CV-707 Website Redesign of Commvault.com
CommVault
Information Architecture Document
(IAD) v6.3
FVM Advertising
________________________________________________________________________
The Purpose of this document is to provide direction to the designer and developer.
These documents do not reflect final design decisions. They show only our
thinking to date and serve as a jumping off point for the Designer and to help the
Developer understand some core requirements of the website and its scope.
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
Key: Page 2
Save Date: Fri Apr 01 2011
Key
xx
8.0.0
xx
1.1.08.6.0
xx
1.1.05.3.2
xx
1.1.05.3.2.1
6.2.x
Case Study
PDFs6.2.x
Case Study
PDFs1.1.06.2.1
xx.yyy
XX
4
8
xx
1.1.02.4.2.1
xx
11.0.0
6
3
xx
1.1.03.4.0
Related 2nd Level Landing
Pages
3
1
2
2nd Level Landing Pages.
Landing Pages are often limited
to overview and summary
content and usually have other
landing pages and content
pages below them that will each
explore in detail a theme on the
Landing Page.
2
3rd Level Landing Pages
4
4th Level Landing Pages
6
5th Level Landing Pages
7
Content Pages.
Content Pages include detailed
in-depth content that explores
and explains a subject.
8
Downloads and Rich Media
9
Group Level Landing Page
1
Blach hash marks indicates
significant new content is
needed for this page.
5
5
7
9
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
Sitemap Overview: Page 3
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
Sitemap Overview
Footer Navigation
Global Navigation
Privacy Policy
9.0.0
Legal
8.0.0
Contact Us
5.0.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Simplified
Design and
Build
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets We
Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
Log In
6.0.0
Your Country
7.0.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
CV Homepage
0.0.0
Sales
4.0.0
Utility Navigation
Site Map
10.0.0
1
The Site has been
organized into three major
groups in order to
* reduce the immense
complexity of information
on this site
* support the brand
These sections are:
"The Software": All things
related to software
"Simpana Nation": All
things related to people
around the software
"Us": All things related to
the company that makes
the software
1
The Software
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
1.0.0 The Software: Page 4
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
1.0.0 The Software
The Software
1.0.0
CV Homepage
0.0.0
1
THE SOFTWARE
SECTION
LANDING PAGE
AN OVERVIEW of the
software which
includes tech overview
as well as reinforces
CommVault's unique
approach.
Here we also come in
contact with the
professional elements
of the brand:
* Forward Thinking
* Cutting Edge
* Innovative
* Professional
* The Right Choice
1
The Software
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
1.1.0 What It Solves: Page 5
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
1.1.0 What It Solves
Backup and
Recovery
1.1.01.1.1
Backup and Recovery
1.1.01.1.1.1
SnapProtect
1.1.01.1.1.2
Replication
1.1.01.1.1.3
SRM
1.1.01.1.1.4
Deduplication
1.1.01.1.1.5
Archive
1.1.01.1.6
Storage Optimization
1.1.01.1.6.2
Archive for Space Mgmt
1.1.01.1.6.1
Scenarios We
Address
1.1.01.1.6.3.1
Information
Governance
1.1.01.1.6.3
Utilities/
Foundation
1.1.02.4.1
Enterprise Search
1.1.02.4.1.1
Content Organization
1.1.02.4.1.2
Privacy Violation Mgmt
1.1.02.4.1.4
Records Declaration
1.1.02.4.1.3
Retention Life Cycle Mgmt
1.1.02.4.1.5
Records Management
1.1.02.4.1.6
Compliance
1.1.01.1.6.4
Data Authentication
1.1.02.4.2.1.1
FIPS Compliance
1.1.02.4.2.1.2
Optimized Review
1.1.02.4.2.1.3
eDiscovery
1.1.01.1.6.3.
Federated Legal Hold
1.1.02.4.2.2.1
Early Case Assessment
1.1.02.4.2.2.2
EDRM
1.1.02.4.2.2.3
Cloud Storage Integration
1.1.01.1.3.2
Virtual Server
Protection
1.1.01.1.3
Virtualization
1.1.01.1.3.1
What It
Solves
1.1.0
The Software
1.0.0
CV Homepage
0.0.0
Microsoft SQL Server
1.1.2.3
Microsoft Exchange
1.1.2.1
Microsoft SharePoint
1.1.2.2
Oracle
1.1.2.4
SAP R/3 and NetWeaver
1.1.2.5
Sybase
1.1.01.1.2.6
Mod Application
Mgmt
1.1.01.1.2
Disaster Recovery
1.1.01.1.5.1
Disaster
Recovery
1.1.01.1.5
ROBO
1.1.01.1.4.1
Workstation BU and Reco
1.1.01.1.4.2
ROBO/DLO
1.1.01.1.4
FY12 Campaigns
1. Virtualization
2. MDM
3. Corporate
4. Information
Governance
5. Health Care
NOTE
The Software
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
1.2.0 What it Works With : Page 6
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
1.2.0 What it Works With
1.1.0
1.1.0
1.1.0
1.1.0
Microsoft
1.2.1.1
Linux
1.2.1.2
Novell
1.2.1.3
VMWare
1.2.1.4
Platforms
1.1.01.2.1
Technology
Partners
1.1.01.2.4
3PAR
1.2.4.x 1.1.0
1.1.0
Introduction
1.2.5.1
Our Programs
1.2.5.2
Our Partners
1.2.5.3
Service
Providers
1.1.01.2.5
Strategic
Partners
1.1.01.2.3
Group Logic
1.2.3.3
Case
1.2.3.1
Dell
1.2.3.2
Hewlett-Packard
1.2.3.4
Hitachi Data Systems
1.2.3.5
Informatica
1.1.01.2.3.6
McAfee
1.1.01.2.3.7
Microsoft
1.1.01.2.3.8
NetApp
1.1.01.2.3.9
VMware
1.1.01.2.3.11
Oracle
1.1.01.2.3.10
Hardware
1.1.01.2.2
What It
Works with
1.2.0
The Software
1.0.0
CV Homepage
0.0.0
3PAR
1.2.4.x
3PAR
1.2.4.x
The Software
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
1.3.0 How it Works: Page 7
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
1.3.0 How it Works
LP Contents
1. Technical Architecture
2. Architecture Diagram
3. Discussion of
Philosophical Approach
which sets CV apart from
competition.
1
How it
Works
1.3.0
The Software
1.0.0
CV Homepage
0.0.0
1
The Software
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
1.4.0 Switching
is Simple: Page 8
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
1.4.0 Switching
is Simple
LP Contents
1. What is involved in
Install
2. Fast Pass Option
1
Switching
is Simple
1.4.0
The Software
1.0.0
CV Homepage
0.0.0
1
The Software
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
1.5.0 Business Value: Page 9
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
1.5.0 Business Value
Business Value LP
Contents
1. Total Cost of Ownership
2. Personnel Costs
3. Costs of Replacing
Other Solutions
4. Services and Support
Costs
5. Adding More
6. Upgrades
7. Licenses
8. Bundling
9. Sample Pricing
10. Myth Dispeller
11. Calculator
1
The
Business
Value
1.5.0
The Software
1.0.0
CV Homepage
0.0.0
1
The Software
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
1.6.0 Library: Page 10
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
1.6.0 Library
Product
1.1.0 1.6.1
Modernize Your Data
1.1.0 1.6.2
Virtual Server Protection
1.1.0 1.6.3
Information Governance
1.1.0 1.6.5
Microsoft Solutions
1.1.0 1.6.6
Enterprise Applications
1.1.0 1.6.7
Data Reduction
1.1.0 1.6.4
The Software
1.0.0
CV Homepage
0.0.0
1.1.01.6.x.x
Data Sheets
1.6.x.x
Data Sheets
1.6.x.x
Data Sheets
1.1.01.6.x.x
White Papers
1.6.x.x
White Papers
1.6.x.x
White Papers
1.1.01.6.x.x
Videos
1.6.x.x
Videos
1.6.x.x
Videos
1
All categories in the
Library are supported by
these three types of assets
1
Library
1.6.0
Simpana Nation
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
2.0.0 Simpana NatIon: Page 11
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
2.0.0 Simpana NatIon CV Homepage
0.0.0
Simpana Nation
2.0.0
SIMPANA NATION
SECTION
LANDING PAGE
AN OVERVIEW of all
of the different people
that touch Simpana
from customers, to
partners.
Here we also come in
contact with the human
elements of the brand:
* The Human Side
* The sum is greater
than it's parts
* Passionate
* Esprit de Corps
* Buzz
* Professionalism
* Focus
* Service focused
1
1
Simpana Nation
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
2.1.0 Services and Support: Page 12
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
2.1.0 Services and Support
SRM Profile Analysis (PA)
1.1.02.1.1.1
Messaging Services PA
1.1.02.1.1.2
Content Awareness PA
1.1.02.1.1.3
Data MAP Planning
1.1.02.1.1.4
Site Review and Wellness
1.1.02.1.1.5
CV Migration Planning
1.1.02.1.1.6
Data Protection Accel
1.1.02.1.2.1
Archive Accel
1.1.02.1.2.2
Replication Accel
1.1.02.1.2.3
Content Search Accel
1.1.02.1.2.4
Dbase Protection Accel
1.1.02.1.2.5
Disaster Reco Accel
1.1.02.1.2.6
Content Director Accel
1.1.02.1.2.7
Upgrade Accel
1.1.02.1.2.8
Custom Implementation
1.1.02.1.2.9
Professional
Design Svcs
1.1.02.1.1
Professional
Build Svcs
1.1.02.1.2
Support
Services
1.1.02.1.3.2
Pro and Other
Manage Svcs
1.1.02.1.3
Certification
2.1.3.3.4
Support Services Options
1.1.02.1.3.2.1
Technical Reference Library
2.1.3.3.5
Disaster Recovery Planning
1.1.02.1.3.1
1.1.0
Project Lifecycle Mgmt
2.1.3.2
eRecovery
1.1.02.1.3.3
1.1.0
eDiscovery
2.1.3.4
CV Residency Services
1.1.02.1.3.2.2
Business Critical Support
1.1.02.1.3.2.3
Remote Assistance
1.1.02.1.3.2.4
ROMS
1.1.02.1.3.2.5
Transformation Services
1.1.02.1.3.5
PA CommValue Program
1.1.02.1.2.10
Professional
Services
1.1.02.1.3.1
Training
Services
1.1.02.1.3.3
Telephone Support
1.1.02.1.3.2.6
Web - Ex Support
1.1.02.1.3.2.7
Release and
Hdwr Support
1.1.02.1.4
Training Locations
2.1.3.3.3
Training
2.1.3.3.1
Curriculum and Registration
2.1.3.3.2
Fast Pass
1.1.02.1.1.7
CV Homepage
0.0.0
Simpana Nation
2.0.0
This section has be reorganized
in recognition of the fact that
users are more interested in
types of help than they are in the
methodology of installing and
running Simpana
1
1
2
Is "Fast Pass" part of
professional services?
2
Services
and
Support
2.1.0
Maintenance
Advantage
1.1.02.1.3.4
Simpana Nation
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
2.2.0 Who Trusts Us: Page 13
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
2.2.0 Who Trusts Us
6.2.x
Case Study
PDFs6.2.x
Case Study
PDFs1.1.06.2.1
Case Study
PDFs
Featured
1.1.06.1.0
Case Studies
1.1.06.2.0
Testimonials
1.1.06.3.0
Library
1.1.06.4.0
Who Trusts
Us
2.2.0
CV Homepage
0.0.0
Simpana Nation
2.0.0
1
The organization of this
section follows the
organization of the current
section.
It has been elevated to 2nd
level though..
1
Simpana Nation
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
2.3.0 Markets We Serve: Page 14
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
2.3.0 Markets We Serve
SLED
2.3.4.1
Federal
2.3.4.2
Small
2.3.3.1
Medium
2.3.3.2
Hospitals
2.3.2.1
Pharmaceutical
2.3.2.2
Banking
2.3.1.1
Fund Management
2.3.1.2
Insurers
2.3.2.3
Markets
We Serve
2.3.0
Financial
1.1.02.3.1
HealthCare
1.1.02.3.2
Small/Medium
Business
1.1.02.3.3
Government
1.1.02.3.4
CV Homepage
0.0.0
Simpana Nation
2.0.0
1
This section will be highly
flexible so that it can follow
campaigns
1
Simpana Nation
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
2.4.0 Our Partners : Page 15
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
2.4.0 Our Partners
Partner
Overview
1.1.02.4.1
Support for
Partners
1.1.02.4.3
1.1.0
1.1.0
1.1.0
1.1.0
Introduction
2.4.2.1
Benefits
2.4.2.2
Requirements
2.4.2.3
FAQ
2.4.2.4
Become a
Partner
1.1.02.4.2
Join
2.4.2.5
Technology
Partners
1.1.02.4.1.2
Reseller
Partners
1.1.02.4.1.3
Services
Partners
1.1.02.4.1.4
Strategic
Partners
1.1.02.4.1.1
Our
Partners
2.4.0
CV Homepage
0.0.0
Simpana Nation
2.0.0
Simpana Nation
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
2.5.0 Existing Customers: Page 16
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
2.5.0 Existing Customers
1.1.0
1.1.0
Existing
Customers
2.5.0
Maybe You Missed This
2.5.3
Upgrades
2.5.4
Expansion
2.5.5
Join
2.5.6
FAQ
2.5.7
Documentation
2.5.8
Release and
Hdwr Support
1.1.02.5.1
CV Software Doc
1.1.02.5.1.3.1
Hardware Comp Matrix
1.1.02.5.1.1.1
NDMP Comp Matrix
1.1.02.5.1.2.1
Snapshot Comp Matrix
1.1.02.5.1.1.2
Product Registration
1.1.02.5.1.3.2
3rd Party
Software
1.1.02.5.1.2
3rd Party
Hardware
1.1.02.5.1.1
Commvault
Product
1.1.02.5.1.3
CV Homepage
0.0.0
Simpana Nation
2.0.0
Maintenance
Advantage
1.1.02.5.2
2
Link to Maintenance
Advantage Section
2
1
This section's Landing
Page includes:
* Overview
* Benefits of Registration
* Information on Manage
Services
* Login to ....
1
Us
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
3.0.0 Us: Page 17
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
3.0.0 Us
1
US SECTION
LANDING PAGE
AN OVERVIEW of
Commvault including
the CV's Vision and
core principal of
Solving Forward.
Here we also come in
contact with the
corporate elements of
the brand:
* Passionate
* Professional
* Planetary Citizens
* Transparent
* Successful
1
Us
3.0.0
CV Homepage
0.0.0
Us
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
3.1.0 Company Information: Page 18
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
3.1.0 Company Information
Corporate Citizenship
3.1.0.5
Community Affairs
3.1.0.4
History
3.1.0.1
FAQ
3.1.0.6
Executive Management
3.1.0.3
Company
Information
3.1.0
Us
3.0.0
CV Homepage
0.0.0
Our People
3.1.0.2
Activities such as Mike
McMahon's Honduras Trip
1
1
Us
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
3.2.0 Newsroom: Page 19
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
3.2.0 Newsroom
Newsroom
3.2.0
1.1.0
1.1.0
Press Releases
3.2.1.1
Media Coverage
3.2.1.2
News and
Media
1.1.03.2.1
Analyst
Reports
1.1.03.2.2
1.1.0
1.1.0
DW Blogs
3.2.3.1
DP Blogs
3.2.3.2
Blogs
1.1.03.2.3
1.1.0
ST Blogs
3.2.3.3
1.1.0
JE Blogs
3.2.3.4
Media
Resources
1.1.03.2.4
1.1.0
Media eKits
3.2.4.1
1.1.0
Logos
3.2.4.2
Headshots
3.2.4.3
CommVault@DCIG
3.2.3.5
Around the Web
3.2.3.6
Awards and
Accolades
1.1.03.2.5
Calendar
1.1.03.2.6
Us
3.0.0
CV Homepage
0.0.0
Us
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
3.3.0 Investor Relations: Page 20
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
3.3.0 Investor Relations
1.1.0
1.1.0
Quarterly Results
3.3.1.1
Annual Reports
3.3.1.2
Financial
Information
1.1.03.3.1
News and
Events
1.1.03.3.2
Stock
Performance
1.1.03.3.3
Investor
Relations
3.3.0
SEC Filings
3.3.1.3
Proxy
3.3.1.4
Earnings Estimate
3.3.1.5
Analyst Coverage
3.3.1.6
Ownership Summary
3.3.1.7
1
1 2
1.1.0
1.1.0
Board of Directors
3.3.4.1
Board of Committees
3.3.4.2
Corporate
Governance
1.1.03.3.4
Contact the Board
3.3.4.3
Code of Conduct
3.3.4.4
Us
3.0.0
CV Homepage
0.0.0
All Content in News and
Events will now be on a
single Landing Page
1
All Content in Stock
Performance including
Quote/Chart and History
will now be on a single
Landing Page
2
Us
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
3.4.0 Careers: Page 21
Save Date: Fri Apr 01 2011
Services
and
Support
2.1.0
Who Trusts
Us
2.2.0
Markets
We Serve
2.3.0
Our
Partners
2.4.0
Existing
Customers
2.5.0
Company
Information
3.1.0
News and
Media
3.2.0
Investor
Relations
3.3.0
Careers
3.4.0
What It
Solves
1.1.0
What It
Works with
1.2.0
How it
Works
1.3.0
Switching
is Simple
1.4.0
The
Business
Value
1.5.0
Library
1.6.0
Simpana Nation
2.0.0
The Software
1.0.0
Us
3.0.0
3.4.0 Careers
Careers
3.4.0
Us
3.0.0
CV Homepage
0.0.0
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
X.0.0 Utility Navigation: Page 22
Save Date: Fri Apr 01 2011
X.0.0 Utility Navigation
Latin America
4.0.2.3
United States
4.0.2.1
Canada
4.0.2.2
EMEA
4.0.2.4
Asia-Pacific and Japan
4.0.2.5
Locate a
Reseller
4.0.2
Contact Sales
4.0.1
Get More
Information
4.0.3
CV Homepage
0.0.0
Contact Us
5.0.0
Log In
6.0.0
Your Country
7.0.0
Sales
4.0.0
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
Wire: Homepage: Page 23
Save Date: Fri Apr 01 2011
Wire: Homepage
The Software
Lorem ipsum dolor sit amet, consectetur
adipiscing elit. Nulla a sagittis sapien.
Curabitur viverra rutrum tellus,
Simpana Nation
Lorem ipsum dolor sit amet, consectetur
adipiscing elit. Nulla a sagittis sapien.
Curabitur viverra rutrum tellus,
Us
Lorem ipsum dolor sit amet, consectetur
adipiscing elit. Nulla a sagittis sapien.
Curabitur viverra rutrum tellus,
Your Country: Ipsum Login in to Your Account
<PROMO BLOCK 1>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis
sapien. Curabitur viverra rutrum tellus,
<PROMO BLOCK 2>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis
sapien. Curabitur viverra rutrum tellus,
Sales
Lorem ipsum dolor sit amet,
consectetur
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
Wire: Group Level Landing Page: Page
24
Save Date: Fri Apr 01 2011
Wire: Group Level Landing Page
5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved.
<SECTION NAVIGATION BLOCK>
The
Software
<SECTION NAME> [ For Example: The Software]
<OVERVIEW COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus,
<DISCUSSION COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt turpis. Nulla vulputate
est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio
mauris ac ante. In lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at
vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at,
elementum at est. Donec metus urna, bibendum quis sodales at, vestibulum eget metus.
Simpana
Nation
Us
<PROMOTION COPY 1>
Lorem ipsum dolor sit amet,
adipiscing elit. rutrum tellus,
<PROMOTION COPY 2>
Lorem ipsum dolor sit amet,
adipiscing elit. rutrum tellus,
Sales Your Country: Ipsum Login
< SUB SECTION MODULE 1> [ For Example: "What It Does]
IMG
< LINK TO: SUB SECTION 1>
< SUB SECTION OVERVIEW 1>
Nulla a sagittis sapien. Curabitur viverra rut
< SUB SECTION MODULE 1> [ For Example: "How it Works]
IMG
< LINK TO: SUB SECTION 1>
< SUB SECTION OVERVIEW 1>
Nulla a sagittis sapien. Curabitur viverra rut
< SUB SECTION MODULE 1> [ For Example: "Curabitur Viverra" ]
IMG
< LINK TO: SUB SECTION 1>
< SUB SECTION OVERVIEW 1>
Nulla a sagittis sapien. Curabitur viverra rut
< SUB SECTION MODULE 1> [ For Example: "Simplified Design and etc."]
IMG
< LINK TO: SUB SECTION 1>
< SUB SECTION OVERVIEW 1>
Nulla a sagittis sapien. Curabitur viverra rut
<FEATURED CONTENT>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit
amet tincidunt turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus
vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio mauris ac ante. In
lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi
eleifend at vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non
lectus. Etiam sem est, laoreet a vestibulum at, elementum at est. Donec metus urna,
bibendum quis sodales at, vestibulum eget metus.
Homepage > Section Level [e.g: The Software]
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
Wire: Second Level LP: Page 25
Save Date: Fri Apr 01 2011
Wire: Second Level LP
5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved.
<SECTION NAVIGATION BLOCK>
The
Software
<SECTION NAME> [ For Example: What it Does]
<OVERVIEW COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus,
<DISCUSSION COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt turpis. Nulla vulputate
est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio
mauris ac ante. In lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at
vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at,
elementum at est. Donec metus urna, bibendum quis sodales at, vestibulum eget metus.
Simpana
Nation
Us
< SUB SECTION MODULE 2> [ For Example: Virtual Server Protection]
IMG
< LINK TO: SUB SECTION 2>
< SUB SECTION OVERVIEW 2>
Nulla ien. viverra rutrum tellus, id aliquam ante
< LINK TO: SUB SUB SECTION>
< LINK TO: SUB SUB SECTION>
<PROMOTION COPY 1>
Lorem ipsum dolor sit amet,
adipiscing elit. rutrum tellus,
<PROMOTION COPY 2>
Lorem ipsum dolor sit amet,
adipiscing elit. rutrum tellus,
Sales Your Country: Ipsum Login
Virtual Server Protection
< SUB SECTION MODULE 1> [ For Example: Modernize Your Data]
IMG
< LINK TO: SUB SECTION 1>
< SUB SECTION OVERVIEW 1>
Nulla a sagittis sapien. Curabitur viverra rut
< LINK TO: SUB SUB SECTION>
< LINK TO: SUB SUB SECTION>
< LINK TO: SUB SUB SECTION>
< LINK TO: SUB SUB SECTION>
<FEATURED CONTENT>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit
amet tincidunt turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus
vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio mauris ac ante. In
lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi
eleifend at vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non
lectus. Etiam sem est, laoreet a vestibulum at, elementum at est. Donec metus urna,
bibendum quis sodales at, vestibulum eget metus.
Homepage > Section Level [e.g: The Software] > 2nd Level [e.g: What It Does]
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
Wire: Third Level LP: Page 26
Save Date: Fri Apr 01 2011
Wire: Third Level LP
5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved.
<SUB SUB SECTION NAVIGATION BLOCK>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus,
The
Software
Simpana
Nation
Us
<OVERVIEW COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis
sapien. Curabitur viverra rutrum tellus,
<IT EXEC COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis
sapien. Curabitur viverra rutrum tellus,
<ADMIN COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis
sapien. Curabitur viverra rutrum tellus,
Homepage > Section Level [e.g: The Software] > 2nd Level [e.g: What It Does]> 3rd Level [e.g: Virtual Server Protection]
IMG
< LINK TO: SUB SUB SECTION 1> [ For Example: Virtualization]
< SUB SECTION OVERVIEW 1>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, id
aliquam ante eleifend quis.
IMG
< LINK TO: SUB SUB SECTION 1> [ For Example: Cloud Storage Integration]
< SUB SECTION OVERVIEW 1>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, id
aliquam ante eleifend quis.
Sales Your Country: Ipsum Login
Project :CV-707
Auth: Mark Waldo
Client: CommVault
FVM Advertising
Copyright 2011 Confidential
Wire: Content Page: Page 27
Save Date: Fri Apr 01 2011
Wire: Content Page
5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved.
<SECTION CONTENT>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus,
The
Software
Sales Your Country: Ipsum Login
<OVERVIEW COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus,
<IT EXEC COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus,
<ADMIN COPY>
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt
turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper,
metus elit eleifend felis, sed dapibus odio mauris ac ante. In lorem lorem, ultricies sit amet iaculis in,
rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at vehicula arcu aliquet. Nunc diam mauris,
volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at, elementum at est.
Donec metus urna, bibendum quis sodales.
Donec metus urna, bibendum quis sodales at, vestibulum eget metus. Maecenas convallis pharetra
sapien, ac interdum erat dictum in. Sed quis enim nulla. Phasellus tempus imperdiet massa nec
elementum. Donec at risus massa. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aenean
accumsan lacinia placerat. In egestas fermentum euismod. Fusce nec mauris quis turpis ullamcorper
fermentum nec nec tortor.
Simpana
Nation
Us
<SUB SUB SECTION INTERNAL
NAVIGATION>
Overview
Nested Section
Nested Section
Resources
Nested Section
Nested Section
Nested Section
Nested Section
Case Studies
Nested Section
Nested Section
Nested Section
Nested Section
Nested Section
Nested Section
Homepage > Section Level [e.g: The Software] > 2nd Level [e.g: What It Does]> 3rd Level [e.g: Virtual Server Protection] > Content Level [e.g: Virtualization]
<SIDEBAR COPY 1 >
Lorem ipsum dolor sit amet,
consectetur adipiscing elit. Nulla a
sagittis sapien. Curabitur viverra
rutrum tellus,
<SIDEBAR COPY 2 >
Lorem ipsum dolor sit amet,
consectetur adipiscing elit. Nulla a
sagittis sapien. Curabitur viverra
rutrum tellus,
<SIDEBAR COPY 3 >
Lorem ipsum dolor sit amet,
consectetur adipiscing elit. Nulla a
sagittis sapien. Curabitur viverra
rutrum tellus,
1
Internal Navigation
accomodates for content
that is in the existing tab
structure
1
Structure is similar to
existing Newsroom.
2
2
SIDEBAR CONTENT
* Downloads
* Related Content
3
3
<SECTION NAME> [ For Example: Virtualization]

Cv 707 a iad-v6.3

  • 1.
    CV-707 Website Redesignof Commvault.com CommVault Information Architecture Document (IAD) v6.3 FVM Advertising ________________________________________________________________________ The Purpose of this document is to provide direction to the designer and developer. These documents do not reflect final design decisions. They show only our thinking to date and serve as a jumping off point for the Designer and to help the Developer understand some core requirements of the website and its scope.
  • 2.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential Key: Page 2 Save Date: Fri Apr 01 2011 Key xx 8.0.0 xx 1.1.08.6.0 xx 1.1.05.3.2 xx 1.1.05.3.2.1 6.2.x Case Study PDFs6.2.x Case Study PDFs1.1.06.2.1 xx.yyy XX 4 8 xx 1.1.02.4.2.1 xx 11.0.0 6 3 xx 1.1.03.4.0 Related 2nd Level Landing Pages 3 1 2 2nd Level Landing Pages. Landing Pages are often limited to overview and summary content and usually have other landing pages and content pages below them that will each explore in detail a theme on the Landing Page. 2 3rd Level Landing Pages 4 4th Level Landing Pages 6 5th Level Landing Pages 7 Content Pages. Content Pages include detailed in-depth content that explores and explains a subject. 8 Downloads and Rich Media 9 Group Level Landing Page 1 Blach hash marks indicates significant new content is needed for this page. 5 5 7 9
  • 3.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential Sitemap Overview: Page 3 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 Sitemap Overview Footer Navigation Global Navigation Privacy Policy 9.0.0 Legal 8.0.0 Contact Us 5.0.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Simplified Design and Build 1.4.0 The Business Value 1.5.0 Library 1.6.0 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 Log In 6.0.0 Your Country 7.0.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 CV Homepage 0.0.0 Sales 4.0.0 Utility Navigation Site Map 10.0.0 1 The Site has been organized into three major groups in order to * reduce the immense complexity of information on this site * support the brand These sections are: "The Software": All things related to software "Simpana Nation": All things related to people around the software "Us": All things related to the company that makes the software 1
  • 4.
    The Software Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 1.0.0 The Software: Page 4 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 1.0.0 The Software The Software 1.0.0 CV Homepage 0.0.0 1 THE SOFTWARE SECTION LANDING PAGE AN OVERVIEW of the software which includes tech overview as well as reinforces CommVault's unique approach. Here we also come in contact with the professional elements of the brand: * Forward Thinking * Cutting Edge * Innovative * Professional * The Right Choice 1
  • 5.
    The Software Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 1.1.0 What It Solves: Page 5 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 1.1.0 What It Solves Backup and Recovery 1.1.01.1.1 Backup and Recovery 1.1.01.1.1.1 SnapProtect 1.1.01.1.1.2 Replication 1.1.01.1.1.3 SRM 1.1.01.1.1.4 Deduplication 1.1.01.1.1.5 Archive 1.1.01.1.6 Storage Optimization 1.1.01.1.6.2 Archive for Space Mgmt 1.1.01.1.6.1 Scenarios We Address 1.1.01.1.6.3.1 Information Governance 1.1.01.1.6.3 Utilities/ Foundation 1.1.02.4.1 Enterprise Search 1.1.02.4.1.1 Content Organization 1.1.02.4.1.2 Privacy Violation Mgmt 1.1.02.4.1.4 Records Declaration 1.1.02.4.1.3 Retention Life Cycle Mgmt 1.1.02.4.1.5 Records Management 1.1.02.4.1.6 Compliance 1.1.01.1.6.4 Data Authentication 1.1.02.4.2.1.1 FIPS Compliance 1.1.02.4.2.1.2 Optimized Review 1.1.02.4.2.1.3 eDiscovery 1.1.01.1.6.3. Federated Legal Hold 1.1.02.4.2.2.1 Early Case Assessment 1.1.02.4.2.2.2 EDRM 1.1.02.4.2.2.3 Cloud Storage Integration 1.1.01.1.3.2 Virtual Server Protection 1.1.01.1.3 Virtualization 1.1.01.1.3.1 What It Solves 1.1.0 The Software 1.0.0 CV Homepage 0.0.0 Microsoft SQL Server 1.1.2.3 Microsoft Exchange 1.1.2.1 Microsoft SharePoint 1.1.2.2 Oracle 1.1.2.4 SAP R/3 and NetWeaver 1.1.2.5 Sybase 1.1.01.1.2.6 Mod Application Mgmt 1.1.01.1.2 Disaster Recovery 1.1.01.1.5.1 Disaster Recovery 1.1.01.1.5 ROBO 1.1.01.1.4.1 Workstation BU and Reco 1.1.01.1.4.2 ROBO/DLO 1.1.01.1.4 FY12 Campaigns 1. Virtualization 2. MDM 3. Corporate 4. Information Governance 5. Health Care NOTE
  • 6.
    The Software Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 1.2.0 What it Works With : Page 6 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 1.2.0 What it Works With 1.1.0 1.1.0 1.1.0 1.1.0 Microsoft 1.2.1.1 Linux 1.2.1.2 Novell 1.2.1.3 VMWare 1.2.1.4 Platforms 1.1.01.2.1 Technology Partners 1.1.01.2.4 3PAR 1.2.4.x 1.1.0 1.1.0 Introduction 1.2.5.1 Our Programs 1.2.5.2 Our Partners 1.2.5.3 Service Providers 1.1.01.2.5 Strategic Partners 1.1.01.2.3 Group Logic 1.2.3.3 Case 1.2.3.1 Dell 1.2.3.2 Hewlett-Packard 1.2.3.4 Hitachi Data Systems 1.2.3.5 Informatica 1.1.01.2.3.6 McAfee 1.1.01.2.3.7 Microsoft 1.1.01.2.3.8 NetApp 1.1.01.2.3.9 VMware 1.1.01.2.3.11 Oracle 1.1.01.2.3.10 Hardware 1.1.01.2.2 What It Works with 1.2.0 The Software 1.0.0 CV Homepage 0.0.0 3PAR 1.2.4.x 3PAR 1.2.4.x
  • 7.
    The Software Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 1.3.0 How it Works: Page 7 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 1.3.0 How it Works LP Contents 1. Technical Architecture 2. Architecture Diagram 3. Discussion of Philosophical Approach which sets CV apart from competition. 1 How it Works 1.3.0 The Software 1.0.0 CV Homepage 0.0.0 1
  • 8.
    The Software Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 1.4.0 Switching is Simple: Page 8 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 1.4.0 Switching is Simple LP Contents 1. What is involved in Install 2. Fast Pass Option 1 Switching is Simple 1.4.0 The Software 1.0.0 CV Homepage 0.0.0 1
  • 9.
    The Software Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 1.5.0 Business Value: Page 9 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 1.5.0 Business Value Business Value LP Contents 1. Total Cost of Ownership 2. Personnel Costs 3. Costs of Replacing Other Solutions 4. Services and Support Costs 5. Adding More 6. Upgrades 7. Licenses 8. Bundling 9. Sample Pricing 10. Myth Dispeller 11. Calculator 1 The Business Value 1.5.0 The Software 1.0.0 CV Homepage 0.0.0 1
  • 10.
    The Software Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 1.6.0 Library: Page 10 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 1.6.0 Library Product 1.1.0 1.6.1 Modernize Your Data 1.1.0 1.6.2 Virtual Server Protection 1.1.0 1.6.3 Information Governance 1.1.0 1.6.5 Microsoft Solutions 1.1.0 1.6.6 Enterprise Applications 1.1.0 1.6.7 Data Reduction 1.1.0 1.6.4 The Software 1.0.0 CV Homepage 0.0.0 1.1.01.6.x.x Data Sheets 1.6.x.x Data Sheets 1.6.x.x Data Sheets 1.1.01.6.x.x White Papers 1.6.x.x White Papers 1.6.x.x White Papers 1.1.01.6.x.x Videos 1.6.x.x Videos 1.6.x.x Videos 1 All categories in the Library are supported by these three types of assets 1 Library 1.6.0
  • 11.
    Simpana Nation Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 2.0.0 Simpana NatIon: Page 11 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 2.0.0 Simpana NatIon CV Homepage 0.0.0 Simpana Nation 2.0.0 SIMPANA NATION SECTION LANDING PAGE AN OVERVIEW of all of the different people that touch Simpana from customers, to partners. Here we also come in contact with the human elements of the brand: * The Human Side * The sum is greater than it's parts * Passionate * Esprit de Corps * Buzz * Professionalism * Focus * Service focused 1 1
  • 12.
    Simpana Nation Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 2.1.0 Services and Support: Page 12 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 2.1.0 Services and Support SRM Profile Analysis (PA) 1.1.02.1.1.1 Messaging Services PA 1.1.02.1.1.2 Content Awareness PA 1.1.02.1.1.3 Data MAP Planning 1.1.02.1.1.4 Site Review and Wellness 1.1.02.1.1.5 CV Migration Planning 1.1.02.1.1.6 Data Protection Accel 1.1.02.1.2.1 Archive Accel 1.1.02.1.2.2 Replication Accel 1.1.02.1.2.3 Content Search Accel 1.1.02.1.2.4 Dbase Protection Accel 1.1.02.1.2.5 Disaster Reco Accel 1.1.02.1.2.6 Content Director Accel 1.1.02.1.2.7 Upgrade Accel 1.1.02.1.2.8 Custom Implementation 1.1.02.1.2.9 Professional Design Svcs 1.1.02.1.1 Professional Build Svcs 1.1.02.1.2 Support Services 1.1.02.1.3.2 Pro and Other Manage Svcs 1.1.02.1.3 Certification 2.1.3.3.4 Support Services Options 1.1.02.1.3.2.1 Technical Reference Library 2.1.3.3.5 Disaster Recovery Planning 1.1.02.1.3.1 1.1.0 Project Lifecycle Mgmt 2.1.3.2 eRecovery 1.1.02.1.3.3 1.1.0 eDiscovery 2.1.3.4 CV Residency Services 1.1.02.1.3.2.2 Business Critical Support 1.1.02.1.3.2.3 Remote Assistance 1.1.02.1.3.2.4 ROMS 1.1.02.1.3.2.5 Transformation Services 1.1.02.1.3.5 PA CommValue Program 1.1.02.1.2.10 Professional Services 1.1.02.1.3.1 Training Services 1.1.02.1.3.3 Telephone Support 1.1.02.1.3.2.6 Web - Ex Support 1.1.02.1.3.2.7 Release and Hdwr Support 1.1.02.1.4 Training Locations 2.1.3.3.3 Training 2.1.3.3.1 Curriculum and Registration 2.1.3.3.2 Fast Pass 1.1.02.1.1.7 CV Homepage 0.0.0 Simpana Nation 2.0.0 This section has be reorganized in recognition of the fact that users are more interested in types of help than they are in the methodology of installing and running Simpana 1 1 2 Is "Fast Pass" part of professional services? 2 Services and Support 2.1.0 Maintenance Advantage 1.1.02.1.3.4
  • 13.
    Simpana Nation Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 2.2.0 Who Trusts Us: Page 13 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 2.2.0 Who Trusts Us 6.2.x Case Study PDFs6.2.x Case Study PDFs1.1.06.2.1 Case Study PDFs Featured 1.1.06.1.0 Case Studies 1.1.06.2.0 Testimonials 1.1.06.3.0 Library 1.1.06.4.0 Who Trusts Us 2.2.0 CV Homepage 0.0.0 Simpana Nation 2.0.0 1 The organization of this section follows the organization of the current section. It has been elevated to 2nd level though.. 1
  • 14.
    Simpana Nation Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 2.3.0 Markets We Serve: Page 14 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 2.3.0 Markets We Serve SLED 2.3.4.1 Federal 2.3.4.2 Small 2.3.3.1 Medium 2.3.3.2 Hospitals 2.3.2.1 Pharmaceutical 2.3.2.2 Banking 2.3.1.1 Fund Management 2.3.1.2 Insurers 2.3.2.3 Markets We Serve 2.3.0 Financial 1.1.02.3.1 HealthCare 1.1.02.3.2 Small/Medium Business 1.1.02.3.3 Government 1.1.02.3.4 CV Homepage 0.0.0 Simpana Nation 2.0.0 1 This section will be highly flexible so that it can follow campaigns 1
  • 15.
    Simpana Nation Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 2.4.0 Our Partners : Page 15 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 2.4.0 Our Partners Partner Overview 1.1.02.4.1 Support for Partners 1.1.02.4.3 1.1.0 1.1.0 1.1.0 1.1.0 Introduction 2.4.2.1 Benefits 2.4.2.2 Requirements 2.4.2.3 FAQ 2.4.2.4 Become a Partner 1.1.02.4.2 Join 2.4.2.5 Technology Partners 1.1.02.4.1.2 Reseller Partners 1.1.02.4.1.3 Services Partners 1.1.02.4.1.4 Strategic Partners 1.1.02.4.1.1 Our Partners 2.4.0 CV Homepage 0.0.0 Simpana Nation 2.0.0
  • 16.
    Simpana Nation Project :CV-707 Auth:Mark Waldo Client: CommVault FVM Advertising Copyright 2011 Confidential 2.5.0 Existing Customers: Page 16 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 2.5.0 Existing Customers 1.1.0 1.1.0 Existing Customers 2.5.0 Maybe You Missed This 2.5.3 Upgrades 2.5.4 Expansion 2.5.5 Join 2.5.6 FAQ 2.5.7 Documentation 2.5.8 Release and Hdwr Support 1.1.02.5.1 CV Software Doc 1.1.02.5.1.3.1 Hardware Comp Matrix 1.1.02.5.1.1.1 NDMP Comp Matrix 1.1.02.5.1.2.1 Snapshot Comp Matrix 1.1.02.5.1.1.2 Product Registration 1.1.02.5.1.3.2 3rd Party Software 1.1.02.5.1.2 3rd Party Hardware 1.1.02.5.1.1 Commvault Product 1.1.02.5.1.3 CV Homepage 0.0.0 Simpana Nation 2.0.0 Maintenance Advantage 1.1.02.5.2 2 Link to Maintenance Advantage Section 2 1 This section's Landing Page includes: * Overview * Benefits of Registration * Information on Manage Services * Login to .... 1
  • 17.
    Us Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential 3.0.0 Us: Page 17 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 3.0.0 Us 1 US SECTION LANDING PAGE AN OVERVIEW of Commvault including the CV's Vision and core principal of Solving Forward. Here we also come in contact with the corporate elements of the brand: * Passionate * Professional * Planetary Citizens * Transparent * Successful 1 Us 3.0.0 CV Homepage 0.0.0
  • 18.
    Us Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential 3.1.0 Company Information: Page 18 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 3.1.0 Company Information Corporate Citizenship 3.1.0.5 Community Affairs 3.1.0.4 History 3.1.0.1 FAQ 3.1.0.6 Executive Management 3.1.0.3 Company Information 3.1.0 Us 3.0.0 CV Homepage 0.0.0 Our People 3.1.0.2 Activities such as Mike McMahon's Honduras Trip 1 1
  • 19.
    Us Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential 3.2.0 Newsroom: Page 19 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 3.2.0 Newsroom Newsroom 3.2.0 1.1.0 1.1.0 Press Releases 3.2.1.1 Media Coverage 3.2.1.2 News and Media 1.1.03.2.1 Analyst Reports 1.1.03.2.2 1.1.0 1.1.0 DW Blogs 3.2.3.1 DP Blogs 3.2.3.2 Blogs 1.1.03.2.3 1.1.0 ST Blogs 3.2.3.3 1.1.0 JE Blogs 3.2.3.4 Media Resources 1.1.03.2.4 1.1.0 Media eKits 3.2.4.1 1.1.0 Logos 3.2.4.2 Headshots 3.2.4.3 CommVault@DCIG 3.2.3.5 Around the Web 3.2.3.6 Awards and Accolades 1.1.03.2.5 Calendar 1.1.03.2.6 Us 3.0.0 CV Homepage 0.0.0
  • 20.
    Us Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential 3.3.0 Investor Relations: Page 20 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 3.3.0 Investor Relations 1.1.0 1.1.0 Quarterly Results 3.3.1.1 Annual Reports 3.3.1.2 Financial Information 1.1.03.3.1 News and Events 1.1.03.3.2 Stock Performance 1.1.03.3.3 Investor Relations 3.3.0 SEC Filings 3.3.1.3 Proxy 3.3.1.4 Earnings Estimate 3.3.1.5 Analyst Coverage 3.3.1.6 Ownership Summary 3.3.1.7 1 1 2 1.1.0 1.1.0 Board of Directors 3.3.4.1 Board of Committees 3.3.4.2 Corporate Governance 1.1.03.3.4 Contact the Board 3.3.4.3 Code of Conduct 3.3.4.4 Us 3.0.0 CV Homepage 0.0.0 All Content in News and Events will now be on a single Landing Page 1 All Content in Stock Performance including Quote/Chart and History will now be on a single Landing Page 2
  • 21.
    Us Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential 3.4.0 Careers: Page 21 Save Date: Fri Apr 01 2011 Services and Support 2.1.0 Who Trusts Us 2.2.0 Markets We Serve 2.3.0 Our Partners 2.4.0 Existing Customers 2.5.0 Company Information 3.1.0 News and Media 3.2.0 Investor Relations 3.3.0 Careers 3.4.0 What It Solves 1.1.0 What It Works with 1.2.0 How it Works 1.3.0 Switching is Simple 1.4.0 The Business Value 1.5.0 Library 1.6.0 Simpana Nation 2.0.0 The Software 1.0.0 Us 3.0.0 3.4.0 Careers Careers 3.4.0 Us 3.0.0 CV Homepage 0.0.0
  • 22.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential X.0.0 Utility Navigation: Page 22 Save Date: Fri Apr 01 2011 X.0.0 Utility Navigation Latin America 4.0.2.3 United States 4.0.2.1 Canada 4.0.2.2 EMEA 4.0.2.4 Asia-Pacific and Japan 4.0.2.5 Locate a Reseller 4.0.2 Contact Sales 4.0.1 Get More Information 4.0.3 CV Homepage 0.0.0 Contact Us 5.0.0 Log In 6.0.0 Your Country 7.0.0 Sales 4.0.0
  • 23.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential Wire: Homepage: Page 23 Save Date: Fri Apr 01 2011 Wire: Homepage The Software Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, Simpana Nation Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, Us Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, Your Country: Ipsum Login in to Your Account <PROMO BLOCK 1> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <PROMO BLOCK 2> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, Sales Lorem ipsum dolor sit amet, consectetur
  • 24.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential Wire: Group Level Landing Page: Page 24 Save Date: Fri Apr 01 2011 Wire: Group Level Landing Page 5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved. <SECTION NAVIGATION BLOCK> The Software <SECTION NAME> [ For Example: The Software] <OVERVIEW COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <DISCUSSION COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio mauris ac ante. In lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at, elementum at est. Donec metus urna, bibendum quis sodales at, vestibulum eget metus. Simpana Nation Us <PROMOTION COPY 1> Lorem ipsum dolor sit amet, adipiscing elit. rutrum tellus, <PROMOTION COPY 2> Lorem ipsum dolor sit amet, adipiscing elit. rutrum tellus, Sales Your Country: Ipsum Login < SUB SECTION MODULE 1> [ For Example: "What It Does] IMG < LINK TO: SUB SECTION 1> < SUB SECTION OVERVIEW 1> Nulla a sagittis sapien. Curabitur viverra rut < SUB SECTION MODULE 1> [ For Example: "How it Works] IMG < LINK TO: SUB SECTION 1> < SUB SECTION OVERVIEW 1> Nulla a sagittis sapien. Curabitur viverra rut < SUB SECTION MODULE 1> [ For Example: "Curabitur Viverra" ] IMG < LINK TO: SUB SECTION 1> < SUB SECTION OVERVIEW 1> Nulla a sagittis sapien. Curabitur viverra rut < SUB SECTION MODULE 1> [ For Example: "Simplified Design and etc."] IMG < LINK TO: SUB SECTION 1> < SUB SECTION OVERVIEW 1> Nulla a sagittis sapien. Curabitur viverra rut <FEATURED CONTENT> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio mauris ac ante. In lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at, elementum at est. Donec metus urna, bibendum quis sodales at, vestibulum eget metus. Homepage > Section Level [e.g: The Software]
  • 25.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential Wire: Second Level LP: Page 25 Save Date: Fri Apr 01 2011 Wire: Second Level LP 5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved. <SECTION NAVIGATION BLOCK> The Software <SECTION NAME> [ For Example: What it Does] <OVERVIEW COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <DISCUSSION COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio mauris ac ante. In lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at, elementum at est. Donec metus urna, bibendum quis sodales at, vestibulum eget metus. Simpana Nation Us < SUB SECTION MODULE 2> [ For Example: Virtual Server Protection] IMG < LINK TO: SUB SECTION 2> < SUB SECTION OVERVIEW 2> Nulla ien. viverra rutrum tellus, id aliquam ante < LINK TO: SUB SUB SECTION> < LINK TO: SUB SUB SECTION> <PROMOTION COPY 1> Lorem ipsum dolor sit amet, adipiscing elit. rutrum tellus, <PROMOTION COPY 2> Lorem ipsum dolor sit amet, adipiscing elit. rutrum tellus, Sales Your Country: Ipsum Login Virtual Server Protection < SUB SECTION MODULE 1> [ For Example: Modernize Your Data] IMG < LINK TO: SUB SECTION 1> < SUB SECTION OVERVIEW 1> Nulla a sagittis sapien. Curabitur viverra rut < LINK TO: SUB SUB SECTION> < LINK TO: SUB SUB SECTION> < LINK TO: SUB SUB SECTION> < LINK TO: SUB SUB SECTION> <FEATURED CONTENT> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio mauris ac ante. In lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at, elementum at est. Donec metus urna, bibendum quis sodales at, vestibulum eget metus. Homepage > Section Level [e.g: The Software] > 2nd Level [e.g: What It Does]
  • 26.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential Wire: Third Level LP: Page 26 Save Date: Fri Apr 01 2011 Wire: Third Level LP 5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved. <SUB SUB SECTION NAVIGATION BLOCK> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, The Software Simpana Nation Us <OVERVIEW COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <IT EXEC COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <ADMIN COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, Homepage > Section Level [e.g: The Software] > 2nd Level [e.g: What It Does]> 3rd Level [e.g: Virtual Server Protection] IMG < LINK TO: SUB SUB SECTION 1> [ For Example: Virtualization] < SUB SECTION OVERVIEW 1> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, id aliquam ante eleifend quis. IMG < LINK TO: SUB SUB SECTION 1> [ For Example: Cloud Storage Integration] < SUB SECTION OVERVIEW 1> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, id aliquam ante eleifend quis. Sales Your Country: Ipsum Login
  • 27.
    Project :CV-707 Auth: MarkWaldo Client: CommVault FVM Advertising Copyright 2011 Confidential Wire: Content Page: Page 27 Save Date: Fri Apr 01 2011 Wire: Content Page 5.0.0 Site Map | 6.0.0 Terms and Conditions | 7.0.0 Privacy Policy © Copyright 2010 CommVault Inc. All Rights Reserved. <SECTION CONTENT> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, The Software Sales Your Country: Ipsum Login <OVERVIEW COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <IT EXEC COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <ADMIN COPY> Lorem ipsum dolor sit amet, consectetur adipiscing elit. Integer ut nulla nibh. Maecenas sit amet tincidunt turpis. Nulla vulputate est non lacus adipiscing mattis. Nunc dapibus, metus vitae semper ullamcorper, metus elit eleifend felis, sed dapibus odio mauris ac ante. In lorem lorem, ultricies sit amet iaculis in, rhoncus vel ligula. Vivamus imperdiet massa nec mi eleifend at vehicula arcu aliquet. Nunc diam mauris, volutpat quis dapibus sed, cursus non lectus. Etiam sem est, laoreet a vestibulum at, elementum at est. Donec metus urna, bibendum quis sodales. Donec metus urna, bibendum quis sodales at, vestibulum eget metus. Maecenas convallis pharetra sapien, ac interdum erat dictum in. Sed quis enim nulla. Phasellus tempus imperdiet massa nec elementum. Donec at risus massa. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aenean accumsan lacinia placerat. In egestas fermentum euismod. Fusce nec mauris quis turpis ullamcorper fermentum nec nec tortor. Simpana Nation Us <SUB SUB SECTION INTERNAL NAVIGATION> Overview Nested Section Nested Section Resources Nested Section Nested Section Nested Section Nested Section Case Studies Nested Section Nested Section Nested Section Nested Section Nested Section Nested Section Homepage > Section Level [e.g: The Software] > 2nd Level [e.g: What It Does]> 3rd Level [e.g: Virtual Server Protection] > Content Level [e.g: Virtualization] <SIDEBAR COPY 1 > Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <SIDEBAR COPY 2 > Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, <SIDEBAR COPY 3 > Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla a sagittis sapien. Curabitur viverra rutrum tellus, 1 Internal Navigation accomodates for content that is in the existing tab structure 1 Structure is similar to existing Newsroom. 2 2 SIDEBAR CONTENT * Downloads * Related Content 3 3 <SECTION NAME> [ For Example: Virtualization]