA PROMpT @nicoletasusanu
The key features of
Knowledge Alliances
Innovation in higher education
and innovation through higher
education in enterprises and
their socio-economic
environment: innovation is
considered as state-of-the-art
project-specific and related to
the partnerships context and
analysed needs.
Sustainability of university-
business cooperation. A strong
and committed partnership
with a balanced participation
from enterprises and higher
education institutions are
pivotal for the success of
Knowledge Alliances. The role
and contribution of each
participating organisation and
associate partner have to be
specific and complementary.
Impact going beyond the project's
lifetime and beyond the
organisations involved in the
Alliance. It is expected that
partnership and activities persist. For
that, results/deliverables might not
be stand-alone but be linked
to/integrated into existing
undertakings, schemes, projects,
platforms, ventures etc. Changes in
higher education institutions and
enterprises have to be measurable.
Results and solutions have to be
transferable and accessible to a
broader audience.
EUrOPA PROMpT @nicoletasusanu
Quality assurance aspects
Knowledge Alliances
are required to accomplish targeted
dissemination activities which reach out
to stakeholders, policy makers,
professionals and enterprises
Knowledge Alliances
should generate new ways and
instruments to facilitate their
collaboration and to ensure that the
partnership between higher education
and business persists.
Knowledge Alliances
are subject to a particular monitoring
which requires active participation from
all participants and stakeholders.
Knowledge Alliances
should budget for the presentation of
their project and the results at the
University-Business Forum and/or other
relevant events (up to five during the
project duration)
Knowledge Alliances
should foresee their participation in
thematic clusters to support cross-
fertilisation, exchange of good practices
and mutual learning.
Knowledge Alliances
should deliver publications such as reports,
handbooks, guidelines, etc. As a general rule,
results should be made available as open
educational resources (OER) as well as on
relevant professional, sectorial or competent
authorities' platforms.
EUrOPA PROMpT @nicoletasusanu
a research institute
an accreditation, certification
or qualification body
a higher education institution.
an intermediary or association
which represents enterprises.
eligibile
applicants
01
04
05
a public body at local, regional
or national level
a public or private, small,
medium or large enterprise
(including social enterprises).
02 06
an organisation active in the
field of education, training and
youth
an intermediary or association
which represents education,
training or youth organisations.
03 07
08
A participating organisation can be any public or private organisation, with its affiliated entities
(if any), established in a Programme Country or in any Partner Country of the world
Higher education institutions established in a Programme Country must hold a valid Erasmus Charter for Higher
Education (ECHE). An ECHE is not required for participating HEIs in Partner Countries.
EUrOPA PROMpT @nicoletasusanu
How to
apply?
Detailed
Project
Description
Detailed
Budget Tables
and Work
Packages
Overview
Declaration
of Honour
To be eligible all the parts of this Application Package must be
completed using the 2020 compulsory templates published on the
Executive Agency's website and submitted electronically.
The language used to complete the Application Package must be an
official EU language understood by all the members of the
consortium.
The Application Package must be completed in one language only.
Application
Package
eForm
EUrOPA PROMpT @nicoletasusanu
Partnership
Each organisation of the consortium has to
individually complete the following sub-sections
As specified in the Erasmus+ Programme Guide,
Knowledge Alliance consortia require the participation
of:
'…minimum six independent organisations from at
least three Programme Countries, out of which at
least two higher education institutions and at least
two enterprises'.
Applicants are requested to verify that all higher
education institutions located in Programme
Countries have a valid Erasmus Charter for Higher
Education
EUrOPA PROMpT @nicoletasusanu
Description of the partners
The description in the sections III.n.1 and III.n.2 should provide
a brief presentation of the organisation, its role in the project
and in the operational/financial management of the project. In
section III.n.3 the proposal should describe the 'Operational
and Technical capacity: skills and expertise of key staff involved
in the project'. It will be used (instead of full CVs) for those staff
members to ascertain the quality of the consortium overall. The
names of all key staff members have to be included in the free
spaces as well as the summary of their skills/experience
relevant for the project domain. A list of any reference to recent
publications, when relevant to the project main topics, shall
also be included.
NB: The first key staff to be listed under P1 shall be the Project
coordinator (also referred to as 'Project manager' and 'Contact
person' in section A.2 of the eForm).
.
EUrOPA PROMpT @nicoletasusanu
Work Packages Overview
Management (MGNT)
including activities such as planning, finances,
coordination and communication between
partners, organisation of project meetings,
etc.
Evaluation (EV)
a specific activity addressed to assess if the
quality of outputs and results. It can be
internal and external.
Preparation (PREP)
this workpackage type is expected to include activities
such as a detailed needs analysis (surveys;
comprehensive reports of the problem areas; etc.), an
analysis of the state of art in the field, data on best
practices etc..
Implementation (IMP)
substantial activities including the development and testing
of the intellectual outputs/tangible results of the project
(such as curricula, pedagogical materials, studies, open
educational resources, etc.).
Dissemination and Exploitation of
results (DISS&EXP)
including activities relating to information
spreading and awareness raising and
mainstreaming and multiplication of
results.
Quality Assurance (QA)
internal quality monitoring measures that
aim to guarantee that the quality of the
project processes and results will meet the
predetermined plans. EUrOPA PROMpT @nicoletasusanu
Work Package must include a detailed description containing
the aims and objectives of the
Work Package.
how the partners involved
will organise their work.
an overview of the monitoring
and evaluation of the work
undertaken within the Work
Packages
milestones and overall
approaches
performance indicators
the relationship/linkages
with other Work Packages
and with the overall
coordination of the project
EUrOPA PROMpT @nicoletasusanu
Each of the type of Work Packages has to be covered at
least once. If applicants fail to present the minimum
required, their proposal may be considered as
incomplete. Certain types of Work Packages may be used
several times according to the proposed activities.
Applicants have to specify the costs associated to each
Work Package. It should be noted that the total number of
staff days is the basis for calculating the EU grant
(Implementation Support) for the project. The total
number of days indicated in this section should correspond
with the information provided in:
•Section VII.7 "Overview of consortium partners
involved and resources required"
•Attachment "Detailed budget tables" (Excel)
The number of days invested by each partner organisation
should correspond with the information provided in the
detailed budget table and in the WP sections on
''Explanation of Work Package expenditures'‘.
EUrOPA PROMpT @nicoletasusanu
Budget
preparation
The budget under the Knowledge Alliance action must be drafted on the basis of the unit cost
system. The "unit costs" system is a simplified form of determining the amount of the grant; by
its nature, such simplified forms of grants are contributions to the main costs of a project which
are not a reimbursement of the real expenditures linked to specific activities in the project.
The EU contribution, calculated through the unit cost, will not fully cover all expenses.
It is for the beneficiary to ensure that all activities will take place as planned.
It is intended to cover any activity directly linked to the implementation of the project.
This amount will cover all kinds of activities of the work package, like: meetings, translations,
travel, intellectual work etc.
Therefore, for every work package and the activities related to it, you have to estimate the
number of staff days needed per category and country group of the partners. This means that
the partnership meetings and related travels cannot be included as such as an item in the
budget. While consortium meetings are welcome, we consider that the “learning mobility”
activities should be dedicated to the learners as such. The learning mobility activities should
support/complement the other activities of the Alliance and bring added value in the
realisation of the project's objectives. Consortium activities (meeting, conferences, etc…) are
considered as "Implementation support" based on the Unit cost system. The budget requested
for mobility cannot be used to finance costs for travels & subsistence (e.g. attendance costs,
partnership meetings).
EUrOPA PROMpT @nicoletasusanu
€
Budget
Maximum EU contribution awarded for a 2-year Knowledge Alliance:
700 000 EUR
Maximum EU contribution awarded for a 3-year Knowledge
Alliance:
1 000 000 EUR
EUrOPA PROMpT @nicoletasusanu
manager
01
teacher/trainer/
researcher
02
technician
03
administrative staff.
04
Staff categories
EUrOPA PROMpT @nicoletasusanu
This staff category includes
legislators, senior officials
and managers (Staff
Category 1 of the ISCO-88
(COM)
This staff category
includes science,
health, teaching and
other professionals
(Staff Category 2 of the
ISCO-88 (COM))
This staff category
includes technicians
and associate
professionals (Staff
Category 3 of the
ISCO-88 (COM))
This staff category
includes office and
customer service clerks
(Staff Category 4 of the
ISCO-88 (COM))
Manager
Teacher/
Trainer/
Researcher
Technician
Administrative
staff
EUrOPA PROMpT @nicoletasusanu
Permanent staff with
an employment
contract with one of
the beneficiaries
Temporary staff with
an employment
contract with one of
the beneficiaries
Interim staff recruited
through a specialised
external Agency,
Personnel working on
the basis of a contract
of employment
recognized by the
respective national
legislation or
equivalent
appointing act
Eligible staff
EUrOPA PROMpT @nicoletasusanu
Contribution to unit costs
The budget of the project must be
drafted on the basis of the unit
cost system.
B2.1 per manager involved per day of
work on the project
.
B2.2 per researcher/ teacher/trainer
involved per day of work on the project
.
B2.3 per technician involved per day of
work on the project
.
B2.4 per administrative staff involved
per day of work on the project
EUrOPA PROMpT @nicoletasusanu
Budget
Applicants will have to
justify the type and
volume of resources
needed in relation to the
implementation of the
proposed activities and
outputs. The outputs
should be substantial in
quality and quantity to
qualify for this type of
grant support.
The unit cost calculation for any activity and output is solely based on the
staff input
EUrOPA PROMpT @nicoletasusanu
Budget
Applicants will have to
justify the type and
volume of resources
needed in relation to the
implementation of the
proposed activities and
outputs.
The outputs should be
substantial in quality and
quantity to qualify for this
type of grant support.
The unit cost calculation for any activity and output is solely based on the
staff input
EUrOPA PROMpT @nicoletasusanu
Contribution to the travel costs of participants,
from their place of origin to the venue of the activity and return
For travel distances between 100 and 1999 KM: 275 EUR per participant
NB: applicants will have to justify that mobility activities are necessary to achieve
the objectives
For travel distances of 2000 KM or more: 360 EUR per participant
NB: applicants will have to justify that mobility activities are necessary to
achieve the objectives
EUrOPA PROMpT @nicoletasusanu
Subsistence costs
Activities targeting staff up to the 14th day of activity: 100 EUR per day per
participant + between the 15 th and 60 th day of activity: 70 EUR per day per
participant results of the project
Activities targeting learners: up to the 14th day of activity: 55 EUR per day
per participant + between the 15 th and 60 th day of activity: 40 EUR per
day per participant
EUrOPA PROMpT @nicoletasusanu
any act or omission relating to the use or presentation of false, incorrect or incomplete
statements or documents, which has as its effect the misappropriation or wrongful
retention of funds or assets from the Union budget, the non-disclosure of information in
violation of a specific obligation, with the same effect or the misapplication of such funds
or assets for purposes other than those for which they were originally granted.
Fraud
1
a violation of applicable laws or regulations or ethical standards of the
profession to which a person or entity belongs, or any wrongful conduct of a
person or entity which has an impact on its professional credibility where
such conduct denotes wrongful intent or gross negligence.
Gave professional misconduct
2
any infringement of a provision of Union law resulting
from an act or omission by a beneficiary, which has or
would have the effect of prejudicing the Union’s budget
Irregularity
3
Grant agreement terminology
to pay attention
EUrOPA PROMpT @nicoletasusanu
Impact and dissemination
(maximum 20 points)
Quality of the project team and the
cooperation arrangements
(maximum 30 points)
Quality of the project design and
implementation (maximum 25 points)
AWARD
CRITERIA
Relevance of the proposal (maximum
25 points)
EUrOPA PROMpT @nicoletasusanu
Applicants have to submit their grant
application at the latest by 26
February 2020 at 17:00 (Brussels
time) for projects starting on 1
November of the same year or 1
January of the following year.
EUrOPA PROMpT @nicoletasusanu
Useful documents
• Call for proposals 2020 — EAC/A02/2019
• 2020 annual work programme for the implementation of Erasmus+ - C(2019) 5823
• Erasmus+ Programme Guide 2020
• Knowledge Alliances 2020 guide for applicants
• Knowledge Alliances 2020 FAQ
• Knowledge Alliances 2020 General conditions – Multi beneficiaries model
grant agreement
• Knowledge Alliances 2020 Special conditions – Multi beneficiaries model
grant agreement
• Europe 2020 strategy
• Strategic framework for European cooperation in education and training (ET 2020)
• European cooperation in the youth field (2010–2018)
• Renewed EU Youth Strategy 2019-2027
• EU Work Plan for Sport 2017-2020
EUrOPA PROMpT @nicoletasusanu
EUrOPA PROMpT @nicoletasusanu
@NicoletaSusanu
@EUfundingopportunities
europapromt@gmail.com
https://it.linkedin.com/in/nicoleta-susanu
If opportunity
doesn’t knock,
build a door.
Milton Berle
“
”EUrOPA PROMpT @nicoletasusanu
Thank YouFree Design
@FPPT.com
@Allptp.com
@tiniptp.com
www.free-powerpoint-tempates-design.com
www.yourwebsite.com

Erasmus + Knowledge Alliances 2020 call EAC/A02/2019 open

  • 1.
    Erasmus + Knowledge Alliances2020 Nicoleta Susanu EUrOPA PROMpT @nicoletasusanu
  • 2.
    OBJECTIVES AND ACTIONS OFTHE ERASMUS PROGRAMME the objectives of the Europe 2020 strategy, including the headline education target the objectives of the strategic framework for European cooperation in education and training (ET 2020), including the corresponding benchmarks the sustainable development of Partner Countries in the field of higher education the overall objectives of the framework for European cooperation in the youth field (2010–2018) as well as the objectives of the renewed EU Youth Strategy 2019-2027 the objective of developing the European dimension in sport, in particular grassroots sport, in line with the third EU Work Plan for Sport 2017-2020 the promotion of European values in accordance with Article 2 of the Treaty on European Union 01 02 03 04 05 06 The Erasmus+ Programme aims to contribute to the achievement of: EUrOPA PROMpT @nicoletasusanu
  • 3.
    Supporting educators, youth workers,educational leaders and support staff Transparency and recognition of skills and qualifications Social inclusion Innovative practices in a digital era Environmental and climate goals Supporting opportunities for all in acquiring and developing key competences, including basic skills Sustainable investment, quality and efficiency of education, training and youth systems Social and educational value of European cultural heritage, its contribution to job creation, economic growth and social cohesion HORIZONTAL PRIORITIES EUrOPA PROMpT @nicoletasusanu
  • 4.
    WHAT IS AKNOWLEDGE ALLIANCE? • Knowledge Alliances are transnational, structured and result-driven projects, notably between higher education and business. • Knowledge Alliances are open to any discipline, sector and to cross-sectoral cooperation. • The partners share common goals and work together towards mutually beneficial results and outcomes. • The results and expected outcomes are clearly defined, realistic and address the issues identified in the needs analysis. • Knowledge Alliances are meant to have a short and long-term impact on the wide range of stakeholders involved, at individual, organisational and systemic level. • As a general rule, Knowledge Alliances target the cooperation between organisations established in Programme Countries. However, organisations from Partner Countries can be involved in a Knowledge Alliance, as partners (not as applicants), if their participation brings an essential added value to the project. EUrOPA PROMpT @nicoletasusanu
  • 5.
  • 6.
    Boosting innovation inhigher education, business and in the broader socio-economic environment Developing entrepreneurial mind-set and skills Stimulating the flow and exchange of knowledge between higher education and enterprises ACTIVITIES SUPPORTED UNDER THIS ACTION EUrOPA PROMpT @nicoletasusanu
  • 7.
    The key featuresof Knowledge Alliances Innovation in higher education and innovation through higher education in enterprises and their socio-economic environment: innovation is considered as state-of-the-art project-specific and related to the partnerships context and analysed needs. Sustainability of university- business cooperation. A strong and committed partnership with a balanced participation from enterprises and higher education institutions are pivotal for the success of Knowledge Alliances. The role and contribution of each participating organisation and associate partner have to be specific and complementary. Impact going beyond the project's lifetime and beyond the organisations involved in the Alliance. It is expected that partnership and activities persist. For that, results/deliverables might not be stand-alone but be linked to/integrated into existing undertakings, schemes, projects, platforms, ventures etc. Changes in higher education institutions and enterprises have to be measurable. Results and solutions have to be transferable and accessible to a broader audience. EUrOPA PROMpT @nicoletasusanu
  • 8.
    Quality assurance aspects KnowledgeAlliances are required to accomplish targeted dissemination activities which reach out to stakeholders, policy makers, professionals and enterprises Knowledge Alliances should generate new ways and instruments to facilitate their collaboration and to ensure that the partnership between higher education and business persists. Knowledge Alliances are subject to a particular monitoring which requires active participation from all participants and stakeholders. Knowledge Alliances should budget for the presentation of their project and the results at the University-Business Forum and/or other relevant events (up to five during the project duration) Knowledge Alliances should foresee their participation in thematic clusters to support cross- fertilisation, exchange of good practices and mutual learning. Knowledge Alliances should deliver publications such as reports, handbooks, guidelines, etc. As a general rule, results should be made available as open educational resources (OER) as well as on relevant professional, sectorial or competent authorities' platforms. EUrOPA PROMpT @nicoletasusanu
  • 9.
    a research institute anaccreditation, certification or qualification body a higher education institution. an intermediary or association which represents enterprises. eligibile applicants 01 04 05 a public body at local, regional or national level a public or private, small, medium or large enterprise (including social enterprises). 02 06 an organisation active in the field of education, training and youth an intermediary or association which represents education, training or youth organisations. 03 07 08 A participating organisation can be any public or private organisation, with its affiliated entities (if any), established in a Programme Country or in any Partner Country of the world Higher education institutions established in a Programme Country must hold a valid Erasmus Charter for Higher Education (ECHE). An ECHE is not required for participating HEIs in Partner Countries. EUrOPA PROMpT @nicoletasusanu
  • 10.
    How to apply? Detailed Project Description Detailed Budget Tables andWork Packages Overview Declaration of Honour To be eligible all the parts of this Application Package must be completed using the 2020 compulsory templates published on the Executive Agency's website and submitted electronically. The language used to complete the Application Package must be an official EU language understood by all the members of the consortium. The Application Package must be completed in one language only. Application Package eForm EUrOPA PROMpT @nicoletasusanu
  • 11.
    Partnership Each organisation ofthe consortium has to individually complete the following sub-sections As specified in the Erasmus+ Programme Guide, Knowledge Alliance consortia require the participation of: '…minimum six independent organisations from at least three Programme Countries, out of which at least two higher education institutions and at least two enterprises'. Applicants are requested to verify that all higher education institutions located in Programme Countries have a valid Erasmus Charter for Higher Education EUrOPA PROMpT @nicoletasusanu
  • 12.
    Description of thepartners The description in the sections III.n.1 and III.n.2 should provide a brief presentation of the organisation, its role in the project and in the operational/financial management of the project. In section III.n.3 the proposal should describe the 'Operational and Technical capacity: skills and expertise of key staff involved in the project'. It will be used (instead of full CVs) for those staff members to ascertain the quality of the consortium overall. The names of all key staff members have to be included in the free spaces as well as the summary of their skills/experience relevant for the project domain. A list of any reference to recent publications, when relevant to the project main topics, shall also be included. NB: The first key staff to be listed under P1 shall be the Project coordinator (also referred to as 'Project manager' and 'Contact person' in section A.2 of the eForm). . EUrOPA PROMpT @nicoletasusanu
  • 13.
    Work Packages Overview Management(MGNT) including activities such as planning, finances, coordination and communication between partners, organisation of project meetings, etc. Evaluation (EV) a specific activity addressed to assess if the quality of outputs and results. It can be internal and external. Preparation (PREP) this workpackage type is expected to include activities such as a detailed needs analysis (surveys; comprehensive reports of the problem areas; etc.), an analysis of the state of art in the field, data on best practices etc.. Implementation (IMP) substantial activities including the development and testing of the intellectual outputs/tangible results of the project (such as curricula, pedagogical materials, studies, open educational resources, etc.). Dissemination and Exploitation of results (DISS&EXP) including activities relating to information spreading and awareness raising and mainstreaming and multiplication of results. Quality Assurance (QA) internal quality monitoring measures that aim to guarantee that the quality of the project processes and results will meet the predetermined plans. EUrOPA PROMpT @nicoletasusanu
  • 14.
    Work Package mustinclude a detailed description containing the aims and objectives of the Work Package. how the partners involved will organise their work. an overview of the monitoring and evaluation of the work undertaken within the Work Packages milestones and overall approaches performance indicators the relationship/linkages with other Work Packages and with the overall coordination of the project EUrOPA PROMpT @nicoletasusanu
  • 15.
    Each of thetype of Work Packages has to be covered at least once. If applicants fail to present the minimum required, their proposal may be considered as incomplete. Certain types of Work Packages may be used several times according to the proposed activities. Applicants have to specify the costs associated to each Work Package. It should be noted that the total number of staff days is the basis for calculating the EU grant (Implementation Support) for the project. The total number of days indicated in this section should correspond with the information provided in: •Section VII.7 "Overview of consortium partners involved and resources required" •Attachment "Detailed budget tables" (Excel) The number of days invested by each partner organisation should correspond with the information provided in the detailed budget table and in the WP sections on ''Explanation of Work Package expenditures'‘. EUrOPA PROMpT @nicoletasusanu
  • 16.
    Budget preparation The budget underthe Knowledge Alliance action must be drafted on the basis of the unit cost system. The "unit costs" system is a simplified form of determining the amount of the grant; by its nature, such simplified forms of grants are contributions to the main costs of a project which are not a reimbursement of the real expenditures linked to specific activities in the project. The EU contribution, calculated through the unit cost, will not fully cover all expenses. It is for the beneficiary to ensure that all activities will take place as planned. It is intended to cover any activity directly linked to the implementation of the project. This amount will cover all kinds of activities of the work package, like: meetings, translations, travel, intellectual work etc. Therefore, for every work package and the activities related to it, you have to estimate the number of staff days needed per category and country group of the partners. This means that the partnership meetings and related travels cannot be included as such as an item in the budget. While consortium meetings are welcome, we consider that the “learning mobility” activities should be dedicated to the learners as such. The learning mobility activities should support/complement the other activities of the Alliance and bring added value in the realisation of the project's objectives. Consortium activities (meeting, conferences, etc…) are considered as "Implementation support" based on the Unit cost system. The budget requested for mobility cannot be used to finance costs for travels & subsistence (e.g. attendance costs, partnership meetings). EUrOPA PROMpT @nicoletasusanu €
  • 17.
    Budget Maximum EU contributionawarded for a 2-year Knowledge Alliance: 700 000 EUR Maximum EU contribution awarded for a 3-year Knowledge Alliance: 1 000 000 EUR EUrOPA PROMpT @nicoletasusanu
  • 18.
  • 19.
    This staff categoryincludes legislators, senior officials and managers (Staff Category 1 of the ISCO-88 (COM) This staff category includes science, health, teaching and other professionals (Staff Category 2 of the ISCO-88 (COM)) This staff category includes technicians and associate professionals (Staff Category 3 of the ISCO-88 (COM)) This staff category includes office and customer service clerks (Staff Category 4 of the ISCO-88 (COM)) Manager Teacher/ Trainer/ Researcher Technician Administrative staff EUrOPA PROMpT @nicoletasusanu
  • 20.
    Permanent staff with anemployment contract with one of the beneficiaries Temporary staff with an employment contract with one of the beneficiaries Interim staff recruited through a specialised external Agency, Personnel working on the basis of a contract of employment recognized by the respective national legislation or equivalent appointing act Eligible staff EUrOPA PROMpT @nicoletasusanu
  • 21.
    Contribution to unitcosts The budget of the project must be drafted on the basis of the unit cost system. B2.1 per manager involved per day of work on the project . B2.2 per researcher/ teacher/trainer involved per day of work on the project . B2.3 per technician involved per day of work on the project . B2.4 per administrative staff involved per day of work on the project EUrOPA PROMpT @nicoletasusanu
  • 22.
    Budget Applicants will haveto justify the type and volume of resources needed in relation to the implementation of the proposed activities and outputs. The outputs should be substantial in quality and quantity to qualify for this type of grant support. The unit cost calculation for any activity and output is solely based on the staff input EUrOPA PROMpT @nicoletasusanu
  • 23.
    Budget Applicants will haveto justify the type and volume of resources needed in relation to the implementation of the proposed activities and outputs. The outputs should be substantial in quality and quantity to qualify for this type of grant support. The unit cost calculation for any activity and output is solely based on the staff input EUrOPA PROMpT @nicoletasusanu
  • 24.
    Contribution to thetravel costs of participants, from their place of origin to the venue of the activity and return For travel distances between 100 and 1999 KM: 275 EUR per participant NB: applicants will have to justify that mobility activities are necessary to achieve the objectives For travel distances of 2000 KM or more: 360 EUR per participant NB: applicants will have to justify that mobility activities are necessary to achieve the objectives EUrOPA PROMpT @nicoletasusanu
  • 25.
    Subsistence costs Activities targetingstaff up to the 14th day of activity: 100 EUR per day per participant + between the 15 th and 60 th day of activity: 70 EUR per day per participant results of the project Activities targeting learners: up to the 14th day of activity: 55 EUR per day per participant + between the 15 th and 60 th day of activity: 40 EUR per day per participant EUrOPA PROMpT @nicoletasusanu
  • 26.
    any act oromission relating to the use or presentation of false, incorrect or incomplete statements or documents, which has as its effect the misappropriation or wrongful retention of funds or assets from the Union budget, the non-disclosure of information in violation of a specific obligation, with the same effect or the misapplication of such funds or assets for purposes other than those for which they were originally granted. Fraud 1 a violation of applicable laws or regulations or ethical standards of the profession to which a person or entity belongs, or any wrongful conduct of a person or entity which has an impact on its professional credibility where such conduct denotes wrongful intent or gross negligence. Gave professional misconduct 2 any infringement of a provision of Union law resulting from an act or omission by a beneficiary, which has or would have the effect of prejudicing the Union’s budget Irregularity 3 Grant agreement terminology to pay attention EUrOPA PROMpT @nicoletasusanu
  • 27.
    Impact and dissemination (maximum20 points) Quality of the project team and the cooperation arrangements (maximum 30 points) Quality of the project design and implementation (maximum 25 points) AWARD CRITERIA Relevance of the proposal (maximum 25 points) EUrOPA PROMpT @nicoletasusanu
  • 28.
    Applicants have tosubmit their grant application at the latest by 26 February 2020 at 17:00 (Brussels time) for projects starting on 1 November of the same year or 1 January of the following year. EUrOPA PROMpT @nicoletasusanu
  • 29.
    Useful documents • Callfor proposals 2020 — EAC/A02/2019 • 2020 annual work programme for the implementation of Erasmus+ - C(2019) 5823 • Erasmus+ Programme Guide 2020 • Knowledge Alliances 2020 guide for applicants • Knowledge Alliances 2020 FAQ • Knowledge Alliances 2020 General conditions – Multi beneficiaries model grant agreement • Knowledge Alliances 2020 Special conditions – Multi beneficiaries model grant agreement • Europe 2020 strategy • Strategic framework for European cooperation in education and training (ET 2020) • European cooperation in the youth field (2010–2018) • Renewed EU Youth Strategy 2019-2027 • EU Work Plan for Sport 2017-2020 EUrOPA PROMpT @nicoletasusanu
  • 30.
  • 31.
    If opportunity doesn’t knock, builda door. Milton Berle “ ”EUrOPA PROMpT @nicoletasusanu
  • 32.