CN Earthing Manual
                                                                               Section E2 – Earthing Guidance Notes




                                            Revision Log

    Version 2               Prepared by Nigel Johnson               Date August 2007
            Revision and update of section to be issued as part of a combined Earthing
            Manual.
             The main alterations are:-
             Section E1 and E2 have been re-arranged/revamped for increased clarity.
             Section E2.2 to E2.5 - greater detail on recent changes to earthing policy, including
             classification of Distribution sites as either Hot or Cold.
            Section E2.7 - detailed requirements for provision of Primary Substation Hot site
            register
            Section E2.8 - detailed description of earth systems used throughout Company’s
            networks from LV to 132kV, including new 11kV NER earthing arrangements.
    Version 1                Prepared by Tony Haggis                 Date February 2001
             First draft.




Version 2                                 Date of Issue - September 2007                               Page 2 of 12
                 The current version of the this document resides in the E.ON UK Documentum database
                CAUTION –any other copies in electronic, printed or other formats may be out of date
                                               © Central Networks plc
CN Earthing Manual
                                                                                              Section E2 – Earthing Guidance Notes




                                                     Contents
 E2 EARTHING GUIDANCE NOTES                                                                                                               4
 E2.1 INTRODUCTION                                                                                                                        4
 E2.2 WHAT ARE SIGNIFICANT RECENT CHANGES?                                                                                                4
 E2.3 WHAT MAKES A DISTRIBUTION SUBSTATION ‘HOT’ OR ‘COLD’?                                                                               5
 E2.4 SEGREGATED HV AND LV EARTHS AT DISTRIBUTION SUBSTATIONS                                                                             5
 E2.5 STANDARD DISTRIBUTION EARTHING METHODOLOGY                                                                                          6
 E2.6 DIFFICULT OR NON-STANDARD SITUATIONS                                                                                                6
 E2.7 HOT PRIMARY AND GRID SITES                                                                                                          7
 E2.8 METHODS OF EARTHING USED ON THE COMPANY’S NETWORKS                                                                                  7
 E2.8.1 132kV Network.....................................................................................................................7
 E2.8.2 66kV & 33kV Networks ........................................................................................................7
 E2.8.3 25kV Networks.....................................................................................................................8
 E2.8.4 11kV (& 6.6kV) Networks.....................................................................................................8
 E2.8.5 Earthing of Low Voltage Networks.....................................................................................10
 E2.8.5.1 Provision of LV Earthing Terminal ..................................................................................11




Version 2                                            Date of Issue - September 2007                                        Page 3 of 12
                       The current version of the this document resides in the E.ON UK Documentum database
                      CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                         © Central Networks plc
CN Earthing Manual
                                                                                  Section E2 – Earthing Guidance Notes




 E2 Earthing Guidance Notes
   E2.1 Introduction
   There have been few changes to Electricity Supply Industry earthing standards and practices
   since the introduction of Protective Multiple Earthing in the 1970’s.
   However, the widespread introduction of electronic equipment used in conjunction with
   telephone lines (i.e. fax machines, computer modems etc.) has highlighted the issue of Earth
   Potential Rise (EPR) and Transferred Potentials.
   There have been incidents of damage to electronic equipment during supply system earth faults
   and also transfers of potential into telecommunications systems. The European
   telecommunications industry has been increasingly concerned over the danger to their
   equipment and staff from transferred potentials.
   The problem has been further exacerbated by the use of cables with plastic oversheaths (Alpex,
   PIAS, Triplex etc). This means there is now more reliance on substation earth electrodes
   instead of the lead cable sheaths that provided much of the earthing system in the past. Another
   factor is the reduction in size of distribution plant which enables substations to be built on
   smaller plots which are then more difficult to earth.
   This has resulted in the European telecommunications industry driving through changes to
   earthing standards that now place onerous duties on the electricity supply industry to protect
   persons from electric shock due to Earth Potential Rise which results in Touch, Step & Transfer
   Potentials.
   This legislation is risk assessment based. The effects of electricity on persons varies between
   people depending on such things as their age, state of health, type of footwear duration of fault
   etc, Also the effectiveness of earthing system varies according to soil types, surface cover
   material, weather conditions etc. It is incumbent on individual electricity companies to design,
   install and maintain their systems such that they satisfy the objectives set by of legislation.
   This section of the Earthing Manual highlights the main changes now incorporated into Central
   Networks standards in order to fulfil our obligations.

   E2.2 What are Significant Recent Changes?
    •       Hot/Cold Distribution Sites
            The greatest recent change is the classification of ground mounted distribution sites as
            either ‘Hot’ or ‘Cold’.
    •       One Ohm Rule
            Previously, regulations permitted combining HV and LV earths at ground mounted
            distribution sites when the resistance was below 1 ohm. This rule is no longer valid for
            new sites.
    •       3m Separation Pole Mounted Earths
            In the past HV and LV earths were separated by 3m at pole mounted transformers. This
            separation is now no longer sufficient.

Version 2                                     Date of Issue - September 2007                              Page 4 of 12
                    The current version of the this document resides in the E.ON UK Documentum database
                   CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                  © Central Networks plc
CN Earthing Manual
                                                                                   Section E2 – Earthing Guidance Notes




    •       11kV Neutral Earthing
            A new NER arrangement has been adopted for earthing of 11kV systems.

   E2.3 What makes a distribution substation ‘Hot’ or ‘Cold’?
   At Grid or Primary Substations the EPR will be calculated on a site by site basis. However, this
   approach is not practicable for distribution sites because of the large numbers involved,
   therefore some simplified rules are used to determine ‘Hot’ or ‘Cold’ status. These rules are:-
    •       The site is considered ‘Cold’ if the installation is connected to a Primary or Grid
            Substation via an underground cable without any overhead line in the route. In this
            case the majority of the earth fault current will return to source via the cable sheath
            and not through the ground – hence the EPR will be below 430 volts. The HV & LV
            Earth can be combined.
    •       The site is considered ‘Hot’ if there is not a continuous underground cable back to
            the Primary or Grid Substation. Earth fault current must return to source through the
            ground and this causes an EPR which is assumed to be above the 430 volt limit. The
            HV & LV Earths must be segregated to prevent voltages in excess of 430 volts from
            being transferred into the LV neutral/earth system
   The alternative backfeeding arrangements must also be considered when assessing the
   hot/cold status. For normal running conditions the site may be cold (i.e. underground fed) but
   could be classified as hot if all the alternative backfeeds have overhead lines as part of the
   circuit back to the source. If the normal feed is all underground and at least one backfeed is also
   all underground then the site can be classified as cold since the substation is unlikely to be
   disconnected from a low resistance primary substation site.
   To achieve an EPR less than 430 volts at an overhead fed 11kV distribution substation, then the
   overall earth value would typically need to be less than 0.3 - 0.5 ohms. Often it is impractical to
   achieve such low earth resistance values at distribution sites hence the HV and LV earths will
   usually be segregated. However, if it is decided to combine the HV and LV earths then a site
   specific calculation must be made to confirm the EPR is actually below 430volts.
   Existing distributions sites shall be assessed to determine the site classification when significant
   material changes occur. This is especially important when an 11kV network is being
   reconfigured to make sure a site is not inadvertently made hot without further precautions being
   taken.
   Also distribution substations may also become hot if they are connected via cable to a nearby
   Hot Primary or Grid site.

   E2.4 Segregated HV and LV earths at Distribution Substations

   It is accepted that at some sites the earths will be unnecessarily segregated. This is particularly
   true in large villages or small towns which have a reasonably large earth system which is
   ‘islanded’ because the incoming circuits are all overhead. If the cost of segregation is
   prohibitively high or impractical then the cost of a full earthing study may be justified.




Version 2                                      Date of Issue - September 2007                              Page 5 of 12
                     The current version of the this document resides in the E.ON UK Documentum database
                    CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                   © Central Networks plc
CN Earthing Manual
                                                                                  Section E2 – Earthing Guidance Notes




      In the past most pole transformers have had separate HV/LV earths, whereas the
      vast majority of ground mounted substations have had a combined HV/LV earth.
      Previously the regulations permitted joining the HV and LV earths when their
      combined resistance was less than 1 ohm. This has now changed – the old ‘1 ohm
      rule’ is no longer valid for new sites.

       If in doubt, treat it as ‘Hot’ and segregate the two earths.
   The LV earth system must be located outside of the 430 volt potential contour that surrounds
   the HV earth electrode during an 11kV earth fault. This distance varies and depends on the type
   of installation, the local soil resistivity value and the size of the HV earth mat. In very high
   resistivity soils this separation can be over 40 metres for a pole mounted site.
      Typically pole mounted HV & LV earths were separated by 3 metres to avoid
      transferring excessive voltages via the ground. The 3m separation distance is now
      no longer sufficient.
   The new separation distances have been calculated by an earth modelling computer
   programme and are detailed in Section “E5 Distribution Standard Earthing Layouts”.

   E2.5 Standard Distribution Earthing Methodology
   Because there are numerous distribution installations, standard earthing arrangements have
   been adopted. The following three sections of the Earthing Manual can be used to predict the
   type and size of the earth system for the most common values of soil resistivity.

            E3 Soil Resistivity Measurements
            E4 Earth Electrode Resistance Tests
            E5 Distribution Standard Earthing Layouts

   This will help advise landowners of the extent of proposed earthing excavation before work
   starts and to estimate the quantity of earthing materials required to complete the installation.

   E2.6 Difficult or non-standard situations
   The Distribution Standard Earthing Layouts are designed to cover the majority of situations and
   a standard solution should be the first approach. Sometimes this may mean placing a
   transformer some distance away from a third party installation in order to maintain adequate
   HV/LV segregation.
   However, there will be occasions where the standard approach is not practical or the soil
   resistivity is so high that specialist advice is required to overcome specific site difficulties. The
   cost of this has to be borne by the project.
   For advice please contact the Central Networks Earthing Specialist or initiate a survey using
   one of the approved earth consultants listed in Section AE1.1.




Version 2                                     Date of Issue - September 2007                              Page 6 of 12
                    The current version of the this document resides in the E.ON UK Documentum database
                   CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                  © Central Networks plc
CN Earthing Manual
                                                                                Section E2 – Earthing Guidance Notes




   E2.7 Hot Primary and Grid Sites
   All Primary or Grid sites shall have the EPR assessed and the details recorded on the
   Company’s hot site register. This information shall be made available to the relevant
   telecommunications companies. The owner of the Central Network’s hot site register shall be
   listed on the Energy Networks Association’s, Rise of Earth Potential website to provide the
   telecommunication companies with a point of contact. The information to be made available on
   request is:-
            •   Hot/Cold site classification (based on either 650 or 430 volt limits)
            •   Grid Reference or address of the site
            •   Extent of the hot zone (if known), otherwise quote 100m (as detailed in ENA ER
                S36).
   Hot Primary/Grid sites require an isolation unit fitting to all incoming telecomms circuits.
   Telecomms circuits passing through the hot zone surrounding a primary or grid site require no
   specific precautions unless the EPR at the point of the telecomms circuit exceeds 1700 Volts for
   sites with fast protection clearance (i.e. less than 0.2 seconds) or 1150 volts for slower
   protection clearance times. ENA ER S36 provides more detail.
   Where reasonably practicable all new primary/grid sites shall be designed as cold sites. Where
   a cold site is impractical then any distribution sites that are cable connected to the new site shall
   be assessed to determine the EPR at that location. If the distribution site is declared hot for a
   fault at the primary substation then the HV and LV earths must be segregated.
   In general new LV supplies feeding a Primary or Grid site shall be derived from a dedicated on-
   site transformer. This transformer should not be used to provide LV supplies to customers off
   the site. If in doubt or where existing LV supplies are involved with supplying off-site third parties
   then refer to the Central Networks Earthing Specialist for further advice.

   E2.8 Methods of Earthing used on the Company’s Networks
   An application guide is available that provides greater detail on neutral earthing requirements
   for the Company’s HV and EHV networks. Figure E2.1 shows typical neutral earthing
   arrangements found on Central Networks systems.

    E2.8.1 132kV Network
    The 132kV network is a three wire, three phase network, except for the railway traction
    supplies which is a single phase 25kV system, with one pole earthed.

    All 400/132kV and 275/132kV transformers have their star points solidly connected to earth.
    Transformers at 132/66kV, 132/33kV and 132/11kV will also have the star point of each 132kV
    winding solidly connected to earth, in effect forming a multiple earthed system. This multiple
    direct earthing gives rise to the large earth fault currents experienced on the 132kV system.

    E2.8.2 66kV & 33kV Networks
    The 132/66kV and 132/33kV transformers are usually delta connected on the secondary side.
    These 33 or 66kV windings will be earthed by an earthing transformer. In the past the earthing


Version 2                                   Date of Issue - September 2007                              Page 7 of 12
                  The current version of the this document resides in the E.ON UK Documentum database
                 CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                © Central Networks plc
CN Earthing Manual
                                                                                   Section E2 – Earthing Guidance Notes




    transformer may have been low impedance in which case an NER would also be required to
    limit the earth fault current to an acceptable value.

    For new installations each earthing transformer should be high impedance to limit the
    prospective earth fault current to match the full load current of the main transformer up to a
    maximum of 1000Amps.

                Table E2.3 Earth fault limits for 132/33 and 132/66kV transformers
            Main Transformer              33kV High Impedance                       66kV High Impedance
                 rating                Earthing Transformer -Earth                 Earthing Transformer –
                 (MVA)                     Fault Rating (Amps)                    Earth Fault Rating (Amps)
                   15                                   260                                       -
                   20                                   350                                     175
                   30                                   525                                     260
                   40                                   700                                     350
                   45                                   800                                     400
                   60                                  1000                                     525
                   75                                  1000                                     650
                   90                                  1000                                     800
             120 and above                             1000                                     1000

    E2.8.3 25kV Networks
    This is a single phase system for provision of supplies for railway traction systems. One pole
    of the secondary output of the 132/25kV winding is solidly earthed. The pole to be earthed is
    governed by and set out in Engineering Recommendation P24 “A. C. Traction Supplies to
    British Railways.”

    E2.8.4 11kV (& 6.6kV) Networks
    Depending on the vector group, 132/11kV, 66/11kV and 33/11kV transformers can have the
    secondary winding either delta or star connected. These transformers will be earthed on the
    secondary side either by an earthing transformer (if delta connected) or via the star point.

             Historically, small rating transformers (typically those less than 10MVA) had their
             secondary neutral solidly connected to earth. On all other transformers the
             secondary neutral was impedance earthed i.e. via a resistor or reactor.

    There are a number of existing arrangements for NER configurations at 11kV. In general either
    one NER was used across the site to earth all the transformer neutrals or alternatively each
    transformer had its own individual NER.

    The existing 11kV neutral earthing philosophy has three main requirements:-

            •   to limit the overall prospective earth fault currents for any site to be less than
                1500Amps for normal running arrangements. This has the benefit of reducing
                EPRs throughout the whole 11kV network.
            •   to ensure there is sufficient earth fault current to operate protection at remote
                ends of the 11kV network.

Version 2                                      Date of Issue - September 2007                              Page 8 of 12
                     The current version of the this document resides in the E.ON UK Documentum database
                    CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                   © Central Networks plc
CN Earthing Manual
                                                                                        Section E2 – Earthing Guidance Notes




            •    to ensure the transformer neutrals are not solidly earthed at any time. This
                 prevents excessive earth fault currents from occurring on the network.

    This can be achieved in a number of ways and depends on the number of transformer at the
    site. This often involves the use of a specially designed switching cubicle for each transformer
    which controls the NER running arrangements across the site. It should be noted that the new
    philosophy prevents the use of high impedance earthing transformers at 11kV. The preferred
    11kV NER size is 1000Amps but this can be modified to either 750 or 1500 Amps as detailed
    in the Neutral Earthing Application Guide.

    For new systems a typical arrangement would be as shown in the figure below. The switches
    would be configured so that one NER earths all transformers. The other ‘un-used’ NER would
    be available when a transformer is switched out for maintenance.


                                  T1 switching                                      T2 switching
                                     cubicle                                           cubicle
            T1                                                                                                  T2

                                       B                                                B

                             A                                                                     A
                                                 C                              C


                         T1 NER                                                                    T2 NER




    Some double secondary transformers (also known as double bubble or three winding
    transformers) having delta secondaries have been installed using only one earthing
    transformer in conjunction with a Thompson Strap. The Thompson Strap is an electrical
    connection installed within the transformer tank between the two blue phase (or L3) secondary
    windings. By convention the earthing transformer is then connected to the ‘b’ secondary
    winding. This arrangement also provides an earth return path for faults fed from the ‘a’
    winding. The use of Thompson Straps is still permitted.

    The new NER policy can still be applied to double secondary transformers as shown below.

                                                        T1 switching cubicle
                   T1b
                                                                 B                       To Common Neutral
                                                                                         Earth Bar & adjacent
                                                         A                C
                  T1a                                                                   transformer switching
                                                                                              cubicle(s)
                                                     T1 NER


Version 2                                        Date of Issue - September 2007                                 Page 9 of 12
                     The current version of the this document resides in the E.ON UK Documentum database
                    CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                       © Central Networks plc
CN Earthing Manual
                                                                                         Section E2 – Earthing Guidance Notes




                                                                    T1 switching cubicle


                                                                            B                        To Common Neutral
            T1b
                                                                                                     Earth Bar & adjacent
                                                                     A               C              transformer switching
                                         Low Impedance
  Thompson Strap                                                                                          cubicle(s)
                                             Earthing
                                           Transformer          T1 NER
                T1a


    The earthing transformers in these situations will be a low impedance type. A nominal
    impedance must be designed into the earthing transformer to guard against the effects of a
    direct short circuit of the associated NER.

    In a very few instances the transformer secondary may be earthed by using an Arc
    Suppression Coil (ASC or Petersen Coil). The ASC is ‘tuned’ to the capacitance of the 11kV
    cables and overhead lines connected to the substation. This will minimise current at the fault
    position during a single phase to earth fault condition. If the fault persists then the system will
    automatically revert back to the normal resistor earthing arrangement.

    The 11/0.415kV distribution transformers have a delta connection on the primary winding and
    subsequently are therefore not earthed on the 11kV side.

    E2.8.5 Earthing of Low Voltage Networks
    The low voltage side of a three phase distribution transformer is star connected. This star point
    forms the neutral of the LV system and will be solidly connected to earth at all times. For single
    phase transformers one terminal will be designated as the neutral point and will again be
    solidly connected to earth.

    LV distribution networks can have a separate protective conductor (sheath earth system) or
    this can be combined with the neutral conductor (PME). Engineering Recommendation G12/3
    details the specific requirements for the application of PME on low voltage networks.

            •         All new underground LV networks shall be constructed using CNE cables to
                      establish a network suitable for the provision of PME terminals.

            •         All new overhead LV networks shall be constructed using Aerial Bundled
                      Conductors (ABC) suitable for providing PME terminals.

    Wherever substantive work (e.g. refurbishment, diversions etc..) is undertaken on LV networks
    then the network shall be brought up to a standard to provide PME supplies. This work should
    also ensure existing sheath earth customers do not have their existing earthing terminal
    compromised.




Version 2                                          Date of Issue - September 2007                              Page 10 of 12
                         The current version of the this document resides in the E.ON UK Documentum database
                        CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                       © Central Networks plc
CN Earthing Manual
                                                                                 Section E2 – Earthing Guidance Notes




    E2.8.5.1 Provision of LV Earthing Terminal
    The provision of a LV earthing terminal has been achieved by various means in the past. The
    present company policy with regard to the provision of a LV earth terminal is detailed below :-

      PME Terminal (TN-C-S)
      All new supplies, or existing customers requesting a load increase, will normally be
      offered a PME terminal. However, for reasons of safety some installations are not suitable
      for a PME earth terminal in which case a TT supply will be offered (see Section E6.3 for a
      detailed list of exceptions). Under the ESQC Regulations, the Company is not obliged to
      offer a free PME earth terminal to existing customers that do not already have a PME
      earth.

      Sheath Earth Terminal (TN-S)
      The Company has an ongoing obligation to maintain the integrity of the sheath earth
      terminal of customers which already have this type of earthing. If an existing sheath earth
      customer requests a service alteration or in the event of a fault repair then the existing
      sheath earth must be maintained unless the customer request a PME earth terminal
      instead. A sheath earth terminal shall not be made available to new customers (or existing
      customers if they do not already have an earth terminal).

      PNB Earthing
      PNB is a special method of earthing, similar to PME, where the neutral earth is installed at
      or adjacent to the customer’s installation instead of at the transformer position. This
      method can still be used provided the supply is from a dedicated pole mounted
      transformer supplying a single customer..

      No Company Earth Terminal (TT)
      It is not possible for the Company to provide a PME earthing terminal where :-

            i)    the customer’s installation does not conform to the statutory regulations
                  regarding the provision of PME supplies.

            ii)   the customers property is deemed to be unsuitable for a PME supply.

      In these circumstances the PME terminal shall be rendered inaccessible to prevent
      unauthorised access by third parties and the customer must be advised that it will be
      necessary to provide their own alternative means of earth fault protection (e.g. their own
      earth electrode and suitably sized RCD).




Version 2                                    Date of Issue - September 2007                              Page 11 of 12
                   The current version of the this document resides in the E.ON UK Documentum database
                  CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                 © Central Networks plc
CN Earthing Manual
                                                                                                                                                       Section E2 – Earthing Guidance Notes

                                          Figure E2.1 Typical Examples of Existing Neutral Earthing Arrangements

                  Grid Supply                                                                                        Grid Supply
               Auto-Transformer                                                                                   Auto-Transformer
               400(or 275)/132kV                                                                                  400(or 275)/132kV

                                                                                                              National Grid                                                             Neutral
                National Grid                                                                                                                                                            always
                                                                        Neutral
                                                                         always                                       DNO         132kV                                                  solidly
                    DNO         132kV                                    solidly                                                                                                        earthed.
                                                                        earthed.
        Grid Substation                                                                     Grid Substation
          Transformer                                                                      Double Secondary
        132/33(or 66)kV                                                                                                               ‘A’ winding            ‘B’ winding
                                                                                             Transformer
                                                                                             132/11/11kV

Note
Occasionally the                                                       Earthing
primary winding here                                                   Transformer
                            33(or 66)kV
may be a star
                                                                                                                                                                                              Earthing
connection. In which                                                                            Earthing                                                                                      Transformer
case the star point                                                                             Transformer
will not be earthed.                                                   NER will not be          (NOT REQUIRED
                                                                          required if           if Thompson             11kV                                                11kV
                                                                           earthing             Strap used)
                  Primary                                              transformer has
                 Substation                                            high impedance.
                Transformer
               33(or 66)/11kV                                                                          Could be                                                                             Could be
                                                                                                                            THOMPSON STRAP If only one earthing transformer
                                                                                                         solid                                                                                solid
                                                                        Could be solid              (historically),         has been used on a delta connected, double
                                                                                                                                                                                         (historically),
                                                                         (historically),            resistance or           secondary transformer a connection is installed within       resistance or
                                   11kV                                 resistance or                 reactance             the transformer tank between the blue phase or L3              reactance
                                                                           reactance                   earthed.             secondary windings. By convention the earthing                  earthed.
                                                                            earthed.                                        transformer is connected to the ‘B’ winding. This
                 Distribution                                                                                               arrangement effectively provides an earth return path
                  Substation                                                                                                for faults fed from the ‘A’ winding.
                 Transformer
                 11kV/415V                                               Steelwork earth
                                                                          only bonded to
                                                              LV
                                                                         LV neutral earth
                                                            always
                                                             solidly
                                                                        if site is declared
                                                            earthed             Cold.
                                415V

   Version 2                                                             Date of Issue - September 2007                                                                              Page 12 of 12
                                                     The current version of the this document resides in the E.ON UK Documentum database
                                                    CAUTION –any other copies in electronic, printed or other formats may be out of date
                                                                                     © Central Networks plc

More Related Content

What's hot

Basics of earthing
Basics of earthingBasics of earthing
Basics of earthingAsif Eqbal
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systemsBiswajit Pratihari
 
UNDERGROUND HIGH POWER TRANSMISSION LINES
UNDERGROUND HIGH POWER TRANSMISSION LINESUNDERGROUND HIGH POWER TRANSMISSION LINES
UNDERGROUND HIGH POWER TRANSMISSION LINESVISHNU ARAVIND
 
Technical presentation on modern earthing
Technical presentation on modern earthingTechnical presentation on modern earthing
Technical presentation on modern earthingPankaj Chakraborty
 
Alfredkim electrical earthing
Alfredkim electrical earthingAlfredkim electrical earthing
Alfredkim electrical earthingalfredkim
 
IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)
IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)
IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)Mayank Velani
 
Overview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power SystemsOverview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power Systemsmichaeljmack
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing DesignIOSRJEEE
 
Testing Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant CapabilityTesting Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant CapabilityTechnical Representatives, Inc.
 
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)Andreas ILIOU - Elektro- Solar
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthingDenuka
 

What's hot (20)

Basics of earthing
Basics of earthingBasics of earthing
Basics of earthing
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
 
Grounding
GroundingGrounding
Grounding
 
UNDERGROUND HIGH POWER TRANSMISSION LINES
UNDERGROUND HIGH POWER TRANSMISSION LINESUNDERGROUND HIGH POWER TRANSMISSION LINES
UNDERGROUND HIGH POWER TRANSMISSION LINES
 
Technical presentation on modern earthing
Technical presentation on modern earthingTechnical presentation on modern earthing
Technical presentation on modern earthing
 
Alfredkim electrical earthing
Alfredkim electrical earthingAlfredkim electrical earthing
Alfredkim electrical earthing
 
Report uk pv plants part 1
Report  uk pv plants part 1Report  uk pv plants part 1
Report uk pv plants part 1
 
Earthing
EarthingEarthing
Earthing
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)
IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)
IS : 3043 -1987 CODE OF PRACTICE FOR EARTHING(REACTANCE GROUNDING)
 
تأريض2
تأريض2تأريض2
تأريض2
 
Overview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power SystemsOverview of Grounding for Industrial and Commercial Power Systems
Overview of Grounding for Industrial and Commercial Power Systems
 
Substation Earthing Design
Substation Earthing DesignSubstation Earthing Design
Substation Earthing Design
 
Earthing
EarthingEarthing
Earthing
 
Grounding systems
Grounding systemsGrounding systems
Grounding systems
 
underground presentation
underground presentation underground presentation
underground presentation
 
Testing Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant CapabilityTesting Pv Micro Inverters Using The Am Xs Four Quadrant Capability
Testing Pv Micro Inverters Using The Am Xs Four Quadrant Capability
 
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
Report earthing grounding pv with shielded, armoured dc cabling (worldwide)
 
Electrical earthing
Electrical earthingElectrical earthing
Electrical earthing
 
Earthing
EarthingEarthing
Earthing
 

Similar to E2 earthing manual earth guidance notes

[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...Schneider Electric
 
Des 1024 d manual_en_de
Des 1024 d manual_en_deDes 1024 d manual_en_de
Des 1024 d manual_en_deWan Peace
 
Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...eeiej
 
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...eeiej_journal
 
ETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsHimmelstern
 
Silicon to photonics optical interconnect routing: Compass EOS
Silicon to photonics optical interconnect routing: Compass EOSSilicon to photonics optical interconnect routing: Compass EOS
Silicon to photonics optical interconnect routing: Compass EOSAsaf Somekh
 
WP88 Power and Cooling for POE
WP88  Power and Cooling for POEWP88  Power and Cooling for POE
WP88 Power and Cooling for POESE_NAM_Training
 
Final project presentation
Final  project presentationFinal  project presentation
Final project presentationfaisal00121
 
Photovoltaic solar farm: earthing system design for cost reduction and syste...
Photovoltaic solar farm: earthing system design for  cost reduction and syste...Photovoltaic solar farm: earthing system design for  cost reduction and syste...
Photovoltaic solar farm: earthing system design for cost reduction and syste...IJECEIAES
 
Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015
Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015
Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015Dimitris Filippou
 
Power Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesPower Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesThorne & Derrick International
 
Theory of “NELVAC (No EMI Low Voltage AC Cables)“
Theory of “NELVAC (No EMI Low Voltage AC Cables)“Theory of “NELVAC (No EMI Low Voltage AC Cables)“
Theory of “NELVAC (No EMI Low Voltage AC Cables)“IRJET Journal
 

Similar to E2 earthing manual earth guidance notes (20)

[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
 
Megis mpls
Megis mplsMegis mpls
Megis mpls
 
Des 1024 d manual_en_de
Des 1024 d manual_en_deDes 1024 d manual_en_de
Des 1024 d manual_en_de
 
Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...Topology and configuration selection for dc dc converters in space electrical...
Topology and configuration selection for dc dc converters in space electrical...
 
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
TOPOLOGY AND CONFIGURATION SELECTION FOR DC/DC CONVERTERS IN SPACE ELECTRICAL...
 
Experimental Technologies
Experimental TechnologiesExperimental Technologies
Experimental Technologies
 
ETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway SystemsETAP - Ugs Underground Raceway Systems
ETAP - Ugs Underground Raceway Systems
 
AN10754
AN10754AN10754
AN10754
 
14A-Earthing.pdf
14A-Earthing.pdf14A-Earthing.pdf
14A-Earthing.pdf
 
Silicon to photonics optical interconnect routing: Compass EOS
Silicon to photonics optical interconnect routing: Compass EOSSilicon to photonics optical interconnect routing: Compass EOS
Silicon to photonics optical interconnect routing: Compass EOS
 
WP88 Power and Cooling for POE
WP88  Power and Cooling for POEWP88  Power and Cooling for POE
WP88 Power and Cooling for POE
 
Final project presentation
Final  project presentationFinal  project presentation
Final project presentation
 
Icnd210 s02l05
Icnd210 s02l05Icnd210 s02l05
Icnd210 s02l05
 
Photovoltaic solar farm: earthing system design for cost reduction and syste...
Photovoltaic solar farm: earthing system design for  cost reduction and syste...Photovoltaic solar farm: earthing system design for  cost reduction and syste...
Photovoltaic solar farm: earthing system design for cost reduction and syste...
 
Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015
Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015
Cabling For Next-Generation PoE Applications - BICSI Greece Conference 2015
 
Power Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesPower Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage Cables
 
10 fn s37
10 fn s3710 fn s37
10 fn s37
 
10 fn s37
10 fn s3710 fn s37
10 fn s37
 
CCNA Icnd110 s02l01
CCNA Icnd110 s02l01CCNA Icnd110 s02l01
CCNA Icnd110 s02l01
 
Theory of “NELVAC (No EMI Low Voltage AC Cables)“
Theory of “NELVAC (No EMI Low Voltage AC Cables)“Theory of “NELVAC (No EMI Low Voltage AC Cables)“
Theory of “NELVAC (No EMI Low Voltage AC Cables)“
 

Recently uploaded

Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...Pooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...Suhani Kapoor
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...home
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 

Recently uploaded (20)

Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
VIP College Call Girls Gorakhpur Bhavna 8250192130 Independent Escort Service...
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 

E2 earthing manual earth guidance notes

  • 1. Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head of Network Engineering
  • 2. CN Earthing Manual Section E2 – Earthing Guidance Notes Revision Log Version 2 Prepared by Nigel Johnson Date August 2007 Revision and update of section to be issued as part of a combined Earthing Manual. The main alterations are:- Section E1 and E2 have been re-arranged/revamped for increased clarity. Section E2.2 to E2.5 - greater detail on recent changes to earthing policy, including classification of Distribution sites as either Hot or Cold. Section E2.7 - detailed requirements for provision of Primary Substation Hot site register Section E2.8 - detailed description of earth systems used throughout Company’s networks from LV to 132kV, including new 11kV NER earthing arrangements. Version 1 Prepared by Tony Haggis Date February 2001 First draft. Version 2 Date of Issue - September 2007 Page 2 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 3. CN Earthing Manual Section E2 – Earthing Guidance Notes Contents E2 EARTHING GUIDANCE NOTES 4 E2.1 INTRODUCTION 4 E2.2 WHAT ARE SIGNIFICANT RECENT CHANGES? 4 E2.3 WHAT MAKES A DISTRIBUTION SUBSTATION ‘HOT’ OR ‘COLD’? 5 E2.4 SEGREGATED HV AND LV EARTHS AT DISTRIBUTION SUBSTATIONS 5 E2.5 STANDARD DISTRIBUTION EARTHING METHODOLOGY 6 E2.6 DIFFICULT OR NON-STANDARD SITUATIONS 6 E2.7 HOT PRIMARY AND GRID SITES 7 E2.8 METHODS OF EARTHING USED ON THE COMPANY’S NETWORKS 7 E2.8.1 132kV Network.....................................................................................................................7 E2.8.2 66kV & 33kV Networks ........................................................................................................7 E2.8.3 25kV Networks.....................................................................................................................8 E2.8.4 11kV (& 6.6kV) Networks.....................................................................................................8 E2.8.5 Earthing of Low Voltage Networks.....................................................................................10 E2.8.5.1 Provision of LV Earthing Terminal ..................................................................................11 Version 2 Date of Issue - September 2007 Page 3 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 4. CN Earthing Manual Section E2 – Earthing Guidance Notes E2 Earthing Guidance Notes E2.1 Introduction There have been few changes to Electricity Supply Industry earthing standards and practices since the introduction of Protective Multiple Earthing in the 1970’s. However, the widespread introduction of electronic equipment used in conjunction with telephone lines (i.e. fax machines, computer modems etc.) has highlighted the issue of Earth Potential Rise (EPR) and Transferred Potentials. There have been incidents of damage to electronic equipment during supply system earth faults and also transfers of potential into telecommunications systems. The European telecommunications industry has been increasingly concerned over the danger to their equipment and staff from transferred potentials. The problem has been further exacerbated by the use of cables with plastic oversheaths (Alpex, PIAS, Triplex etc). This means there is now more reliance on substation earth electrodes instead of the lead cable sheaths that provided much of the earthing system in the past. Another factor is the reduction in size of distribution plant which enables substations to be built on smaller plots which are then more difficult to earth. This has resulted in the European telecommunications industry driving through changes to earthing standards that now place onerous duties on the electricity supply industry to protect persons from electric shock due to Earth Potential Rise which results in Touch, Step & Transfer Potentials. This legislation is risk assessment based. The effects of electricity on persons varies between people depending on such things as their age, state of health, type of footwear duration of fault etc, Also the effectiveness of earthing system varies according to soil types, surface cover material, weather conditions etc. It is incumbent on individual electricity companies to design, install and maintain their systems such that they satisfy the objectives set by of legislation. This section of the Earthing Manual highlights the main changes now incorporated into Central Networks standards in order to fulfil our obligations. E2.2 What are Significant Recent Changes? • Hot/Cold Distribution Sites The greatest recent change is the classification of ground mounted distribution sites as either ‘Hot’ or ‘Cold’. • One Ohm Rule Previously, regulations permitted combining HV and LV earths at ground mounted distribution sites when the resistance was below 1 ohm. This rule is no longer valid for new sites. • 3m Separation Pole Mounted Earths In the past HV and LV earths were separated by 3m at pole mounted transformers. This separation is now no longer sufficient. Version 2 Date of Issue - September 2007 Page 4 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 5. CN Earthing Manual Section E2 – Earthing Guidance Notes • 11kV Neutral Earthing A new NER arrangement has been adopted for earthing of 11kV systems. E2.3 What makes a distribution substation ‘Hot’ or ‘Cold’? At Grid or Primary Substations the EPR will be calculated on a site by site basis. However, this approach is not practicable for distribution sites because of the large numbers involved, therefore some simplified rules are used to determine ‘Hot’ or ‘Cold’ status. These rules are:- • The site is considered ‘Cold’ if the installation is connected to a Primary or Grid Substation via an underground cable without any overhead line in the route. In this case the majority of the earth fault current will return to source via the cable sheath and not through the ground – hence the EPR will be below 430 volts. The HV & LV Earth can be combined. • The site is considered ‘Hot’ if there is not a continuous underground cable back to the Primary or Grid Substation. Earth fault current must return to source through the ground and this causes an EPR which is assumed to be above the 430 volt limit. The HV & LV Earths must be segregated to prevent voltages in excess of 430 volts from being transferred into the LV neutral/earth system The alternative backfeeding arrangements must also be considered when assessing the hot/cold status. For normal running conditions the site may be cold (i.e. underground fed) but could be classified as hot if all the alternative backfeeds have overhead lines as part of the circuit back to the source. If the normal feed is all underground and at least one backfeed is also all underground then the site can be classified as cold since the substation is unlikely to be disconnected from a low resistance primary substation site. To achieve an EPR less than 430 volts at an overhead fed 11kV distribution substation, then the overall earth value would typically need to be less than 0.3 - 0.5 ohms. Often it is impractical to achieve such low earth resistance values at distribution sites hence the HV and LV earths will usually be segregated. However, if it is decided to combine the HV and LV earths then a site specific calculation must be made to confirm the EPR is actually below 430volts. Existing distributions sites shall be assessed to determine the site classification when significant material changes occur. This is especially important when an 11kV network is being reconfigured to make sure a site is not inadvertently made hot without further precautions being taken. Also distribution substations may also become hot if they are connected via cable to a nearby Hot Primary or Grid site. E2.4 Segregated HV and LV earths at Distribution Substations It is accepted that at some sites the earths will be unnecessarily segregated. This is particularly true in large villages or small towns which have a reasonably large earth system which is ‘islanded’ because the incoming circuits are all overhead. If the cost of segregation is prohibitively high or impractical then the cost of a full earthing study may be justified. Version 2 Date of Issue - September 2007 Page 5 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 6. CN Earthing Manual Section E2 – Earthing Guidance Notes In the past most pole transformers have had separate HV/LV earths, whereas the vast majority of ground mounted substations have had a combined HV/LV earth. Previously the regulations permitted joining the HV and LV earths when their combined resistance was less than 1 ohm. This has now changed – the old ‘1 ohm rule’ is no longer valid for new sites. If in doubt, treat it as ‘Hot’ and segregate the two earths. The LV earth system must be located outside of the 430 volt potential contour that surrounds the HV earth electrode during an 11kV earth fault. This distance varies and depends on the type of installation, the local soil resistivity value and the size of the HV earth mat. In very high resistivity soils this separation can be over 40 metres for a pole mounted site. Typically pole mounted HV & LV earths were separated by 3 metres to avoid transferring excessive voltages via the ground. The 3m separation distance is now no longer sufficient. The new separation distances have been calculated by an earth modelling computer programme and are detailed in Section “E5 Distribution Standard Earthing Layouts”. E2.5 Standard Distribution Earthing Methodology Because there are numerous distribution installations, standard earthing arrangements have been adopted. The following three sections of the Earthing Manual can be used to predict the type and size of the earth system for the most common values of soil resistivity. E3 Soil Resistivity Measurements E4 Earth Electrode Resistance Tests E5 Distribution Standard Earthing Layouts This will help advise landowners of the extent of proposed earthing excavation before work starts and to estimate the quantity of earthing materials required to complete the installation. E2.6 Difficult or non-standard situations The Distribution Standard Earthing Layouts are designed to cover the majority of situations and a standard solution should be the first approach. Sometimes this may mean placing a transformer some distance away from a third party installation in order to maintain adequate HV/LV segregation. However, there will be occasions where the standard approach is not practical or the soil resistivity is so high that specialist advice is required to overcome specific site difficulties. The cost of this has to be borne by the project. For advice please contact the Central Networks Earthing Specialist or initiate a survey using one of the approved earth consultants listed in Section AE1.1. Version 2 Date of Issue - September 2007 Page 6 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 7. CN Earthing Manual Section E2 – Earthing Guidance Notes E2.7 Hot Primary and Grid Sites All Primary or Grid sites shall have the EPR assessed and the details recorded on the Company’s hot site register. This information shall be made available to the relevant telecommunications companies. The owner of the Central Network’s hot site register shall be listed on the Energy Networks Association’s, Rise of Earth Potential website to provide the telecommunication companies with a point of contact. The information to be made available on request is:- • Hot/Cold site classification (based on either 650 or 430 volt limits) • Grid Reference or address of the site • Extent of the hot zone (if known), otherwise quote 100m (as detailed in ENA ER S36). Hot Primary/Grid sites require an isolation unit fitting to all incoming telecomms circuits. Telecomms circuits passing through the hot zone surrounding a primary or grid site require no specific precautions unless the EPR at the point of the telecomms circuit exceeds 1700 Volts for sites with fast protection clearance (i.e. less than 0.2 seconds) or 1150 volts for slower protection clearance times. ENA ER S36 provides more detail. Where reasonably practicable all new primary/grid sites shall be designed as cold sites. Where a cold site is impractical then any distribution sites that are cable connected to the new site shall be assessed to determine the EPR at that location. If the distribution site is declared hot for a fault at the primary substation then the HV and LV earths must be segregated. In general new LV supplies feeding a Primary or Grid site shall be derived from a dedicated on- site transformer. This transformer should not be used to provide LV supplies to customers off the site. If in doubt or where existing LV supplies are involved with supplying off-site third parties then refer to the Central Networks Earthing Specialist for further advice. E2.8 Methods of Earthing used on the Company’s Networks An application guide is available that provides greater detail on neutral earthing requirements for the Company’s HV and EHV networks. Figure E2.1 shows typical neutral earthing arrangements found on Central Networks systems. E2.8.1 132kV Network The 132kV network is a three wire, three phase network, except for the railway traction supplies which is a single phase 25kV system, with one pole earthed. All 400/132kV and 275/132kV transformers have their star points solidly connected to earth. Transformers at 132/66kV, 132/33kV and 132/11kV will also have the star point of each 132kV winding solidly connected to earth, in effect forming a multiple earthed system. This multiple direct earthing gives rise to the large earth fault currents experienced on the 132kV system. E2.8.2 66kV & 33kV Networks The 132/66kV and 132/33kV transformers are usually delta connected on the secondary side. These 33 or 66kV windings will be earthed by an earthing transformer. In the past the earthing Version 2 Date of Issue - September 2007 Page 7 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 8. CN Earthing Manual Section E2 – Earthing Guidance Notes transformer may have been low impedance in which case an NER would also be required to limit the earth fault current to an acceptable value. For new installations each earthing transformer should be high impedance to limit the prospective earth fault current to match the full load current of the main transformer up to a maximum of 1000Amps. Table E2.3 Earth fault limits for 132/33 and 132/66kV transformers Main Transformer 33kV High Impedance 66kV High Impedance rating Earthing Transformer -Earth Earthing Transformer – (MVA) Fault Rating (Amps) Earth Fault Rating (Amps) 15 260 - 20 350 175 30 525 260 40 700 350 45 800 400 60 1000 525 75 1000 650 90 1000 800 120 and above 1000 1000 E2.8.3 25kV Networks This is a single phase system for provision of supplies for railway traction systems. One pole of the secondary output of the 132/25kV winding is solidly earthed. The pole to be earthed is governed by and set out in Engineering Recommendation P24 “A. C. Traction Supplies to British Railways.” E2.8.4 11kV (& 6.6kV) Networks Depending on the vector group, 132/11kV, 66/11kV and 33/11kV transformers can have the secondary winding either delta or star connected. These transformers will be earthed on the secondary side either by an earthing transformer (if delta connected) or via the star point. Historically, small rating transformers (typically those less than 10MVA) had their secondary neutral solidly connected to earth. On all other transformers the secondary neutral was impedance earthed i.e. via a resistor or reactor. There are a number of existing arrangements for NER configurations at 11kV. In general either one NER was used across the site to earth all the transformer neutrals or alternatively each transformer had its own individual NER. The existing 11kV neutral earthing philosophy has three main requirements:- • to limit the overall prospective earth fault currents for any site to be less than 1500Amps for normal running arrangements. This has the benefit of reducing EPRs throughout the whole 11kV network. • to ensure there is sufficient earth fault current to operate protection at remote ends of the 11kV network. Version 2 Date of Issue - September 2007 Page 8 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 9. CN Earthing Manual Section E2 – Earthing Guidance Notes • to ensure the transformer neutrals are not solidly earthed at any time. This prevents excessive earth fault currents from occurring on the network. This can be achieved in a number of ways and depends on the number of transformer at the site. This often involves the use of a specially designed switching cubicle for each transformer which controls the NER running arrangements across the site. It should be noted that the new philosophy prevents the use of high impedance earthing transformers at 11kV. The preferred 11kV NER size is 1000Amps but this can be modified to either 750 or 1500 Amps as detailed in the Neutral Earthing Application Guide. For new systems a typical arrangement would be as shown in the figure below. The switches would be configured so that one NER earths all transformers. The other ‘un-used’ NER would be available when a transformer is switched out for maintenance. T1 switching T2 switching cubicle cubicle T1 T2 B B A A C C T1 NER T2 NER Some double secondary transformers (also known as double bubble or three winding transformers) having delta secondaries have been installed using only one earthing transformer in conjunction with a Thompson Strap. The Thompson Strap is an electrical connection installed within the transformer tank between the two blue phase (or L3) secondary windings. By convention the earthing transformer is then connected to the ‘b’ secondary winding. This arrangement also provides an earth return path for faults fed from the ‘a’ winding. The use of Thompson Straps is still permitted. The new NER policy can still be applied to double secondary transformers as shown below. T1 switching cubicle T1b B To Common Neutral Earth Bar & adjacent A C T1a transformer switching cubicle(s) T1 NER Version 2 Date of Issue - September 2007 Page 9 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 10. CN Earthing Manual Section E2 – Earthing Guidance Notes T1 switching cubicle B To Common Neutral T1b Earth Bar & adjacent A C transformer switching Low Impedance Thompson Strap cubicle(s) Earthing Transformer T1 NER T1a The earthing transformers in these situations will be a low impedance type. A nominal impedance must be designed into the earthing transformer to guard against the effects of a direct short circuit of the associated NER. In a very few instances the transformer secondary may be earthed by using an Arc Suppression Coil (ASC or Petersen Coil). The ASC is ‘tuned’ to the capacitance of the 11kV cables and overhead lines connected to the substation. This will minimise current at the fault position during a single phase to earth fault condition. If the fault persists then the system will automatically revert back to the normal resistor earthing arrangement. The 11/0.415kV distribution transformers have a delta connection on the primary winding and subsequently are therefore not earthed on the 11kV side. E2.8.5 Earthing of Low Voltage Networks The low voltage side of a three phase distribution transformer is star connected. This star point forms the neutral of the LV system and will be solidly connected to earth at all times. For single phase transformers one terminal will be designated as the neutral point and will again be solidly connected to earth. LV distribution networks can have a separate protective conductor (sheath earth system) or this can be combined with the neutral conductor (PME). Engineering Recommendation G12/3 details the specific requirements for the application of PME on low voltage networks. • All new underground LV networks shall be constructed using CNE cables to establish a network suitable for the provision of PME terminals. • All new overhead LV networks shall be constructed using Aerial Bundled Conductors (ABC) suitable for providing PME terminals. Wherever substantive work (e.g. refurbishment, diversions etc..) is undertaken on LV networks then the network shall be brought up to a standard to provide PME supplies. This work should also ensure existing sheath earth customers do not have their existing earthing terminal compromised. Version 2 Date of Issue - September 2007 Page 10 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 11. CN Earthing Manual Section E2 – Earthing Guidance Notes E2.8.5.1 Provision of LV Earthing Terminal The provision of a LV earthing terminal has been achieved by various means in the past. The present company policy with regard to the provision of a LV earth terminal is detailed below :- PME Terminal (TN-C-S) All new supplies, or existing customers requesting a load increase, will normally be offered a PME terminal. However, for reasons of safety some installations are not suitable for a PME earth terminal in which case a TT supply will be offered (see Section E6.3 for a detailed list of exceptions). Under the ESQC Regulations, the Company is not obliged to offer a free PME earth terminal to existing customers that do not already have a PME earth. Sheath Earth Terminal (TN-S) The Company has an ongoing obligation to maintain the integrity of the sheath earth terminal of customers which already have this type of earthing. If an existing sheath earth customer requests a service alteration or in the event of a fault repair then the existing sheath earth must be maintained unless the customer request a PME earth terminal instead. A sheath earth terminal shall not be made available to new customers (or existing customers if they do not already have an earth terminal). PNB Earthing PNB is a special method of earthing, similar to PME, where the neutral earth is installed at or adjacent to the customer’s installation instead of at the transformer position. This method can still be used provided the supply is from a dedicated pole mounted transformer supplying a single customer.. No Company Earth Terminal (TT) It is not possible for the Company to provide a PME earthing terminal where :- i) the customer’s installation does not conform to the statutory regulations regarding the provision of PME supplies. ii) the customers property is deemed to be unsuitable for a PME supply. In these circumstances the PME terminal shall be rendered inaccessible to prevent unauthorised access by third parties and the customer must be advised that it will be necessary to provide their own alternative means of earth fault protection (e.g. their own earth electrode and suitably sized RCD). Version 2 Date of Issue - September 2007 Page 11 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc
  • 12. CN Earthing Manual Section E2 – Earthing Guidance Notes Figure E2.1 Typical Examples of Existing Neutral Earthing Arrangements Grid Supply Grid Supply Auto-Transformer Auto-Transformer 400(or 275)/132kV 400(or 275)/132kV National Grid Neutral National Grid always Neutral always DNO 132kV solidly DNO 132kV solidly earthed. earthed. Grid Substation Grid Substation Transformer Double Secondary 132/33(or 66)kV ‘A’ winding ‘B’ winding Transformer 132/11/11kV Note Occasionally the Earthing primary winding here Transformer 33(or 66)kV may be a star Earthing connection. In which Earthing Transformer case the star point Transformer will not be earthed. NER will not be (NOT REQUIRED required if if Thompson 11kV 11kV earthing Strap used) Primary transformer has Substation high impedance. Transformer 33(or 66)/11kV Could be Could be THOMPSON STRAP If only one earthing transformer solid solid Could be solid (historically), has been used on a delta connected, double (historically), (historically), resistance or secondary transformer a connection is installed within resistance or 11kV resistance or reactance the transformer tank between the blue phase or L3 reactance reactance earthed. secondary windings. By convention the earthing earthed. earthed. transformer is connected to the ‘B’ winding. This Distribution arrangement effectively provides an earth return path Substation for faults fed from the ‘A’ winding. Transformer 11kV/415V Steelwork earth only bonded to LV LV neutral earth always solidly if site is declared earthed Cold. 415V Version 2 Date of Issue - September 2007 Page 12 of 12 The current version of the this document resides in the E.ON UK Documentum database CAUTION –any other copies in electronic, printed or other formats may be out of date © Central Networks plc