SlideShare a Scribd company logo
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
CD/SAFETY.TRG/02
1/9
EMERGENCY
A MAJOR EMERGENCY OCCURING AT A WORKS IS ONE THAT MAY
AFFECT SEVERAL DEPARTMENTS WITHIN IT AND/ OR MAY CAUSE
SERIOUS INJURIES, LOSS OF LIFE , EXTENSIVE DAMAGE TO PROPERTY
OR SERIOUS DISRUPTION OUTSIDE THE WORKS.
CAUSES :
1. NORMALLY DUE TO MAL FUNCTION OF THE NORMAL OPERATION.
2. INTERVENTION OF OUTSIDE AGENCY
a) FLOODING
b) CRASHED AIR CRAFT
c) ARSON OR SABOTAGE
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
1A/9
A PLANT WITH HAZARDOUS OPERATION/PROCESS MAY LEAD TO
MAJOR ACCIDENT WITH DISASTROUS CONSEQUENCE IN SPITE OF
BEST SAFETY MEASURES.
CD/SAFETY.TRG/02
MAJOR ACCIDENT RESULTS FROM UNCONTROLLED DEVELOPMENT
IN INDUSTRIAL ACTIVITIES CAUSING.
•SERIOUS BODILY INJURY
•LOSS OF LIFE
•EXTENSIVE DAMAGE TO PROPERTY
•ADVERSE EFFECT ON ENVIRONMENT
•DISRUPTION INSIDE AND OUTSIDE THE PLANT
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
2/9
CAUSES OF DISASTER
CD/SAFETY.TRG/02
•TOXIC RELEASE
•MAJOR FIRE/ EXPLOSION
•RADIATION LEAKS.
•EARTHQUAKE
•FLOOD
•AIRCRAFT CRASH
•ARSON / SABOTAGE
SEVERITY OF DISASTROUS EFFECT CAN BE REDUCED BY
PRE DISASTER PLANNING CALLED EMERGENCY
PLANNING.
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
3/9
ON- SITE EMERGENCY PLANNING
WHY REQUIRED :-
1. TO CONTROL THE DAMAGE AND LOSS OF LIFE & PROPERTY IN
CASE OF A MAJOR ACCIDENT.
2. TO FULFIL THE STATUTORY OBLIGATION
THE FACTORIES ACT, 1948, SEC41(B) (4)
EVERY OCCUPIER SHALL, WITH THE APPROVAL OF THE CHIEF
INSPECTOR , DRAW UPAN ON -SITE EMERGENCY PLAN AND
DETAILED DISASTER CONTROL MEASURES FOR HIS FACTORY AND
MAKE KNOWN TO THE WORKERS EMPLOYED THEREIN AND TO
THE GENERAL PUBLIC LIVING IN THE VICINITYOF THE FACTORY
,THE SAFETY MEASURES REQUIRED TO BE TAKEN IN THE EVENT
OF THE ACCIDENT TAKING PLACE.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
4/9
BASIC AND ESSENTIAL FEATURES
1. IDENTIFICATION AND ASSESEMENT OF RISK
• HAZARD ANALYSIS
• HAZOP
PROBABILITY OF OCCURRENCE OF
• MAJOR FIRE / EXPLOSION
• COLLAPSING OF BUILDING / STRUCTURES
• RELEASE OF TOXIC SUBSTANCES etc.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
5/9
2. EFFECTIVE COMMUNICATION AND CO- ORDINATION
• DECLARATION OF EMERGENCY AND RAISING OF ALARM
ALARM SHOULD BE AUDIBLE FROM ALL LOCATIONS
ALARM SHOULD BE CLEARLY INDICATING THE EMERGENCY
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
6/9
3. APPOINTEMENT OF KEY PERSONNEL
(WITH SPECIFIC DUTIES AND RESPONSIBILITIES)
a) WORKS INCIDENT CONTROLLER
• ASSESS THE SITUATION TO DECIDE WHETHER MAJOR EMERGENCY
EXISTS OR LIKELY TO DEVELOP.
• INITIATES EMERGENCY PROCEDURES.
• INFORMS WORKS MAIN CONTROLLER.
• ASSUMES RESPONSIBILITY OF WORKS MAIN CONTROLLER UNTIL HE
ARRIVES.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
7/9
WORKS MAIN CONTROLLER
• SELECTED FROM SENIOR MOST TECHNICAL PERSONS.
•AUTHOTISED TO ACTIVATE MAJOR EMERGENCY PROCEDURESS.
• CO- ORDINATES , DIRECTS & GUIDES PLANT AND OUTSIDE
EMERGENCY SERVICES.
• LIASE WITH RESCUE AUTHRITIES, MEDICAL TEAM, FIRE
BRIGADE, POLICE AND OTHER LOCAL AUTHORITIES.
• CONTROLS TRAFFIC MOVEMENT AND REHABILITATION OF
AFFECTED PEOPLE.
• ISSUES STATEMENT TO PRESS , RADIO, TV etc.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
8/9
4. OTHER KEY PERSONNEL
• PLAY KEY ROLE IN ADVISING AND IMPLEMENTING
DECISIONS OF WORKS MAIN CONTROLLER.
• SENIOR PERSONS FROM - PRODUCTION
-ENGINEERING
- PERSONNEL
- SAFETY/ SECURITY
- LABORATORY
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
9/9
5. EMERGENCY CONTROL CENTRE
- SUITABLY LOCATED AND ADEQUATELY EQUIPPED WITH
•RELEVANT DATA(MSDS etc)
• EQUIPMENTS -PPEs etc.
• EFFECTIVE MEANS OF COMMUNICATION
TELEPHONE, WIRELESS, WALKIE TALKIE, MESSANGERS.
• CONTACT ADDRESS / TELEPHONE NOS. OF SENIOR
EXECUTIVES , KEY PERSONNEL(CALL OUT LIST )
•PLAN SHOWING QUANTITIES AND LOCATION OF HAZARDOUS
MATERAL/AREA, SAFE AREA FOR EVACUATION.
• INFORMATION ON ANTIDOTES FOR HAZARDOUS
CHEMICALS.
CD/SAFETY.TRG/02
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
10/
EMERGENCY PLAN FOR CHANDA WORKS
EXPECTED EMERGENCIES :
1.
2.
3.
4.
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
11/
EMERGENCY PLAN FOR CHANDA WORKS
RAISING OF ALARM :
1.WHO CAN RAISE THE ALRM ?
2.WHERE ALL THE ALARM SWITCHES WILL BE
LOCATED ?
3.HOW THE ALARM WILL DISTINGUISH BETWEEN
TYPES OF EMERGENCIES ?
4.WHERE WILL THE ALARMS BE LOCATED ?
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
12/
APPOINTMENT OF KEY PERSONNEL
1. WORKS INCIDENT CONTROLLER ?
2. WORKS MAIN CONTROLLER ?
3. OTHER KEY PERSONNEL ?
A) RUNNERS
B) FIRST AIDERS
C) FIRE FIGHTERS
D) CORDONING TEAM
E) SECURITY
F) TRAFFIC CONTROLLING TEAM
EMERGENCY PLANNING
ACC-CHANDA --SAFETY
13/
EMERGENCY CONTROL CENTRE
1. WHERE IT SHOULD BE LOCATED ?
2. HOW MANY ECC SHOULD BE THERE ?
3. EQUIPMENTS INSIDE THE ECC
a) TEL NOS. OF EMERGENCY SERVICES
b)TEL NOS. OF KEY PERSONNELS.
C) LIST OF ALL RESCUE TEAM MEMBERS
d ) INFORMATION ON ANTIDOTES
e ) WIRELESS/ WALKIE-TALKIE

More Related Content

Similar to emergency plan.ppt

Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9
Helmy ismail
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
Selva Prakash
 
Environment & Industrial disasters
Environment & Industrial disastersEnvironment & Industrial disasters
Environment & Industrial disasters
Ankur Sharma
 
Industrial safety.
Industrial safety.Industrial safety.
Industrial safety.
psc2015
 
K-Y call
K-Y callK-Y call
Challenging Environment In Asia Requires Emergency Response
Challenging Environment In Asia Requires Emergency ResponseChallenging Environment In Asia Requires Emergency Response
Challenging Environment In Asia Requires Emergency Response
Enterprise Security Risk Management
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
psc2015
 
The AART Way of Hazard Reporting
The AART Way of Hazard ReportingThe AART Way of Hazard Reporting
The AART Way of Hazard Reporting
ASK EHS Engineering & Consultants
 
Triage
TriageTriage
Triage
azizkhan1995
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)
Austin McFarland
 
Presentation1
Presentation1Presentation1
Presentation1
GULFAM KHALID
 
Hazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites saferHazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites safer
Sangeeta Phadke
 
AL_Yamama_Rain_Contingency_Plan[1][1].pptx
AL_Yamama_Rain_Contingency_Plan[1][1].pptxAL_Yamama_Rain_Contingency_Plan[1][1].pptx
AL_Yamama_Rain_Contingency_Plan[1][1].pptx
adeebzahid1
 
Site Selection for Mission Critical Facilities
Site Selection for Mission Critical FacilitiesSite Selection for Mission Critical Facilities
Site Selection for Mission Critical Facilities
Schneider Electric
 
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
ScienceTec & CorrTec-Engineering
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
eSAT Publishing House
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jan
capstonerx
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates
Dwarika Bhushan Sharma
 

Similar to emergency plan.ppt (20)

Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9Soft Gelatin PS risk21-9
Soft Gelatin PS risk21-9
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
 
Environment & Industrial disasters
Environment & Industrial disastersEnvironment & Industrial disasters
Environment & Industrial disasters
 
Industrial safety.
Industrial safety.Industrial safety.
Industrial safety.
 
K-Y call
K-Y callK-Y call
K-Y call
 
Challenging Environment In Asia Requires Emergency Response
Challenging Environment In Asia Requires Emergency ResponseChallenging Environment In Asia Requires Emergency Response
Challenging Environment In Asia Requires Emergency Response
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
The AART Way of Hazard Reporting
The AART Way of Hazard ReportingThe AART Way of Hazard Reporting
The AART Way of Hazard Reporting
 
Triage
TriageTriage
Triage
 
Muhammad Resume
Muhammad ResumeMuhammad Resume
Muhammad Resume
 
FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)FTS SOS Plan for Surprise falls (1)
FTS SOS Plan for Surprise falls (1)
 
Presentation1
Presentation1Presentation1
Presentation1
 
Hazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites saferHazardous area installations -how to make 92% of sites safer
Hazardous area installations -how to make 92% of sites safer
 
AL_Yamama_Rain_Contingency_Plan[1][1].pptx
AL_Yamama_Rain_Contingency_Plan[1][1].pptxAL_Yamama_Rain_Contingency_Plan[1][1].pptx
AL_Yamama_Rain_Contingency_Plan[1][1].pptx
 
Site Selection for Mission Critical Facilities
Site Selection for Mission Critical FacilitiesSite Selection for Mission Critical Facilities
Site Selection for Mission Critical Facilities
 
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
PRECAUTIONS REQUIRED FOR STOPPING MACHINES FACING COVID19.
 
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
5 Trial Trenches (Temporary Works) Risk Assessment Templates.docx
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Annual ed epp2010 jan
Annual ed  epp2010 janAnnual ed  epp2010 jan
Annual ed epp2010 jan
 
5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates5 trial trenches (temporary works) risk assessment templates
5 trial trenches (temporary works) risk assessment templates
 

Recently uploaded

Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 

Recently uploaded (20)

Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 

emergency plan.ppt

  • 1. EMERGENCY PLANNING ACC-CHANDA --SAFETY CD/SAFETY.TRG/02 1/9 EMERGENCY A MAJOR EMERGENCY OCCURING AT A WORKS IS ONE THAT MAY AFFECT SEVERAL DEPARTMENTS WITHIN IT AND/ OR MAY CAUSE SERIOUS INJURIES, LOSS OF LIFE , EXTENSIVE DAMAGE TO PROPERTY OR SERIOUS DISRUPTION OUTSIDE THE WORKS. CAUSES : 1. NORMALLY DUE TO MAL FUNCTION OF THE NORMAL OPERATION. 2. INTERVENTION OF OUTSIDE AGENCY a) FLOODING b) CRASHED AIR CRAFT c) ARSON OR SABOTAGE
  • 2. EMERGENCY PLANNING ACC-CHANDA --SAFETY 1A/9 A PLANT WITH HAZARDOUS OPERATION/PROCESS MAY LEAD TO MAJOR ACCIDENT WITH DISASTROUS CONSEQUENCE IN SPITE OF BEST SAFETY MEASURES. CD/SAFETY.TRG/02 MAJOR ACCIDENT RESULTS FROM UNCONTROLLED DEVELOPMENT IN INDUSTRIAL ACTIVITIES CAUSING. •SERIOUS BODILY INJURY •LOSS OF LIFE •EXTENSIVE DAMAGE TO PROPERTY •ADVERSE EFFECT ON ENVIRONMENT •DISRUPTION INSIDE AND OUTSIDE THE PLANT
  • 3. EMERGENCY PLANNING ACC-CHANDA --SAFETY 2/9 CAUSES OF DISASTER CD/SAFETY.TRG/02 •TOXIC RELEASE •MAJOR FIRE/ EXPLOSION •RADIATION LEAKS. •EARTHQUAKE •FLOOD •AIRCRAFT CRASH •ARSON / SABOTAGE SEVERITY OF DISASTROUS EFFECT CAN BE REDUCED BY PRE DISASTER PLANNING CALLED EMERGENCY PLANNING.
  • 4. EMERGENCY PLANNING ACC-CHANDA --SAFETY 3/9 ON- SITE EMERGENCY PLANNING WHY REQUIRED :- 1. TO CONTROL THE DAMAGE AND LOSS OF LIFE & PROPERTY IN CASE OF A MAJOR ACCIDENT. 2. TO FULFIL THE STATUTORY OBLIGATION THE FACTORIES ACT, 1948, SEC41(B) (4) EVERY OCCUPIER SHALL, WITH THE APPROVAL OF THE CHIEF INSPECTOR , DRAW UPAN ON -SITE EMERGENCY PLAN AND DETAILED DISASTER CONTROL MEASURES FOR HIS FACTORY AND MAKE KNOWN TO THE WORKERS EMPLOYED THEREIN AND TO THE GENERAL PUBLIC LIVING IN THE VICINITYOF THE FACTORY ,THE SAFETY MEASURES REQUIRED TO BE TAKEN IN THE EVENT OF THE ACCIDENT TAKING PLACE. CD/SAFETY.TRG/02
  • 5. EMERGENCY PLANNING ACC-CHANDA --SAFETY 4/9 BASIC AND ESSENTIAL FEATURES 1. IDENTIFICATION AND ASSESEMENT OF RISK • HAZARD ANALYSIS • HAZOP PROBABILITY OF OCCURRENCE OF • MAJOR FIRE / EXPLOSION • COLLAPSING OF BUILDING / STRUCTURES • RELEASE OF TOXIC SUBSTANCES etc. CD/SAFETY.TRG/02
  • 6. EMERGENCY PLANNING ACC-CHANDA --SAFETY 5/9 2. EFFECTIVE COMMUNICATION AND CO- ORDINATION • DECLARATION OF EMERGENCY AND RAISING OF ALARM ALARM SHOULD BE AUDIBLE FROM ALL LOCATIONS ALARM SHOULD BE CLEARLY INDICATING THE EMERGENCY CD/SAFETY.TRG/02
  • 7. EMERGENCY PLANNING ACC-CHANDA --SAFETY 6/9 3. APPOINTEMENT OF KEY PERSONNEL (WITH SPECIFIC DUTIES AND RESPONSIBILITIES) a) WORKS INCIDENT CONTROLLER • ASSESS THE SITUATION TO DECIDE WHETHER MAJOR EMERGENCY EXISTS OR LIKELY TO DEVELOP. • INITIATES EMERGENCY PROCEDURES. • INFORMS WORKS MAIN CONTROLLER. • ASSUMES RESPONSIBILITY OF WORKS MAIN CONTROLLER UNTIL HE ARRIVES. CD/SAFETY.TRG/02
  • 8. EMERGENCY PLANNING ACC-CHANDA --SAFETY 7/9 WORKS MAIN CONTROLLER • SELECTED FROM SENIOR MOST TECHNICAL PERSONS. •AUTHOTISED TO ACTIVATE MAJOR EMERGENCY PROCEDURESS. • CO- ORDINATES , DIRECTS & GUIDES PLANT AND OUTSIDE EMERGENCY SERVICES. • LIASE WITH RESCUE AUTHRITIES, MEDICAL TEAM, FIRE BRIGADE, POLICE AND OTHER LOCAL AUTHORITIES. • CONTROLS TRAFFIC MOVEMENT AND REHABILITATION OF AFFECTED PEOPLE. • ISSUES STATEMENT TO PRESS , RADIO, TV etc. CD/SAFETY.TRG/02
  • 9. EMERGENCY PLANNING ACC-CHANDA --SAFETY 8/9 4. OTHER KEY PERSONNEL • PLAY KEY ROLE IN ADVISING AND IMPLEMENTING DECISIONS OF WORKS MAIN CONTROLLER. • SENIOR PERSONS FROM - PRODUCTION -ENGINEERING - PERSONNEL - SAFETY/ SECURITY - LABORATORY CD/SAFETY.TRG/02
  • 10. EMERGENCY PLANNING ACC-CHANDA --SAFETY 9/9 5. EMERGENCY CONTROL CENTRE - SUITABLY LOCATED AND ADEQUATELY EQUIPPED WITH •RELEVANT DATA(MSDS etc) • EQUIPMENTS -PPEs etc. • EFFECTIVE MEANS OF COMMUNICATION TELEPHONE, WIRELESS, WALKIE TALKIE, MESSANGERS. • CONTACT ADDRESS / TELEPHONE NOS. OF SENIOR EXECUTIVES , KEY PERSONNEL(CALL OUT LIST ) •PLAN SHOWING QUANTITIES AND LOCATION OF HAZARDOUS MATERAL/AREA, SAFE AREA FOR EVACUATION. • INFORMATION ON ANTIDOTES FOR HAZARDOUS CHEMICALS. CD/SAFETY.TRG/02
  • 11. EMERGENCY PLANNING ACC-CHANDA --SAFETY 10/ EMERGENCY PLAN FOR CHANDA WORKS EXPECTED EMERGENCIES : 1. 2. 3. 4.
  • 12. EMERGENCY PLANNING ACC-CHANDA --SAFETY 11/ EMERGENCY PLAN FOR CHANDA WORKS RAISING OF ALARM : 1.WHO CAN RAISE THE ALRM ? 2.WHERE ALL THE ALARM SWITCHES WILL BE LOCATED ? 3.HOW THE ALARM WILL DISTINGUISH BETWEEN TYPES OF EMERGENCIES ? 4.WHERE WILL THE ALARMS BE LOCATED ?
  • 13. EMERGENCY PLANNING ACC-CHANDA --SAFETY 12/ APPOINTMENT OF KEY PERSONNEL 1. WORKS INCIDENT CONTROLLER ? 2. WORKS MAIN CONTROLLER ? 3. OTHER KEY PERSONNEL ? A) RUNNERS B) FIRST AIDERS C) FIRE FIGHTERS D) CORDONING TEAM E) SECURITY F) TRAFFIC CONTROLLING TEAM
  • 14. EMERGENCY PLANNING ACC-CHANDA --SAFETY 13/ EMERGENCY CONTROL CENTRE 1. WHERE IT SHOULD BE LOCATED ? 2. HOW MANY ECC SHOULD BE THERE ? 3. EQUIPMENTS INSIDE THE ECC a) TEL NOS. OF EMERGENCY SERVICES b)TEL NOS. OF KEY PERSONNELS. C) LIST OF ALL RESCUE TEAM MEMBERS d ) INFORMATION ON ANTIDOTES e ) WIRELESS/ WALKIE-TALKIE