SlideShare a Scribd company logo
1 of 6
Download to read offline
E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H
October 2016 1 of 6
Eng. Ahmed Hafez Abd El Hamid
ADDRESS
VILLA 93, BANAFSEG 2, 1ST
SETTLEMENT, NEW CAIRO, CAIRO, EGYPT.
TEL: (+202) 22711056, CELL: (+2) 01150015455
E-MAIL: AHMEDHAFEZDAWAH@GMAIL.COM
PERSONAL
BORN ON OCTOBER 23, 1986
MARRIED
EGYPTIAN CITIZEN.
EDUCATION
M.SC 2011-2016
AIN SHAMS UNIVERSITY, CAIRO, EGYPT
MAJOR: CIVIL ENGINEERING (STRUCTURAL)
B.SC 2004-2009
AIN SHAMS UNIVERSITY, CAIRO, EGYPT
MAJOR: CIVIL ENGINEERING (STRUCTURAL) (HONORS)
EMPLOYMENT
TECHNICAL OFFICE MANGER 2013-CURRENT
CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD
TENDERING AND PROPOSAL ENGINEER 2012- 2013
CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD
TECHNICAL OFFICE ENGINEER 2010-2012
CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD
SITE ENGINEER IN POST TENSIONNING SYSTEM 2009-2011
CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD
RESPONSIBILITIES
EXECUTION, TENDERING, PROPOSALS AND TECHNICAL OFFICE FOR POST TENSIONNING SYSTEM
PARTICIPATED IN THE FOLLOWING PROJECTS:
1. IN 2016 “GRAND EGYPTIAN MUSEUM”, WAS EXECUTED FOR THE MINISTRY OF STATE FOR
ANTIQUITIES AND THE SUPREME COUNCIL OF ANTIQUITIES, THE BUILDING LOCATED AT
REMAYAH SQUARE, EGYPT. “THE BUILDING CONSTRUCTED ON A 10,000 M
2
LAND WITH A
TOTAL BUILT UP AREA OF 10,000 M
2
DIVIDED TO ROOF SLAB FOLDED PLATE. THE FLOORS
ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 275 MM THICKNESS
AND PRESTRESSED BEAMS. THE FLOORS PRESTRESSSED IN ONE DIRECTION USING 0.6 INCH
LOW RELAXATION STEEL STRANDS PROVIDED BY CSS "CONCRETE STRESSING SYSTEM CO."
LICENSEE OF CCL LTD. THE SPANS VARIED FROM 10 TO 40M. THE TOTAL CONSTRUCTION
VALUE FOR THE STRUCTURAL WORKS EQUAL TO USD 795,000,000.
E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H
October 2016 2 of 6
2. IN 2016 “PORT FOUAD MALL”, WAS EXECUTED FOR ENGINEERING AUTHORITY OF THE
EGYPTIAN ARMED FORCES, DEFENCE MINISTRY, THE BUILDING LOCATED AT PORT FOUAD,
PORT SAIED, EGYPT. “THE BUILDING CONSTRUCTED ON A 6,000 M
2
LAND WITH A TOTAL
BUILT UP AREA OF 12,000 M
2
DIVIDED ON GROUND FLOOR AND 2 TYPICAL FLOORS". THE
FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 250 MM
THICKNESS. THE FLOORS PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW
RELAXATION STEEL STRANDS PROVIDED BY CSS "CONCRETE STRESSING SYSTEM CO."
LICENSEE OF CCL LTD. THE SPANS VARIED FROM 8 TO 16M. THE TOTAL CONSTRUCTION
VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 15,000,000.
3. IN 2015 “CLEOPATRA REFLEX MALL”, WAS EXECUTED FOR CLEOPATRA GROUP, THE
BUILDING LOCATED AT 26 JULY AXIS, GIZA, EGYPT. “THE BUILDING CONSTRUCTED ON A
25,000 M
2
LAND WITH A TOTAL BUILT UP AREA OF 60,000 M
2
DIVIDED ON GROUND FLOOR AND
2 TYPICAL FLOORS". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT
PLATES OF 220 MM THICKNESS AND WAFFLE FLAT PLATES OF 600 MM THICKNESS. THE
FLOORS PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL
STRANDS. THE SPANS VARIED FROM 8 TO 16M. THE TOTAL CONSTRUCTION VALUE FOR THE
STRUCTURAL WORKS EQUAL TO EGP 90,000,000.
4. IN 2014 EL-MORSHEDY MALL WAS EXECUTED FOR BONYAN FOR INVESTEMENT &
DEVELOPMENT, THE BUILDING LOCATED IN SHEKH ZAYED CITY, EGYPT. THE BUILDING
CONSTRUCTED ON A 7,000M2 LAND WITH A TOTAL BUILT UP AREA OF 35,000M2 DIVIDED ON
TWO BASEMENTS, GROUND, AND FOUR TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED
WITH PRESTRESSED CONCRETE FLAT PLATES OF 280 MM THICKNESS AND PRESTRESSSED IN
TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED
FROM 6 TO 13.5M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE
STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL
WORKS EQUAL TO EGP 25,000,000.
5. IN 2014 DRAYAH UNIVERSITY WAS EXECUTED FOR NEW MINIA COMPANY FOR EDUCATIONAL
SERVICES, THE BUILDING LOCATED IN NEW MINIA CITY, EGYPT. THE BUILDING
CONSTRUCTED ON A 2,500M2 LAND WITH A TOTAL BUILT UP AREA OF 7,500M2 DIVIDED ON
GROUND, FIRST AND ROOF FLOOR SLAB. THE FLOORS ARE CONSTRUCTED WITH
PRESTRESSED CONCRETE FLAT PLATES OF 250 MM THICKNESS AND PRESTRESSSED IN TWO
DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6
TO 13.5M AND PRESTRESSED BEAMS IN ONE DIRECTION. THE JACKING STRESSES REACH
75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION
VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 15,000,000.
6. IN 2014 LIVING-IN MALL WAS DESIGNED FOR LIVING IN INTERIORS DESIGN HOUSE, THE
BUILDING LOCATED IN NEW CAIRO CITY, EGYPT. THE BUILDING CONSTRUCTED ON A
4,500M2 LAND WITH A TOTAL BUILT UP AREA OF 31,000M2 DIVIDED ON THREE BASEMENTS,
GROUND, AND FIVE TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED
CONCRETE FLAT PLATES OF 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS
USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 12M. THE
JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS.
THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP
20,000,000.
E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H
October 2016 3 of 6
7. IN 2013 “ETISALAT OFFICE BUILDING”, SMART VILLAGE COMPANY, WAS EXECUTED FOR
ETISALAT MISR, THE BUILDING LOCATED IN SMART VILLAGE COMPANY, CAIRO ALEXANDRIA
DESERT ROAD, EGYPT. “THE BUILDING CONSTRUCTED ON A 6,000 M
2
LAND WITH A TOTAL
BUILT UP AREA OF 40,000 M
2
DIVIDED ON TWO BASEMENTS, GROUND FLOOR AND 4 TYPICAL
FLOORS". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF
300 MM THICKNESS AND WAFFLE FLAT PLATES OF 550 MM THICKNESS. THE FLOORS
PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE
SPANS VARIED FROM 7 TO 25M. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL
WORKS EQUAL TO EGP 60,000,000.
PHOTOS DURING CONSTRUCTION
8. IN 2012 TULIP COMPOUND WAS EXECUTED FOR ABRAJ MISR, THE PROJECT LOCATED IN
ELMOKATAM, EGYPT. THE PROJECT CONSISTS OF 23 BUILDING WITH 10 DIFFERENT TYPES.
THE PROJECT CONSTRUCTED ON A 30,000M2 LAND WITH A TOTAL BUILT UP AREA OF
82,000M2 DIVIDED ON ONE BASEMENT, GROUND, AND FIVE TYPICAL FLOORS. THE FLOORS
ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 220 MM THICKNESS
AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS.
THE SPANS VARIED FROM 4 TO 8M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE
TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE
STRUCTURAL WORKS EQUAL TO EGP 35,000,000.
9. IN 2011 DAKAHLIA GROUP HQ. WAS EXECUTED FOR M/S AL-ALAMEYA FOR ENTERTAINMENT
AND TOURISM, THE BUILDING LOCATED IN NEW CAIRO CITY, EGYPT. THE BUILDING
CONSTRUCTED ON A 1,800M2 LAND WITH A TOTAL BUILT UP AREA OF 12,000M2 DIVIDED ON
TWO BASEMENTS, GROUND, AND FOUR TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED
WITH PRESTRESSED CONCRETE FLAT PLATES OF 280 AND 380 MM THICKNESS AND
PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE
SPANS VARIED FROM 6 TO 11M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE
TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE
STRUCTURAL WORKS EQUAL TO EGP 18,000,000.
10. IN 2011 RAYA OFFICE BUILDING WAS EXECUTED FOR RAYA TRADING CORP., THE BUILDING
LOCATED IN SHEKH ZAYED CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 17,000M2
LAND WITH A TOTAL BUILT UP AREA OF 70,000M2 DIVIDED ON TWO BASEMENTS, GROUND,
AND FIVE TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE
FLAT PLATES OF 220 AND 280 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS
USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 11M. THE
JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS.
THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP
60,000,000.
E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H
October 2016 4 of 6
11. IN 2011 GANIN FERTILITY HOSPITAL WAS EXECUTED FOR DR. HOSSAM ZAKI., THE BUILDING
LOCATED IN NEW CAIRO CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 4,000M2 LAND
WITH A TOTAL BUILT UP AREA OF 20,000M2 DIVIDED ON ONE BASEMENT, GROUND, AND
THREE TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE
FLAT PLATES OF 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6
INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 11M. THE JACKING
STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL
CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 30,000,000.
12. IN 2011 RAYA OFFICE BUILDING WAS EXECUTED FOR RAYA TRADING CORP., THE BUILDING
LOCATED IN LAND NO. 133, NEW CAIRO CITY, EGYPT. THE BUILDING CONSTRUCTED ON A
2,500M2 LAND WITH A TOTAL BUILT UP AREA OF 20,000M2 DIVIDED ON ONE BASEMENT,
GROUND, AND SIX TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED
CONCRETE FLAT PLATES OF 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS
USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 13M. THE
JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS.
THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP
25,000,000.
13. IN 2010 AND 2011 DAMAC PARK AVENUE ZONES (A, B, C, D & E) WAS EXECUTED FOR
DAMAC PROPERTIES, THE BUILDING LOCATED IN SHEKH ZAYED CITY, EGYPT. PARK AVENUE
PROJECT IS CONSISTING OF 6 ZONES (A, B, C, D, E & F) ON A 120,625 M2 LAND AND WITH A
TOTAL BUILT UP AREA OF 247,153.00 M2 INCLUDING A BASEMENT COVERING 102,400 M2
ACCOMMODATING AROUND 2,880 CARS. ZONES ARE SEPARATED BY SEMI SHADED
LANDSCAPED OUTDOOR AVENUES WHICH SUPPORTS THE MAIN CONCEPT OF THE PROJECT
OF PROVIDING AN OUTSTANDING OUTDOOR SHOPPING EXPERIENCE. ROAD SETBACK AREA=
APPROX 20,000.00 M2. LANDSCAPE AREA= 72,375.00 M2. THE FLOORS ARE
CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 250 AND 300 MM
THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION
STEEL STRANDS. THE SPANS VARIED FROM 7 TO 15M. THE TOTAL CONSTRUCTION VALUE
FOR THE STRUCTURAL WORKS EQUAL TO EGP 240,000,000.
PHOTOS DURING CONSTRUCTION
14. IN 2010 AND 2011 INDUSTRIAL COMPONENT BUILDING WAS EXECUTED FOR CONTACT
GROUP, THE BUILDING LOCATED IN LAND NO. 77, NEW CAIRO CITY, EGYPT. “THE BUILDING
CONSTRUCTED ON A 2,000 M
2
LAND WITH A TOTAL BUILT UP AREA OF 10,000 M
2
DIVIDED ON
TWO BASEMENTS, GROUND FLOOR, AND 6 TYPICAL FLOORS". THE FLOORS ARE
CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 250, 280 AND 300 MM
THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION
STEEL STRANDS. THE SPANS VARIED FROM 6 TO 12M. THE FLOORS RESIST DIFFERENT LIVE
LOADS CHANGED FROM 2.5 TO 20 KN/M
2
. THE TOTAL CONSTRUCTION VALUE FOR THE
E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H
October 2016 5 of 6
STRUCTURAL WORKS EQUAL TO EGP 10,000,000.
15. IN 2010 HANIMIX FACTORY FOR WOODEN & METAL INDUSTRIES WAS EXECUTED FOR
HANIMEX, THE BUILDING LOCATED IN THE INDUSTRIAL ZONE - BLOCK 20011 - LAND NO. 19,
ELOBOOR CITY, EGYPT. “THE BUILDING CONSTRUCTED ON A 1,000 M
2
LAND WITH A TOTAL
BUILT UP AREA OF 4,000 M
2
DIVIDED ON GROUND FLOOR, AND 3 TYPICAL FLOORS ". THE
FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 400 MM
THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION
STEEL STRANDS. THE SPANS VARIED FROM 6 TO 10M. THE FLOORS RESIST DIFFERENT LIVE
LOADS CHANGED FROM 1 TO 20 KN/M
2
. THE TOTAL CONSTRUCTION VALUE FOR THE
STRUCTURAL WORKS EQUAL TO EGP 15,000,000.
16. IN 2009 AND 2010 AHLI UNITED BANK EGYPT (HEAD OFFICE BUILDING) WAS EXECUTED FOR
AHLI UNITED BANK OF EGYPT, THE BUILDING LOCATED IN NEW CAIRO CITY, EGYPT. “THE
BUILDING CONSTRUCTED ON A 6,000 M2 LAND WITH A TOTAL BUILT UP AREA OF 32,500 M2
DIVIDED ON TWO BASEMENTS, GROUND FLOOR, MEZZANINE AND 3 TYPICAL FLOORS". THE
FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 320 MM
THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION
STEEL STRANDS. THE SPANS VARIED FROM 8 TO 30M. THE TOTAL CONSTRUCTION VALUE
FOR THE STRUCTURAL WORKS EQUAL TO EGP 35,000,000.
PHOTOS DURING CONSTRUCTION
POST GRADUATE COURSES
PREPARATORY COURSE FOR M.SC, [CIVIL ENGINEERING (STRUCTURAL)] 2011-2012
AIN SHAMS UNIVERSITY, CAIRO, EGYPT
THE PROFESSIONAL PROGRAM IN PROJECT MANAGEMENT (PRMG) 2011-2012
AMERICAN UNIVERSITY IN CAIRO (AUC), CAIRO, EGYPT
WRITING AND MANAGEMENT WINNING PROPOSALS FOR ENGINEERING PROJECTS 2012
AMERICAN UNIVERSITY IN CAIRO (AUC), CAIRO, EGYPT
SKILLS
EXECUTION, TENDERING, PROPOSALS AND TECHNICAL OFFICE OF PRESTRESSED CONCRETE
STRUCTURES.
KNOWLEDGE OF FINITE ELEMENT, IBM SYSTEM AND APPLICATION SOFTWARE.
CONFERENCE PARTICIPATION
FOURTEEN INTERNATIONAL CONFERENCE ON STRUCTURAL AND GEOTECHNICAL
ENGINEERING, AIN SHAMS UNIVERSITY, DEC. 2015.
E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H
October 2016 6 of 6
PUBLICATIONS
PAPERS
1. “PUNCHING BEHAVIOR OF RC SLABS RETROFITTED WITH FRP SHEETS UNDER
ECCENTRIC LOADING”, BY DAWAH A., ELAFANDY T., AND ABDELRAHMAN A., FOURTEEN
INTERNATIONAL CONFERENCE ON STRUCTURAL AND GEOTECHNICAL ENGINEERING, AIN
SHAMS UNIVERSITY, DEC. 2015.

More Related Content

Viewers also liked

калина одвічний символ україни
калина   одвічний символ україникалина   одвічний символ україни
калина одвічний символ україниНаталія Ярмолич
 
Port of Long Beach - Final Presentation.
Port of Long Beach - Final Presentation.Port of Long Beach - Final Presentation.
Port of Long Beach - Final Presentation.Bill Barrick
 
FEM Introduction: Solving ODE-BVP using the Galerkin's Method
FEM Introduction: Solving ODE-BVP using the Galerkin's MethodFEM Introduction: Solving ODE-BVP using the Galerkin's Method
FEM Introduction: Solving ODE-BVP using the Galerkin's MethodSuddhasheel GHOSH, PhD
 
プログラマ脳を鍛える会 Vol8
プログラマ脳を鍛える会 Vol8プログラマ脳を鍛える会 Vol8
プログラマ脳を鍛える会 Vol8har hogefoo
 
Descubre el mensaje
Descubre el mensajeDescubre el mensaje
Descubre el mensajeZeus Diaz
 
并购视角下国际图书出版产业的竞争战略
并购视角下国际图书出版产业的竞争战略并购视角下国际图书出版产业的竞争战略
并购视角下国际图书出版产业的竞争战略zhong sun
 
6º.4 .msf. esquema
6º.4 .msf. esquema6º.4 .msf. esquema
6º.4 .msf. esquemafrangober
 
Millennials Will Inherit the Industry
Millennials Will Inherit the IndustryMillennials Will Inherit the Industry
Millennials Will Inherit the IndustryFathomllc
 
プログラマ脳を鍛える会 Vol1
プログラマ脳を鍛える会 Vol1プログラマ脳を鍛える会 Vol1
プログラマ脳を鍛える会 Vol1har hogefoo
 

Viewers also liked (13)

5603226-sl-SI
5603226-sl-SI5603226-sl-SI
5603226-sl-SI
 
калина одвічний символ україни
калина   одвічний символ україникалина   одвічний символ україни
калина одвічний символ україни
 
Resume - Nikhil_Sreekumar
Resume - Nikhil_SreekumarResume - Nikhil_Sreekumar
Resume - Nikhil_Sreekumar
 
Gene ict 1
Gene ict 1Gene ict 1
Gene ict 1
 
Port of Long Beach - Final Presentation.
Port of Long Beach - Final Presentation.Port of Long Beach - Final Presentation.
Port of Long Beach - Final Presentation.
 
resumeCoreyWilliams2
resumeCoreyWilliams2resumeCoreyWilliams2
resumeCoreyWilliams2
 
FEM Introduction: Solving ODE-BVP using the Galerkin's Method
FEM Introduction: Solving ODE-BVP using the Galerkin's MethodFEM Introduction: Solving ODE-BVP using the Galerkin's Method
FEM Introduction: Solving ODE-BVP using the Galerkin's Method
 
プログラマ脳を鍛える会 Vol8
プログラマ脳を鍛える会 Vol8プログラマ脳を鍛える会 Vol8
プログラマ脳を鍛える会 Vol8
 
Descubre el mensaje
Descubre el mensajeDescubre el mensaje
Descubre el mensaje
 
并购视角下国际图书出版产业的竞争战略
并购视角下国际图书出版产业的竞争战略并购视角下国际图书出版产业的竞争战略
并购视角下国际图书出版产业的竞争战略
 
6º.4 .msf. esquema
6º.4 .msf. esquema6º.4 .msf. esquema
6º.4 .msf. esquema
 
Millennials Will Inherit the Industry
Millennials Will Inherit the IndustryMillennials Will Inherit the Industry
Millennials Will Inherit the Industry
 
プログラマ脳を鍛える会 Vol1
プログラマ脳を鍛える会 Vol1プログラマ脳を鍛える会 Vol1
プログラマ脳を鍛える会 Vol1
 

Similar to Eng.Ahmed Hafez-January 2017

Steel construction for the 2018 FIFA World Cup in Russia
Steel construction for the 2018 FIFA World Cup in RussiaSteel construction for the 2018 FIFA World Cup in Russia
Steel construction for the 2018 FIFA World Cup in RussiaShapeCUT
 
Skys crapper shanghai tower presentation
Skys crapper shanghai tower presentationSkys crapper shanghai tower presentation
Skys crapper shanghai tower presentationRaiyyanKhalak
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016Hossam A.Aziz
 
Construction Manager
Construction ManagerConstruction Manager
Construction ManagerAhmed Shalan
 
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...IRJET Journal
 
WS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSION
WS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSIONWS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSION
WS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSIONMohammed Omar
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesAkshey Sharma
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABISelf employed
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfAlasAlthaher
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay SandsBimenpreet Kaur
 
curriculum vitae with a photo
curriculum vitae with a photocurriculum vitae with a photo
curriculum vitae with a photoTaysser Ahmed
 
Izgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - AprilIzgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - AprilMurat Cengiz
 
Westpark Imperia offices and showroom
Westpark Imperia offices and showroomWestpark Imperia offices and showroom
Westpark Imperia offices and showroomSachin Jain
 
Shahid Alam(Resume for Structural)
Shahid Alam(Resume for Structural)Shahid Alam(Resume for Structural)
Shahid Alam(Resume for Structural)SHAHID ALAM
 
Eng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewEng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewHassan Ossama
 
Omar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab
 

Similar to Eng.Ahmed Hafez-January 2017 (20)

Steel construction for the 2018 FIFA World Cup in Russia
Steel construction for the 2018 FIFA World Cup in RussiaSteel construction for the 2018 FIFA World Cup in Russia
Steel construction for the 2018 FIFA World Cup in Russia
 
Skys crapper shanghai tower presentation
Skys crapper shanghai tower presentationSkys crapper shanghai tower presentation
Skys crapper shanghai tower presentation
 
Hossam resume 12 2016
Hossam resume 12 2016Hossam resume 12 2016
Hossam resume 12 2016
 
Construction Manager
Construction ManagerConstruction Manager
Construction Manager
 
Final ES CP July 2016
Final ES CP July 2016Final ES CP July 2016
Final ES CP July 2016
 
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
STUDY OF COMPARISON BETWEEN TWO ATRIUM BUILDINGS IN VARIOUS SEISMIC ZONES WIT...
 
WS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSION
WS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSIONWS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSION
WS COMPARATIVE ADVANTAGE AND BLDG DETAILS_ENGLISH VERSION
 
Burj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologiesBurj Khalifa - Design & construction technologies
Burj Khalifa - Design & construction technologies
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
curriculum vitae with a photo
curriculum vitae with a photocurriculum vitae with a photo
curriculum vitae with a photo
 
STANLEY. UPDATED CV
STANLEY. UPDATED CVSTANLEY. UPDATED CV
STANLEY. UPDATED CV
 
Izgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - AprilIzgen On Going Projects - Danieli - April
Izgen On Going Projects - Danieli - April
 
Westpark Imperia offices and showroom
Westpark Imperia offices and showroomWestpark Imperia offices and showroom
Westpark Imperia offices and showroom
 
Shahid Alam(Resume for Structural)
Shahid Alam(Resume for Structural)Shahid Alam(Resume for Structural)
Shahid Alam(Resume for Structural)
 
Eng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewEng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 New
 
IMT SlideShare
IMT SlideShareIMT SlideShare
IMT SlideShare
 
Omar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab_CVECG
Omar Khattab_CVECG
 

Eng.Ahmed Hafez-January 2017

  • 1. E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H October 2016 1 of 6 Eng. Ahmed Hafez Abd El Hamid ADDRESS VILLA 93, BANAFSEG 2, 1ST SETTLEMENT, NEW CAIRO, CAIRO, EGYPT. TEL: (+202) 22711056, CELL: (+2) 01150015455 E-MAIL: AHMEDHAFEZDAWAH@GMAIL.COM PERSONAL BORN ON OCTOBER 23, 1986 MARRIED EGYPTIAN CITIZEN. EDUCATION M.SC 2011-2016 AIN SHAMS UNIVERSITY, CAIRO, EGYPT MAJOR: CIVIL ENGINEERING (STRUCTURAL) B.SC 2004-2009 AIN SHAMS UNIVERSITY, CAIRO, EGYPT MAJOR: CIVIL ENGINEERING (STRUCTURAL) (HONORS) EMPLOYMENT TECHNICAL OFFICE MANGER 2013-CURRENT CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD TENDERING AND PROPOSAL ENGINEER 2012- 2013 CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD TECHNICAL OFFICE ENGINEER 2010-2012 CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD SITE ENGINEER IN POST TENSIONNING SYSTEM 2009-2011 CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD RESPONSIBILITIES EXECUTION, TENDERING, PROPOSALS AND TECHNICAL OFFICE FOR POST TENSIONNING SYSTEM PARTICIPATED IN THE FOLLOWING PROJECTS: 1. IN 2016 “GRAND EGYPTIAN MUSEUM”, WAS EXECUTED FOR THE MINISTRY OF STATE FOR ANTIQUITIES AND THE SUPREME COUNCIL OF ANTIQUITIES, THE BUILDING LOCATED AT REMAYAH SQUARE, EGYPT. “THE BUILDING CONSTRUCTED ON A 10,000 M 2 LAND WITH A TOTAL BUILT UP AREA OF 10,000 M 2 DIVIDED TO ROOF SLAB FOLDED PLATE. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 275 MM THICKNESS AND PRESTRESSED BEAMS. THE FLOORS PRESTRESSSED IN ONE DIRECTION USING 0.6 INCH LOW RELAXATION STEEL STRANDS PROVIDED BY CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD. THE SPANS VARIED FROM 10 TO 40M. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO USD 795,000,000.
  • 2. E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H October 2016 2 of 6 2. IN 2016 “PORT FOUAD MALL”, WAS EXECUTED FOR ENGINEERING AUTHORITY OF THE EGYPTIAN ARMED FORCES, DEFENCE MINISTRY, THE BUILDING LOCATED AT PORT FOUAD, PORT SAIED, EGYPT. “THE BUILDING CONSTRUCTED ON A 6,000 M 2 LAND WITH A TOTAL BUILT UP AREA OF 12,000 M 2 DIVIDED ON GROUND FLOOR AND 2 TYPICAL FLOORS". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 250 MM THICKNESS. THE FLOORS PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS PROVIDED BY CSS "CONCRETE STRESSING SYSTEM CO." LICENSEE OF CCL LTD. THE SPANS VARIED FROM 8 TO 16M. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 15,000,000. 3. IN 2015 “CLEOPATRA REFLEX MALL”, WAS EXECUTED FOR CLEOPATRA GROUP, THE BUILDING LOCATED AT 26 JULY AXIS, GIZA, EGYPT. “THE BUILDING CONSTRUCTED ON A 25,000 M 2 LAND WITH A TOTAL BUILT UP AREA OF 60,000 M 2 DIVIDED ON GROUND FLOOR AND 2 TYPICAL FLOORS". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 220 MM THICKNESS AND WAFFLE FLAT PLATES OF 600 MM THICKNESS. THE FLOORS PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 8 TO 16M. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 90,000,000. 4. IN 2014 EL-MORSHEDY MALL WAS EXECUTED FOR BONYAN FOR INVESTEMENT & DEVELOPMENT, THE BUILDING LOCATED IN SHEKH ZAYED CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 7,000M2 LAND WITH A TOTAL BUILT UP AREA OF 35,000M2 DIVIDED ON TWO BASEMENTS, GROUND, AND FOUR TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 280 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 13.5M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 25,000,000. 5. IN 2014 DRAYAH UNIVERSITY WAS EXECUTED FOR NEW MINIA COMPANY FOR EDUCATIONAL SERVICES, THE BUILDING LOCATED IN NEW MINIA CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 2,500M2 LAND WITH A TOTAL BUILT UP AREA OF 7,500M2 DIVIDED ON GROUND, FIRST AND ROOF FLOOR SLAB. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 250 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 13.5M AND PRESTRESSED BEAMS IN ONE DIRECTION. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 15,000,000. 6. IN 2014 LIVING-IN MALL WAS DESIGNED FOR LIVING IN INTERIORS DESIGN HOUSE, THE BUILDING LOCATED IN NEW CAIRO CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 4,500M2 LAND WITH A TOTAL BUILT UP AREA OF 31,000M2 DIVIDED ON THREE BASEMENTS, GROUND, AND FIVE TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 12M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 20,000,000.
  • 3. E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H October 2016 3 of 6 7. IN 2013 “ETISALAT OFFICE BUILDING”, SMART VILLAGE COMPANY, WAS EXECUTED FOR ETISALAT MISR, THE BUILDING LOCATED IN SMART VILLAGE COMPANY, CAIRO ALEXANDRIA DESERT ROAD, EGYPT. “THE BUILDING CONSTRUCTED ON A 6,000 M 2 LAND WITH A TOTAL BUILT UP AREA OF 40,000 M 2 DIVIDED ON TWO BASEMENTS, GROUND FLOOR AND 4 TYPICAL FLOORS". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 300 MM THICKNESS AND WAFFLE FLAT PLATES OF 550 MM THICKNESS. THE FLOORS PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 7 TO 25M. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 60,000,000. PHOTOS DURING CONSTRUCTION 8. IN 2012 TULIP COMPOUND WAS EXECUTED FOR ABRAJ MISR, THE PROJECT LOCATED IN ELMOKATAM, EGYPT. THE PROJECT CONSISTS OF 23 BUILDING WITH 10 DIFFERENT TYPES. THE PROJECT CONSTRUCTED ON A 30,000M2 LAND WITH A TOTAL BUILT UP AREA OF 82,000M2 DIVIDED ON ONE BASEMENT, GROUND, AND FIVE TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 220 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 4 TO 8M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 35,000,000. 9. IN 2011 DAKAHLIA GROUP HQ. WAS EXECUTED FOR M/S AL-ALAMEYA FOR ENTERTAINMENT AND TOURISM, THE BUILDING LOCATED IN NEW CAIRO CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 1,800M2 LAND WITH A TOTAL BUILT UP AREA OF 12,000M2 DIVIDED ON TWO BASEMENTS, GROUND, AND FOUR TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 280 AND 380 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 11M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 18,000,000. 10. IN 2011 RAYA OFFICE BUILDING WAS EXECUTED FOR RAYA TRADING CORP., THE BUILDING LOCATED IN SHEKH ZAYED CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 17,000M2 LAND WITH A TOTAL BUILT UP AREA OF 70,000M2 DIVIDED ON TWO BASEMENTS, GROUND, AND FIVE TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 220 AND 280 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 11M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 60,000,000.
  • 4. E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H October 2016 4 of 6 11. IN 2011 GANIN FERTILITY HOSPITAL WAS EXECUTED FOR DR. HOSSAM ZAKI., THE BUILDING LOCATED IN NEW CAIRO CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 4,000M2 LAND WITH A TOTAL BUILT UP AREA OF 20,000M2 DIVIDED ON ONE BASEMENT, GROUND, AND THREE TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 11M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 30,000,000. 12. IN 2011 RAYA OFFICE BUILDING WAS EXECUTED FOR RAYA TRADING CORP., THE BUILDING LOCATED IN LAND NO. 133, NEW CAIRO CITY, EGYPT. THE BUILDING CONSTRUCTED ON A 2,500M2 LAND WITH A TOTAL BUILT UP AREA OF 20,000M2 DIVIDED ON ONE BASEMENT, GROUND, AND SIX TYPICAL FLOORS. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 13M. THE JACKING STRESSES REACH 75% OF THE ULTIMATE TENSILE STRENGTH OF THE STRANDS. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 25,000,000. 13. IN 2010 AND 2011 DAMAC PARK AVENUE ZONES (A, B, C, D & E) WAS EXECUTED FOR DAMAC PROPERTIES, THE BUILDING LOCATED IN SHEKH ZAYED CITY, EGYPT. PARK AVENUE PROJECT IS CONSISTING OF 6 ZONES (A, B, C, D, E & F) ON A 120,625 M2 LAND AND WITH A TOTAL BUILT UP AREA OF 247,153.00 M2 INCLUDING A BASEMENT COVERING 102,400 M2 ACCOMMODATING AROUND 2,880 CARS. ZONES ARE SEPARATED BY SEMI SHADED LANDSCAPED OUTDOOR AVENUES WHICH SUPPORTS THE MAIN CONCEPT OF THE PROJECT OF PROVIDING AN OUTSTANDING OUTDOOR SHOPPING EXPERIENCE. ROAD SETBACK AREA= APPROX 20,000.00 M2. LANDSCAPE AREA= 72,375.00 M2. THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 250 AND 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 7 TO 15M. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 240,000,000. PHOTOS DURING CONSTRUCTION 14. IN 2010 AND 2011 INDUSTRIAL COMPONENT BUILDING WAS EXECUTED FOR CONTACT GROUP, THE BUILDING LOCATED IN LAND NO. 77, NEW CAIRO CITY, EGYPT. “THE BUILDING CONSTRUCTED ON A 2,000 M 2 LAND WITH A TOTAL BUILT UP AREA OF 10,000 M 2 DIVIDED ON TWO BASEMENTS, GROUND FLOOR, AND 6 TYPICAL FLOORS". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 250, 280 AND 300 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 12M. THE FLOORS RESIST DIFFERENT LIVE LOADS CHANGED FROM 2.5 TO 20 KN/M 2 . THE TOTAL CONSTRUCTION VALUE FOR THE
  • 5. E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H October 2016 5 of 6 STRUCTURAL WORKS EQUAL TO EGP 10,000,000. 15. IN 2010 HANIMIX FACTORY FOR WOODEN & METAL INDUSTRIES WAS EXECUTED FOR HANIMEX, THE BUILDING LOCATED IN THE INDUSTRIAL ZONE - BLOCK 20011 - LAND NO. 19, ELOBOOR CITY, EGYPT. “THE BUILDING CONSTRUCTED ON A 1,000 M 2 LAND WITH A TOTAL BUILT UP AREA OF 4,000 M 2 DIVIDED ON GROUND FLOOR, AND 3 TYPICAL FLOORS ". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 400 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 6 TO 10M. THE FLOORS RESIST DIFFERENT LIVE LOADS CHANGED FROM 1 TO 20 KN/M 2 . THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 15,000,000. 16. IN 2009 AND 2010 AHLI UNITED BANK EGYPT (HEAD OFFICE BUILDING) WAS EXECUTED FOR AHLI UNITED BANK OF EGYPT, THE BUILDING LOCATED IN NEW CAIRO CITY, EGYPT. “THE BUILDING CONSTRUCTED ON A 6,000 M2 LAND WITH A TOTAL BUILT UP AREA OF 32,500 M2 DIVIDED ON TWO BASEMENTS, GROUND FLOOR, MEZZANINE AND 3 TYPICAL FLOORS". THE FLOORS ARE CONSTRUCTED WITH PRESTRESSED CONCRETE FLAT PLATES OF 320 MM THICKNESS AND PRESTRESSSED IN TWO DIRECTIONS USING 0.6 INCH LOW RELAXATION STEEL STRANDS. THE SPANS VARIED FROM 8 TO 30M. THE TOTAL CONSTRUCTION VALUE FOR THE STRUCTURAL WORKS EQUAL TO EGP 35,000,000. PHOTOS DURING CONSTRUCTION POST GRADUATE COURSES PREPARATORY COURSE FOR M.SC, [CIVIL ENGINEERING (STRUCTURAL)] 2011-2012 AIN SHAMS UNIVERSITY, CAIRO, EGYPT THE PROFESSIONAL PROGRAM IN PROJECT MANAGEMENT (PRMG) 2011-2012 AMERICAN UNIVERSITY IN CAIRO (AUC), CAIRO, EGYPT WRITING AND MANAGEMENT WINNING PROPOSALS FOR ENGINEERING PROJECTS 2012 AMERICAN UNIVERSITY IN CAIRO (AUC), CAIRO, EGYPT SKILLS EXECUTION, TENDERING, PROPOSALS AND TECHNICAL OFFICE OF PRESTRESSED CONCRETE STRUCTURES. KNOWLEDGE OF FINITE ELEMENT, IBM SYSTEM AND APPLICATION SOFTWARE. CONFERENCE PARTICIPATION FOURTEEN INTERNATIONAL CONFERENCE ON STRUCTURAL AND GEOTECHNICAL ENGINEERING, AIN SHAMS UNIVERSITY, DEC. 2015.
  • 6. E N G . A H M E D H A F E Z A B D E L H A M I D D A W A H October 2016 6 of 6 PUBLICATIONS PAPERS 1. “PUNCHING BEHAVIOR OF RC SLABS RETROFITTED WITH FRP SHEETS UNDER ECCENTRIC LOADING”, BY DAWAH A., ELAFANDY T., AND ABDELRAHMAN A., FOURTEEN INTERNATIONAL CONFERENCE ON STRUCTURAL AND GEOTECHNICAL ENGINEERING, AIN SHAMS UNIVERSITY, DEC. 2015.