SlideShare a Scribd company logo
Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 1 of 6
Mutaz Ahmed Ali Osman
Resident Add: Saudi Arabia – Riyadh
Mobile: +966501834091 Iqama: Transferable
Material Status: Single Email Address: mutaz.ahmed.ali@live.com
An accomplished professional, seeking mid managerial assignments in Project Management &
Implementation with an organization of repute in Telecom sector, preferably in Saudi Arabia
PROFILE
Health Insurance management professional with expertise in development of
corporate and business projects and programs across large multi-divisional business units.
Recognized for business strategy development and program analysis and implementation to
reduce risk and increase operational productivity and efficiencies. Demonstrated leadership in
business process improvement, complex problem resolution, organizational change and project
management, gaining business consensus, and implementing technology solution decisions.
Job Objective
To secure a position with an expanding company as Telecommunications Project Manager where my
education and experience can be utilized to the fullest.
Employment Experience: Total years of experience 11+ yrs
Senior Project Manager, Huda Constructing St. Saudi – Riyadh February 2015 – Till now
Contractor with Huawei & Mobily
Project: Zain & Mobily (IBS project)
 Expert in IBS Phases and technicalities(DAS,CW,EM)
 Direct and manage IBS project covering the whole IBS cycle (SAQ, Design, Implementation and Acceptance
 Ensure that plans are entered into the standardized format and updated on daily basis
 Delegate team tasks
 Facilitate team tasks appropriately, problem solver, decision maker and able to motivate team member
 Facilitate ongoing evaluation of his team
 Verify progress and quality of work against agreed specifications and plans and report any deviations as per
project process
 Verify the accuracy and quality for all documents and site reports submitted
 Manage project budget, Monitor and Control Cost, time and Quality.
 Ensure timely invoicing of the project, and follow up the accounts
Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 2 of 6
Project Manager ,Takhatob Telecommunication .Saudi- Riyadh
Company ASP with NSN & Huawei
Project : Zain Saudi(swap , IBS & FTK) and STC(USF9 & FTK)
 Reports daily and weekly project Status to the GM head
 Works closely with the Project Coordinator to ensure that project-related assets, such
as communications, documentation and artifacts are updated and maintained
 Submit monthly timesheets
 Monitoring project risks and scope creep to identify potential problems and proactively
identifying solutions to address them in advance.
 Escalating promptly any issues that may impact operations.
 Producing stage plans, highlight reports, risk logs, requests for change etc.
 Providing strategic direction during the implementation stages.
 Managing client expectations by ensuring the delivery of the highest quality service
 Acting on client feedback.
 Monitoring staff & team performance
 Attend and participate in customer/ vendor meetings.
 Resolves conflicts when and where needed
Apr2014 – November2016
Project Coordinator , FCGI in Saudi- Jadda Company ASP with Ericsson
Project: STC (FTK& Add LTE) And Mobily (FTK, LTE1800,LTE2300,W900)
 Attend and collaborate in planning meetings.
 Preparing the handover document (binder, site master data)
 Support the teams in the technical issue
 Determine and prepare the scope of work for services and Engineering,
Procurement.
 Prepare project execution plans, contracting strategy and prepare project cost
estimation.
 Preparing the handover document (binder, site master data)
 Preparing the sites Reports
 Submit monthly timesheets
 Supervise equipments installation, testing and commissioning according to the
vendor standards.
 Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
 Attend and participate in customer/ vendor meetings.
May 2013 – March 2014
Project Coordinator, PLUS Inter Co. Ltd.
Zain Sudan 2G/3G Project
 Attend and collaborate in planning meetings.
 Determine and prepare the scope of work for services and Engineering,
Procurement.
 Prepare project execution plans, contracting strategy and prepare project cost
estimation.
Apr 2010 – May 2012
Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 3 of 6
 Supervise equipments installation, testing and commissioning according to the
vendor standards.
 Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
 Attend and participate in customer/ vendor meetings.
Project Coordinator, Ericsson A/B for Zain-Sudan
 Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
 Collect/Gather, analyze, and prepare the day to day operation’s report which
includes (RFI, RFA, and RFS) and share it with the project manager.
 Negotiate site costing with the ASPs and ensure the installation cost within the
UPL.
 Day to day monitoring and controlling for all ASPs tasks and ensure all tasks are
aligning to the plan.
 Arrange site acceptance with Customer and handover the site to the operation
department and update the site handler.
 Distribute tasks between the ASPs based on the geographic distribution of the
team as well as the team capability.
 Facilitate materials for the sites according to the site configuration (Radio,
Transmission and Power) provided by Operator.
 Responsible for delivering the site needs equipment in accordance to the
project’s planned cost
 Attend and participate in customer as well as ASPs meetings.
Sepr2008 –December 2008
Project coordinator, ICTSolutions Co.Ltd.
Zain Sudan 3G project
 Acquire project patch according to the available resources and budget.
 Determine needed resource according to scale of qualifications.
 Preparing the handover document (binder, site master data)
 Prepare project execution plans, contracting strategy and prepare project cost
estimation.
 Supervise equipments installation, testing and commissioning according to the
vendor standards.
 Plan, schedule and provide work direction as required for preparation designs,
processes, reports correspondence and related data.
 Attend and participate in customer meetings.
Jul 2007 – Aug 2009
Installation & Testing Engineer, ICTSolutions Co.Ltd. Zain Sd project Jul 2006 – Mar2007
 Installation and Testing Engineer (BTS test) responsible for installing, testing, integrating GSM base
transceiver station (BTS) equipments and microwave installation & alignment (indoor & outdoor).
Implementation, testing and commissioning of Ericsson microwave equipments(MINI LINK-E, MINI LINK-TN
and MINI LINK- HC) include dish alignment (0.3, 0.6, 0.9, 1.2, 1.8, 2.4, 3.0 meter)
Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 4 of 6
 Determine needed resource according to scale of qualifications.
 Responsible of installation, commissioning, testing and integration of Ericsson BTS (RBS2000 family),
Microwave (Mini-Link TN 2p,6p and 20p) and SDH Long Haul (MDRS and OMS).
 Have a knowledge in microwave protection 1+1 space diversity , 1+1 frequency diversity, XPIC double
polarization
 Implementation and commissioning of Ericsson MINI LINK Traffic Node (20P, 6P, 2P and CN) including
software upgrade and adding node to management system. Installation, testing, commissioning and
troubleshooting of Ericsson 3G node B (macro 2308, 6301). Installation, testing, commissioning and
troubleshooting 2G RBS (2206, 2206V2, 2106, 2106V2, 2102V3,2216,2216V2 2308,2309). Beside MDRS155EC
Marconi Digital Radio System
 Installation and commissioning of Ericsson Power System(BBS2000,BBS2000I,PBC6500)
 Excellent knowledge for Ericsson software(OMT for RBS , LMT for Node B and LTE accessing to the TN ,
MINI LINK craft LCT , MINI LINK management for MINI LINK- E and Marconi System
Installation of GSM & Node B Antennas System with ASC, RET, TMA, diplexer and feeder. And testing all the
equipment by Site master(DTF, VSWR)
 Huawei BTS 3606 installation, testing, Pasolinc network management tools ‘PCMT’ software for
transmission and alignment microwave dish 0.6 with protection 1+1
 Huawei DF , Emerson , GPS and rectifier installation
 Report performance to project coordinators.
Telecom Engineer, SUDATEL (Sudanese Telecommunication Co. Ltd) Apr 2005 – Apr 2006
 Monitoring and supervising the Voice SWITCH for the international calls (Inbound & Outbound).
 Sort out all customer complaints with regard to the International calls.
 Ensure the connectivity of the SWITCH (Power, sub-station).
 Report the operation performance on Daily basis.
 Monitoring and supervising the Voice SWITCH for the international calls (Inbound & Outbound).
 Sort out all customer complaints with regard to the International calls.
 Ensure the connectivity of the SWITCH (Power, sub-station).
 Report the operation performance on Daily basis.
Education & Qualifications
 M.Sc. in Electronics Engineering ( Telecommunication Engineering)
Sudan University of Science and Technology (SUST), Oct 2009
 B.Sc. (Honors) in Electrical & Electronics Engineering
University for Technological Science (UTS) Jan 2006
 CCNA preparation course
Data Net, Sept 2006.
 Project Management Professional PMP Training course (35PDU’s)
From Cambridge International Training Center ,2009.
 Project Management Professional PMP Preparation PMP Training course (35PDU’s)
Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 5 of 6
From HEXA Engineering Training Canter, Oct- 2011.
 Ericsson (RBS 6000 WCDMA Installation & Commissioning).
From Ericsson ASP Mentor
 MINI-LINK TN R3 Installation (LZU 108 6895)
From Ericsson ASP Mentor
 WCDMA RBS 3106/3206 installation(LZU 108 6479)
From Ericsson ASP Mentor
 MINI-LINK HC Basic Setup (LZU 108 6281)
From Ericsson ASP Mentor
 RBS 2106/2206 Installation Verification (LZU 108 5740)
From Ericsson ASP Mentor
 RBS 2116/2216 Inst.&Inst. Verification(LZU 108 6830)
From Ericsson ASP Mentor
 WCDMA Radio Network Functionality(LZU108 5686 R6A)
From Ericsson Education Canter LEBANON
Personal Skills:
Computer Skills
 Installation and commissioning RBS, ML-TN and MDRS Systems.
 Troubleshoot or replace the MDRS and ML.TN units and making alignment for TRM hops.
 Tracing SW or HW Problem for RBS, ML-TN and MDRS.
 Know how to fabricate the cables associated for Ericsson BTS System.
 MS Windows® (Professional).
 MS Office® (Word®, Excel® and Power point®) (Professional).
 Primavera p6 (Excellent).
 Operation Management
 Project Scope, Management, and Rollout
 Productivity and Performance
 Revenue Escalation and Cost Reduction
 Customer Service Relations
 Problem Resolution and Decision Making
 Training, Leadership, and Team Building
 Negotiation and Presentation
 Budget and Time Management
 Strategic and Tactical Planning
Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 6 of 6
PROFESSIONAL MEMBERSHIPS
 Member of Sudan Engineering Society since 2005
 Registered at Saudi Council of Engineers as Electrical Engineer since 2013
Languages
 Arabic (Mother tongue),
 English (Very good reading, writing and speaking)
REFERENCE
References are available on request.

More Related Content

What's hot

Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
Anwardeen Jawaharlal
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Gary Dickson
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveSanthosh Prabhakaran
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarGowrijayashankar S V
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar
 
Resume of Sohail Butt as safety officer
Resume of Sohail Butt as safety officer Resume of Sohail Butt as safety officer
Resume of Sohail Butt as safety officer sohail butt
 
CV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistCV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistAtif Masroor
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq Ali
 
Dubai cv
Dubai cvDubai cv
Dubai cv
Sabir C
 
Safi-Ullah HSE Resume
Safi-Ullah HSE ResumeSafi-Ullah HSE Resume
Safi-Ullah HSE Resumesaif jutt
 
Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)mohammed ilias
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
Ali Raza Mughal
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017Sajid Akhtar
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed Shahzad
 

What's hot (20)

Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)Curriculum Vitae (Updated verion for Saudi Aramco)
Curriculum Vitae (Updated verion for Saudi Aramco)
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin Executive
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document Controller
 
Resume of Sohail Butt as safety officer
Resume of Sohail Butt as safety officer Resume of Sohail Butt as safety officer
Resume of Sohail Butt as safety officer
 
CV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / SpecialistCV - S Atif Masroor - Document Control Manager / Specialist
CV - S Atif Masroor - Document Control Manager / Specialist
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document Controller
 
PABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMANPABITRA HVAC DRAFTSMAN
PABITRA HVAC DRAFTSMAN
 
shamim ahmad HSE manager CV
shamim ahmad HSE manager CVshamim ahmad HSE manager CV
shamim ahmad HSE manager CV
 
cv updated (1)
cv updated (1)cv updated (1)
cv updated (1)
 
Dubai cv
Dubai cvDubai cv
Dubai cv
 
Safi-Ullah HSE Resume
Safi-Ullah HSE ResumeSafi-Ullah HSE Resume
Safi-Ullah HSE Resume
 
Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)Resume of Mohammed Ilias-(Sr. Document Controller)
Resume of Mohammed Ilias-(Sr. Document Controller)
 
JUSTICE HSE CV
JUSTICE HSE CVJUSTICE HSE CV
JUSTICE HSE CV
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
FAHID HSE CV
FAHID HSE CVFAHID HSE CV
FAHID HSE CV
 
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
CV Sajid Akhtar - Lead Document Controller - 01 Jan 2017
 
Naveed shahzad land surveyor cv
Naveed shahzad land surveyor cvNaveed shahzad land surveyor cv
Naveed shahzad land surveyor cv
 

Viewers also liked

PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVMAHMOOD AHMED
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPsureshrenu1996
 
CV Aloui Arbi - English Ver
CV Aloui Arbi - English VerCV Aloui Arbi - English Ver
CV Aloui Arbi - English Ver
Arbi . M . Aloui
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
Enaia Kamel
 
c.v Wael Al-dabeh new 1
c.v Wael Al-dabeh new 1 c.v Wael Al-dabeh new 1
c.v Wael Al-dabeh new 1 Wael Dibbeh
 

Viewers also liked (6)

PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
CV Aloui Arbi - English Ver
CV Aloui Arbi - English VerCV Aloui Arbi - English Ver
CV Aloui Arbi - English Ver
 
Enaia electrical design. engineer cv
Enaia electrical design. engineer  cvEnaia electrical design. engineer  cv
Enaia electrical design. engineer cv
 
Resume
ResumeResume
Resume
 
c.v Wael Al-dabeh new 1
c.v Wael Al-dabeh new 1 c.v Wael Al-dabeh new 1
c.v Wael Al-dabeh new 1
 

Similar to Eng Mutaz Ahmed Ali (Senior Project Manager Resume)

Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
Rana Muhammad Zahid
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
Rana Muhammad Zahid
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
Rana Muhammad Zahid
 
Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
Rana Muhammad Zahid
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Dabban
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016pradipd123
 
Shahid Ali Telecom CV
Shahid Ali Telecom CVShahid Ali Telecom CV
Shahid Ali Telecom CVShahid A
 
Rasha_Adel_elsayed
Rasha_Adel_elsayedRasha_Adel_elsayed
Rasha_Adel_elsayedrasha adel
 
Hassan Shabir CV 2016-April
Hassan Shabir CV 2016-AprilHassan Shabir CV 2016-April
Hassan Shabir CV 2016-AprilHassan Shubayr
 
Hassan shabir cv 2016 april
Hassan shabir cv 2016 aprilHassan shabir cv 2016 april
Hassan shabir cv 2016 april
Hassan Shubayr
 

Similar to Eng Mutaz Ahmed Ali (Senior Project Manager Resume) (20)

Resume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat HossainResume_Mohammad Shahadat Hossain
Resume_Mohammad Shahadat Hossain
 
Anas W Shaheen CV
Anas W Shaheen CVAnas W Shaheen CV
Anas W Shaheen CV
 
mohamed sobhi cv
mohamed sobhi cvmohamed sobhi cv
mohamed sobhi cv
 
Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
 
Bernard_Onyiwe Resume 2017_Modified
Bernard_Onyiwe Resume 2017_ModifiedBernard_Onyiwe Resume 2017_Modified
Bernard_Onyiwe Resume 2017_Modified
 
CV_PM_Mohammed Fazal Imran
CV_PM_Mohammed Fazal ImranCV_PM_Mohammed Fazal Imran
CV_PM_Mohammed Fazal Imran
 
Adnan Kamal Dabban CV
Adnan Kamal Dabban CV Adnan Kamal Dabban CV
Adnan Kamal Dabban CV
 
SAHEEM CV
SAHEEM CVSAHEEM CV
SAHEEM CV
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
CV Mujeeb
CV MujeebCV Mujeeb
CV Mujeeb
 
CV_SANDEEP_PROF
CV_SANDEEP_PROFCV_SANDEEP_PROF
CV_SANDEEP_PROF
 
Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016
 
Shivayogayya Hiremath
Shivayogayya HiremathShivayogayya Hiremath
Shivayogayya Hiremath
 
Shahid Ali Telecom CV
Shahid Ali Telecom CVShahid Ali Telecom CV
Shahid Ali Telecom CV
 
Rasha_Adel_elsayed
Rasha_Adel_elsayedRasha_Adel_elsayed
Rasha_Adel_elsayed
 
Hassan Shabir CV 2016-April
Hassan Shabir CV 2016-AprilHassan Shabir CV 2016-April
Hassan Shabir CV 2016-April
 
Hassan shabir cv 2016 april
Hassan shabir cv 2016 aprilHassan shabir cv 2016 april
Hassan shabir cv 2016 april
 

Eng Mutaz Ahmed Ali (Senior Project Manager Resume)

  • 1. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 1 of 6 Mutaz Ahmed Ali Osman Resident Add: Saudi Arabia – Riyadh Mobile: +966501834091 Iqama: Transferable Material Status: Single Email Address: mutaz.ahmed.ali@live.com An accomplished professional, seeking mid managerial assignments in Project Management & Implementation with an organization of repute in Telecom sector, preferably in Saudi Arabia PROFILE Health Insurance management professional with expertise in development of corporate and business projects and programs across large multi-divisional business units. Recognized for business strategy development and program analysis and implementation to reduce risk and increase operational productivity and efficiencies. Demonstrated leadership in business process improvement, complex problem resolution, organizational change and project management, gaining business consensus, and implementing technology solution decisions. Job Objective To secure a position with an expanding company as Telecommunications Project Manager where my education and experience can be utilized to the fullest. Employment Experience: Total years of experience 11+ yrs Senior Project Manager, Huda Constructing St. Saudi – Riyadh February 2015 – Till now Contractor with Huawei & Mobily Project: Zain & Mobily (IBS project)  Expert in IBS Phases and technicalities(DAS,CW,EM)  Direct and manage IBS project covering the whole IBS cycle (SAQ, Design, Implementation and Acceptance  Ensure that plans are entered into the standardized format and updated on daily basis  Delegate team tasks  Facilitate team tasks appropriately, problem solver, decision maker and able to motivate team member  Facilitate ongoing evaluation of his team  Verify progress and quality of work against agreed specifications and plans and report any deviations as per project process  Verify the accuracy and quality for all documents and site reports submitted  Manage project budget, Monitor and Control Cost, time and Quality.  Ensure timely invoicing of the project, and follow up the accounts
  • 2. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 2 of 6 Project Manager ,Takhatob Telecommunication .Saudi- Riyadh Company ASP with NSN & Huawei Project : Zain Saudi(swap , IBS & FTK) and STC(USF9 & FTK)  Reports daily and weekly project Status to the GM head  Works closely with the Project Coordinator to ensure that project-related assets, such as communications, documentation and artifacts are updated and maintained  Submit monthly timesheets  Monitoring project risks and scope creep to identify potential problems and proactively identifying solutions to address them in advance.  Escalating promptly any issues that may impact operations.  Producing stage plans, highlight reports, risk logs, requests for change etc.  Providing strategic direction during the implementation stages.  Managing client expectations by ensuring the delivery of the highest quality service  Acting on client feedback.  Monitoring staff & team performance  Attend and participate in customer/ vendor meetings.  Resolves conflicts when and where needed Apr2014 – November2016 Project Coordinator , FCGI in Saudi- Jadda Company ASP with Ericsson Project: STC (FTK& Add LTE) And Mobily (FTK, LTE1800,LTE2300,W900)  Attend and collaborate in planning meetings.  Preparing the handover document (binder, site master data)  Support the teams in the technical issue  Determine and prepare the scope of work for services and Engineering, Procurement.  Prepare project execution plans, contracting strategy and prepare project cost estimation.  Preparing the handover document (binder, site master data)  Preparing the sites Reports  Submit monthly timesheets  Supervise equipments installation, testing and commissioning according to the vendor standards.  Plan, schedule and provide work direction as required for preparation designs, processes, reports correspondence and related data.  Attend and participate in customer/ vendor meetings. May 2013 – March 2014 Project Coordinator, PLUS Inter Co. Ltd. Zain Sudan 2G/3G Project  Attend and collaborate in planning meetings.  Determine and prepare the scope of work for services and Engineering, Procurement.  Prepare project execution plans, contracting strategy and prepare project cost estimation. Apr 2010 – May 2012
  • 3. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 3 of 6  Supervise equipments installation, testing and commissioning according to the vendor standards.  Plan, schedule and provide work direction as required for preparation designs, processes, reports correspondence and related data.  Attend and participate in customer/ vendor meetings. Project Coordinator, Ericsson A/B for Zain-Sudan  Plan, schedule and provide work direction as required for preparation designs, processes, reports correspondence and related data.  Collect/Gather, analyze, and prepare the day to day operation’s report which includes (RFI, RFA, and RFS) and share it with the project manager.  Negotiate site costing with the ASPs and ensure the installation cost within the UPL.  Day to day monitoring and controlling for all ASPs tasks and ensure all tasks are aligning to the plan.  Arrange site acceptance with Customer and handover the site to the operation department and update the site handler.  Distribute tasks between the ASPs based on the geographic distribution of the team as well as the team capability.  Facilitate materials for the sites according to the site configuration (Radio, Transmission and Power) provided by Operator.  Responsible for delivering the site needs equipment in accordance to the project’s planned cost  Attend and participate in customer as well as ASPs meetings. Sepr2008 –December 2008 Project coordinator, ICTSolutions Co.Ltd. Zain Sudan 3G project  Acquire project patch according to the available resources and budget.  Determine needed resource according to scale of qualifications.  Preparing the handover document (binder, site master data)  Prepare project execution plans, contracting strategy and prepare project cost estimation.  Supervise equipments installation, testing and commissioning according to the vendor standards.  Plan, schedule and provide work direction as required for preparation designs, processes, reports correspondence and related data.  Attend and participate in customer meetings. Jul 2007 – Aug 2009 Installation & Testing Engineer, ICTSolutions Co.Ltd. Zain Sd project Jul 2006 – Mar2007  Installation and Testing Engineer (BTS test) responsible for installing, testing, integrating GSM base transceiver station (BTS) equipments and microwave installation & alignment (indoor & outdoor). Implementation, testing and commissioning of Ericsson microwave equipments(MINI LINK-E, MINI LINK-TN and MINI LINK- HC) include dish alignment (0.3, 0.6, 0.9, 1.2, 1.8, 2.4, 3.0 meter)
  • 4. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 4 of 6  Determine needed resource according to scale of qualifications.  Responsible of installation, commissioning, testing and integration of Ericsson BTS (RBS2000 family), Microwave (Mini-Link TN 2p,6p and 20p) and SDH Long Haul (MDRS and OMS).  Have a knowledge in microwave protection 1+1 space diversity , 1+1 frequency diversity, XPIC double polarization  Implementation and commissioning of Ericsson MINI LINK Traffic Node (20P, 6P, 2P and CN) including software upgrade and adding node to management system. Installation, testing, commissioning and troubleshooting of Ericsson 3G node B (macro 2308, 6301). Installation, testing, commissioning and troubleshooting 2G RBS (2206, 2206V2, 2106, 2106V2, 2102V3,2216,2216V2 2308,2309). Beside MDRS155EC Marconi Digital Radio System  Installation and commissioning of Ericsson Power System(BBS2000,BBS2000I,PBC6500)  Excellent knowledge for Ericsson software(OMT for RBS , LMT for Node B and LTE accessing to the TN , MINI LINK craft LCT , MINI LINK management for MINI LINK- E and Marconi System Installation of GSM & Node B Antennas System with ASC, RET, TMA, diplexer and feeder. And testing all the equipment by Site master(DTF, VSWR)  Huawei BTS 3606 installation, testing, Pasolinc network management tools ‘PCMT’ software for transmission and alignment microwave dish 0.6 with protection 1+1  Huawei DF , Emerson , GPS and rectifier installation  Report performance to project coordinators. Telecom Engineer, SUDATEL (Sudanese Telecommunication Co. Ltd) Apr 2005 – Apr 2006  Monitoring and supervising the Voice SWITCH for the international calls (Inbound & Outbound).  Sort out all customer complaints with regard to the International calls.  Ensure the connectivity of the SWITCH (Power, sub-station).  Report the operation performance on Daily basis.  Monitoring and supervising the Voice SWITCH for the international calls (Inbound & Outbound).  Sort out all customer complaints with regard to the International calls.  Ensure the connectivity of the SWITCH (Power, sub-station).  Report the operation performance on Daily basis. Education & Qualifications  M.Sc. in Electronics Engineering ( Telecommunication Engineering) Sudan University of Science and Technology (SUST), Oct 2009  B.Sc. (Honors) in Electrical & Electronics Engineering University for Technological Science (UTS) Jan 2006  CCNA preparation course Data Net, Sept 2006.  Project Management Professional PMP Training course (35PDU’s) From Cambridge International Training Center ,2009.  Project Management Professional PMP Preparation PMP Training course (35PDU’s)
  • 5. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 5 of 6 From HEXA Engineering Training Canter, Oct- 2011.  Ericsson (RBS 6000 WCDMA Installation & Commissioning). From Ericsson ASP Mentor  MINI-LINK TN R3 Installation (LZU 108 6895) From Ericsson ASP Mentor  WCDMA RBS 3106/3206 installation(LZU 108 6479) From Ericsson ASP Mentor  MINI-LINK HC Basic Setup (LZU 108 6281) From Ericsson ASP Mentor  RBS 2106/2206 Installation Verification (LZU 108 5740) From Ericsson ASP Mentor  RBS 2116/2216 Inst.&Inst. Verification(LZU 108 6830) From Ericsson ASP Mentor  WCDMA Radio Network Functionality(LZU108 5686 R6A) From Ericsson Education Canter LEBANON Personal Skills: Computer Skills  Installation and commissioning RBS, ML-TN and MDRS Systems.  Troubleshoot or replace the MDRS and ML.TN units and making alignment for TRM hops.  Tracing SW or HW Problem for RBS, ML-TN and MDRS.  Know how to fabricate the cables associated for Ericsson BTS System.  MS Windows® (Professional).  MS Office® (Word®, Excel® and Power point®) (Professional).  Primavera p6 (Excellent).  Operation Management  Project Scope, Management, and Rollout  Productivity and Performance  Revenue Escalation and Cost Reduction  Customer Service Relations  Problem Resolution and Decision Making  Training, Leadership, and Team Building  Negotiation and Presentation  Budget and Time Management  Strategic and Tactical Planning
  • 6. Mutaz.ahmed.ali@livel.com | +966 501834091 | Riyadh | December 2012 | Page 6 of 6 PROFESSIONAL MEMBERSHIPS  Member of Sudan Engineering Society since 2005  Registered at Saudi Council of Engineers as Electrical Engineer since 2013 Languages  Arabic (Mother tongue),  English (Very good reading, writing and speaking) REFERENCE References are available on request.