MEGGER
MEGGER
 The term megger or megohmmeter refers to an
instrument for measuring high voltage electrical
insulation.
 “Megger” is the brand name of the first portable
insulation measuring instrument.
 Also, insulation resistance tester known as megger
is small in size, portable and popular
 Practically, it is used in operation of continuity,
short circuit and open circuit tests of electrical
installation.
 A Megger has a crank shaft with clutch mechanism.
We can vary the speed of cranking with a help of
clutch.
 This arrangement is located between magnets. The
whole setup is called DC Generator.
 On the left side of the DC generator, there is a scale
showing the resistance values from 0 to infinity.
 The circuit consists of two coils Coil-A and Coil-B.
Both the coils are connected to the DC generator
 Megger operates on the principle that current
flowing through a conductor placed in a magnetic
field experiences a torque. Mathematically, the force
is proportional to the current and the magnetic flux.
 Where, Vector Force = force and direction of the
current and magnetic field.
 Case (I): If the resistance has a higher value then the
pointer on the device coil will move towards infinity.
 Case(II): If the resistance value is low then the
pointer will indicate zero resistance.
WORKING
 When the current flows from the generator,
through the pressure coil, the coil tends to set
itself at right angles to the field of the
permanent magnet.
 When the test terminals are open,
corresponding to infinite resistance, no current
flows through deflection coil.
 The supply to the meter is usually given by a
hand driven permanent magnet dc generator.
 Thus the pressure coil governs the motion of the
moving element making it move to its extreme
anticlockwise position.
 The pointer comes to rest at the infinity end of the
scale.
 When the test terminals are short circuited (zero
resistance), the current from the generator flowing
through the current coil is large enough to produce
sufficient torque to overcome the counter-clockwise
torque of the pressure coil.
 Due to this, pointer moves over a scale showing
zero resistance.
 When the high resistance to be tested is
connected between terminals T1 and T2 the
opposing torques of the coils balance each other
so that pointer attains a stationary position at
some intermediate point on scale.
 The scale is calibrated in mega ohms .
Advantages of Hand Operated Megger
 Still keeps important in such high-tech world as it’s an oldest
method for IR value determination.
 No external source required to operate.
 Cheaper available in market.
Disadvantages of Hand Operated Megger
 At least 2 person required to operate i.e. one for rotation of
crank other to connect megger with electrical system to be
tested.
 Accuracy is not up to the level as it’s varies with rotation of
crank.
 Require very high care & safety during use of the same.
LCR meter
 LCR meters can be understood as a multimeter,
this is because it can measure resistance,
inductance, capacitance as per the
requirement.
 The significant component of LCR meter is
the Wheatstone bridge and RC ratio arm
circuits.
 The component whose value is to be measured is
connected in one of the arms of the bridge. There
are different provisions for the different type of
measurements.
 If the value of resistance is to be measured, then
Wheatstone bridge comes into picture while the
value of inductance and capacitance can be
measured by comparing it with standard capacitor
present in RC ratio arm circuit.
 Working of LCR Meter
 The bridge is adjusted in null position in order to
balance it completely.
 Besides, the sensitivity of the meter should also be
adjusted along with balancing of the bridge.
 The output from the bridge is fed to emitter follower
circuit.
 The emitter follower is widely used as a buffer
amplifier to reduce the loading on the previous
stage and provide a lower impedance output for
any following circuits.

 The output from emitter follower circuit is given as
an input to detector amplifier.
 The significance of detector amplifier can be
understood by the fact that if the measuring
signal is low in magnitude, it will not be able to
move the indicator of PMMC meter.
 Thus, in order to achieve the sustainable
indication, we need to have a high magnitude
measuring signal.
 The rectifier is used in the circuit to convert the
AC signal into DC signal.
 When the bridge is provided with AC excitation
then at the output end of the bridge the AC signal
needs transformation into DC signal.

More Related Content

Similar to EM unit 3 part 2.pdf

ELECTRICAL INSTRUMENTS 3.pptx
ELECTRICAL INSTRUMENTS 3.pptxELECTRICAL INSTRUMENTS 3.pptx
ELECTRICAL INSTRUMENTS 3.pptx
roshan375533
 
Electronic Measurement - Insulation Resistance Measurement - Megger
Electronic Measurement - Insulation Resistance Measurement - MeggerElectronic Measurement - Insulation Resistance Measurement - Megger
Electronic Measurement - Insulation Resistance Measurement - Megger
Burdwan University
 
1. Introduction.pdf
1. Introduction.pdf1. Introduction.pdf
1. Introduction.pdf
LIEWHUIFANGUNIMAP
 
EmI Unit-2.pptx
EmI Unit-2.pptxEmI Unit-2.pptx
EmI Unit-2.pptx
MamthaMam1
 
Linear and angular measurement
Linear and angular measurementLinear and angular measurement
Linear and angular measurement
Er Ashvin Deogade
 
ammeter and voltmeter presentation. For college pdf
ammeter and voltmeter presentation. For college pdfammeter and voltmeter presentation. For college pdf
ammeter and voltmeter presentation. For college pdf
ashutoshmall444
 
Transducers
TransducersTransducers
Transducers
Mayur Sevak
 
DC Voltmeter and Ammeter
DC Voltmeter and AmmeterDC Voltmeter and Ammeter
DC Voltmeter and Ammeter
AL- AMIN
 
Amit mahto final
Amit mahto finalAmit mahto final
Amit mahto final
Jitendra Rajput
 
EMI Unit 5 Bridges and Measurement of Physical Parameters
EMI Unit 5 Bridges and  Measurement of Physical ParametersEMI Unit 5 Bridges and  Measurement of Physical Parameters
EMI Unit 5 Bridges and Measurement of Physical Parameters
GVNSK Sravya
 
Copy of Transducers.pdf
Copy of Transducers.pdfCopy of Transducers.pdf
Copy of Transducers.pdf
rsharma999995
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
Parth Patel
 
Measurement of motion, force and torque
Measurement of motion, force and torqueMeasurement of motion, force and torque
Measurement of motion, force and torque
ARKA JAIN University
 
Mw &dc lab (90) iv i
Mw &dc lab (90) iv iMw &dc lab (90) iv i
Mw &dc lab (90) iv i
Prabhu Kiran
 
Sensor and transducers lect 1
Sensor and transducers lect 1Sensor and transducers lect 1
Sensor and transducers lect 1
prashant tripathi
 
TRANSDUCERS (2).ppt
TRANSDUCERS (2).pptTRANSDUCERS (2).ppt
TRANSDUCERS (2).ppt
VigneshwariMahamuni1
 
Chapter 6 TRANSDUCERS.ppt
Chapter 6 TRANSDUCERS.pptChapter 6 TRANSDUCERS.ppt
Chapter 6 TRANSDUCERS.ppt
prakash65044
 
MI Mod2.ppt
MI Mod2.pptMI Mod2.ppt
MI Mod2.ppt
BlessyJoy18
 
Operation and Control of Inductive Wireless Power Transfer
Operation and Control of Inductive Wireless Power Transfer Operation and Control of Inductive Wireless Power Transfer
Operation and Control of Inductive Wireless Power Transfer
Indian Institute of Technology Guwahati
 

Similar to EM unit 3 part 2.pdf (20)

ELECTRICAL INSTRUMENTS 3.pptx
ELECTRICAL INSTRUMENTS 3.pptxELECTRICAL INSTRUMENTS 3.pptx
ELECTRICAL INSTRUMENTS 3.pptx
 
Electronic Measurement - Insulation Resistance Measurement - Megger
Electronic Measurement - Insulation Resistance Measurement - MeggerElectronic Measurement - Insulation Resistance Measurement - Megger
Electronic Measurement - Insulation Resistance Measurement - Megger
 
1. Introduction.pdf
1. Introduction.pdf1. Introduction.pdf
1. Introduction.pdf
 
EmI Unit-2.pptx
EmI Unit-2.pptxEmI Unit-2.pptx
EmI Unit-2.pptx
 
Linear and angular measurement
Linear and angular measurementLinear and angular measurement
Linear and angular measurement
 
ammeter and voltmeter presentation. For college pdf
ammeter and voltmeter presentation. For college pdfammeter and voltmeter presentation. For college pdf
ammeter and voltmeter presentation. For college pdf
 
Transducers
TransducersTransducers
Transducers
 
DC Voltmeter and Ammeter
DC Voltmeter and AmmeterDC Voltmeter and Ammeter
DC Voltmeter and Ammeter
 
Amit mahto final
Amit mahto finalAmit mahto final
Amit mahto final
 
EMI Unit 5 Bridges and Measurement of Physical Parameters
EMI Unit 5 Bridges and  Measurement of Physical ParametersEMI Unit 5 Bridges and  Measurement of Physical Parameters
EMI Unit 5 Bridges and Measurement of Physical Parameters
 
Copy of Transducers.pdf
Copy of Transducers.pdfCopy of Transducers.pdf
Copy of Transducers.pdf
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
3059
30593059
3059
 
Measurement of motion, force and torque
Measurement of motion, force and torqueMeasurement of motion, force and torque
Measurement of motion, force and torque
 
Mw &dc lab (90) iv i
Mw &dc lab (90) iv iMw &dc lab (90) iv i
Mw &dc lab (90) iv i
 
Sensor and transducers lect 1
Sensor and transducers lect 1Sensor and transducers lect 1
Sensor and transducers lect 1
 
TRANSDUCERS (2).ppt
TRANSDUCERS (2).pptTRANSDUCERS (2).ppt
TRANSDUCERS (2).ppt
 
Chapter 6 TRANSDUCERS.ppt
Chapter 6 TRANSDUCERS.pptChapter 6 TRANSDUCERS.ppt
Chapter 6 TRANSDUCERS.ppt
 
MI Mod2.ppt
MI Mod2.pptMI Mod2.ppt
MI Mod2.ppt
 
Operation and Control of Inductive Wireless Power Transfer
Operation and Control of Inductive Wireless Power Transfer Operation and Control of Inductive Wireless Power Transfer
Operation and Control of Inductive Wireless Power Transfer
 

More from tadi1padma

EVT unit 1 part 1.pptx
EVT unit 1 part 1.pptxEVT unit 1 part 1.pptx
EVT unit 1 part 1.pptx
tadi1padma
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometers
tadi1padma
 
megger.pptx
megger.pptxmegger.pptx
megger.pptx
tadi1padma
 
Measurement of Resistance.pptx
Measurement of Resistance.pptxMeasurement of Resistance.pptx
Measurement of Resistance.pptx
tadi1padma
 
EM unit 1 part 5.pdf
EM unit 1 part 5.pdfEM unit 1 part 5.pdf
EM unit 1 part 5.pdf
tadi1padma
 
frequency meters.pptx
frequency  meters.pptxfrequency  meters.pptx
frequency meters.pptx
tadi1padma
 
single phase energy meter.pptx
single phase energy meter.pptxsingle phase energy meter.pptx
single phase energy meter.pptx
tadi1padma
 
potentiometer II.pptx
potentiometer II.pptxpotentiometer II.pptx
potentiometer II.pptx
tadi1padma
 
Errors in Measuring Instruments.ppt
Errors in Measuring Instruments.pptErrors in Measuring Instruments.ppt
Errors in Measuring Instruments.ppt
tadi1padma
 

More from tadi1padma (9)

EVT unit 1 part 1.pptx
EVT unit 1 part 1.pptxEVT unit 1 part 1.pptx
EVT unit 1 part 1.pptx
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometers
 
megger.pptx
megger.pptxmegger.pptx
megger.pptx
 
Measurement of Resistance.pptx
Measurement of Resistance.pptxMeasurement of Resistance.pptx
Measurement of Resistance.pptx
 
EM unit 1 part 5.pdf
EM unit 1 part 5.pdfEM unit 1 part 5.pdf
EM unit 1 part 5.pdf
 
frequency meters.pptx
frequency  meters.pptxfrequency  meters.pptx
frequency meters.pptx
 
single phase energy meter.pptx
single phase energy meter.pptxsingle phase energy meter.pptx
single phase energy meter.pptx
 
potentiometer II.pptx
potentiometer II.pptxpotentiometer II.pptx
potentiometer II.pptx
 
Errors in Measuring Instruments.ppt
Errors in Measuring Instruments.pptErrors in Measuring Instruments.ppt
Errors in Measuring Instruments.ppt
 

Recently uploaded

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 

Recently uploaded (20)

Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 

EM unit 3 part 2.pdf

  • 2. MEGGER  The term megger or megohmmeter refers to an instrument for measuring high voltage electrical insulation.  “Megger” is the brand name of the first portable insulation measuring instrument.  Also, insulation resistance tester known as megger is small in size, portable and popular  Practically, it is used in operation of continuity, short circuit and open circuit tests of electrical installation.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.  A Megger has a crank shaft with clutch mechanism. We can vary the speed of cranking with a help of clutch.  This arrangement is located between magnets. The whole setup is called DC Generator.  On the left side of the DC generator, there is a scale showing the resistance values from 0 to infinity.  The circuit consists of two coils Coil-A and Coil-B. Both the coils are connected to the DC generator
  • 9.  Megger operates on the principle that current flowing through a conductor placed in a magnetic field experiences a torque. Mathematically, the force is proportional to the current and the magnetic flux.  Where, Vector Force = force and direction of the current and magnetic field.  Case (I): If the resistance has a higher value then the pointer on the device coil will move towards infinity.  Case(II): If the resistance value is low then the pointer will indicate zero resistance.
  • 10. WORKING  When the current flows from the generator, through the pressure coil, the coil tends to set itself at right angles to the field of the permanent magnet.  When the test terminals are open, corresponding to infinite resistance, no current flows through deflection coil.  The supply to the meter is usually given by a hand driven permanent magnet dc generator.
  • 11.
  • 12.  Thus the pressure coil governs the motion of the moving element making it move to its extreme anticlockwise position.  The pointer comes to rest at the infinity end of the scale.  When the test terminals are short circuited (zero resistance), the current from the generator flowing through the current coil is large enough to produce sufficient torque to overcome the counter-clockwise torque of the pressure coil.  Due to this, pointer moves over a scale showing zero resistance.
  • 13.
  • 14.  When the high resistance to be tested is connected between terminals T1 and T2 the opposing torques of the coils balance each other so that pointer attains a stationary position at some intermediate point on scale.  The scale is calibrated in mega ohms .
  • 15. Advantages of Hand Operated Megger  Still keeps important in such high-tech world as it’s an oldest method for IR value determination.  No external source required to operate.  Cheaper available in market. Disadvantages of Hand Operated Megger  At least 2 person required to operate i.e. one for rotation of crank other to connect megger with electrical system to be tested.  Accuracy is not up to the level as it’s varies with rotation of crank.  Require very high care & safety during use of the same.
  • 16.
  • 17.
  • 18. LCR meter  LCR meters can be understood as a multimeter, this is because it can measure resistance, inductance, capacitance as per the requirement.  The significant component of LCR meter is the Wheatstone bridge and RC ratio arm circuits.  The component whose value is to be measured is connected in one of the arms of the bridge. There are different provisions for the different type of measurements.
  • 19.  If the value of resistance is to be measured, then Wheatstone bridge comes into picture while the value of inductance and capacitance can be measured by comparing it with standard capacitor present in RC ratio arm circuit.
  • 20.
  • 21.  Working of LCR Meter  The bridge is adjusted in null position in order to balance it completely.  Besides, the sensitivity of the meter should also be adjusted along with balancing of the bridge.  The output from the bridge is fed to emitter follower circuit.  The emitter follower is widely used as a buffer amplifier to reduce the loading on the previous stage and provide a lower impedance output for any following circuits. 
  • 22.  The output from emitter follower circuit is given as an input to detector amplifier.  The significance of detector amplifier can be understood by the fact that if the measuring signal is low in magnitude, it will not be able to move the indicator of PMMC meter.  Thus, in order to achieve the sustainable indication, we need to have a high magnitude measuring signal.  The rectifier is used in the circuit to convert the AC signal into DC signal.  When the bridge is provided with AC excitation then at the output end of the bridge the AC signal needs transformation into DC signal.