INTRODUCTION AND OBJECTIVES.
OBJECTIVE
PRIMARY OBJECTIVE:
• To study the effectiveness of Preventive maintenance of critical equipment in Apollo Tyres.
SECONDARY OBJECTIVE:
• To analyse the mechanical down time and identify the opportunities of improvement of availability of critical
equipment.
Critical equipment – Dual Extruder and Calendar.
Tools used :
– OEE (Over all equipment effectiveness).
– OEE = Efficiency x Availability x Quality.
– Pareto Analysis – to find out major break downs.
Data Collection : Ten month’s data is used for analysis. And main emphasis is on secondary data.
– Primary Data :- Personal interview with maintenance department, production department, planning
department, quality control department and Industrial engineering department personals.
– Secondary Data :- Machine logs, Production reports, Company manuals, Industrial engineering journals.
LIMITATIONS.
• Due to confidentiality nature of quality and performance data, it was difficult to get certain details.
• Intervention from the employees union which made collection of data difficult.
OVER ALL EQUIPMENT
EFFECTIVENESS
• OEE OF CALENDAR
Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE
Jul-13 0.9803 0.9462 0.996 0.92385 92.38496
Aug-13 0.9573 0.8911 0.9958 0.849467 84.94672
Sep-13 0.9488 0.9695 0.9957 0.915906 91.59062
Oct-13 0.9095 0.8414 0.9954 0.761733 76.17331
Nov-13 0.9548 0.9305 0.9957 0.884621 88.46211
Dec-13 0.9671 0.9243 0.9958 0.890136 89.01362 0.95298 86.40747
Jan-14 0.9331 0.9629 0.9957 0.894619 89.46185
Feb-14 0.968 0.8806 0.996 0.849011 84.90111
Mar-14 0.9347 0.906 0.9962 0.84362 84.36202
Apr-14 0.9762 0.8512 0.9962 0.827784 82.77839
• OEE OF DUAL EXTRUDER
Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE
Jul-13 0.977 0.9221 0.916 0.82522 82.52
Aug-13 0.9091 0.8814 0.965 0.77324 77.32
Sep-13 0.9154 0.9121 0.932 0.77816 77.81
Oct-13 0.9264 0.8254 0.968 0.74018 74.01
Nov-13 0.9672 0.9157 0.956 0.8467 84.67
Dec-13 0.9034 0.9262 0.983 0.8225 82.25 0.928 79.11
Jan-14 0.9084 0.8949 0.968 0.78691 78.69
Feb-14 0.922 0.8493 0.986 0.77209 77.2
Mar-14 0.9081 0.878 0.971 0.77419 77.41
Apr-14 0.945 0.8656 0.979 0.7924 79.23
BREAK DOWN ANALYSIS
 Calendar.
• Total mechanical down = 306.67 hrs.
• From Pareto analysis we found out top 5
downtimes.
• That are Mill failure, Led off Feed roll break
failures, Feed conveyor related failures, mill
guide failures, Roller failures.
 Dual Extruder
 Total mechanical down = 541.43 hrs.
 From Pareto analysis we found out top 5
downtimes.
 That are Skiver not skiving, Mill break down,
head related general failures, Cooling conveyor
joint failures, belt conveyor failures.
0
10
20
30
40
50
60
70
80
90
100
0
1000
2000
3000
4000
5000
6000
7000
8000
Skivernotskiving
Millbreakdown
Headrelatedgeneral…
coolingconveyor…
Beltconveyorfailure
feedingmillbreak…
temprature…
Rollerconceyorfailure
speedfluctuation
Headrubberleakage
RubberJamBetween…
Skiveranglevariation
stockloaderfailure
0
10
20
30
40
50
60
70
80
90
100
0
1000
2000
3000
4000
5000
6000
FINDINGS
CALENDAR
• The major five failures are Mill
failure, Led off Feed roll break
failures, Feed conveyor related
failures, mill guide failures, Roller
failures.
• After eliminating these failures:
– 72.15% of reduction in total
mechanical break down.
– 3.385% increase in availability, i.e. to
98.67%.
– 3.07% increase in OEE, I.e. to
89.44%.
– Rs. 94667.1 reduction in terms of man
power cost.
DUAL EXTRUDER.
• The major five failures are Skiver
not skiving, Mill break down, head
related general failures, Cooling
conveyor joint failures, belt
conveyor failures.
• After eliminating these failures:
– 80.12% of reduction in total
mechanical break down.
– 6.9% increase in availability, i.e. to
99.72%.
– 5.93% increase in OEE, I.e. to
85.04%.
– Rs. 122067.3 reduction in terms of
man power cost.
SUGGESTIONS
Effectiveness of preventive maintenance in critical equip at Apollo tyres
Effectiveness of preventive maintenance in critical equip at Apollo tyres

More Related Content

Viewers also liked

OpenERP preventive maintenance case of use
OpenERP preventive maintenance case of useOpenERP preventive maintenance case of use
OpenERP preventive maintenance case of use
Avanzosc, S.L.
 
OM_MAO_2012_Jun
OM_MAO_2012_JunOM_MAO_2012_Jun
OM_MAO_2012_Jun
MDO_Lab
 
PPP01 - Overview of Preventive Maintenance
PPP01 - Overview of Preventive Maintenance PPP01 - Overview of Preventive Maintenance
PPP01 - Overview of Preventive Maintenance
Maintenance Connection
 
Preventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig MaintenancePreventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig Maintenance
nfra erp
 
Aeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha AirAeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha Air
Saban Kumar K.C.
 
PM PRESENTATION
PM PRESENTATIONPM PRESENTATION
PM PRESENTATION
marvin mojica
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced Scorecard
Ricky Smith CMRP, CMRT
 
Preventative Maintenance of Robots in Automotive Industry
Preventative Maintenance of Robots in Automotive IndustryPreventative Maintenance of Robots in Automotive Industry
Preventative Maintenance of Robots in Automotive Industry
DataWorks Summit/Hadoop Summit
 
Electrical maintenance engineer kpi
Electrical maintenance engineer kpiElectrical maintenance engineer kpi
Electrical maintenance engineer kpi
qewtiret
 
How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance Program
SchoolDude
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
nfra erp
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Julie Rampello
 
HVAC Preventive maintenance Presentation EVRaju
HVAC Preventive maintenance  Presentation EVRajuHVAC Preventive maintenance  Presentation EVRaju
HVAC Preventive maintenance Presentation EVRaju
Venkata Raju Edarapalli
 

Viewers also liked (13)

OpenERP preventive maintenance case of use
OpenERP preventive maintenance case of useOpenERP preventive maintenance case of use
OpenERP preventive maintenance case of use
 
OM_MAO_2012_Jun
OM_MAO_2012_JunOM_MAO_2012_Jun
OM_MAO_2012_Jun
 
PPP01 - Overview of Preventive Maintenance
PPP01 - Overview of Preventive Maintenance PPP01 - Overview of Preventive Maintenance
PPP01 - Overview of Preventive Maintenance
 
Preventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig MaintenancePreventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig Maintenance
 
Aeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha AirAeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha Air
 
PM PRESENTATION
PM PRESENTATIONPM PRESENTATION
PM PRESENTATION
 
Maintenance Manager Balanced Scorecard
Maintenance Manager Balanced ScorecardMaintenance Manager Balanced Scorecard
Maintenance Manager Balanced Scorecard
 
Preventative Maintenance of Robots in Automotive Industry
Preventative Maintenance of Robots in Automotive IndustryPreventative Maintenance of Robots in Automotive Industry
Preventative Maintenance of Robots in Automotive Industry
 
Electrical maintenance engineer kpi
Electrical maintenance engineer kpiElectrical maintenance engineer kpi
Electrical maintenance engineer kpi
 
How to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance ProgramHow to set up a Preventive Maintenance Program
How to set up a Preventive Maintenance Program
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
 
HVAC Preventive maintenance Presentation EVRaju
HVAC Preventive maintenance  Presentation EVRajuHVAC Preventive maintenance  Presentation EVRaju
HVAC Preventive maintenance Presentation EVRaju
 

Similar to Effectiveness of preventive maintenance in critical equip at Apollo tyres

Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Singh Kakkar
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
Mohammad IFTAKHAR
 
Industrial plants and safety project
Industrial plants and safety projectIndustrial plants and safety project
Industrial plants and safety project
NikoZurabishvili
 
SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.
Santhana Bharathi
 
PROJECT REPORT ON Engineers india limited's share movement
PROJECT REPORT ON Engineers india limited's share movementPROJECT REPORT ON Engineers india limited's share movement
PROJECT REPORT ON Engineers india limited's share movement
Axis Bank
 
Cash Flow Portfolio
Cash Flow PortfolioCash Flow Portfolio
QC CIRCLE PRESENTATION (1).pptx
QC CIRCLE PRESENTATION (1).pptxQC CIRCLE PRESENTATION (1).pptx
QC CIRCLE PRESENTATION (1).pptx
RajeshGanesan24
 
Optimization of Capacity Utilization in a Manufacturing Industry – A Case Study
Optimization of Capacity Utilization in a Manufacturing Industry – A Case StudyOptimization of Capacity Utilization in a Manufacturing Industry – A Case Study
Optimization of Capacity Utilization in a Manufacturing Industry – A Case Study
IJMER
 
Waste2013KickOff
Waste2013KickOffWaste2013KickOff
Waste2013KickOff
Abdel Moneim Daoud
 
Rice Co-Op Presentation
Rice Co-Op PresentationRice Co-Op Presentation
Rice Co-Op Presentation
Scott Rice
 
Fault Diagnosis of Ball Bearing using AI kurthosis and Signal Processing
Fault Diagnosis of Ball Bearing using AI kurthosis and Signal ProcessingFault Diagnosis of Ball Bearing using AI kurthosis and Signal Processing
Fault Diagnosis of Ball Bearing using AI kurthosis and Signal Processing
Sridhara R
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
aliyudhi_h
 
Lean Assessment 03-09-11
Lean Assessment 03-09-11Lean Assessment 03-09-11
Lean Assessment 03-09-11
Louis Poggenburg
 
FRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd Level
FRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd LevelFRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd Level
FRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd Level
Kenneth J Meding
 
CV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHANCV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHAN
Hardik Chauhan
 
Cv hardik chauhan
Cv hardik chauhanCv hardik chauhan
Cv hardik chauhan
Hardik Chauhan
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET Journal
 
Coveris.TPM.Step 0.12.21.15.pptx
Coveris.TPM.Step 0.12.21.15.pptxCoveris.TPM.Step 0.12.21.15.pptx
Coveris.TPM.Step 0.12.21.15.pptx
TimothyCavitt
 
Production Planning Industrial Engineering Management E-Book
Production Planning Industrial Engineering Management E-BookProduction Planning Industrial Engineering Management E-Book
Production Planning Industrial Engineering Management E-Book
Luis Cabrera
 
AABB - Improving Methods for Matching Single Donor Platelet Production -blue
AABB - Improving Methods for Matching Single Donor Platelet Production -blueAABB - Improving Methods for Matching Single Donor Platelet Production -blue
AABB - Improving Methods for Matching Single Donor Platelet Production -blue
Tracy Mallios
 

Similar to Effectiveness of preventive maintenance in critical equip at Apollo tyres (20)

Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 Final
 
Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Industrial plants and safety project
Industrial plants and safety projectIndustrial plants and safety project
Industrial plants and safety project
 
SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.SMC CFT 2012-13-IInd Half.
SMC CFT 2012-13-IInd Half.
 
PROJECT REPORT ON Engineers india limited's share movement
PROJECT REPORT ON Engineers india limited's share movementPROJECT REPORT ON Engineers india limited's share movement
PROJECT REPORT ON Engineers india limited's share movement
 
Cash Flow Portfolio
Cash Flow PortfolioCash Flow Portfolio
Cash Flow Portfolio
 
QC CIRCLE PRESENTATION (1).pptx
QC CIRCLE PRESENTATION (1).pptxQC CIRCLE PRESENTATION (1).pptx
QC CIRCLE PRESENTATION (1).pptx
 
Optimization of Capacity Utilization in a Manufacturing Industry – A Case Study
Optimization of Capacity Utilization in a Manufacturing Industry – A Case StudyOptimization of Capacity Utilization in a Manufacturing Industry – A Case Study
Optimization of Capacity Utilization in a Manufacturing Industry – A Case Study
 
Waste2013KickOff
Waste2013KickOffWaste2013KickOff
Waste2013KickOff
 
Rice Co-Op Presentation
Rice Co-Op PresentationRice Co-Op Presentation
Rice Co-Op Presentation
 
Fault Diagnosis of Ball Bearing using AI kurthosis and Signal Processing
Fault Diagnosis of Ball Bearing using AI kurthosis and Signal ProcessingFault Diagnosis of Ball Bearing using AI kurthosis and Signal Processing
Fault Diagnosis of Ball Bearing using AI kurthosis and Signal Processing
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
 
Lean Assessment 03-09-11
Lean Assessment 03-09-11Lean Assessment 03-09-11
Lean Assessment 03-09-11
 
FRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd Level
FRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd LevelFRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd Level
FRI44 Safe Planning Through 4D Schedule Integration Cardiff 3rd Level
 
CV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHANCV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHAN
 
Cv hardik chauhan
Cv hardik chauhanCv hardik chauhan
Cv hardik chauhan
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
 
Coveris.TPM.Step 0.12.21.15.pptx
Coveris.TPM.Step 0.12.21.15.pptxCoveris.TPM.Step 0.12.21.15.pptx
Coveris.TPM.Step 0.12.21.15.pptx
 
Production Planning Industrial Engineering Management E-Book
Production Planning Industrial Engineering Management E-BookProduction Planning Industrial Engineering Management E-Book
Production Planning Industrial Engineering Management E-Book
 
AABB - Improving Methods for Matching Single Donor Platelet Production -blue
AABB - Improving Methods for Matching Single Donor Platelet Production -blueAABB - Improving Methods for Matching Single Donor Platelet Production -blue
AABB - Improving Methods for Matching Single Donor Platelet Production -blue
 

Recently uploaded

CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 

Recently uploaded (20)

CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 

Effectiveness of preventive maintenance in critical equip at Apollo tyres

  • 1.
  • 2. INTRODUCTION AND OBJECTIVES. OBJECTIVE PRIMARY OBJECTIVE: • To study the effectiveness of Preventive maintenance of critical equipment in Apollo Tyres. SECONDARY OBJECTIVE: • To analyse the mechanical down time and identify the opportunities of improvement of availability of critical equipment. Critical equipment – Dual Extruder and Calendar. Tools used : – OEE (Over all equipment effectiveness). – OEE = Efficiency x Availability x Quality. – Pareto Analysis – to find out major break downs. Data Collection : Ten month’s data is used for analysis. And main emphasis is on secondary data. – Primary Data :- Personal interview with maintenance department, production department, planning department, quality control department and Industrial engineering department personals. – Secondary Data :- Machine logs, Production reports, Company manuals, Industrial engineering journals. LIMITATIONS. • Due to confidentiality nature of quality and performance data, it was difficult to get certain details. • Intervention from the employees union which made collection of data difficult.
  • 3. OVER ALL EQUIPMENT EFFECTIVENESS • OEE OF CALENDAR Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE Jul-13 0.9803 0.9462 0.996 0.92385 92.38496 Aug-13 0.9573 0.8911 0.9958 0.849467 84.94672 Sep-13 0.9488 0.9695 0.9957 0.915906 91.59062 Oct-13 0.9095 0.8414 0.9954 0.761733 76.17331 Nov-13 0.9548 0.9305 0.9957 0.884621 88.46211 Dec-13 0.9671 0.9243 0.9958 0.890136 89.01362 0.95298 86.40747 Jan-14 0.9331 0.9629 0.9957 0.894619 89.46185 Feb-14 0.968 0.8806 0.996 0.849011 84.90111 Mar-14 0.9347 0.906 0.9962 0.84362 84.36202 Apr-14 0.9762 0.8512 0.9962 0.827784 82.77839
  • 4. • OEE OF DUAL EXTRUDER Month Availability Performance Quality OEE OEE% Avg Avail Avg OEE Jul-13 0.977 0.9221 0.916 0.82522 82.52 Aug-13 0.9091 0.8814 0.965 0.77324 77.32 Sep-13 0.9154 0.9121 0.932 0.77816 77.81 Oct-13 0.9264 0.8254 0.968 0.74018 74.01 Nov-13 0.9672 0.9157 0.956 0.8467 84.67 Dec-13 0.9034 0.9262 0.983 0.8225 82.25 0.928 79.11 Jan-14 0.9084 0.8949 0.968 0.78691 78.69 Feb-14 0.922 0.8493 0.986 0.77209 77.2 Mar-14 0.9081 0.878 0.971 0.77419 77.41 Apr-14 0.945 0.8656 0.979 0.7924 79.23
  • 5. BREAK DOWN ANALYSIS  Calendar. • Total mechanical down = 306.67 hrs. • From Pareto analysis we found out top 5 downtimes. • That are Mill failure, Led off Feed roll break failures, Feed conveyor related failures, mill guide failures, Roller failures.  Dual Extruder  Total mechanical down = 541.43 hrs.  From Pareto analysis we found out top 5 downtimes.  That are Skiver not skiving, Mill break down, head related general failures, Cooling conveyor joint failures, belt conveyor failures. 0 10 20 30 40 50 60 70 80 90 100 0 1000 2000 3000 4000 5000 6000 7000 8000 Skivernotskiving Millbreakdown Headrelatedgeneral… coolingconveyor… Beltconveyorfailure feedingmillbreak… temprature… Rollerconceyorfailure speedfluctuation Headrubberleakage RubberJamBetween… Skiveranglevariation stockloaderfailure 0 10 20 30 40 50 60 70 80 90 100 0 1000 2000 3000 4000 5000 6000
  • 6. FINDINGS CALENDAR • The major five failures are Mill failure, Led off Feed roll break failures, Feed conveyor related failures, mill guide failures, Roller failures. • After eliminating these failures: – 72.15% of reduction in total mechanical break down. – 3.385% increase in availability, i.e. to 98.67%. – 3.07% increase in OEE, I.e. to 89.44%. – Rs. 94667.1 reduction in terms of man power cost. DUAL EXTRUDER. • The major five failures are Skiver not skiving, Mill break down, head related general failures, Cooling conveyor joint failures, belt conveyor failures. • After eliminating these failures: – 80.12% of reduction in total mechanical break down. – 6.9% increase in availability, i.e. to 99.72%. – 5.93% increase in OEE, I.e. to 85.04%. – Rs. 122067.3 reduction in terms of man power cost.