SlideShare a Scribd company logo
1 of 4
AHMED ABDEL FATTAH AHMED SHALAN
Date of Birth: 04-11-1977
Place of Birth: Tanta,Egypt
Nationality: Egyptian
Marital Status: Married
PermanentAddress: NasirCity- Cairo- Egypt
Contact Telephone: +201063697974
shalan@yahoo.comhmdEmail address:
OBJECTIVE
Seeking a challenging position in the civil engineering field for one of the most reputable companies
around the world where hard workers are rewarded and gaining the experience that will benefit both
the company and the employee.
EDUCATION
.Cairo, Egypt–Universityto2001 AL Azhar6199
Graduated from the Faculty of Engineering - Civil Department. Major main courses: Structural
Analysis, Concrete Design, Soil Mechanics, Steel Structure and Project Management.
Graduation project: Project Management for International Medical Center in Cairo – Egypt.
:EXPERIENCEWORK
AlrwoadModernEngeneering:nowtill5. 201ulForm J
Working as construction manager in Egypt
Project:*new Giza University – (150.000.000 EGP)
* Maxim Mall (100.000.000 EGP)
:HassanAllamConstructionjun20152014 till.unForm J
Working as Construction Section Engineer in Algeria branch
Projects: * Boufarik Power Plant – (55,000,000 €)
* Chlef Cement Project – (22,000,000 €)
nypa2013:EGYTECH Com.2012 to Dec.SepromF
Working as project manager in building (C) at Cairo airport
Cost (36,000,000) EGP all concert work
ational companyNarafi2012 Kh.Augto2011.ctOFrom
Working as project engineer in West Damietta Power Station (500 MW) cost (18,000,000) EGP. All
concrete & finishing works.
onstructionHassn AllamC2011:.ugAto2010ec.DFrom
Working as project engineer in Alshabab Power station in AL Ismailia (1000 MW). Cost (220,000,000)
EGP. All concrete works for foundations &buildings.
llamconstructionAHassan2010:.Nov009 to2Aug.From
Working as project engineer in cement Arabia factory in Al Ain Al sokhna.
Cost (2,000,000) EGP. Concrete works for two Cement silos (slip form) & one cement mill.
companylding ContractingBui2009:Ashamil.epS2008 toec.DFrom
Working as project manager in Sharjah cooperative society (Algren mall).
companyconstruction2008:Arabtec.Nov2007 to.NovFrom
Working as construction manager in Dubai Racecourse project (cost 4, 6 billion Dhs).
Pile caps, concrete works, slip form, steel structures.
2007:Al Arrab General contracting Company..ovN2006 toFromJun.
Working as project Engineer on belrashed tower (G+4B+25 typ. + Health Club).Piles, pile caps,
concrete, finishing (block works, plastering, painting, tiles, skirting walls).
2006:Al Zamalek contracting company..Nov2004 to.FromSep
Working as project Engineer in (G+6) building
Piles, pile cap, concrete, finishing (block works, plastering, painting, tiles, skirting wall).
Working as site Engineer on Al Niamey tower (G+16TYP)
Concrete, finishing (block works, plastering).
Egypt).-2004:Egyptian officecontractor (Tanta. 2001 to Jul.FromSep
Working as site Engineer, Q/S and maintenance steel &concrete project & Sewage station project.
Computer Skills:
AutoCad ( 2014) – Primavera (P3) - Microsoft Office
Activities/Interest:
Football &Reading
Languages
Arabic- Mother Tongue
English - Fluent
References
Available upon request
Construction Manager

More Related Content

What's hot

Eng.khaled CV update
Eng.khaled CV update Eng.khaled CV update
Eng.khaled CV update Khaled Hassen
 
ahmed hassan khalil (myc.v)
ahmed hassan khalil (myc.v)ahmed hassan khalil (myc.v)
ahmed hassan khalil (myc.v)ahmed hassan
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineerahmed zain
 
CV Osama Salah Aug 2015
CV Osama Salah Aug 2015CV Osama Salah Aug 2015
CV Osama Salah Aug 2015osama shahin
 
Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud M.Khairy
 
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 newahmed elbouz
 
Updated khaled fahmy cv
Updated khaled fahmy cvUpdated khaled fahmy cv
Updated khaled fahmy cvKHALED FAHMY
 
c.v mohab A.hamza (References)
c.v mohab A.hamza (References) c.v mohab A.hamza (References)
c.v mohab A.hamza (References) Mohab Hamza
 
Mahmoud_Bakr_Portfolio
Mahmoud_Bakr_PortfolioMahmoud_Bakr_Portfolio
Mahmoud_Bakr_PortfolioMahmoud Bakr
 

What's hot (19)

Eng.khaled CV update
Eng.khaled CV update Eng.khaled CV update
Eng.khaled CV update
 
ahmed hassan khalil (myc.v)
ahmed hassan khalil (myc.v)ahmed hassan khalil (myc.v)
ahmed hassan khalil (myc.v)
 
Ahmed zain -mechanical engineer
Ahmed zain -mechanical engineerAhmed zain -mechanical engineer
Ahmed zain -mechanical engineer
 
Youssef CV pdf
Youssef CV pdfYoussef CV pdf
Youssef CV pdf
 
CV Osama Salah Aug 2015
CV Osama Salah Aug 2015CV Osama Salah Aug 2015
CV Osama Salah Aug 2015
 
Mina 2016
Mina 2016Mina 2016
Mina 2016
 
Hossam Hendawy 2016
Hossam Hendawy 2016Hossam Hendawy 2016
Hossam Hendawy 2016
 
Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)Mahmoud-Mostafa-Khairy-cv (1)
Mahmoud-Mostafa-Khairy-cv (1)
 
Hassan Omar
Hassan OmarHassan Omar
Hassan Omar
 
m.anwar c.v ( E )
m.anwar c.v ( E )m.anwar c.v ( E )
m.anwar c.v ( E )
 
Ahmed's resume
Ahmed's resume Ahmed's resume
Ahmed's resume
 
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 new
 
Updated khaled fahmy cv
Updated khaled fahmy cvUpdated khaled fahmy cv
Updated khaled fahmy cv
 
Cv rebbouche bilal en
Cv rebbouche bilal enCv rebbouche bilal en
Cv rebbouche bilal en
 
yasser C.V (K.S.A)..
yasser C.V (K.S.A)..yasser C.V (K.S.A)..
yasser C.V (K.S.A)..
 
Marwan Shafie
Marwan ShafieMarwan Shafie
Marwan Shafie
 
Kamal CV
Kamal CVKamal CV
Kamal CV
 
c.v mohab A.hamza (References)
c.v mohab A.hamza (References) c.v mohab A.hamza (References)
c.v mohab A.hamza (References)
 
Mahmoud_Bakr_Portfolio
Mahmoud_Bakr_PortfolioMahmoud_Bakr_Portfolio
Mahmoud_Bakr_Portfolio
 

Viewers also liked

SERVS 1603 MarApr 2016 V2
SERVS 1603 MarApr 2016 V2SERVS 1603 MarApr 2016 V2
SERVS 1603 MarApr 2016 V2Johnna Harrison
 
ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...
ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...
ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...IPPOKRATIS DASKALAKIS
 
Sistema locomotor prof Ivanise Meyer
Sistema locomotor prof Ivanise MeyerSistema locomotor prof Ivanise Meyer
Sistema locomotor prof Ivanise MeyerIvanise Meyer
 
inventory control system
inventory control systeminventory control system
inventory control systemSonali Kukreja
 
фотоотчет на сайт ладушки ладошки -
фотоотчет на сайт ладушки ладошки -фотоотчет на сайт ладушки ладошки -
фотоотчет на сайт ладушки ладошки -virtualtaganrog
 
Game theory project
Game theory projectGame theory project
Game theory projectAagam Shah
 

Viewers also liked (8)

SERVS 1603 MarApr 2016 V2
SERVS 1603 MarApr 2016 V2SERVS 1603 MarApr 2016 V2
SERVS 1603 MarApr 2016 V2
 
ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...
ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...
ΣΥΝΕΔΡΙΟ ΥΨΗΛΗΣ ΣΤΡΑΤΗΓΙΚΗΣ ΙΔΙΣ-ΓΕΕΘΑ-ΦΥΣΗ ΣΥΓΚΡΟΥΣΕΩΝ ΚΑΙ ΜΕΛΛΟΝΤΙΚΟ ΕΠΙΧΕΙ...
 
wipe station
wipe stationwipe station
wipe station
 
Sistema locomotor prof Ivanise Meyer
Sistema locomotor prof Ivanise MeyerSistema locomotor prof Ivanise Meyer
Sistema locomotor prof Ivanise Meyer
 
inventory control system
inventory control systeminventory control system
inventory control system
 
фотоотчет на сайт ладушки ладошки -
фотоотчет на сайт ладушки ладошки -фотоотчет на сайт ладушки ладошки -
фотоотчет на сайт ладушки ладошки -
 
Josh CV
Josh CVJosh CV
Josh CV
 
Game theory project
Game theory projectGame theory project
Game theory project
 

Similar to Construction Manager

Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed El-Anwar
 
Steel Design Works Portfolio
Steel Design Works PortfolioSteel Design Works Portfolio
Steel Design Works PortfolioMohamed Ragih
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016Mohammed Salah
 
Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1SAMIH FAHMY
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
eslam eldesoky CV - 2016 - M
eslam eldesoky CV - 2016 - Meslam eldesoky CV - 2016 - M
eslam eldesoky CV - 2016 - MEslam Elhager
 

Similar to Construction Manager (20)

C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Al Forkan
Al ForkanAl Forkan
Al Forkan
 
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
Mohamed mustafa mohamed el anwar .general lifting supervisor & lifting pl...
 
John Gamil CV
John Gamil CVJohn Gamil CV
John Gamil CV
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
Mohamed Ashraf_CV
Mohamed Ashraf_CVMohamed Ashraf_CV
Mohamed Ashraf_CV
 
EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016EMAD ABDELAZIM CV 2016
EMAD ABDELAZIM CV 2016
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
Steel Design Works Portfolio
Steel Design Works PortfolioSteel Design Works Portfolio
Steel Design Works Portfolio
 
Basma Abdel-monem cv
Basma Abdel-monem cvBasma Abdel-monem cv
Basma Abdel-monem cv
 
MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016MOHAMED SALAH C.V 2016
MOHAMED SALAH C.V 2016
 
remon rezek c.v
remon rezek c.vremon rezek c.v
remon rezek c.v
 
cv elsayed
cv elsayedcv elsayed
cv elsayed
 
Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1Eng. Samih Fahmy Resume1
Eng. Samih Fahmy Resume1
 
mohamed solyman Cv22
mohamed solyman Cv22 mohamed solyman Cv22
mohamed solyman Cv22
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
My C.V -Updated Mrach 2015
My C.V -Updated Mrach 2015My C.V -Updated Mrach 2015
My C.V -Updated Mrach 2015
 
yasser radwan
yasser radwanyasser radwan
yasser radwan
 
eslam eldesoky CV - 2016 - M
eslam eldesoky CV - 2016 - Meslam eldesoky CV - 2016 - M
eslam eldesoky CV - 2016 - M
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 

Construction Manager

  • 1. AHMED ABDEL FATTAH AHMED SHALAN Date of Birth: 04-11-1977 Place of Birth: Tanta,Egypt Nationality: Egyptian Marital Status: Married PermanentAddress: NasirCity- Cairo- Egypt Contact Telephone: +201063697974 shalan@yahoo.comhmdEmail address: OBJECTIVE Seeking a challenging position in the civil engineering field for one of the most reputable companies around the world where hard workers are rewarded and gaining the experience that will benefit both the company and the employee. EDUCATION .Cairo, Egypt–Universityto2001 AL Azhar6199 Graduated from the Faculty of Engineering - Civil Department. Major main courses: Structural Analysis, Concrete Design, Soil Mechanics, Steel Structure and Project Management. Graduation project: Project Management for International Medical Center in Cairo – Egypt. :EXPERIENCEWORK AlrwoadModernEngeneering:nowtill5. 201ulForm J Working as construction manager in Egypt Project:*new Giza University – (150.000.000 EGP) * Maxim Mall (100.000.000 EGP)
  • 2. :HassanAllamConstructionjun20152014 till.unForm J Working as Construction Section Engineer in Algeria branch Projects: * Boufarik Power Plant – (55,000,000 €) * Chlef Cement Project – (22,000,000 €) nypa2013:EGYTECH Com.2012 to Dec.SepromF Working as project manager in building (C) at Cairo airport Cost (36,000,000) EGP all concert work ational companyNarafi2012 Kh.Augto2011.ctOFrom Working as project engineer in West Damietta Power Station (500 MW) cost (18,000,000) EGP. All concrete & finishing works. onstructionHassn AllamC2011:.ugAto2010ec.DFrom Working as project engineer in Alshabab Power station in AL Ismailia (1000 MW). Cost (220,000,000) EGP. All concrete works for foundations &buildings. llamconstructionAHassan2010:.Nov009 to2Aug.From Working as project engineer in cement Arabia factory in Al Ain Al sokhna. Cost (2,000,000) EGP. Concrete works for two Cement silos (slip form) & one cement mill. companylding ContractingBui2009:Ashamil.epS2008 toec.DFrom Working as project manager in Sharjah cooperative society (Algren mall). companyconstruction2008:Arabtec.Nov2007 to.NovFrom Working as construction manager in Dubai Racecourse project (cost 4, 6 billion Dhs). Pile caps, concrete works, slip form, steel structures. 2007:Al Arrab General contracting Company..ovN2006 toFromJun. Working as project Engineer on belrashed tower (G+4B+25 typ. + Health Club).Piles, pile caps, concrete, finishing (block works, plastering, painting, tiles, skirting walls). 2006:Al Zamalek contracting company..Nov2004 to.FromSep
  • 3. Working as project Engineer in (G+6) building Piles, pile cap, concrete, finishing (block works, plastering, painting, tiles, skirting wall). Working as site Engineer on Al Niamey tower (G+16TYP) Concrete, finishing (block works, plastering). Egypt).-2004:Egyptian officecontractor (Tanta. 2001 to Jul.FromSep Working as site Engineer, Q/S and maintenance steel &concrete project & Sewage station project. Computer Skills: AutoCad ( 2014) – Primavera (P3) - Microsoft Office Activities/Interest: Football &Reading Languages Arabic- Mother Tongue English - Fluent References Available upon request