AHMED A.ELKADER A.ELFATAH BESAR
TEL0227007356 MOBILE01068626004 E.MAILahmedbesar@YAHOO.COM
ahmedabdelkaderbesar@gmail.om
CURRICULUM VITAE
AHMED A.ELKADER A.ELFATAH BESAR
5 ELEDARASTREET, KOZZIKA, ELMAADY, CAIRO
01068626008 01126888237
Objective:
I'm seeking a challenging opportunity in a leader company where I can improve my technical and
managerial capabilities.
Educational background:
Qualification : Bachelor of Production engineering and mechanical design.
University : Mansoura University.
Graduation year : June, 2006.
Graduation project : Design and production of full automatic
Filling and capping yogurt machine (Excellent).
Accumulative grade : 63.3%
Training courses
1- ASEC Cement manufacturing course (ACMC).
2- Hydraulics in cement industries at ASEC training center.
3- SAP course.
4- SKF bearings course (By SKF Egypt team):
Dealing with bearing types and selection, bearing mounting and dismantle.
5- Maintenance scheduling planning and work control.
6- Supervisory Skills program.
7- Coal mill, handling & safety.
8- Maximo asset management software.
Computer and language Skills:
 Internet Capabilities.
 Engineering drawing using Auto Cad (2D).
 Microsoft office Capabilities (word, excel, power point).
 Good command in English.
 Maximo asset management software.
 SAP Management of business operation software.
Work experiences:
 From Nov 2013 up to Now:
Work as a mechanical maintenance engineer in NLsupervision Company with the following
activities and duties:
1. Organize all mechanical work crews.
2. Assign activities in accordance with other maintenance team.
3. Ensure the work quality and provide information and solution while repair.
4. Achieve optimal availability of production equipment.
5. Allocate the means of and procedures for repair after receiving information for trouble
shooting or any repair.
6. Prepare the daily mechanical job plan.
7. Prepare monthly mechanical report.
8. Share in preparation of the yearly budget plan.
AHMED A.ELKADER A.ELFATAH BESAR
TEL0227007356 MOBILE01068626004 E.MAILahmedbesar@YAHOO.COM
ahmedabdelkaderbesar@gmail.om
 From May 2010 up to Oct 2013:
Work as a preventive maintenance engineer in the Arab Swiss Engineering Company (ASEC)
at Sinai white cement plant with the following activities:
1. Execution of inspection tasks for all site machinery in which include rotary equipment
(rotary kiln, tube and vertical mills, rotary packer), material transporting equipment (belt
conveyors, screw conveyor, bucket elevator, and drag chains), utilities and service plant.
2. Work orders acc. To the inspection tasks.
3. Planning the minor and major shutdown scheduling and activities according to inspection
and stoppage plan.
4. Follow up the mechanical performance of the maintenance works which executed
according to the shutdown schedules and work orders
5. Perform the equipment's breakdown analysis, action plans and damage report
6. Prepare and develop the Preventive maintenance schedules according to the equipment
instructions and recommendation.
7. Develop the PM with RCA and RF
8. Measuring and analysis the failure predictive variables like temperature, wear and
vibration.
9. Effective Coordination with other departments for work executing and development.
 From Dec, 2006 till May2010:
Work as a mechanical engineer in RHI (Reliance Heavy Industries Company) and participated
the following main projects:
 From April 2009 till May2010:
Work as a technical assistant engineer at SPEGYCO grinding and packing plant with RHI team
to apply PM system.
 From April 2008 till April2009:
Work as a mechanical engineer at Sinai Cement Company (Erection of gray cement line2,
consulting project dealing with the final testing and commissioning.
 From August 2007 to April2008:
Work as a mechanical maintenance engineer at ELAMERYA Cement Company with all
responsibilities of all mechanical maintenance activities of the cement storage and packing plant.
 Participated the following projects.
1- Revamping project of line 3 at AMCC (ELAMERYA Cement Company).
2- Upgrading (Capacity increase) project of Elrashedya Cement Company (Jordan 2008).
3- Overhaul shutdown at Titan Bani swif cement company (2007)
Personal skills:
 The ability to lead and organize the team work.
 The ability to work under pressure.
 Good communication.
Personal information:
Name : Ahmed Abd Elkader Abd Elfatah Besar.
Birth date : 1/1/1983.
Nationality : Egyptian.
Martial status : Married.
Military service : Exempted.

ENG - Ahmedbesar(CV)

  • 1.
    AHMED A.ELKADER A.ELFATAHBESAR TEL0227007356 MOBILE01068626004 E.MAILahmedbesar@YAHOO.COM ahmedabdelkaderbesar@gmail.om CURRICULUM VITAE AHMED A.ELKADER A.ELFATAH BESAR 5 ELEDARASTREET, KOZZIKA, ELMAADY, CAIRO 01068626008 01126888237 Objective: I'm seeking a challenging opportunity in a leader company where I can improve my technical and managerial capabilities. Educational background: Qualification : Bachelor of Production engineering and mechanical design. University : Mansoura University. Graduation year : June, 2006. Graduation project : Design and production of full automatic Filling and capping yogurt machine (Excellent). Accumulative grade : 63.3% Training courses 1- ASEC Cement manufacturing course (ACMC). 2- Hydraulics in cement industries at ASEC training center. 3- SAP course. 4- SKF bearings course (By SKF Egypt team): Dealing with bearing types and selection, bearing mounting and dismantle. 5- Maintenance scheduling planning and work control. 6- Supervisory Skills program. 7- Coal mill, handling & safety. 8- Maximo asset management software. Computer and language Skills:  Internet Capabilities.  Engineering drawing using Auto Cad (2D).  Microsoft office Capabilities (word, excel, power point).  Good command in English.  Maximo asset management software.  SAP Management of business operation software. Work experiences:  From Nov 2013 up to Now: Work as a mechanical maintenance engineer in NLsupervision Company with the following activities and duties: 1. Organize all mechanical work crews. 2. Assign activities in accordance with other maintenance team. 3. Ensure the work quality and provide information and solution while repair. 4. Achieve optimal availability of production equipment. 5. Allocate the means of and procedures for repair after receiving information for trouble shooting or any repair. 6. Prepare the daily mechanical job plan. 7. Prepare monthly mechanical report. 8. Share in preparation of the yearly budget plan.
  • 2.
    AHMED A.ELKADER A.ELFATAHBESAR TEL0227007356 MOBILE01068626004 E.MAILahmedbesar@YAHOO.COM ahmedabdelkaderbesar@gmail.om  From May 2010 up to Oct 2013: Work as a preventive maintenance engineer in the Arab Swiss Engineering Company (ASEC) at Sinai white cement plant with the following activities: 1. Execution of inspection tasks for all site machinery in which include rotary equipment (rotary kiln, tube and vertical mills, rotary packer), material transporting equipment (belt conveyors, screw conveyor, bucket elevator, and drag chains), utilities and service plant. 2. Work orders acc. To the inspection tasks. 3. Planning the minor and major shutdown scheduling and activities according to inspection and stoppage plan. 4. Follow up the mechanical performance of the maintenance works which executed according to the shutdown schedules and work orders 5. Perform the equipment's breakdown analysis, action plans and damage report 6. Prepare and develop the Preventive maintenance schedules according to the equipment instructions and recommendation. 7. Develop the PM with RCA and RF 8. Measuring and analysis the failure predictive variables like temperature, wear and vibration. 9. Effective Coordination with other departments for work executing and development.  From Dec, 2006 till May2010: Work as a mechanical engineer in RHI (Reliance Heavy Industries Company) and participated the following main projects:  From April 2009 till May2010: Work as a technical assistant engineer at SPEGYCO grinding and packing plant with RHI team to apply PM system.  From April 2008 till April2009: Work as a mechanical engineer at Sinai Cement Company (Erection of gray cement line2, consulting project dealing with the final testing and commissioning.  From August 2007 to April2008: Work as a mechanical maintenance engineer at ELAMERYA Cement Company with all responsibilities of all mechanical maintenance activities of the cement storage and packing plant.  Participated the following projects. 1- Revamping project of line 3 at AMCC (ELAMERYA Cement Company). 2- Upgrading (Capacity increase) project of Elrashedya Cement Company (Jordan 2008). 3- Overhaul shutdown at Titan Bani swif cement company (2007) Personal skills:  The ability to lead and organize the team work.  The ability to work under pressure.  Good communication. Personal information: Name : Ahmed Abd Elkader Abd Elfatah Besar. Birth date : 1/1/1983. Nationality : Egyptian. Martial status : Married. Military service : Exempted.