SlideShare a Scribd company logo
Site Name : BARAUN
Site ID : I-MP-SIUR-ENB-6002
1 Initial On Air
Rev. No Date Reason for issue Samsung Signature RJIL Signature
Appendix -B
DATE:
I-MP-SIUR-ENB-6002 MP5SRMR003B-36 I-MP-SIUR-ENB-6002
BARAUN Baraun BARAUN
2008-06-28 2015-07-27
24.74846 24.74846 24.74846
81.28663 81.28661 81.28663
GBT GBT GBT
(m) 0.0 0.0 0.0
(m) 31.0 35.0 31.0
FDD LTE GSM TDD LTE
(MHz) 1823.6 941.2 2342.5
1 4 1
ACE,XXDWH-17-65I-VT
XAHT-XAHT-
HTDBSW086517
ACE,XXDWH-17-65I-VT
(dBi) 16.4 17.5 16.4
(deg) 2.0 3.0 4.0
(deg) 7.7 7.0 7.2
(dB) 15.0 15.0 15.0
(dBm) 46.0 43.0 46.0
(dB) 0.0 1.5 0.0
(m) 2.0 42.0 2.0
(dB/100m) 15.5 3.62 18.2
(W) 1545.25 559.71 1512.17
1.0 0.9 1.0
1.0 0.9 1.0
(W) 0 1360.1 0
(W) 1545.25 1919.81 1512.17
Date of first radiation in respect of BTS ID I-MP-SIUR-ENB-6002 is 15/12/2015
TECHNICALPARAMETER
System Type (GSM/CDMA/UMTS/LTE)
Base Channel Frequency
Carriers /Sector (worst)
Make and model of Antenna
Antenna Gain
Total Tilt
Vertical Beamwidth
Side Lobe Attenuation
TxPower
Combiner Loss
EIRP (Total)
Unit Loss
RF Cable Length
EIRP (TCH) incl DTX, ATPC
ATPC Factor
Item Units
SITEDATA
Site ID
Name
Date of Commissioning
Building Heights AGL
Antenna Height AGL
Address
B - I : SITE DATA & TECHNICAL PARAMETERS
NAME OF THE TSP: RJIL 4G
NAME OF THE BTS: BARAUN
FORMAT FOR CERTIFICATION OF BTS FOR COMPLIANCE OF THE EMF EXPOSURE LEVELS (CALCULATION OF EIRP/EIRPth)
Reliance Jio FDD LTE RTL Reliance Jio TDD LTE
Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSIL
EIRP Base Channel
DTX Factor
Latitude
Longitude
RTT/GBT
4/10
B-II : EIRP/EIRPth CALCULATION
Lat Long
24.74846 81.28663 C1 Remark
Not-Applicable
ComputationofEIRP/EIRPthat
adjacent
Reliance Jio TDD LTE 59848.37
Overall EIRP/EIRPth 0.09
Normally Compliant (YES/NO) YES
EIRPth on ground EIRPth on ground
Reliance Jio FDD LTE 69970.59
RTL 45001.96
Building (B0) EIRPth at the Building Roof Top Corners and other points on the periphery of exclusion
Building Top Corners
5/10
Corner/Accessible Location Distance (m) Height (m)
N/A N/A N/A
SITE LAYOUT
BARAUN
I-MP-SIUR-ENB-6002
Site Name
Site ID
SITE ID -
I-MP-SIUR-ENB-6002_0 I-MP-SIUR-ENB-6002_30 I-MP-SIUR-ENB-6002_60
I-MP-SIUR-ENB-6002_90 I-MP-SIUR-ENB-6002_120 I-MP-SIUR-ENB-6002_150
I-MP-SIUR-ENB-6002_180 I-MP-SIUR-ENB-6002_210 I-MP-SIUR-ENB-6002_240
I-MP-SIUR-ENB-6002_270 I-MP-SIUR-ENB-6002_300 I-MP-SIUR-ENB-6002_330
I-MP-SIUR-ENB-6002_EXISTING TOWER I-MP-SIUR-ENB-6002_EXISTING BUILDING I-MP-SIUR-ENB-6002_GPS
I-MP-SIUR-ENB-6002
PANAROMIC PHOTOS
EXISTING TOWER, EXISTING BUILDING & GPS PHOTO
I-MP-SIUR-ENB-6002_CAUTION I-MP-SIUR-ENB-6002_WARNING I-MP-SIUR-ENB-6002_DANGER
I-MP-SIUR-ENB-6002_ALPHA I-MP-SIUR-ENB-6002_BETA I-MP-SIUR-ENB-6002_GAMMA
SIGNAGE PHOTOS
SECTOR PHOTO
Site Name :
Site ID :
Latitude :
Longitude :
Adjacent
building
Latitude Longitude Height (m) No. of floor
Azimuth from the
Tower
Distance from
Tower (m)
Any Neighbour Towers within 20m Radius:
Format for collecting Adjacent building / General Public access area data
BARAUN
I-MP-SIUR-ENB-6002
24.74846
81.28663
Site ID : I-MP-SIUR-ENB-6002Site Name : BARAUN
State : Madhya Pradesh
First Radiation date & time : 2015-12-15 14:33:38
Description :
: Service OFF notification means services of eNB are OFF i.e. eNB is locked.
: Loading Start notification means eNB System parameters, configurations and software download started in eNB from OSS i.e. eNB commissioning started.
: Loading End notification means eNB System parameters, configurations and software download completed. i.e. eNB Commissioning completed
Proof of Commissioning Date & Time
Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSILSite Address :

More Related Content

What's hot

Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish Bhattacharya
Varun Chandra
 
ZXSDR Trainning
ZXSDR TrainningZXSDR Trainning
ZXSDR Trainning
Najam Saqib
 
Finnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDRFinnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDR
Juha Mattila
 
Iai rca sra4_r_specsheet
Iai rca sra4_r_specsheetIai rca sra4_r_specsheet
Iai rca sra4_r_specsheet
Electromate
 
Macron mini6 28-specsheet
Macron mini6 28-specsheetMacron mini6 28-specsheet
Macron mini6 28-specsheet
Electromate
 
MultiDyne Products & Technology V14
MultiDyne Products & Technology V14MultiDyne Products & Technology V14
MultiDyne Products & Technology V14
VidOvation - Moving Video Forward
 
Diagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benzDiagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benz
absolute scan
 
Dvt500
Dvt500Dvt500
Iai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheetIai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheet
Electromate
 
GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01
robin huang
 
EMBEDDED PROJECTS BASED COMPONANTS
 EMBEDDED PROJECTS BASED COMPONANTS EMBEDDED PROJECTS BASED COMPONANTS
EMBEDDED PROJECTS BASED COMPONANTS
DURGA ELECTRONICS
 
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
Md. Saifur Rahman
 
Iai rca a4_r_specsheet
Iai rca a4_r_specsheetIai rca a4_r_specsheet
Iai rca a4_r_specsheet
Electromate
 
Pannel antenna
Pannel antennaPannel antenna
Pannel antenna
sourabh27tyagi
 
ComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data SheetComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data Sheet
JMAC Supply
 
EU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel WirelessEU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel Wireless
Parallel Wireless, Inc.
 
Iai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheetIai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheet
Electromate
 
ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018
Alon Zheltkov
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyAnna Bancroft
 

What's hot (20)

Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish Bhattacharya
 
ZXSDR Trainning
ZXSDR TrainningZXSDR Trainning
ZXSDR Trainning
 
UMTS
UMTS UMTS
UMTS
 
Finnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDRFinnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDR
 
Iai rca sra4_r_specsheet
Iai rca sra4_r_specsheetIai rca sra4_r_specsheet
Iai rca sra4_r_specsheet
 
Macron mini6 28-specsheet
Macron mini6 28-specsheetMacron mini6 28-specsheet
Macron mini6 28-specsheet
 
MultiDyne Products & Technology V14
MultiDyne Products & Technology V14MultiDyne Products & Technology V14
MultiDyne Products & Technology V14
 
Diagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benzDiagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benz
 
Dvt500
Dvt500Dvt500
Dvt500
 
Iai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheetIai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheet
 
GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01
 
EMBEDDED PROJECTS BASED COMPONANTS
 EMBEDDED PROJECTS BASED COMPONANTS EMBEDDED PROJECTS BASED COMPONANTS
EMBEDDED PROJECTS BASED COMPONANTS
 
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
 
Iai rca a4_r_specsheet
Iai rca a4_r_specsheetIai rca a4_r_specsheet
Iai rca a4_r_specsheet
 
Pannel antenna
Pannel antennaPannel antenna
Pannel antenna
 
ComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data SheetComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data Sheet
 
EU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel WirelessEU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel Wireless
 
Iai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheetIai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheet
 
ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
 

Viewers also liked

EMF Survey
EMF SurveyEMF Survey
EMF Survey
Tempus Telcosys
 
Rf survey
Rf surveyRf survey
Rf survey
Harish Kumawat
 
GSM Link Budget
GSM Link BudgetGSM Link Budget
GSM Link Budget
Naveen Jakhar, I.T.S
 
Marketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community EngagementMarketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community Engagement
Greater Bridgeport Transit
 
Comparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsComparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM Systems
IOSR Journals
 
Building Construction tower project
Building Construction tower projectBuilding Construction tower project
Building Construction tower project
XingYue0907
 
Radiation from the Mobile tower
Radiation from the Mobile towerRadiation from the Mobile tower
Radiation from the Mobile tower
MUNEESH NK NK
 
Notes on optical fiber communication unit7
Notes on optical fiber communication unit7Notes on optical fiber communication unit7
Notes on optical fiber communication unit7
Jagadish M
 
Cooling tower
Cooling towerCooling tower
Cooling tower
Sujeet TAMBE
 
Tl book
Tl bookTl book
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Giri
nimay1
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4g
Vijay Anand
 
GBM package in r
GBM package in rGBM package in r
GBM package in r
mark_landry
 
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
THANDAIAH PRABU
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
AIRTEL
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
snookala
 
Optical tech
Optical techOptical tech
Optical tech
coolateeq
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
Natasha Murashev
 

Viewers also liked (20)

EMF Survey
EMF SurveyEMF Survey
EMF Survey
 
LOS Survey
LOS SurveyLOS Survey
LOS Survey
 
Rf survey
Rf surveyRf survey
Rf survey
 
Rf survey
Rf surveyRf survey
Rf survey
 
GSM Link Budget
GSM Link BudgetGSM Link Budget
GSM Link Budget
 
Marketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community EngagementMarketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community Engagement
 
Comparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsComparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM Systems
 
Building Construction tower project
Building Construction tower projectBuilding Construction tower project
Building Construction tower project
 
Radiation from the Mobile tower
Radiation from the Mobile towerRadiation from the Mobile tower
Radiation from the Mobile tower
 
Notes on optical fiber communication unit7
Notes on optical fiber communication unit7Notes on optical fiber communication unit7
Notes on optical fiber communication unit7
 
Cooling tower
Cooling towerCooling tower
Cooling tower
 
Tl book
Tl bookTl book
Tl book
 
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Giri
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4g
 
GBM package in r
GBM package in rGBM package in r
GBM package in r
 
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
Optical tech
Optical techOptical tech
Optical tech
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
 

Similar to EMF calculation sample report

SCFT report
SCFT reportSCFT report
SCFT report
anil parmar
 
Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trend
3G4G
 
Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trend
Sylvia Lu
 
WaveIN introduction
WaveIN introductionWaveIN introduction
WaveIN introduction
Jed Lee
 
TMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZTMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZ
Giovanny Bocanegra
 
Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016
ewin aulia
 
QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34
Electromate
 
Xexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manualXexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manual
xxgpstraker
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Yasas Anuradha
 
Sdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_usSdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_us
ZTE
 
RF Optimization Slide deck.pptx
RF Optimization Slide deck.pptxRF Optimization Slide deck.pptx
RF Optimization Slide deck.pptx
ssuser2b76bb
 
HR-045-職場經驗分享
HR-045-職場經驗分享HR-045-職場經驗分享
HR-045-職場經驗分享handbook
 
Handheld Point of Sale Terminal
Handheld Point of Sale TerminalHandheld Point of Sale Terminal
Handheld Point of Sale Terminal
Premier Farnell
 
robot-brochure-en.pdf
robot-brochure-en.pdfrobot-brochure-en.pdf
robot-brochure-en.pdf
przemlat
 
FANUC robots overview
FANUC robots overviewFANUC robots overview
FANUC robots overview
FANUC Europe
 
Day 11 eigrp
Day 11 eigrpDay 11 eigrp
Day 11 eigrp
CYBERINTELLIGENTS
 
BGP Route Aggregation Lab WorkBook
BGP Route Aggregation Lab WorkBookBGP Route Aggregation Lab WorkBook
BGP Route Aggregation Lab WorkBook
RHC Technologies
 
Tems investigation 16.3.2 connectable devices
Tems investigation 16.3.2   connectable devicesTems investigation 16.3.2   connectable devices
Tems investigation 16.3.2 connectable devices
mysritech
 
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Dien Ha The
 

Similar to EMF calculation sample report (20)

SCFT report
SCFT reportSCFT report
SCFT report
 
Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trend
 
Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trend
 
WaveIN introduction
WaveIN introductionWaveIN introduction
WaveIN introduction
 
TMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZTMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZ
 
Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016
 
QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34
 
Xexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manualXexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manual
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
 
Sdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_usSdru 10 w-to-20w_9-band_us
Sdru 10 w-to-20w_9-band_us
 
RF Optimization Slide deck.pptx
RF Optimization Slide deck.pptxRF Optimization Slide deck.pptx
RF Optimization Slide deck.pptx
 
HR-045-職場經驗分享
HR-045-職場經驗分享HR-045-職場經驗分享
HR-045-職場經驗分享
 
Handheld Point of Sale Terminal
Handheld Point of Sale TerminalHandheld Point of Sale Terminal
Handheld Point of Sale Terminal
 
robot-brochure-en.pdf
robot-brochure-en.pdfrobot-brochure-en.pdf
robot-brochure-en.pdf
 
FANUC robots overview
FANUC robots overviewFANUC robots overview
FANUC robots overview
 
Day 11 eigrp
Day 11 eigrpDay 11 eigrp
Day 11 eigrp
 
Foo
FooFoo
Foo
 
BGP Route Aggregation Lab WorkBook
BGP Route Aggregation Lab WorkBookBGP Route Aggregation Lab WorkBook
BGP Route Aggregation Lab WorkBook
 
Tems investigation 16.3.2 connectable devices
Tems investigation 16.3.2   connectable devicesTems investigation 16.3.2   connectable devices
Tems investigation 16.3.2 connectable devices
 
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 

EMF calculation sample report

  • 1.
  • 2. Site Name : BARAUN Site ID : I-MP-SIUR-ENB-6002 1 Initial On Air Rev. No Date Reason for issue Samsung Signature RJIL Signature
  • 3.
  • 4. Appendix -B DATE: I-MP-SIUR-ENB-6002 MP5SRMR003B-36 I-MP-SIUR-ENB-6002 BARAUN Baraun BARAUN 2008-06-28 2015-07-27 24.74846 24.74846 24.74846 81.28663 81.28661 81.28663 GBT GBT GBT (m) 0.0 0.0 0.0 (m) 31.0 35.0 31.0 FDD LTE GSM TDD LTE (MHz) 1823.6 941.2 2342.5 1 4 1 ACE,XXDWH-17-65I-VT XAHT-XAHT- HTDBSW086517 ACE,XXDWH-17-65I-VT (dBi) 16.4 17.5 16.4 (deg) 2.0 3.0 4.0 (deg) 7.7 7.0 7.2 (dB) 15.0 15.0 15.0 (dBm) 46.0 43.0 46.0 (dB) 0.0 1.5 0.0 (m) 2.0 42.0 2.0 (dB/100m) 15.5 3.62 18.2 (W) 1545.25 559.71 1512.17 1.0 0.9 1.0 1.0 0.9 1.0 (W) 0 1360.1 0 (W) 1545.25 1919.81 1512.17 Date of first radiation in respect of BTS ID I-MP-SIUR-ENB-6002 is 15/12/2015 TECHNICALPARAMETER System Type (GSM/CDMA/UMTS/LTE) Base Channel Frequency Carriers /Sector (worst) Make and model of Antenna Antenna Gain Total Tilt Vertical Beamwidth Side Lobe Attenuation TxPower Combiner Loss EIRP (Total) Unit Loss RF Cable Length EIRP (TCH) incl DTX, ATPC ATPC Factor Item Units SITEDATA Site ID Name Date of Commissioning Building Heights AGL Antenna Height AGL Address B - I : SITE DATA & TECHNICAL PARAMETERS NAME OF THE TSP: RJIL 4G NAME OF THE BTS: BARAUN FORMAT FOR CERTIFICATION OF BTS FOR COMPLIANCE OF THE EMF EXPOSURE LEVELS (CALCULATION OF EIRP/EIRPth) Reliance Jio FDD LTE RTL Reliance Jio TDD LTE Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSIL EIRP Base Channel DTX Factor Latitude Longitude RTT/GBT 4/10
  • 5. B-II : EIRP/EIRPth CALCULATION Lat Long 24.74846 81.28663 C1 Remark Not-Applicable ComputationofEIRP/EIRPthat adjacent Reliance Jio TDD LTE 59848.37 Overall EIRP/EIRPth 0.09 Normally Compliant (YES/NO) YES EIRPth on ground EIRPth on ground Reliance Jio FDD LTE 69970.59 RTL 45001.96 Building (B0) EIRPth at the Building Roof Top Corners and other points on the periphery of exclusion Building Top Corners 5/10
  • 6. Corner/Accessible Location Distance (m) Height (m) N/A N/A N/A SITE LAYOUT BARAUN I-MP-SIUR-ENB-6002 Site Name Site ID
  • 7. SITE ID - I-MP-SIUR-ENB-6002_0 I-MP-SIUR-ENB-6002_30 I-MP-SIUR-ENB-6002_60 I-MP-SIUR-ENB-6002_90 I-MP-SIUR-ENB-6002_120 I-MP-SIUR-ENB-6002_150 I-MP-SIUR-ENB-6002_180 I-MP-SIUR-ENB-6002_210 I-MP-SIUR-ENB-6002_240 I-MP-SIUR-ENB-6002_270 I-MP-SIUR-ENB-6002_300 I-MP-SIUR-ENB-6002_330 I-MP-SIUR-ENB-6002_EXISTING TOWER I-MP-SIUR-ENB-6002_EXISTING BUILDING I-MP-SIUR-ENB-6002_GPS I-MP-SIUR-ENB-6002 PANAROMIC PHOTOS EXISTING TOWER, EXISTING BUILDING & GPS PHOTO
  • 8. I-MP-SIUR-ENB-6002_CAUTION I-MP-SIUR-ENB-6002_WARNING I-MP-SIUR-ENB-6002_DANGER I-MP-SIUR-ENB-6002_ALPHA I-MP-SIUR-ENB-6002_BETA I-MP-SIUR-ENB-6002_GAMMA SIGNAGE PHOTOS SECTOR PHOTO
  • 9. Site Name : Site ID : Latitude : Longitude : Adjacent building Latitude Longitude Height (m) No. of floor Azimuth from the Tower Distance from Tower (m) Any Neighbour Towers within 20m Radius: Format for collecting Adjacent building / General Public access area data BARAUN I-MP-SIUR-ENB-6002 24.74846 81.28663
  • 10. Site ID : I-MP-SIUR-ENB-6002Site Name : BARAUN State : Madhya Pradesh First Radiation date & time : 2015-12-15 14:33:38 Description : : Service OFF notification means services of eNB are OFF i.e. eNB is locked. : Loading Start notification means eNB System parameters, configurations and software download started in eNB from OSS i.e. eNB commissioning started. : Loading End notification means eNB System parameters, configurations and software download completed. i.e. eNB Commissioning completed Proof of Commissioning Date & Time Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSILSite Address :