Name of Projects Safe Man hours
SMS Forging - Surat 7 Millions
Grasim VSF-Bharuch 12 Million
GHB - Valsad ---------
JCB -Jaipur On Deputation
HERO - Halol 4.3 millions
OBEROI ETERNIA 0.5 million
Total Years of service 68 Months
Name of Projects Activities
SMS Forging – Surat. Heavy structural erection, roof sheeting, Deep
excavation,4km walk way @19mtrs and 24mtrs
Grasim VSF-Bharuch 175mtr height Chimney, Deck sheeting, Heavy Equipment
and Structural erection with zero incidents
GHB – Valsad. 4 months- starting setup
JCB - Jaipur Restart and successful completion of site activities due
to major site EHS issues (On Deputation)
HERO – Halol. Heavy structural erection , Deck sheeting and glazing
work
OBEROI ETERNIA High raise Building (71 floor) ,crane Erection
Total Years of service 68 Months
Name of Projects Activities
SMS Forging - Surat 7Million safe man hours award,
Grasim VSF-Bharuch 13Million safe man hours certificate and appreciation letter
GHB – Valsad. Nil
JCB -Jaipur Appreciation letter for individual performance
HERO - Halol 4.3 Million safe man hours certificate
Total Years of service 63 Months
- Openings
- Columns
Legend -
CUT OUT ID No.
for effective
PTW system
Homemade Debris Chute by
empty Drums
Inadequate Tools for handling manhole cover
Tool Made from scrap
Extension Rod for aluminum
Tower
Crow Bar Ring spanner
Booklet of EHS
management & Good
practices adopted at site.
1.Easy to demonstrate the
safety improvements / new
initiatives & practices done at
site to the visitors & clients .
2. Easy to demonstrate the site
facilities provided and statistics
performance to the client &
visitors .
3. Having a clear picture of
statistics and resources using at
site .
▪Brief details ▪Advantages*
▪Kaizen pics(if any)
▪Initiative by: Mr. Rajeev Dath
▪Designation: EHSM
▪Project: Hero Project , Halol
For 50 nos. of skylight openings @ 12 mtr
height , wall Shuttering / concreting works a
working platform was required , hence using
the scrape bars made a platform and under
the platform catch net was tightened and
anchoring arrangement made for the safe
working condition .
Platform is such like it can shift after
completing the task to new opening works .
1. Use of Scrape
reinforcement bars.
2. Cost saving instead of
using boom lift .
3. Time saving instead of
making the platform on
the spot by doing welding
work for each opening .
4. Improving quality works
by eliminating the
welding work on truss.
5. Productive work ,
requiring less time to shift
the platform .
Brief details Advantages* • Kaizen pics(if any)
▪Initiative by: Mr. Rajeev Dath
▪Designation: EHSM
▪Project: Hero Project , Halol
Use of waste wooden scrape
in making recycle bin
1. Using waste wooden ply boards
.
2. Reducing wastage at site.
3. Cost effective No material cost
.
4. Waste bending wires / from
work material are being kept
inside the bin .
5. Improving housekeeping
arrangements at site .
6. Encouraging workmen & staff in
pep talk to put the waste
material found at site inside the
bin.
▪Brief details ▪Advantages* ▪Kaizen pics(if any)
▪Initiative by: Mr.RD / Mr.Suresh
▪Designation: FW/EHS – In charge
▪Project: Hero Project , Halol
▪Brief details ▪Advantages* ▪Kaizen pics(if any)
Use of Tubular walk way
planks for barricading
1. Using banned / unused walk
way planks for barricading
purpose.
2. Controlling the use of
tubular planks as working
platform by using in
barricading material .
3. Minimizing/saving storage
space
4. Adequate protection
Performance Feed Back From EHS Dept. JCB -Jaipur
Location – Ripening
Activity – Pipe erection
Unsafe Act – Standing on pipe/convex surface , Descending by wrong posture
Unsafe condition- obstruction on access/inadequate access
Inadequate access – Worker resting on pipe while ascending /descending
on scaffold
Before After
Adequate access with landing platform for ascending /descending on
scaffold
Hazard – Slip, and fall from height, sharp tipped/solid objects underneath , inadequate access
Risk – Personal injury, Permanent disability and Fatality
CA PA - Scaffold erection and inspection as per SOP, all access and egress cleared and free
from obstructions. Maintaining good housekeeping , Provided adequate landing for resting
/provided clear access towards scaffols
Hazard- tagline
directly tied on horizontal
clamps, slip of horizontal
clamp, fall of lifted load,
sudden impact/over load
Risk- Severe
injury, permanent
disability, fatality
CAPA- Clamp using
for tagline instead of
direct tied with
horizontal clamp
Name of Project Hero MotoCorp
Project
Total Site Area 210 Acres
Constructed area 1.5 lakhs Sqm
Total Value of Contract 384.39 Cr.
Duration of Project 12 months
LOI issued on 24th Nov 2014
Main Plant
Medical Store
MC DOL
FA DOL
Admin Building
Dispatch Block
Weld Shop
Paint Shop
Tower Block
Porch Area
Periphery road
Amphitheatre
Canteen area
Weld DOL
ESS-2
Paint Store
Scrap Yard
ETP building
Propane Yard OHWT
Client
• Hero
MotoCorp Ltd.
Consultant
• Semac
Consultants
Pvt. Ltd
PMC
• JLL Property
Consultants
(India) Pvt. Ltd
Contractor
• L&T
Construction
Items UOM Quantities
Earth work - Excavation Cum 639594
Earthwork – Backfilling Cum 317680
RCC Cum 1,09,559
Formwork Sqm 1,97,672
Reinforcement MT 6,269
Structural Steel MT 13,803
Flooring – VDF Sqm 95,139
Water Proofing – Membrane Sqm 76,390
Painting – Structural Sqm 3,86,910
Painting – Others Sqm 1,64,853
Deck Sheeting Sqm 72,555
ROAD Works Sqm 87,103
Manager - EHS
Mr. Rajeev Dath
Mob.9909927363
Safety Inspector
Mr. Mohsin Pathan
Mob. 9725907047
Supervisor - EHS
Mr. Sujit Kumar Biswas
Mob.9909969384
Safety Inspector
Mr. Anil Kumar
Mob. 9441526778
Safety Inspector
Mr. Dilip
Mob. 8306153882
Safety Inspector
Mr. Neyaz Khan
Mob. 9904689763
Safety Inspector
Mr. Santhosh
Mob. 7600387900
Engineer - EHSO
Mr. Shivam Sharma
Mob.7698087162
First Aider Organization Chart
Hero Moto corp. Project - Halol
First Aider (Controller)
Mr. Syed Jaynal Abedin
Mob.9104958550
First Aider
Mr. Paramvir Singh (JLL)
Mob.9215619022
First Aider
Mr. Sujit Kumar Biswas
Mob.9909969384
First Aider
Mr. Pradeep Saini
Mob. 9099928213
First Aider
Mr. Vinod Marathe
Mob. 7698322515
First Aider
Mr. Shivam Sharma
Mob.7698087162
1707
1600
1731
1861
2113
2038
1984
1600
1470
1300
1435
1790
1920
1850
1880
1350
119
120
465
201
350
281
319
250
START CARD ANALYSIS
Start Card Analysis Total Start card prepared Start Card Analysis Varified Start Card Analysis Incorrect
247
213
222
232
206
218
202 204
155
135 135
145 145 145
140 140
0
50
100
150
200
250
300
Monthly Performance (EHSM/ EHSO)
Monthly Performance (EHSM / EHSO ) Rajeev Dath (EHSM) Monthly Performance (EHSM / EHSO ) Shivam Sharma (EHSO)
Total Man Hours
Month Year Safe Man hours
December 2014 30679
January ~ Dec 2015 3898075
January ~ August 2016 3630138
Total 7558892
Safe Man Hours
Month Year Safe Man hours
December 2014 30679
January ~ September 2015 2783611
13th October 2015 0
October ~ December 2015 980308
January ~ July 2016 3630138
Total 4610446
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
4500000
5000000
30679
2783611
0
980308
3630138
4610446
Safe Man Hours Man Hours (In Million)
0
3
2
3
2
3
6
4 4
9
5
8
4 4
5
4
6
4 4
0
1
2
1 1 1 1 1
2 2 2 2
3 3
4
3
5
2 2
0
2
1
0
1
3
5
3
2
7
3
6
1 1 1 1 1
2
1
NEAR MISS CASES
No. of Near Miss cases Severity Medium Severity Major
0
5
10
15
20
25
30
35
40
45
50
NO.OFFIRSTAIDCASES/SEVERITY
Jan-
15
Feb-
15
Mar-
15
Apr-
15
May-
15
Jun-
15
Jul-
15
Aug-
15
Sep-
15
Oct-
15
Nov-
15
Dec-
15
Jan-
16
Feb-
16
Mar-
16
Apr-
16
May-
16
Jun-
16
Jul-
16
No. of first aid cases 0 3 3 1 40 36 26 32 44 28 15 26 17 14 8 13 8 14 6
Severity of injury Minor Cut Injury 0 3 3 1 38 33 23 29 42 25 13 24 14 12 8 11 7 12 6
Severity of injury Deep Cut Injury 0 0 0 0 2 2 2 2 2 2 2 2 2 2 0 2 1 1 0
Severity of injury Hospitalization / medical Treatment 1 1 1 1 1 0 0 0 0 0 0
First Aid Case Analysis
No. of first aid cases Severity of injury Minor Cut Injury Severity of injury Deep Cut Injury Severity of injury Hospitalization / medical Treatment
Name of site
Origional
Contract Value
Nos. of Peak Man
power Planned
Nos. Of
Workmen
inducted so far
Debit note
raised to
contractor(Rs.)
ACE Provison
(Rs.)
Cost spent
so far
Balance cost
HMCL ,
Halol
384.39 2000 10979 5.46 161.64 60.68 1 Cr.
Sl.No. Description Proposed Rate Issued To S/C Name Issue date Damage date Hand gloves Life
1 Cut resistant (Nytrile coated) hand gloves 38 Rs./Pair Naseem Ansar Ahmed 2/27/2015 3/15/2015
15 Days2 Cut resistant (Nytrile coated) hand gloves 38 Rs./Pair Arvind Kumar Ansar Ahmed 2/27/2015 3/15/2015
3 Cut resistant (Nytrile coated) hand gloves 38 Rs./Pair Fariyad Ansar Ahmed 2/27/2015 3/15/2015
4 Cotton Dotted Hand Gloves 13 Rs./Pair Naseem Ansar Ahmed 2/27/2015 2/28/2015
1 Day5 Cotton Dotted Hand Gloves 13 Rs./Pair Arvind Kumar Ansar Ahmed 2/27/2015 2/28/2015
6 Cotton Dotted Hand Gloves 13 Rs./Pair Fariyad Ansar Ahmed 2/27/2015 2/28/2015
Specific Training Programmes
SL No. Topics Dept./Sec No. of Person
1. Scaffold erection & Assembly Form work 190
2. Work @ Height All dept. 340
3. Painting Hazards & MSDS Painters 65
4. welding work , Gas cutting & Gas cylinder storage Mech. 165
5. Defensive driving technique Veh. Optr 155
6. Handling and safe use of Power hand tools Civil /Mech. 138
7. Emergency communication and fire fighting security 94
8. Material Safety Data Sheet (MSDS) ,material handling & storage Store 58
9. Excavation civil 86
10. Fire fighting Mech. 106
11 Site Security system security 143
12 Material handling Rigging operation Riggers 110
13 First Aid Analysis, Accident investigation & Risk Assessment All 78
14 Electrical safety All 160
Dec 2014 ~ Jul2016 Total No. of workmen Inducted from beginning - 10203
Total Nos of Training - 214 Total Training hours - 7636 Man Hours
Mr. Vinod Marathe (P&M) Mr. Krishna Prasad Gupta (S/c – M/s Jay Kumar )
Scope award winner - July’2016
Ranjeet (carpenter) (S/c - Ashok Prajapati -2)
Mr. Krishna (Helper ) (S/c – B Sidappa)
On Spot Appreciation Reward– JUNE’2016
SCOPE award winners -
workmen
(CQM-KKCL)
Score given - :
3.50
(Segment Head)
Score given - :
3.50
EXECUTIVE AUDIT REPORTS
CAS Audit Analysis -:
Internal Audit Analysis -:
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0 Mr. Shailesh Patel Mr. Chirag Soni Mr. V BhavaniShankar
IMS AUDIT 42090 42258 42436
0
0.77
0.8
0.77
Internal Audit Analysis
OBJECTIVEs
&
IMPROVEMENT
PROGRAMME
List of New EHS improvement programme(s) -: (2016~2017)
Status of New Improvement Programme(s)
SL.
No.
Description
Action By Target Remarks
1
60 % Implementation of LED Light for area lighting
(Replace Sodium lite with LED light)
P&M/STORE
30-08-2016
Closed
75 LED lights of 60 v has been procured 60 nos
are being used at site
2
Implementation & increasing number of dust bin / waste, scrape segregation bins
using waste material or available site resources Such as site made waste bin
along with painting signages / color coding of bins at site)
CM/FW/EHS/SH’s
30-08-2016 10 nos of dustbin has been prepared and is
being used at various locations
3
Conducting HIV / TB Test for workmen at government referral hospital in free of
cost in accordance with NGO
PM/CM/FW/EHS/SH’s 30-08-2016 Sarthi agency has been hired and has been
done 12 nos. of test at referral hospital.
4
Reducing heat stress potential by adopting measures –
Providing Butter Milk & Cold Water along with Sufficient Rest shed facility in
summer season at various project area.
PM/CM/FW/EHS/SH’s 30-04-2016 Closed
5 Fire Fighting Measures -Site Made fire Hydrant facility for workmen camp
PM/CM/FW/EHS/SH’s
& Committee members
30-08-2016 EMR raised for hose pipe , nozzle material ,
material yet to be received
6 Safe access for pedestrians by use of Tubular jalli PM/CM/FW/EHS/SH’s 30-08-2016 Walk way plank used for barricading purpose
near office area and same to be used for
pedestrian too by welding method.
List of Previous EHS improvement programme(s) :- (2015~2016)
Status of Improvement Programme(s)
SL.
No.
Description Action By Target Remarks
1 Obtain NOC for batching plant from state pollution control board – 60 % completed
Project Admin /
P&M
Closed
Provisional Consent Order (CCA) RECEIVED ON 19/12/2015
Consent no. –AWH-18620
Valid Up to – 19-11-2020
2
Recycling of wastage of natural resources (Wooden / Concrete) in useful items (wooden
cap for protruded bars / concrete slipper etc. – Inprogress
FW / EHS / CM Ongoing
Used 96nos
24.3x96 = 2.3T
3
Deafness test ( using weber instrument) for workmen engaged in grinding / chipping
m/c operation / any noise producing m/c or equipment - In progress
EHS / ADMIN / IR Closed Up to feb- 2016
Total workmen test done (grinder) – 35
Total workmen engaged for cheeping operation , test done - 05
4
Reduce noise pollution by measuring noise intensity & provide control measures. – In
progress & maintaining records.
EHS / ADMIN / IR Closed Monitoring started from 04-09-2015 ( Completed)
5
Dictaphone Implementation at site – communicating all hazards / near miss /
observations to upward – Inprogress
EHSO Closed
10-10-2015
Recording of upward communication is being taken by Dictaphone &
workmen also being encouraged for reporting of issues.
6
Conduct all activities (routine & non routine) with risk Assessment only – In progress
(Total 23 activity identified for preparing risk assessment and prepared risk assessment
has been communicated with all concerns )
EHS / CM Closed Total 36 risk assessment prepared and distributed to all concerned along
with acknowledgement
7
Provide training to all employees to ensure they understand the hazards & controls
including policies, procedures & practices – Inprogress.
PM / EHS Closed
Total 08 persons has completed the ATL course at project site.
8 Usage of “STARRT” cards for each activities and effectiveness. CM / EHS Closed Start card is being verified at site on daily basis by the EHS team.
HMCL Project - Halol
HMCL – Halol
- Occupational Illness
AIDS – Awareness and Blood checkup
Blood Donation Camp
Total 45 unit Blood bag
collected
Medical Checkup & Deafness
Test
Eye test By
ophthalmologist
L&T HMCL Project Section Heads plants saplings
JLL&L&T Project Team
Tomorrow’s Earth Is
Today’s Responsibility
The concept of “5S” applied
to the housekeeping is believed to
effectively improve the working
condition. The concept is based on
five elements including Organisation,
Neatness, Cleanliness,
Standardization and Discipline. This
course aims at introducing the
concept of "5S" and its application on
construction sites in such a way that
the employees can make use of this
approach in their work place/dept.
for improving the health and safety
standard in the project.
Awareness and inspiration from the
5s training and Commitment to the
faculties and my organization; I have
started to implement from
office in associate with EHS team
only
Spectacles Provided to Identified Unfit Operators ( As per doctor Guidance & Eye Check-up Report )
Site Committee EHS Meeting
Briefing of new P&M SOPs to operators
/ Drivers
Meeting With Supervisors
Risk Assessment Meeting
Sky Light Glazing Works Confined Space Works
Hume Pipe fixing / Utility WorksConstruction of OHWT
Safe to start work Card
Training By Mr.Vijay Kumar
Safe to start work Card
Training By Mr.D.V.Singh
FLS & Start Work Card
Training
Mr. Bhaskar mitra (CM- Civil)
Mr. Pravat Das (Manager- Civil)
Mr. V Selvakumar (P&m - Incg)
Mr. Rajeev Dath (EHSM)
FLS & Start Work Card
Training
Staff
training
Staff
training
- BOCW Act & Rules
Staff
training
- 5S Introduction &
improvement
Safety Person of the week
Issuance of Orange helmet to new entry
workmen
Refreshment training – Orange Helmet
Workmen
On Spot – Briefing Safe Scaffolding
erection techniqs
Safe use of Fall Arrester - Demo by
Specialized trainers
Meeting With Sub Contractors - IR &
EHS team
Training For EHS Personals – Golden Rule &Safety
Harness Inspection
Monsoon Preparedness
- Electrical Hazards / Risk
(Electricians)
Scaffolders
Training - Scaffolding Erection & Dismantling
Operators Competency Training By GOV.
Approved Competent person
Mr. G Jayabal (Approved Competent Trainer)
Date – 10-06-2016
Date – 08-02-2016 Topic – Front Line Supervisor Training on BOCW Act & Rules
Date – 09-02-2016 Topic – Front Line Supervisor Training on BOCW / SOP / EHSM System
FLS
Training
module Topic – Front Line Supervisor Training on BOCW Act &
Rules Date – 25-03-2016
Mock drill – Electrical Fire
Briefing & Demo – Fire Hazards & fighting
Briefing of Incident & SOP for Glass handling & fixing
Works to Sub Contractor Team
EHSMS ------ Rajeev Dath

More Related Content

Viewers also liked

Getein1600 catalogue
Getein1600 catalogueGetein1600 catalogue
Getein1600 catalogue
Paz Chang
 
Aspectos institucionales sena
Aspectos institucionales senaAspectos institucionales sena
Aspectos institucionales sena
Yenifer Ramirez
 
CS Unitec Multipurpose Grinders: Multi Max
CS Unitec Multipurpose Grinders: Multi MaxCS Unitec Multipurpose Grinders: Multi Max
CS Unitec Multipurpose Grinders: Multi Max
CS Unitec
 
Projects Presentation
Projects PresentationProjects Presentation
Projects Presentation
Ravi Kholakiya
 
Marco teorico
Marco teoricoMarco teorico
Marco teorico
carolina0602
 
Cummins qxs 15 gd parts catalog
Cummins qxs 15 gd parts catalogCummins qxs 15 gd parts catalog
Cummins qxs 15 gd parts catalog
Arvind Negi
 
Helo world!
Helo world!Helo world!
Helo world!
Wak Jek
 
Microsoft Teams for Educators @ CEWA
Microsoft Teams for Educators @ CEWAMicrosoft Teams for Educators @ CEWA
Microsoft Teams for Educators @ CEWA
Daniel M Groenewald
 
WGN_Red
WGN_RedWGN_Red
WGN_Red
Jennifer Woon
 
Application of metallic glasses
Application of metallic glassesApplication of metallic glasses
Application of metallic glasses
Anuj Dave
 
Ameer CV Biomedical
Ameer CV BiomedicalAmeer CV Biomedical
Ameer CV Biomedical
ameer amjith
 

Viewers also liked (12)

Getein1600 catalogue
Getein1600 catalogueGetein1600 catalogue
Getein1600 catalogue
 
Aspectos institucionales sena
Aspectos institucionales senaAspectos institucionales sena
Aspectos institucionales sena
 
SCN_0009
SCN_0009SCN_0009
SCN_0009
 
CS Unitec Multipurpose Grinders: Multi Max
CS Unitec Multipurpose Grinders: Multi MaxCS Unitec Multipurpose Grinders: Multi Max
CS Unitec Multipurpose Grinders: Multi Max
 
Projects Presentation
Projects PresentationProjects Presentation
Projects Presentation
 
Marco teorico
Marco teoricoMarco teorico
Marco teorico
 
Cummins qxs 15 gd parts catalog
Cummins qxs 15 gd parts catalogCummins qxs 15 gd parts catalog
Cummins qxs 15 gd parts catalog
 
Helo world!
Helo world!Helo world!
Helo world!
 
Microsoft Teams for Educators @ CEWA
Microsoft Teams for Educators @ CEWAMicrosoft Teams for Educators @ CEWA
Microsoft Teams for Educators @ CEWA
 
WGN_Red
WGN_RedWGN_Red
WGN_Red
 
Application of metallic glasses
Application of metallic glassesApplication of metallic glasses
Application of metallic glasses
 
Ameer CV Biomedical
Ameer CV BiomedicalAmeer CV Biomedical
Ameer CV Biomedical
 

Similar to EHSMS ------ Rajeev Dath

Salehuddin case study procurement and contract management
Salehuddin case study procurement and contract managementSalehuddin case study procurement and contract management
Salehuddin case study procurement and contract management
Capt(Rtd) Salehuddin Abdul Kadir
 
Summer training project report anurag
Summer training project report anuragSummer training project report anurag
Summer training project report anurag
Anurag Mishra
 
om industrial training report.pptx
om industrial training report.pptxom industrial training report.pptx
om industrial training report.pptx
RohitYadav530108
 
Design and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineDesign and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending Machine
IRJET Journal
 
ALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINE
ALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINEALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINE
ALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINE
silveroak engineering collage
 
manoj cv planning
manoj cv planningmanoj cv planning
manoj cv planning
Manoj Kumar Tiwari
 
Offshore Coating Solution by M/S Parag Sales Corporation Nagpur
Offshore Coating Solution by M/S Parag Sales Corporation NagpurOffshore Coating Solution by M/S Parag Sales Corporation Nagpur
Offshore Coating Solution by M/S Parag Sales Corporation Nagpur
IndiaMART InterMESH Limited
 
processes : from raw bauxite to refractory alumina bricks
processes : from raw bauxite to refractory alumina bricksprocesses : from raw bauxite to refractory alumina bricks
processes : from raw bauxite to refractory alumina bricks
Parth Vaishnav
 
Case study
Case studyCase study
Case study
Vinoy Vincent
 
Optel ceramics
Optel ceramicsOptel ceramics
Optel ceramics
jitharadharmesh
 
Industrial Training Report
Industrial Training ReportIndustrial Training Report
Industrial Training Report
Shubham Chakraborty
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
Vijay Kaushik
 
Abrasive belt grinder capstone report
Abrasive belt grinder   capstone reportAbrasive belt grinder   capstone report
Abrasive belt grinder capstone report
DevenMahajan2
 
CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15
priyabrata palo
 
PROJECT
PROJECTPROJECT
PROJECT
Sripal Kumar
 
Pitac Internship report
Pitac Internship reportPitac Internship report
Pitac Internship report
Hassan Raza
 
Chhabra Thermal Power Plant Report By Chandra Mohan Lodha
Chhabra Thermal Power Plant Report By Chandra Mohan LodhaChhabra Thermal Power Plant Report By Chandra Mohan Lodha
Chhabra Thermal Power Plant Report By Chandra Mohan Lodha
Chandra Mohan Lodha
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IRJET Journal
 
General Estimation & Abstract Sheet of Royal City
General Estimation & Abstract Sheet of Royal CityGeneral Estimation & Abstract Sheet of Royal City
General Estimation & Abstract Sheet of Royal City
IRJET Journal
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plant
Amit Kumar
 

Similar to EHSMS ------ Rajeev Dath (20)

Salehuddin case study procurement and contract management
Salehuddin case study procurement and contract managementSalehuddin case study procurement and contract management
Salehuddin case study procurement and contract management
 
Summer training project report anurag
Summer training project report anuragSummer training project report anurag
Summer training project report anurag
 
om industrial training report.pptx
om industrial training report.pptxom industrial training report.pptx
om industrial training report.pptx
 
Design and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineDesign and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending Machine
 
ALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINE
ALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINEALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINE
ALTERNATIVE SOLUTION OF ROBOT MACHINE BY APPLYING ROTARY MACHINE
 
manoj cv planning
manoj cv planningmanoj cv planning
manoj cv planning
 
Offshore Coating Solution by M/S Parag Sales Corporation Nagpur
Offshore Coating Solution by M/S Parag Sales Corporation NagpurOffshore Coating Solution by M/S Parag Sales Corporation Nagpur
Offshore Coating Solution by M/S Parag Sales Corporation Nagpur
 
processes : from raw bauxite to refractory alumina bricks
processes : from raw bauxite to refractory alumina bricksprocesses : from raw bauxite to refractory alumina bricks
processes : from raw bauxite to refractory alumina bricks
 
Case study
Case studyCase study
Case study
 
Optel ceramics
Optel ceramicsOptel ceramics
Optel ceramics
 
Industrial Training Report
Industrial Training ReportIndustrial Training Report
Industrial Training Report
 
Summer internship report
Summer internship reportSummer internship report
Summer internship report
 
Abrasive belt grinder capstone report
Abrasive belt grinder   capstone reportAbrasive belt grinder   capstone report
Abrasive belt grinder capstone report
 
CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15CV-PPalo.tata.sinter.manager.jun15
CV-PPalo.tata.sinter.manager.jun15
 
PROJECT
PROJECTPROJECT
PROJECT
 
Pitac Internship report
Pitac Internship reportPitac Internship report
Pitac Internship report
 
Chhabra Thermal Power Plant Report By Chandra Mohan Lodha
Chhabra Thermal Power Plant Report By Chandra Mohan LodhaChhabra Thermal Power Plant Report By Chandra Mohan Lodha
Chhabra Thermal Power Plant Report By Chandra Mohan Lodha
 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
 
General Estimation & Abstract Sheet of Royal City
General Estimation & Abstract Sheet of Royal CityGeneral Estimation & Abstract Sheet of Royal City
General Estimation & Abstract Sheet of Royal City
 
Material movement in a manufacturing plant
Material movement in a manufacturing plantMaterial movement in a manufacturing plant
Material movement in a manufacturing plant
 

EHSMS ------ Rajeev Dath

  • 1.
  • 2. Name of Projects Safe Man hours SMS Forging - Surat 7 Millions Grasim VSF-Bharuch 12 Million GHB - Valsad --------- JCB -Jaipur On Deputation HERO - Halol 4.3 millions OBEROI ETERNIA 0.5 million Total Years of service 68 Months
  • 3. Name of Projects Activities SMS Forging – Surat. Heavy structural erection, roof sheeting, Deep excavation,4km walk way @19mtrs and 24mtrs Grasim VSF-Bharuch 175mtr height Chimney, Deck sheeting, Heavy Equipment and Structural erection with zero incidents GHB – Valsad. 4 months- starting setup JCB - Jaipur Restart and successful completion of site activities due to major site EHS issues (On Deputation) HERO – Halol. Heavy structural erection , Deck sheeting and glazing work OBEROI ETERNIA High raise Building (71 floor) ,crane Erection Total Years of service 68 Months
  • 4. Name of Projects Activities SMS Forging - Surat 7Million safe man hours award, Grasim VSF-Bharuch 13Million safe man hours certificate and appreciation letter GHB – Valsad. Nil JCB -Jaipur Appreciation letter for individual performance HERO - Halol 4.3 Million safe man hours certificate Total Years of service 63 Months
  • 5.
  • 6. - Openings - Columns Legend - CUT OUT ID No. for effective PTW system
  • 7. Homemade Debris Chute by empty Drums
  • 8.
  • 9. Inadequate Tools for handling manhole cover Tool Made from scrap
  • 10. Extension Rod for aluminum Tower
  • 11. Crow Bar Ring spanner
  • 12. Booklet of EHS management & Good practices adopted at site. 1.Easy to demonstrate the safety improvements / new initiatives & practices done at site to the visitors & clients . 2. Easy to demonstrate the site facilities provided and statistics performance to the client & visitors . 3. Having a clear picture of statistics and resources using at site . ▪Brief details ▪Advantages* ▪Kaizen pics(if any) ▪Initiative by: Mr. Rajeev Dath ▪Designation: EHSM ▪Project: Hero Project , Halol
  • 13. For 50 nos. of skylight openings @ 12 mtr height , wall Shuttering / concreting works a working platform was required , hence using the scrape bars made a platform and under the platform catch net was tightened and anchoring arrangement made for the safe working condition . Platform is such like it can shift after completing the task to new opening works . 1. Use of Scrape reinforcement bars. 2. Cost saving instead of using boom lift . 3. Time saving instead of making the platform on the spot by doing welding work for each opening . 4. Improving quality works by eliminating the welding work on truss. 5. Productive work , requiring less time to shift the platform . Brief details Advantages* • Kaizen pics(if any) ▪Initiative by: Mr. Rajeev Dath ▪Designation: EHSM ▪Project: Hero Project , Halol
  • 14. Use of waste wooden scrape in making recycle bin 1. Using waste wooden ply boards . 2. Reducing wastage at site. 3. Cost effective No material cost . 4. Waste bending wires / from work material are being kept inside the bin . 5. Improving housekeeping arrangements at site . 6. Encouraging workmen & staff in pep talk to put the waste material found at site inside the bin. ▪Brief details ▪Advantages* ▪Kaizen pics(if any) ▪Initiative by: Mr.RD / Mr.Suresh ▪Designation: FW/EHS – In charge ▪Project: Hero Project , Halol
  • 15. ▪Brief details ▪Advantages* ▪Kaizen pics(if any) Use of Tubular walk way planks for barricading 1. Using banned / unused walk way planks for barricading purpose. 2. Controlling the use of tubular planks as working platform by using in barricading material . 3. Minimizing/saving storage space 4. Adequate protection
  • 16.
  • 17.
  • 18. Performance Feed Back From EHS Dept. JCB -Jaipur
  • 19.
  • 20.
  • 21. Location – Ripening Activity – Pipe erection Unsafe Act – Standing on pipe/convex surface , Descending by wrong posture Unsafe condition- obstruction on access/inadequate access Inadequate access – Worker resting on pipe while ascending /descending on scaffold Before After Adequate access with landing platform for ascending /descending on scaffold Hazard – Slip, and fall from height, sharp tipped/solid objects underneath , inadequate access Risk – Personal injury, Permanent disability and Fatality CA PA - Scaffold erection and inspection as per SOP, all access and egress cleared and free from obstructions. Maintaining good housekeeping , Provided adequate landing for resting /provided clear access towards scaffols
  • 22. Hazard- tagline directly tied on horizontal clamps, slip of horizontal clamp, fall of lifted load, sudden impact/over load Risk- Severe injury, permanent disability, fatality CAPA- Clamp using for tagline instead of direct tied with horizontal clamp
  • 23. Name of Project Hero MotoCorp Project Total Site Area 210 Acres Constructed area 1.5 lakhs Sqm Total Value of Contract 384.39 Cr. Duration of Project 12 months LOI issued on 24th Nov 2014
  • 24. Main Plant Medical Store MC DOL FA DOL Admin Building Dispatch Block Weld Shop Paint Shop Tower Block Porch Area Periphery road Amphitheatre Canteen area Weld DOL ESS-2 Paint Store Scrap Yard ETP building Propane Yard OHWT
  • 25.
  • 26. Client • Hero MotoCorp Ltd. Consultant • Semac Consultants Pvt. Ltd PMC • JLL Property Consultants (India) Pvt. Ltd Contractor • L&T Construction
  • 27. Items UOM Quantities Earth work - Excavation Cum 639594 Earthwork – Backfilling Cum 317680 RCC Cum 1,09,559 Formwork Sqm 1,97,672 Reinforcement MT 6,269 Structural Steel MT 13,803 Flooring – VDF Sqm 95,139 Water Proofing – Membrane Sqm 76,390 Painting – Structural Sqm 3,86,910 Painting – Others Sqm 1,64,853 Deck Sheeting Sqm 72,555 ROAD Works Sqm 87,103
  • 28. Manager - EHS Mr. Rajeev Dath Mob.9909927363 Safety Inspector Mr. Mohsin Pathan Mob. 9725907047 Supervisor - EHS Mr. Sujit Kumar Biswas Mob.9909969384 Safety Inspector Mr. Anil Kumar Mob. 9441526778 Safety Inspector Mr. Dilip Mob. 8306153882 Safety Inspector Mr. Neyaz Khan Mob. 9904689763 Safety Inspector Mr. Santhosh Mob. 7600387900 Engineer - EHSO Mr. Shivam Sharma Mob.7698087162
  • 29. First Aider Organization Chart Hero Moto corp. Project - Halol First Aider (Controller) Mr. Syed Jaynal Abedin Mob.9104958550 First Aider Mr. Paramvir Singh (JLL) Mob.9215619022 First Aider Mr. Sujit Kumar Biswas Mob.9909969384 First Aider Mr. Pradeep Saini Mob. 9099928213 First Aider Mr. Vinod Marathe Mob. 7698322515 First Aider Mr. Shivam Sharma Mob.7698087162
  • 30. 1707 1600 1731 1861 2113 2038 1984 1600 1470 1300 1435 1790 1920 1850 1880 1350 119 120 465 201 350 281 319 250 START CARD ANALYSIS Start Card Analysis Total Start card prepared Start Card Analysis Varified Start Card Analysis Incorrect
  • 31. 247 213 222 232 206 218 202 204 155 135 135 145 145 145 140 140 0 50 100 150 200 250 300 Monthly Performance (EHSM/ EHSO) Monthly Performance (EHSM / EHSO ) Rajeev Dath (EHSM) Monthly Performance (EHSM / EHSO ) Shivam Sharma (EHSO)
  • 32. Total Man Hours Month Year Safe Man hours December 2014 30679 January ~ Dec 2015 3898075 January ~ August 2016 3630138 Total 7558892
  • 33. Safe Man Hours Month Year Safe Man hours December 2014 30679 January ~ September 2015 2783611 13th October 2015 0 October ~ December 2015 980308 January ~ July 2016 3630138 Total 4610446 0 500000 1000000 1500000 2000000 2500000 3000000 3500000 4000000 4500000 5000000 30679 2783611 0 980308 3630138 4610446 Safe Man Hours Man Hours (In Million)
  • 34. 0 3 2 3 2 3 6 4 4 9 5 8 4 4 5 4 6 4 4 0 1 2 1 1 1 1 1 2 2 2 2 3 3 4 3 5 2 2 0 2 1 0 1 3 5 3 2 7 3 6 1 1 1 1 1 2 1 NEAR MISS CASES No. of Near Miss cases Severity Medium Severity Major
  • 35. 0 5 10 15 20 25 30 35 40 45 50 NO.OFFIRSTAIDCASES/SEVERITY Jan- 15 Feb- 15 Mar- 15 Apr- 15 May- 15 Jun- 15 Jul- 15 Aug- 15 Sep- 15 Oct- 15 Nov- 15 Dec- 15 Jan- 16 Feb- 16 Mar- 16 Apr- 16 May- 16 Jun- 16 Jul- 16 No. of first aid cases 0 3 3 1 40 36 26 32 44 28 15 26 17 14 8 13 8 14 6 Severity of injury Minor Cut Injury 0 3 3 1 38 33 23 29 42 25 13 24 14 12 8 11 7 12 6 Severity of injury Deep Cut Injury 0 0 0 0 2 2 2 2 2 2 2 2 2 2 0 2 1 1 0 Severity of injury Hospitalization / medical Treatment 1 1 1 1 1 0 0 0 0 0 0 First Aid Case Analysis No. of first aid cases Severity of injury Minor Cut Injury Severity of injury Deep Cut Injury Severity of injury Hospitalization / medical Treatment
  • 36. Name of site Origional Contract Value Nos. of Peak Man power Planned Nos. Of Workmen inducted so far Debit note raised to contractor(Rs.) ACE Provison (Rs.) Cost spent so far Balance cost HMCL , Halol 384.39 2000 10979 5.46 161.64 60.68 1 Cr. Sl.No. Description Proposed Rate Issued To S/C Name Issue date Damage date Hand gloves Life 1 Cut resistant (Nytrile coated) hand gloves 38 Rs./Pair Naseem Ansar Ahmed 2/27/2015 3/15/2015 15 Days2 Cut resistant (Nytrile coated) hand gloves 38 Rs./Pair Arvind Kumar Ansar Ahmed 2/27/2015 3/15/2015 3 Cut resistant (Nytrile coated) hand gloves 38 Rs./Pair Fariyad Ansar Ahmed 2/27/2015 3/15/2015 4 Cotton Dotted Hand Gloves 13 Rs./Pair Naseem Ansar Ahmed 2/27/2015 2/28/2015 1 Day5 Cotton Dotted Hand Gloves 13 Rs./Pair Arvind Kumar Ansar Ahmed 2/27/2015 2/28/2015 6 Cotton Dotted Hand Gloves 13 Rs./Pair Fariyad Ansar Ahmed 2/27/2015 2/28/2015
  • 37. Specific Training Programmes SL No. Topics Dept./Sec No. of Person 1. Scaffold erection & Assembly Form work 190 2. Work @ Height All dept. 340 3. Painting Hazards & MSDS Painters 65 4. welding work , Gas cutting & Gas cylinder storage Mech. 165 5. Defensive driving technique Veh. Optr 155 6. Handling and safe use of Power hand tools Civil /Mech. 138 7. Emergency communication and fire fighting security 94 8. Material Safety Data Sheet (MSDS) ,material handling & storage Store 58 9. Excavation civil 86 10. Fire fighting Mech. 106 11 Site Security system security 143 12 Material handling Rigging operation Riggers 110 13 First Aid Analysis, Accident investigation & Risk Assessment All 78 14 Electrical safety All 160 Dec 2014 ~ Jul2016 Total No. of workmen Inducted from beginning - 10203 Total Nos of Training - 214 Total Training hours - 7636 Man Hours
  • 38.
  • 39. Mr. Vinod Marathe (P&M) Mr. Krishna Prasad Gupta (S/c – M/s Jay Kumar ) Scope award winner - July’2016
  • 40. Ranjeet (carpenter) (S/c - Ashok Prajapati -2) Mr. Krishna (Helper ) (S/c – B Sidappa) On Spot Appreciation Reward– JUNE’2016
  • 41. SCOPE award winners - workmen
  • 42. (CQM-KKCL) Score given - : 3.50 (Segment Head) Score given - : 3.50 EXECUTIVE AUDIT REPORTS
  • 43.
  • 45. Internal Audit Analysis -: 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0 Mr. Shailesh Patel Mr. Chirag Soni Mr. V BhavaniShankar IMS AUDIT 42090 42258 42436 0 0.77 0.8 0.77 Internal Audit Analysis
  • 47. List of New EHS improvement programme(s) -: (2016~2017) Status of New Improvement Programme(s) SL. No. Description Action By Target Remarks 1 60 % Implementation of LED Light for area lighting (Replace Sodium lite with LED light) P&M/STORE 30-08-2016 Closed 75 LED lights of 60 v has been procured 60 nos are being used at site 2 Implementation & increasing number of dust bin / waste, scrape segregation bins using waste material or available site resources Such as site made waste bin along with painting signages / color coding of bins at site) CM/FW/EHS/SH’s 30-08-2016 10 nos of dustbin has been prepared and is being used at various locations 3 Conducting HIV / TB Test for workmen at government referral hospital in free of cost in accordance with NGO PM/CM/FW/EHS/SH’s 30-08-2016 Sarthi agency has been hired and has been done 12 nos. of test at referral hospital. 4 Reducing heat stress potential by adopting measures – Providing Butter Milk & Cold Water along with Sufficient Rest shed facility in summer season at various project area. PM/CM/FW/EHS/SH’s 30-04-2016 Closed 5 Fire Fighting Measures -Site Made fire Hydrant facility for workmen camp PM/CM/FW/EHS/SH’s & Committee members 30-08-2016 EMR raised for hose pipe , nozzle material , material yet to be received 6 Safe access for pedestrians by use of Tubular jalli PM/CM/FW/EHS/SH’s 30-08-2016 Walk way plank used for barricading purpose near office area and same to be used for pedestrian too by welding method.
  • 48. List of Previous EHS improvement programme(s) :- (2015~2016) Status of Improvement Programme(s) SL. No. Description Action By Target Remarks 1 Obtain NOC for batching plant from state pollution control board – 60 % completed Project Admin / P&M Closed Provisional Consent Order (CCA) RECEIVED ON 19/12/2015 Consent no. –AWH-18620 Valid Up to – 19-11-2020 2 Recycling of wastage of natural resources (Wooden / Concrete) in useful items (wooden cap for protruded bars / concrete slipper etc. – Inprogress FW / EHS / CM Ongoing Used 96nos 24.3x96 = 2.3T 3 Deafness test ( using weber instrument) for workmen engaged in grinding / chipping m/c operation / any noise producing m/c or equipment - In progress EHS / ADMIN / IR Closed Up to feb- 2016 Total workmen test done (grinder) – 35 Total workmen engaged for cheeping operation , test done - 05 4 Reduce noise pollution by measuring noise intensity & provide control measures. – In progress & maintaining records. EHS / ADMIN / IR Closed Monitoring started from 04-09-2015 ( Completed) 5 Dictaphone Implementation at site – communicating all hazards / near miss / observations to upward – Inprogress EHSO Closed 10-10-2015 Recording of upward communication is being taken by Dictaphone & workmen also being encouraged for reporting of issues. 6 Conduct all activities (routine & non routine) with risk Assessment only – In progress (Total 23 activity identified for preparing risk assessment and prepared risk assessment has been communicated with all concerns ) EHS / CM Closed Total 36 risk assessment prepared and distributed to all concerned along with acknowledgement 7 Provide training to all employees to ensure they understand the hazards & controls including policies, procedures & practices – Inprogress. PM / EHS Closed Total 08 persons has completed the ATL course at project site. 8 Usage of “STARRT” cards for each activities and effectiveness. CM / EHS Closed Start card is being verified at site on daily basis by the EHS team.
  • 49.
  • 50. HMCL Project - Halol
  • 51.
  • 52. HMCL – Halol - Occupational Illness
  • 53. AIDS – Awareness and Blood checkup
  • 54. Blood Donation Camp Total 45 unit Blood bag collected
  • 55. Medical Checkup & Deafness Test
  • 57.
  • 58. L&T HMCL Project Section Heads plants saplings
  • 59. JLL&L&T Project Team Tomorrow’s Earth Is Today’s Responsibility
  • 60.
  • 61.
  • 62. The concept of “5S” applied to the housekeeping is believed to effectively improve the working condition. The concept is based on five elements including Organisation, Neatness, Cleanliness, Standardization and Discipline. This course aims at introducing the concept of "5S" and its application on construction sites in such a way that the employees can make use of this approach in their work place/dept. for improving the health and safety standard in the project. Awareness and inspiration from the 5s training and Commitment to the faculties and my organization; I have started to implement from office in associate with EHS team only
  • 63.
  • 64.
  • 65.
  • 66.
  • 67. Spectacles Provided to Identified Unfit Operators ( As per doctor Guidance & Eye Check-up Report )
  • 69. Briefing of new P&M SOPs to operators / Drivers
  • 71. Risk Assessment Meeting Sky Light Glazing Works Confined Space Works Hume Pipe fixing / Utility WorksConstruction of OHWT
  • 72. Safe to start work Card Training By Mr.Vijay Kumar Safe to start work Card Training By Mr.D.V.Singh
  • 73. FLS & Start Work Card Training Mr. Bhaskar mitra (CM- Civil) Mr. Pravat Das (Manager- Civil)
  • 74. Mr. V Selvakumar (P&m - Incg) Mr. Rajeev Dath (EHSM) FLS & Start Work Card Training
  • 78. Safety Person of the week
  • 79. Issuance of Orange helmet to new entry workmen
  • 80. Refreshment training – Orange Helmet Workmen
  • 81. On Spot – Briefing Safe Scaffolding erection techniqs
  • 82. Safe use of Fall Arrester - Demo by Specialized trainers
  • 83. Meeting With Sub Contractors - IR & EHS team
  • 84. Training For EHS Personals – Golden Rule &Safety Harness Inspection
  • 85. Monsoon Preparedness - Electrical Hazards / Risk (Electricians)
  • 86. Scaffolders Training - Scaffolding Erection & Dismantling
  • 87. Operators Competency Training By GOV. Approved Competent person Mr. G Jayabal (Approved Competent Trainer) Date – 10-06-2016
  • 88. Date – 08-02-2016 Topic – Front Line Supervisor Training on BOCW Act & Rules Date – 09-02-2016 Topic – Front Line Supervisor Training on BOCW / SOP / EHSM System FLS Training module Topic – Front Line Supervisor Training on BOCW Act & Rules Date – 25-03-2016
  • 89. Mock drill – Electrical Fire Briefing & Demo – Fire Hazards & fighting
  • 90.
  • 91.
  • 92. Briefing of Incident & SOP for Glass handling & fixing Works to Sub Contractor Team