David’s Bridal
Comparative Analysis
- 2 -
Table of Contents
1. Project Goals and Research Methodology
2. Addressing the Needs of the Bride
3. Websites Researched
4. Online Sales Analysis and Recommendations
5. Registration Analysis and Recommendations
6. Vendor Relationship Analysis and Recommendations
7. Recommendations Summary
8. Conclusion and Next Steps
- 3 -
Project Goals and
Research Methodology
- 4 -
Project and Comparative Analysis Goals
Project Goals
 Increase registration rates
 Increase online sales
 Increase engagement with vendors through content &
placement
Comparative Analysis Goals
 Identify industry best practices
 Recommend changes that can be implemented by start of
2010
- 5 -
Research Methodology
Determine Core
Needs of the Bride
Develop Mission
Statement for
DavidsBridal.com
Identify Websites To
Be Researched
Conduct Research
and Develop
Strategic
Recommendations
for Online Sales,
Registration and
Vendors
Evaluate
Impact vs. Effort of
Recommendations
- 6 -
Addressing the Needs of
the Bride
- 7 -
 Certainty that she is at a website that specializes in wedding
gowns
 A clear and focused online experience that will help her
purchase a gown
 To not be overwhelmed by ancillary wedding products and
services
 Faith in the site’s helpfulness
A Bride Visiting DavidsBridal.com Needs
- 8 -
 By creating a website mission statement which will guide
all recommended strategies and tactics
 By developing recommendations for tactics that align
with the website mission statement
How We Address the Bride’s Needs
- 9 -
Outcomes of a Website Mission Statement
 The website mission statement will reduce “noise” on the
site by helping the bride find what she needs quickly and
easily
 Because the bride is not overwhelmed by the options
available to her, she will be more receptive to other
product and service promotions therefore increasing sales
in these areas
- 10 -
Working Website Mission Statement
DavidsBridal.com offers a full assortment of high-value wedding
gowns as its primary focus.
As a secondary focus, DavidsBridal.com offers a wide range of
wedding products and services that support a bride’s personal
vision for her wedding.
DavidsBridal.com offers the same knowledgeable and respectful
customer service that a bride can find in her local store.
- 11 -
Websites Researched
- 12 -
Website Selection
 No site serves as a simple 1:1 comparison because of the
breadth of David’s Bridal’s offerings
 We identified websites that offer insights into Online Sales,
Registration and Vendors
- 13 -
Final Websites Chosen
Registration
• David's Bridal
• Martha Stewart Weddings
• The Knot
• Eden Bridals
• Baby Center
Online Sales
• David's Bridal
• House of Brides
• The Knot
• Dessy
• Cold Water Creek
Vendors
• David's Bridal
• Martha Stewart Weddings
• The Knot
• WebMD
• Baby Center
The following sites were reviewed but not included in our final comparison:
Anthropologie, Alfred Angelo, Allure Bridals, Best Bridal, Bridal Guide, Bridal Online Store, Brides.com,
Facebook, Home Depot, iVillage, J Crew, Jordan Fashions, Land's End, Macy’s, Michael’s, OneWed.com
OneStopWeddingPlanner.com, PreOwnedWeddingDresses.com, Priscilla of Boston, Style Me Pretty,
Target, Things Remembered, Wal-Mart, Wedding Channel, Wedding Solutions, Lowes
- 14 -
Online Sales Analysis and
Recommendations
- 15 -
When Purchasing Online, a Bride Needs
 To be able to search for a gown using the terms that are
important to her (i.e. color, size, shape, etc.)
 An easy to use and intuitive experience from initial search
to order confirmation
 Certainty that she will find all of the information she needs
before making a final purchasing decision
- 16 -
Online Sales Process
 The online sales process involves four steps
 We have focused on the bride’s needs within three steps of
this four step process
Search
Product
Evaluation
Decision to
Buy
Purchasing
Process –
Shopping
Cart
- 17 -
Our Focus Within the Online Sales Process
 We have not included the shopping cart in our analysis
because changes to that area will not be possible within our
project timeline
 Our recommendations focus on improving the wedding gown
buying experience
 We think this focus will yield the greatest impact within our
project timeline
 The bride’s success purchasing a wedding gown will positively
affect her decision to continue purchasing other products
online
- 18 -
Who Is Doing Online Sales Right?
We went to over 20 fashion related sites and found ten that do
online sales well. At these ten sites we bought gowns and
tested all features.
From this set we selected four sites that offer insights for
David’s Bridal:
 House of Brides
 The Knot
 Dessy
 Cold Water Creek
- 19 -
Online Sales Feature Comparison
David's Bridal House of Brides The Knot Dessy Cold Water Creek
Navigation and Search
Integration of Sitemap 2 5 2 2 1
Product Search 5 3 2 0 0
Shop by Color 4 0 0 5 5
Shop by Style 4 5 5 5 0
Shop by Newest 2 0 2 0 4
Shop by Size 2 3 4 5 3
Shop by Popularity 0 0 1 0 0
Product Evaluation
Film Clip 4 0 0 0 0
Community Reviews within eCom 4 0 2 0 0
Designer Microsites 1 0 4 0 0
Multiple Views and Zoom 3 3 2 4 4
Decision to Buy
Send to Friend 3 3 5 0 5
Send to Social Media Site 5 0 0 2 5
Size Guide 2 4 2 0 0
Workflow Alignment 2 4 3 4 5
0 5
Feature Not Implemented Feature Fully Implemented
KEY:
- 20 -
Areas We Focused On
1. Online Gown Purchasing
2. Relevant Promotions
3. Gown Identification
4. Sizing Guide
5. Site Map
6. Product Search
- 21 -
Weakness: It is difficult to quickly determine how to buy a
gown online at DavidsBridal.com. On the homepage and
subpages, the link to online sales is hard to find.
Implications: The bride needs to move quickly from the home
page to buying a gown online. If the bride has difficulty
finding online sales, she may decide to leave the site.
1. Online Gown Purchasing
- 22 -
The link to online sales on
DavidsBridal.com is not on
the home page.
On pages where it does
appear, it is difficult to find.
It is included among
product categories instead
of on its own level.
1. Online Gown Purchasing
David’s Bridal has the unique challenge of
offering both in-store and online only gowns.
Purchasing will be easier for the bride when it
is clear which gowns are available online and
which gowns are only available in stores.
- 23 -
1. Online Gown Purchasing
If gown sales are of primary
importance to online sales,
then the link for “Bridal
Gowns” should be moved to
the top of the list.
- 24 -
House of Brides makes online
sales very clear by integrating
it into its home page and
tagline.
1. Online Gown Purchasing
- 25 -
1. Online Gown Purchasing
On The Knot, every significant
category has its own label.
The Knot also accommodates
users who think of their wedding
gown as a subset of wedding
attire.
- 26 -
 Make it clear to the bride how she can buy a gown online.
Place a link to online sales on the home page.
 At the highest level of site organization, make online sales a
distinct category. It should not fall within any other
category.
 Clarify which gowns are available online only, in-stores only,
and in both places.
1. Online Gown Purchasing
Recommendations
- 27 -
Weakness: David’s Bridal distracts brides with non relevant
promotions during the online buying process.
Implications: Non relevant promotions may confuse and
overwhelm the bride. Many brides are daunted by the
challenge of finding and purchasing their gown before they
even come to the site. Do not overwhelm them further.
They may leave the site or get diverted from the purchasing
process.
2. Relevant Promotions
- 28 -
David's Bridal includes too
many non relevant
promotions throughout the
online sales process.
2. Relevant Promotions
David's Bridal tries
to take the bride off
of the product page
when she should be
putting a gown in her
shopping cart.
- 29 -
House of Brides limits non
relevant promotions
2. Relevant Promotions
- 30 -
Make everything within the online sales workflow relevant to
buying a gown. The content on each page must keep a bride
focused on purchasing her gown.
2. Relevant Promotions Recommendation
- 31 -
3. Gown Identification
Weakness: A bride needs to search for a gown based on
categories and features that are important to her (i.e. cut,
color, size, cost, etc.)
Implications: A bride will have difficulty finding her gown if the
gowns are defined by a limited set of attributes or given
unusual names. These things will slow down her search and
make buying decisions difficult.
- 32 -
3. Gown Identification
The categorization of gowns
in the David's Bridal
navigation is confusing.
It is does not allow the bride
to search based on features
that are important to her.
- 33 -
3. Gown Identification
Dessy presents a range of
parameters in order to
capture the wide variety of
ways that brides think about
their gowns.
- 34 -
3. Gown Identification Recommendation
Offer a wider and more relevant range of parameters (i.e. cut,
color, size, cost, etc.) that a bride can use to search for her
gown. These parameters should be included in the left side
navigation.
- 35 -
4. Sizing Guide
Weakness: The DavidsBridal.com sizing guide is not easy to
find. Some users say the sizing guide is easier to find
through Google than David's Bridal navigation.
Implications: A bride needs sizing information in order to begin
her online gown search. She may leave the site if she can’t
easily find this information.
- 36 -
4. Sizing Guide
David’s Bridal waits to introduce the
sizing guide too late in the Online Sales
process -- at the product page.
- 37 -
4. Sizing Guide
House of Brides makes it easy to find their sizing guide.
House of Brides presents its
sizing guide in the navigation
throughout the Online Sales
process.
- 38 -
4. Sizing Guide Recommendation
Offer clear access to the sizing guide before the bride arrives at
the product page. Brides need this information before they
start their gown search.
- 39 -
Weakness: Not all brides think the same way. The traditional
left side navigation schema is not the easiest way for
everyone to search for their gown.
Implications: If a bride cannot easily search for her gown, she
may go elsewhere.
5. Site Map
- 40 -
5. Site Map
David’s Bridal’s site map link
is at the bottom of every page
and is easy to miss.
- 41 -
House of Brides places its site
map link prominently at the
top of every page.
5. Site Map
- 42 -
 Brides need many ways to navigate. Promote the site map
as an alternate tool for quickly finding gowns and
understanding the overall site.
 Place the site map link in the navigation on every page.
Make it prominent and easy to find.
5. Site Map Recommendation
- 43 -
6. Product Search
Weakness: Because they all think differently, brides need a
variety of ways to navigate. Offering a variety of navigation
strategies is ideal. DavidsBridal.com offers a strong product
search feature, but its unique benefits are not obvious to
the user.
Implication: Davidsbridal.com is missing a great opportunity to
help a bride find her gown using this existing search feature.
Brides looking to search by multiple criteria may decide to
shop elsewhere if they cannot find this tool.
- 44 -
When a bride uses The Knot’s search
feature she cannot refine her results with
additional criteria.
The Knot also does not help the bride
understand why the results are valid.
This is typical of most wedding sites.
6. Product Search
- 45 -
DavidsBridal.com helps the bride
understand why gowns are included
in her results (i.e. a search for
“strapless” shows results with the
word “strapless” in the description).
Unlike the Knot, DavidsBridal.com allows a bride
to refine her search results with additional criteria
(i.e. color, price, collection, etc.).
6. Product Search
- 46 -
6. Product Search
On the negative
side, the David’s
Bridal search
function hides the
“narrowing” feature
within the
categories.
The bride will not
see the “narrowing”
feature until she
clicks on the “Bridal
Gowns” category.
- 47 -
6. Product Search Recommendation
 The bride needs a variety of ways to search for her gown.
Promote search as a helpful tool for finding a gown.
 Revise the search results to show the narrowing feature
immediately.
DavidsBridal.com’s search
functionality needs to be modified
so that the extensive narrowing
parameters within the category
are seen immediately with the
search results
- 48 -
Online Sales Recommendations
Impact vs. Effort
Recommendation Impact Effort
1. Online Gown Purchasing 4 1
2. Relevant Promotions 4 2
3. Gown Identification 4 3
4. Sizing Guide 2 1
5. Site Map 2 1
6. Product Search 2 1
1 5
Low High
KEY:
- 49 -
Registration Analysis and
Recommendations
- 50 -
When Registering, a Bride Needs
 To understand the benefits of registering
 To understand the conditions of this new relationship
 The ability to control her privacy
- 51 -
 We are focusing on the first three steps of a four step
process.
 The engagement step occurs after submission of user
information. It is not part of our analysis.
Awareness Consideration Conversion Engagement
Our Focus For Registration
- 52 -
Who Is Doing Registration Right?
We went to over 20 fashion related sites and found eight that
do registration well. At these eight sites we registered, gave
them our email address, and accessed privileged content and
tools.
From this set we selected four sites that offer insights for
David’s Bridal:
 Martha Stewart Weddings
 The Knot
 Eden Bridals
 Baby Center
- 53 -
Registration Feature Comparison
David's Bridal Martha Stewart The Knot Eden Bridals Baby Center
Awareness
Email Sign Up Process 5 5 5 n/a 5
Interruptive 3 5 5 1 1
Promotions 5 2 2 1 3
Store Appointment 5 n/a n/a n/a n/a
Wish List / Hanger 5 n/a 3 5 n/a
Consideration
Clear Benefit in Call to Action 2 5 5 2 5
Helpful Tools 1 5 5 2 5
Conversion
Communication Preferences 2 5 5 5 5
Opt-Outs in Form 1 5 5 4 5
Privacy Notice 1 5 4 4 5
Awareness
Registration has many moving parts. The underlying parameters are
common across a variety of businesses.
0 5
Feature Not Implemented Feature Fully Implemented
KEY:
- 54 -
Areas We Focused On
1. Benefits
2. Opt-Outs
3. Registration Requests
4. Resources
5. Privacy Notice
- 55 -
Weakness: A bride needs to understand the benefits of
registration.
Implication: If a bride does not understand the benefits of
registration, she will not register. David’s Bridal will lose the
ability to contact her and retain an ongoing relationship.
1. Benefits
- 56 -
The Knot puts registration in terms that are appealing to the bride.
The Knot doesn’t want you to
“register”. They want you to
“Join”! It’s a party. It’s fun.
1. Benefits
- 57 -
 Find every opportunity to replace the word “Register” with
language that describes the benefits of registration to the
bride.
 Remember that David’s Bridal needs the bride to register. The
bride does not. The bride needs information, updates, tools, a
community, and more. Help her understand that this is what
she will get by registering.
1. Benefits Recommendation
- 58 -
2. Opt-Outs
Opportunity: The bride needs a sense of control.
Implication: If the bride does not have a clear sense of control
when she is registering, she may not register.
- 59 -
2. Opt-Outs
Martha turns opt-outs into a
menu of opportunities.
- 60 -
2. Opt-Outs Recommendation
 Take the opportunity to reinforce the message that
DavidsBridal.com respects the bride and is at her service.
 Create opt-outs that allow her to opt out of emails and
vendor communications.
- 61 -
Weakness: A bride does not want to be confused by multiple
requests to register.
Implication: If there are too many ways to register, a bride may
not know which way is right and may not register at all. She
also may become numb to the registration call to action if it is
made too many times.
3. Registration Requests
- 62 -
After a set period of time, Martha Stewart Weddings stops everyone with an
interruptive invitation to register.
Martha is successful at
earning the respect of her
brides. She is in-your-face-
aggressive but also polite.
She makes it clear when
and where a bride should
register.
3. Registration Requests
- 63 -
Baby Center uses contextually based pop-ups to drive registration.
Baby Center pushes pop-up
windows on top of its pages.
Content is based on the
context of the page it springs
from.
It is not clear though if
signing up here leads to
registering overall…
3. Registration Requests
- 64 -
A bride needs to be clear about when to register and what it
will do for her. Reduce the number of requests for registration.
In exchange for reducing the number of requests, consider a
one time full page take-over triggered by a number of clicks or
time on the site.
3. Registration Request Recommendation
- 65 -
Opportunity: A bride needs help with her wedding tasks. She is
often willing to give up personal information in exchange for
something in return.
Implication: A bride may not register if the benefits of registering
are not significant enough.
4. Resources
- 66 -
The Knot delivers helpful tools in exchange for registering.
Clear Benefits
Clear Call to Action
4. Resources
- 67 -
 Offer the bride resources in exchange for registering.
 Offer things other than content. Content is readily available on
other sites (i.e. The Knot) and will not be seen as a unique
benefit.
 Instead, provide unique tools to help the bride plan her
wedding.
4. Resource Recommendations
- 68 -
Weakness: A bride needs to know what you are doing with her
information. Most likely she has registered elsewhere and has
seen the privacy notice before. She may not have read it, but
assume that she may want to.
Implication: If the bride does not have faith that you will handle
her personal information respectfully and are transparent
about your intentions, she may decide not to register or may
give false information.
5. Privacy Notice
- 69 -
DavidsBridal.com’s privacy
policy is at the bottom of the
page and is not contextual
to registration.
It will not be obvious to a
registering bride that this
privacy policy concerns
registration.
5. Privacy Notice
- 70 -
Both The Knot and Martha Stewart offer clear links to their privacy policies.
Martha, ever polite, makes
sure the bride accepts her
privacy policy by requiring
acceptance of it before the
registration process can be
complete.
The Knot gives a link and
says what the bride will find
there.
5. Privacy Notice
- 71 -
 Make the privacy policy easy to access
 Add the privacy policy to the registration process
5. Privacy Notice Recommendation
- 72 -
Registration Recommendations
Impact vs. Effort
Recommendation Impact Effort
1. Benefits 4 1
2. Opt-Outs 3 2
3. Registration Requests 3 4
4. Resources 3 4
5. Privacy Notice 2 1
1 5
Low High
KEY:
- 73 -
Vendor Relationship Analysis
and Recommendations
- 74 -
What the Bride Needs From Other Vendors
 To learn about other wedding-related products and services
 A sense that David's Bridal is overseeing the introduction
 Trust that David's Bridal is being transparent about how her
information is being used
- 75 -
Our Focus For Vendors
We focus on the first three steps in a four step process
Awareness Consideration Conversion Engagement
- 76 -
Who Is Managing Their Vendors
Successfully?We went to over 20 fashion related web sites and found four
that we think do a good job integrating vendors into their
service offering. We followed these vendors, linked to their
websites, lined them up for our wedding, and read what they
had to say.
From this set we selected four sites that offer fresh insights for
David’s Bridal:
 Martha Stewart Weddings
 The Knot
 Web MD
 Baby Center
- 77 -
Vendors Feature Comparison
David's
Bridal
Martha
Stewart
The Knot WebMD Baby Center
Awareness
Contextual Ad Placement 3 4 3 5 4
Clear Organization of Vendors 1 3 4 2 3
Brand Exposure Through Ad Takes Customer Out of Market 5 2 2 3 2
Integration In Registration Confirmation Email 0 5 5 1 4
Links In Side Bars 5 2 2 2 2
Consideration
Co-sponsored Resources/Content 1 2 2 5 1
Vendors Within Planning Process 4 5 5 n/a n/a
Host Vendor Homepage 2 5 5 0 0
Co-branding 2 2 2 5 2
Conversion
Opt-outs at Registration 0 5 5 4 5
0 5
Feature Not Implemented Feature Fully Implemented
KEY:
- 78 -
Areas We Focused On
1. Vendor Organization
2. Ads
3. Co-Sponsored Content
4. Vendor Information
- 79 -
Weakness: The bride needs vendor listings to be clearly
organized. The first listing she sees is a matrix that is neither
clear nor properly labeled.
Implication: If information on the vendors listing page is
difficult to review or understand, the bride will overlook
important vendors.
1. Vendor Organization
- 80 -
DavidsBridal.com’s
vendor page is not easy
for the bride to use.
1. Vendor Organization The title “Planning
Categories” is confusing. It
does not convey that this
page is a listing of vendors
who offer these products and
services.
- 81 -
The Knot organizes
vendors by categories in
a column format. It
provides tools to help the
bride find the right
vendors for her needs.
1. Vendor Organization
The Knot is clear. It
tells the bride that this
section is for vendors.
- 82 -
She too organizes vendors
in a column format by
category and she provides
tools to help the bride find
vendors that are right for
her.
1. Vendor Organization
Martha Stewart is
also clear that this
section is for
vendors.
- 83 -
Provide a clearly labeled list of vendors and organize it by
category
1. Vendor Organization Recommendation
- 84 -
2. Ads
Weakness: With so much to do, the bride needs to focus on
one thing at a time. Vendor ads in the middle of the online
sales workflow detract from the bride’s focus on buying a
gown.
Implication: Brides need to stay focused on finding and buying
their gown. Otherwise they will be diverted and the sale
lost.
- 85 -
2. Ads
David's Bridal places too many
ads in the online sales process.
They compete for the bride’s
attention.
This ad for a wedding website
takes the bride’s focus away
from buying a gown.
- 86 -
2. Ads
The Knot integrates vendors
seamlessly into the planning
process.
Their intrusion into other
activities (such as gown
purchasing) is minimized.
- 87 -
2. Ads
Through language, Martha
Stewart makes vendors an
implicit part of the wedding
planning process.
Like The Knot, she
minimizes their presence
elsewhere on the site.
- 88 -
2. Ad Recommendations
 Help the bride focus on her tasks by seamlessly and
holistically integrating vendors into the service offering of
the website.
 Make a place for vendors by including them in wedding
planning resources and tools. Here they will capture the
bride’s attention at the right time. Click through rates will
increase.
 Place fewer ads in the sales process.
- 89 -
Weakness: DavidsBridal.com does not offer its vendors a
program for co-sponsored content.
Implication: Without co-sponsored content, DavidsBridal.com
loses potential revenue as well as specialized content that
brides will value.
3. Co-Sponsored Content
- 90 -
WebMD provides a range of co-sponsored content. While WebMD is a media
site, this tactic is relevant to David's Bridal. Co-sponsored content is a way to
seamlessly include vendors in bridal planning tools and resources.
3. Co-Sponsored Content
- 91 -
Integrate co-sponsored content (i.e. helpful articles, customized
tools, blog entries, etc.) into DavidsBridal.com.
This will provide:
 additional vendor revenue for DavidsBridal.com.
 opportunities to tap into the knowledge and expertise of
outside vendors. This will increase David’s Bridal’s online
content offering and better serve the needs of brides.
3. Co-Sponsored Content Recommendation
- 92 -
Weakness: Brides want to learn more about vendors they are
considering. DavidsBridal.com does not consistently provide
information on its vendors nor does it bring them together
in a single location.
Implications: If the bride cannot easily learn about a vendor,
she may not want to work with them.
4. Vendor Information
- 93 -
4. Vendor Information
DavidsBridal.com is
inconsistent. Some vendors
have their own vendor page
(i.e. Partner Detail) while
others do not.
- 94 -
4. Vendor Information
Some DavidsBridal.com
vendors link from
DavidsBridal.com to their own
vendor page on
OurWeddingDay.com.
This is confusing to the bride.
Her primary relationship is with
David’s Bridal. She doesn’t know
the vendor or Our Wedding Day.
- 95 -
The Knot provides each of
its vendors with their own
vendor page.
Placed within the site and
easily found in the
navigation, this information
is credible and helpful to the
bride.
4. Vendor Information
- 96 -
 Help the bride learn more about vendors by giving each one
a page on DavidsBridal.com. Make these pages easy to find.
 On-site vendor pages will convey to the bride that these
vendors have David’s Bridal’s stamp of approval.
4. Vendor Information Recommendation
- 97 -
Vendor Recommendations
Impact vs. Effort
Recommendation Impact Effort
1. Vendor Organization 4 1
2. Ads 4 4
3. Co-Sponsored Content 3 3
4. Vendor Information 3 3
1 5
Low High
KEY:
- 98 -
Recommendations
Summary
- 99 -
Summary of Recommendations
Online Sales
1. Online Gown Purchasing
2. Relevant Promotions
3. Gown Identification
4. Sizing Guide
5. Site Map
6. Product Search
Registration
1. Benefits
2. Opt-Outs
3. Registration Requests
4. Resources
5. Privacy Notice
Vendors
1. Vendor Organization
2. Ads
3. Co-Sponsored Content
4. Vendor Information
- 100 -
All Recommendations: Impact vs. Effort
Online Sales Impact Effort
1. Online Gown Purchasing 4 1
2. Relevant Promotions 4 2
3. Gown Identification 4 3
4. Sizing Guide 2 1
5. Site Map 2 1
6. Product Search 2 1
Registration
1. Benefits 4 1
2. Opt-Outs 3 2
3. Registration Requests 3 4
4. Resources 3 4
5. Privacy Notice 2 1
Vendors
1. Vendor Organization 4 1
2. Ads 4 4
3. Co-Sponsored Content 3 3
4. Vendor Information 3 3
1 5
Low High
KEY:
- 101 -
Conclusion and Next
Steps
- 102 -
Comparative Analysis: Final Observations
If these recommendations are incorporated, we believe that
you will see
 Increased registration rates
 Increased online sales
 Increased engagement with vendors through content &
ad placement

eCommerce Competitive and Comparative Analysis

  • 1.
  • 2.
    - 2 - Tableof Contents 1. Project Goals and Research Methodology 2. Addressing the Needs of the Bride 3. Websites Researched 4. Online Sales Analysis and Recommendations 5. Registration Analysis and Recommendations 6. Vendor Relationship Analysis and Recommendations 7. Recommendations Summary 8. Conclusion and Next Steps
  • 3.
    - 3 - ProjectGoals and Research Methodology
  • 4.
    - 4 - Projectand Comparative Analysis Goals Project Goals  Increase registration rates  Increase online sales  Increase engagement with vendors through content & placement Comparative Analysis Goals  Identify industry best practices  Recommend changes that can be implemented by start of 2010
  • 5.
    - 5 - ResearchMethodology Determine Core Needs of the Bride Develop Mission Statement for DavidsBridal.com Identify Websites To Be Researched Conduct Research and Develop Strategic Recommendations for Online Sales, Registration and Vendors Evaluate Impact vs. Effort of Recommendations
  • 6.
    - 6 - Addressingthe Needs of the Bride
  • 7.
    - 7 - Certainty that she is at a website that specializes in wedding gowns  A clear and focused online experience that will help her purchase a gown  To not be overwhelmed by ancillary wedding products and services  Faith in the site’s helpfulness A Bride Visiting DavidsBridal.com Needs
  • 8.
    - 8 - By creating a website mission statement which will guide all recommended strategies and tactics  By developing recommendations for tactics that align with the website mission statement How We Address the Bride’s Needs
  • 9.
    - 9 - Outcomesof a Website Mission Statement  The website mission statement will reduce “noise” on the site by helping the bride find what she needs quickly and easily  Because the bride is not overwhelmed by the options available to her, she will be more receptive to other product and service promotions therefore increasing sales in these areas
  • 10.
    - 10 - WorkingWebsite Mission Statement DavidsBridal.com offers a full assortment of high-value wedding gowns as its primary focus. As a secondary focus, DavidsBridal.com offers a wide range of wedding products and services that support a bride’s personal vision for her wedding. DavidsBridal.com offers the same knowledgeable and respectful customer service that a bride can find in her local store.
  • 11.
    - 11 - WebsitesResearched
  • 12.
    - 12 - WebsiteSelection  No site serves as a simple 1:1 comparison because of the breadth of David’s Bridal’s offerings  We identified websites that offer insights into Online Sales, Registration and Vendors
  • 13.
    - 13 - FinalWebsites Chosen Registration • David's Bridal • Martha Stewart Weddings • The Knot • Eden Bridals • Baby Center Online Sales • David's Bridal • House of Brides • The Knot • Dessy • Cold Water Creek Vendors • David's Bridal • Martha Stewart Weddings • The Knot • WebMD • Baby Center The following sites were reviewed but not included in our final comparison: Anthropologie, Alfred Angelo, Allure Bridals, Best Bridal, Bridal Guide, Bridal Online Store, Brides.com, Facebook, Home Depot, iVillage, J Crew, Jordan Fashions, Land's End, Macy’s, Michael’s, OneWed.com OneStopWeddingPlanner.com, PreOwnedWeddingDresses.com, Priscilla of Boston, Style Me Pretty, Target, Things Remembered, Wal-Mart, Wedding Channel, Wedding Solutions, Lowes
  • 14.
    - 14 - OnlineSales Analysis and Recommendations
  • 15.
    - 15 - WhenPurchasing Online, a Bride Needs  To be able to search for a gown using the terms that are important to her (i.e. color, size, shape, etc.)  An easy to use and intuitive experience from initial search to order confirmation  Certainty that she will find all of the information she needs before making a final purchasing decision
  • 16.
    - 16 - OnlineSales Process  The online sales process involves four steps  We have focused on the bride’s needs within three steps of this four step process Search Product Evaluation Decision to Buy Purchasing Process – Shopping Cart
  • 17.
    - 17 - OurFocus Within the Online Sales Process  We have not included the shopping cart in our analysis because changes to that area will not be possible within our project timeline  Our recommendations focus on improving the wedding gown buying experience  We think this focus will yield the greatest impact within our project timeline  The bride’s success purchasing a wedding gown will positively affect her decision to continue purchasing other products online
  • 18.
    - 18 - WhoIs Doing Online Sales Right? We went to over 20 fashion related sites and found ten that do online sales well. At these ten sites we bought gowns and tested all features. From this set we selected four sites that offer insights for David’s Bridal:  House of Brides  The Knot  Dessy  Cold Water Creek
  • 19.
    - 19 - OnlineSales Feature Comparison David's Bridal House of Brides The Knot Dessy Cold Water Creek Navigation and Search Integration of Sitemap 2 5 2 2 1 Product Search 5 3 2 0 0 Shop by Color 4 0 0 5 5 Shop by Style 4 5 5 5 0 Shop by Newest 2 0 2 0 4 Shop by Size 2 3 4 5 3 Shop by Popularity 0 0 1 0 0 Product Evaluation Film Clip 4 0 0 0 0 Community Reviews within eCom 4 0 2 0 0 Designer Microsites 1 0 4 0 0 Multiple Views and Zoom 3 3 2 4 4 Decision to Buy Send to Friend 3 3 5 0 5 Send to Social Media Site 5 0 0 2 5 Size Guide 2 4 2 0 0 Workflow Alignment 2 4 3 4 5 0 5 Feature Not Implemented Feature Fully Implemented KEY:
  • 20.
    - 20 - AreasWe Focused On 1. Online Gown Purchasing 2. Relevant Promotions 3. Gown Identification 4. Sizing Guide 5. Site Map 6. Product Search
  • 21.
    - 21 - Weakness:It is difficult to quickly determine how to buy a gown online at DavidsBridal.com. On the homepage and subpages, the link to online sales is hard to find. Implications: The bride needs to move quickly from the home page to buying a gown online. If the bride has difficulty finding online sales, she may decide to leave the site. 1. Online Gown Purchasing
  • 22.
    - 22 - Thelink to online sales on DavidsBridal.com is not on the home page. On pages where it does appear, it is difficult to find. It is included among product categories instead of on its own level. 1. Online Gown Purchasing David’s Bridal has the unique challenge of offering both in-store and online only gowns. Purchasing will be easier for the bride when it is clear which gowns are available online and which gowns are only available in stores.
  • 23.
    - 23 - 1.Online Gown Purchasing If gown sales are of primary importance to online sales, then the link for “Bridal Gowns” should be moved to the top of the list.
  • 24.
    - 24 - Houseof Brides makes online sales very clear by integrating it into its home page and tagline. 1. Online Gown Purchasing
  • 25.
    - 25 - 1.Online Gown Purchasing On The Knot, every significant category has its own label. The Knot also accommodates users who think of their wedding gown as a subset of wedding attire.
  • 26.
    - 26 - Make it clear to the bride how she can buy a gown online. Place a link to online sales on the home page.  At the highest level of site organization, make online sales a distinct category. It should not fall within any other category.  Clarify which gowns are available online only, in-stores only, and in both places. 1. Online Gown Purchasing Recommendations
  • 27.
    - 27 - Weakness:David’s Bridal distracts brides with non relevant promotions during the online buying process. Implications: Non relevant promotions may confuse and overwhelm the bride. Many brides are daunted by the challenge of finding and purchasing their gown before they even come to the site. Do not overwhelm them further. They may leave the site or get diverted from the purchasing process. 2. Relevant Promotions
  • 28.
    - 28 - David'sBridal includes too many non relevant promotions throughout the online sales process. 2. Relevant Promotions David's Bridal tries to take the bride off of the product page when she should be putting a gown in her shopping cart.
  • 29.
    - 29 - Houseof Brides limits non relevant promotions 2. Relevant Promotions
  • 30.
    - 30 - Makeeverything within the online sales workflow relevant to buying a gown. The content on each page must keep a bride focused on purchasing her gown. 2. Relevant Promotions Recommendation
  • 31.
    - 31 - 3.Gown Identification Weakness: A bride needs to search for a gown based on categories and features that are important to her (i.e. cut, color, size, cost, etc.) Implications: A bride will have difficulty finding her gown if the gowns are defined by a limited set of attributes or given unusual names. These things will slow down her search and make buying decisions difficult.
  • 32.
    - 32 - 3.Gown Identification The categorization of gowns in the David's Bridal navigation is confusing. It is does not allow the bride to search based on features that are important to her.
  • 33.
    - 33 - 3.Gown Identification Dessy presents a range of parameters in order to capture the wide variety of ways that brides think about their gowns.
  • 34.
    - 34 - 3.Gown Identification Recommendation Offer a wider and more relevant range of parameters (i.e. cut, color, size, cost, etc.) that a bride can use to search for her gown. These parameters should be included in the left side navigation.
  • 35.
    - 35 - 4.Sizing Guide Weakness: The DavidsBridal.com sizing guide is not easy to find. Some users say the sizing guide is easier to find through Google than David's Bridal navigation. Implications: A bride needs sizing information in order to begin her online gown search. She may leave the site if she can’t easily find this information.
  • 36.
    - 36 - 4.Sizing Guide David’s Bridal waits to introduce the sizing guide too late in the Online Sales process -- at the product page.
  • 37.
    - 37 - 4.Sizing Guide House of Brides makes it easy to find their sizing guide. House of Brides presents its sizing guide in the navigation throughout the Online Sales process.
  • 38.
    - 38 - 4.Sizing Guide Recommendation Offer clear access to the sizing guide before the bride arrives at the product page. Brides need this information before they start their gown search.
  • 39.
    - 39 - Weakness:Not all brides think the same way. The traditional left side navigation schema is not the easiest way for everyone to search for their gown. Implications: If a bride cannot easily search for her gown, she may go elsewhere. 5. Site Map
  • 40.
    - 40 - 5.Site Map David’s Bridal’s site map link is at the bottom of every page and is easy to miss.
  • 41.
    - 41 - Houseof Brides places its site map link prominently at the top of every page. 5. Site Map
  • 42.
    - 42 - Brides need many ways to navigate. Promote the site map as an alternate tool for quickly finding gowns and understanding the overall site.  Place the site map link in the navigation on every page. Make it prominent and easy to find. 5. Site Map Recommendation
  • 43.
    - 43 - 6.Product Search Weakness: Because they all think differently, brides need a variety of ways to navigate. Offering a variety of navigation strategies is ideal. DavidsBridal.com offers a strong product search feature, but its unique benefits are not obvious to the user. Implication: Davidsbridal.com is missing a great opportunity to help a bride find her gown using this existing search feature. Brides looking to search by multiple criteria may decide to shop elsewhere if they cannot find this tool.
  • 44.
    - 44 - Whena bride uses The Knot’s search feature she cannot refine her results with additional criteria. The Knot also does not help the bride understand why the results are valid. This is typical of most wedding sites. 6. Product Search
  • 45.
    - 45 - DavidsBridal.comhelps the bride understand why gowns are included in her results (i.e. a search for “strapless” shows results with the word “strapless” in the description). Unlike the Knot, DavidsBridal.com allows a bride to refine her search results with additional criteria (i.e. color, price, collection, etc.). 6. Product Search
  • 46.
    - 46 - 6.Product Search On the negative side, the David’s Bridal search function hides the “narrowing” feature within the categories. The bride will not see the “narrowing” feature until she clicks on the “Bridal Gowns” category.
  • 47.
    - 47 - 6.Product Search Recommendation  The bride needs a variety of ways to search for her gown. Promote search as a helpful tool for finding a gown.  Revise the search results to show the narrowing feature immediately. DavidsBridal.com’s search functionality needs to be modified so that the extensive narrowing parameters within the category are seen immediately with the search results
  • 48.
    - 48 - OnlineSales Recommendations Impact vs. Effort Recommendation Impact Effort 1. Online Gown Purchasing 4 1 2. Relevant Promotions 4 2 3. Gown Identification 4 3 4. Sizing Guide 2 1 5. Site Map 2 1 6. Product Search 2 1 1 5 Low High KEY:
  • 49.
    - 49 - RegistrationAnalysis and Recommendations
  • 50.
    - 50 - WhenRegistering, a Bride Needs  To understand the benefits of registering  To understand the conditions of this new relationship  The ability to control her privacy
  • 51.
    - 51 - We are focusing on the first three steps of a four step process.  The engagement step occurs after submission of user information. It is not part of our analysis. Awareness Consideration Conversion Engagement Our Focus For Registration
  • 52.
    - 52 - WhoIs Doing Registration Right? We went to over 20 fashion related sites and found eight that do registration well. At these eight sites we registered, gave them our email address, and accessed privileged content and tools. From this set we selected four sites that offer insights for David’s Bridal:  Martha Stewart Weddings  The Knot  Eden Bridals  Baby Center
  • 53.
    - 53 - RegistrationFeature Comparison David's Bridal Martha Stewart The Knot Eden Bridals Baby Center Awareness Email Sign Up Process 5 5 5 n/a 5 Interruptive 3 5 5 1 1 Promotions 5 2 2 1 3 Store Appointment 5 n/a n/a n/a n/a Wish List / Hanger 5 n/a 3 5 n/a Consideration Clear Benefit in Call to Action 2 5 5 2 5 Helpful Tools 1 5 5 2 5 Conversion Communication Preferences 2 5 5 5 5 Opt-Outs in Form 1 5 5 4 5 Privacy Notice 1 5 4 4 5 Awareness Registration has many moving parts. The underlying parameters are common across a variety of businesses. 0 5 Feature Not Implemented Feature Fully Implemented KEY:
  • 54.
    - 54 - AreasWe Focused On 1. Benefits 2. Opt-Outs 3. Registration Requests 4. Resources 5. Privacy Notice
  • 55.
    - 55 - Weakness:A bride needs to understand the benefits of registration. Implication: If a bride does not understand the benefits of registration, she will not register. David’s Bridal will lose the ability to contact her and retain an ongoing relationship. 1. Benefits
  • 56.
    - 56 - TheKnot puts registration in terms that are appealing to the bride. The Knot doesn’t want you to “register”. They want you to “Join”! It’s a party. It’s fun. 1. Benefits
  • 57.
    - 57 - Find every opportunity to replace the word “Register” with language that describes the benefits of registration to the bride.  Remember that David’s Bridal needs the bride to register. The bride does not. The bride needs information, updates, tools, a community, and more. Help her understand that this is what she will get by registering. 1. Benefits Recommendation
  • 58.
    - 58 - 2.Opt-Outs Opportunity: The bride needs a sense of control. Implication: If the bride does not have a clear sense of control when she is registering, she may not register.
  • 59.
    - 59 - 2.Opt-Outs Martha turns opt-outs into a menu of opportunities.
  • 60.
    - 60 - 2.Opt-Outs Recommendation  Take the opportunity to reinforce the message that DavidsBridal.com respects the bride and is at her service.  Create opt-outs that allow her to opt out of emails and vendor communications.
  • 61.
    - 61 - Weakness:A bride does not want to be confused by multiple requests to register. Implication: If there are too many ways to register, a bride may not know which way is right and may not register at all. She also may become numb to the registration call to action if it is made too many times. 3. Registration Requests
  • 62.
    - 62 - Aftera set period of time, Martha Stewart Weddings stops everyone with an interruptive invitation to register. Martha is successful at earning the respect of her brides. She is in-your-face- aggressive but also polite. She makes it clear when and where a bride should register. 3. Registration Requests
  • 63.
    - 63 - BabyCenter uses contextually based pop-ups to drive registration. Baby Center pushes pop-up windows on top of its pages. Content is based on the context of the page it springs from. It is not clear though if signing up here leads to registering overall… 3. Registration Requests
  • 64.
    - 64 - Abride needs to be clear about when to register and what it will do for her. Reduce the number of requests for registration. In exchange for reducing the number of requests, consider a one time full page take-over triggered by a number of clicks or time on the site. 3. Registration Request Recommendation
  • 65.
    - 65 - Opportunity:A bride needs help with her wedding tasks. She is often willing to give up personal information in exchange for something in return. Implication: A bride may not register if the benefits of registering are not significant enough. 4. Resources
  • 66.
    - 66 - TheKnot delivers helpful tools in exchange for registering. Clear Benefits Clear Call to Action 4. Resources
  • 67.
    - 67 - Offer the bride resources in exchange for registering.  Offer things other than content. Content is readily available on other sites (i.e. The Knot) and will not be seen as a unique benefit.  Instead, provide unique tools to help the bride plan her wedding. 4. Resource Recommendations
  • 68.
    - 68 - Weakness:A bride needs to know what you are doing with her information. Most likely she has registered elsewhere and has seen the privacy notice before. She may not have read it, but assume that she may want to. Implication: If the bride does not have faith that you will handle her personal information respectfully and are transparent about your intentions, she may decide not to register or may give false information. 5. Privacy Notice
  • 69.
    - 69 - DavidsBridal.com’sprivacy policy is at the bottom of the page and is not contextual to registration. It will not be obvious to a registering bride that this privacy policy concerns registration. 5. Privacy Notice
  • 70.
    - 70 - BothThe Knot and Martha Stewart offer clear links to their privacy policies. Martha, ever polite, makes sure the bride accepts her privacy policy by requiring acceptance of it before the registration process can be complete. The Knot gives a link and says what the bride will find there. 5. Privacy Notice
  • 71.
    - 71 - Make the privacy policy easy to access  Add the privacy policy to the registration process 5. Privacy Notice Recommendation
  • 72.
    - 72 - RegistrationRecommendations Impact vs. Effort Recommendation Impact Effort 1. Benefits 4 1 2. Opt-Outs 3 2 3. Registration Requests 3 4 4. Resources 3 4 5. Privacy Notice 2 1 1 5 Low High KEY:
  • 73.
    - 73 - VendorRelationship Analysis and Recommendations
  • 74.
    - 74 - Whatthe Bride Needs From Other Vendors  To learn about other wedding-related products and services  A sense that David's Bridal is overseeing the introduction  Trust that David's Bridal is being transparent about how her information is being used
  • 75.
    - 75 - OurFocus For Vendors We focus on the first three steps in a four step process Awareness Consideration Conversion Engagement
  • 76.
    - 76 - WhoIs Managing Their Vendors Successfully?We went to over 20 fashion related web sites and found four that we think do a good job integrating vendors into their service offering. We followed these vendors, linked to their websites, lined them up for our wedding, and read what they had to say. From this set we selected four sites that offer fresh insights for David’s Bridal:  Martha Stewart Weddings  The Knot  Web MD  Baby Center
  • 77.
    - 77 - VendorsFeature Comparison David's Bridal Martha Stewart The Knot WebMD Baby Center Awareness Contextual Ad Placement 3 4 3 5 4 Clear Organization of Vendors 1 3 4 2 3 Brand Exposure Through Ad Takes Customer Out of Market 5 2 2 3 2 Integration In Registration Confirmation Email 0 5 5 1 4 Links In Side Bars 5 2 2 2 2 Consideration Co-sponsored Resources/Content 1 2 2 5 1 Vendors Within Planning Process 4 5 5 n/a n/a Host Vendor Homepage 2 5 5 0 0 Co-branding 2 2 2 5 2 Conversion Opt-outs at Registration 0 5 5 4 5 0 5 Feature Not Implemented Feature Fully Implemented KEY:
  • 78.
    - 78 - AreasWe Focused On 1. Vendor Organization 2. Ads 3. Co-Sponsored Content 4. Vendor Information
  • 79.
    - 79 - Weakness:The bride needs vendor listings to be clearly organized. The first listing she sees is a matrix that is neither clear nor properly labeled. Implication: If information on the vendors listing page is difficult to review or understand, the bride will overlook important vendors. 1. Vendor Organization
  • 80.
    - 80 - DavidsBridal.com’s vendorpage is not easy for the bride to use. 1. Vendor Organization The title “Planning Categories” is confusing. It does not convey that this page is a listing of vendors who offer these products and services.
  • 81.
    - 81 - TheKnot organizes vendors by categories in a column format. It provides tools to help the bride find the right vendors for her needs. 1. Vendor Organization The Knot is clear. It tells the bride that this section is for vendors.
  • 82.
    - 82 - Shetoo organizes vendors in a column format by category and she provides tools to help the bride find vendors that are right for her. 1. Vendor Organization Martha Stewart is also clear that this section is for vendors.
  • 83.
    - 83 - Providea clearly labeled list of vendors and organize it by category 1. Vendor Organization Recommendation
  • 84.
    - 84 - 2.Ads Weakness: With so much to do, the bride needs to focus on one thing at a time. Vendor ads in the middle of the online sales workflow detract from the bride’s focus on buying a gown. Implication: Brides need to stay focused on finding and buying their gown. Otherwise they will be diverted and the sale lost.
  • 85.
    - 85 - 2.Ads David's Bridal places too many ads in the online sales process. They compete for the bride’s attention. This ad for a wedding website takes the bride’s focus away from buying a gown.
  • 86.
    - 86 - 2.Ads The Knot integrates vendors seamlessly into the planning process. Their intrusion into other activities (such as gown purchasing) is minimized.
  • 87.
    - 87 - 2.Ads Through language, Martha Stewart makes vendors an implicit part of the wedding planning process. Like The Knot, she minimizes their presence elsewhere on the site.
  • 88.
    - 88 - 2.Ad Recommendations  Help the bride focus on her tasks by seamlessly and holistically integrating vendors into the service offering of the website.  Make a place for vendors by including them in wedding planning resources and tools. Here they will capture the bride’s attention at the right time. Click through rates will increase.  Place fewer ads in the sales process.
  • 89.
    - 89 - Weakness:DavidsBridal.com does not offer its vendors a program for co-sponsored content. Implication: Without co-sponsored content, DavidsBridal.com loses potential revenue as well as specialized content that brides will value. 3. Co-Sponsored Content
  • 90.
    - 90 - WebMDprovides a range of co-sponsored content. While WebMD is a media site, this tactic is relevant to David's Bridal. Co-sponsored content is a way to seamlessly include vendors in bridal planning tools and resources. 3. Co-Sponsored Content
  • 91.
    - 91 - Integrateco-sponsored content (i.e. helpful articles, customized tools, blog entries, etc.) into DavidsBridal.com. This will provide:  additional vendor revenue for DavidsBridal.com.  opportunities to tap into the knowledge and expertise of outside vendors. This will increase David’s Bridal’s online content offering and better serve the needs of brides. 3. Co-Sponsored Content Recommendation
  • 92.
    - 92 - Weakness:Brides want to learn more about vendors they are considering. DavidsBridal.com does not consistently provide information on its vendors nor does it bring them together in a single location. Implications: If the bride cannot easily learn about a vendor, she may not want to work with them. 4. Vendor Information
  • 93.
    - 93 - 4.Vendor Information DavidsBridal.com is inconsistent. Some vendors have their own vendor page (i.e. Partner Detail) while others do not.
  • 94.
    - 94 - 4.Vendor Information Some DavidsBridal.com vendors link from DavidsBridal.com to their own vendor page on OurWeddingDay.com. This is confusing to the bride. Her primary relationship is with David’s Bridal. She doesn’t know the vendor or Our Wedding Day.
  • 95.
    - 95 - TheKnot provides each of its vendors with their own vendor page. Placed within the site and easily found in the navigation, this information is credible and helpful to the bride. 4. Vendor Information
  • 96.
    - 96 - Help the bride learn more about vendors by giving each one a page on DavidsBridal.com. Make these pages easy to find.  On-site vendor pages will convey to the bride that these vendors have David’s Bridal’s stamp of approval. 4. Vendor Information Recommendation
  • 97.
    - 97 - VendorRecommendations Impact vs. Effort Recommendation Impact Effort 1. Vendor Organization 4 1 2. Ads 4 4 3. Co-Sponsored Content 3 3 4. Vendor Information 3 3 1 5 Low High KEY:
  • 98.
  • 99.
    - 99 - Summaryof Recommendations Online Sales 1. Online Gown Purchasing 2. Relevant Promotions 3. Gown Identification 4. Sizing Guide 5. Site Map 6. Product Search Registration 1. Benefits 2. Opt-Outs 3. Registration Requests 4. Resources 5. Privacy Notice Vendors 1. Vendor Organization 2. Ads 3. Co-Sponsored Content 4. Vendor Information
  • 100.
    - 100 - AllRecommendations: Impact vs. Effort Online Sales Impact Effort 1. Online Gown Purchasing 4 1 2. Relevant Promotions 4 2 3. Gown Identification 4 3 4. Sizing Guide 2 1 5. Site Map 2 1 6. Product Search 2 1 Registration 1. Benefits 4 1 2. Opt-Outs 3 2 3. Registration Requests 3 4 4. Resources 3 4 5. Privacy Notice 2 1 Vendors 1. Vendor Organization 4 1 2. Ads 4 4 3. Co-Sponsored Content 3 3 4. Vendor Information 3 3 1 5 Low High KEY:
  • 101.
    - 101 - Conclusionand Next Steps
  • 102.
    - 102 - ComparativeAnalysis: Final Observations If these recommendations are incorporated, we believe that you will see  Increased registration rates  Increased online sales  Increased engagement with vendors through content & ad placement